CN206299104U - A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming - Google Patents

A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming Download PDF

Info

Publication number
CN206299104U
CN206299104U CN201621427164.3U CN201621427164U CN206299104U CN 206299104 U CN206299104 U CN 206299104U CN 201621427164 U CN201621427164 U CN 201621427164U CN 206299104 U CN206299104 U CN 206299104U
Authority
CN
China
Prior art keywords
scaffold
anchor
workbench
pore
hoist engine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621427164.3U
Other languages
Chinese (zh)
Inventor
苏鹏
王艳波
程飞
邓洪宗
刘秀珍
侯云强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201621427164.3U priority Critical patent/CN206299104U/en
Application granted granted Critical
Publication of CN206299104U publication Critical patent/CN206299104U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming, including scaffold, fastener, hoist engine, steel wire rope, switch, anchor bar, axletree, wheel, and working procedure.The workbench not only reduces construction cost, enhances Saving in time costs, avoids large area and build scaffold, anchor shaft anchor cable hole quality quality is also improved, with obvious economic benefit and social benefit.

Description

A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming
Technical field
The utility model is related to side slope protection field, and specially a kind of work for accelerating anchor shaft anchor cable panel grider pore-forming is put down Platform.
Background technology
According to investigations, protect in highway and each grade road deep vertical shaft, in reinforcing engineering, anchor pole panel grider or anchor Rope panel grider is all common protection form.Anchor pole panel grider working procedure is:Excavation repaiies slope, pore-forming, sets anchor pole reinforcing bar, opens Panel grider basis is dug to make framework of steel reinforcement, pour panel grider.Anchor cable panel grider working procedure is:Excavation repaiies slope, pore-forming, sets pre- Stress anchor cable, slip casting, benefit slurry are (optionally), excavation panel grider is basic makes framework of steel reinforcement, pours panel grider, tensioning fixation.
For pore-forming link, the following steps, the first step are generally divided into:Measurement and positioning.After domatic passed examination, will by design Surveying setting-out is asked to determine hole position;Second step:Rig is in place.Oriented with geologic compass or protractor, and ensure rig bracket jail Gu stabilization, it is desirable to which drilling machine uses air compressor machine air feed, the anhydrous dry drilling of down-the-hole drill to forbid water punching perforation, use drill bit Diameter cannot be less than designing aperture;Simultaneously to ensure hole depth, drilling depth is more than more than projected depth 0.5m;3rd step: Anchor hole is cleared up.Rock dust in hole and ponding are all removed using pressure-air (0.2~0.4Mpa of blast) outside portalling, in order to avoid reduce The adhesion strength of cement mortar and hole wall Rock And Soil;4th step:Anchor hole is checked.After anchor hole pore-forming terminates, must be examined through site supervision Test it is qualified after, next procedure construction can be carried out.The formation variation of anchor cable hole is tackled in drilling process simultaneously, state is crept into (the pressure of the drill, drilling speed), underground water and other special circumstances perform site operation record.
The method of traditional building platform is construction scaffolding.Construction scaffolding as side slope protection engineering load Body, occupies high status in high slope rockmass facility, and due to the particularity of slope retaining, the construction framed bent set up is removed should Meet outside corresponding code requirement, also pitch requirements should be arranged according to the hole of design cloth hole, set and arranged between each layer height and vertical rod Distance, to meet construction needs.In work progress, it is considered to which work layer down-the-hole drill and grouting pump deadweight are larger, in place in rig Before, setting should also be encrypted to the small cross bar of scaffold operating layer, while require to set vertically and horizontally bridging according to technical staff, to carry The entirety and local stiffness of scaffold high.Before drilling machine construction, it is necessary to set up provisional protection canopy in rig operation local location, Prevent top turquoise and sand from falling, it is ensured that construction equipment and personal security.Construction scaffolding is in pore-forming and builds, and pours grid Need to remove again before beam, then built again during stretch-draw anchor, generally existing repeats to build, the problems such as taking time and effort, and Workmen's operation on scaffold, is easier security incident, in addition frequent a dead lift down-the-hole drill up and down, It is also a challenge to workmen's muscle power.For the cut slope of large area, building scaffold needs to take considerable time, such as Fruit side slope is protected not in time, easily causes the geological problems such as slump.
Utility model content
The purpose of this utility model is to overcome above-mentioned deficiency of the prior art, there is provided one kind accelerates anchor shaft anchor cable lattice The workbench of sub- beam pore-forming.The workbench makes easy, small volume, construction quality and is easy to ensure, construct simple, construction speed Degree is fast, can greatly improve the speed and quality of anchor pole and anchor cable pore-forming, it is to avoid large area builds construction scaffolding.
To achieve the above object, the utility model is adopted the following technical scheme that:
A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming, workbench uses construction scaffolding and common car Wheel axletree is built by fastener, gathers materials on the spot, and assembles and disassembles conveniently, is readily transported, it is to avoid large area is built and disassembled and applies Work scaffold, saves the time, reduces construction cost;Workbench is used as power traction by hoist engine, saves labour;Down-the-hole Rig is located on workbench, upper and lower by switching control platform, it is to avoid equipment is carried up and down, while ensure that bore angle And grouting quality;Workbench can stand for two people simultaneously, set on platform and switched at two, and only two people simultaneously roll up by touching switch To raise machine can just work, it is to avoid the security incident that one man operation may trigger;Workbench passes through two steel wire ropes and elevator Machine is connected, it is to avoid single wire rope triggers security incident due to fatigue fracture.
A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming, including:Oblique scaffold, vertical scaffold, platform Scaffold, longitudinally connected axletree scaffold, wheel, hoist engine controlling switch, axletree, skewed horizontal load scaffold, fixed rig pin Hand cradle, horizontal scaffold, steel wire rope, hoist engine, wire rope hoist brandreth, anchor bar and down-the-hole drill, above-mentioned scaffold with It is attached by fastener between scaffold, it is the oblique scaffold, vertical scaffold, longitudinally connected axletree scaffold, oblique It is attached by fastener respectively between support scaffolding and fixed rig scaffold and axletree;Workbench is moved up and down by rolling up Raise machine and power is provided.
Further, hoist engine is controlled by two switches being cascaded.
Further, the workbench is connected by two steel wire ropes with hoist engine.
Further, the oblique scaffold, vertical scaffold, longitudinally connected axletree scaffold, skewed horizontal load scaffold, Fixed rig scaffold is 2, and horizontal scaffold is 3.
Further, anchor bar is 3, every 1.8m long.
Compared with prior art, above-mentioned workbench is taken using construction scaffolding and common wheel shaft by fastener Build, gather materials on the spot, assemble and disassemble conveniently, be readily transported;Power traction is used as by hoist engine, labour is saved;Hidden hole drilling Machine is located on workbench, upper and lower by switching control platform, it is to avoid equipment is carried up and down, at the same ensure that bore angle and Penetration rate.Workbench can stand for two people simultaneously, set on platform and switched at two, and only two people are while touching switch elevator Machine can just work, it is to avoid the security incident that one man operation may trigger.Workbench passes through two steel wire ropes and hoist engine Connection, it is to avoid single wire rope triggers security incident due to fatigue fracture.
In sum, the utility model simple structure, selection is common, and novel in design rationally Making programme is simple, and volume production is held Easily realize, simplify anchor shaft anchor cable drilling construction operation, improve operating efficiency, reduce cost of labor, it is ensured that pore-forming speed Degree and quality, if being applied to side slope protection engineering, are effective to ensure that the timely protection to cut slope.
Brief description of the drawings
Fig. 1 is the structural representation side view of workbench of the present utility model
Fig. 2 is the structural representation elevation of workbench of the present utility model
Fig. 3 is the structural representation plan of workbench of the present utility model
Fig. 4 is the enlarged drawing of the local A in Fig. 3.
Fig. 5 is the schematic diagram in workbench working condition.
Description of reference numerals:
The oblique scaffolds of 1- (2);The vertical scaffolds of 2- (2);(radical can be adjusted 3- platforms scaffold according to actual conditions It is whole);The longitudinally connected axletree scaffolds of 4- (2);5- wheels (4);6- hoist engines controlling switch (2);7- axletrees (2); 8- skewed horizontal loads scaffold (2);9- fixes rig scaffold (2);10- transverse directions scaffold (3);11- Φ 8mm steel wire ropes (2);12- hoist engines (1, rated power 1.5kw);13- wire rope hoists iron shelf (1, field fabrication);14-Φ32 Anchor bar (3, every 1.8m long).
Specific embodiment
The realization of the utility model purpose, functional characteristics and beneficial effect, below in conjunction with instantiation and accompanying drawing do into The detailed description of one step.
As shown in Figure 1-Figure 3, a kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming, it includes:Oblique scaffold 1st, vertical scaffold 2, platform scaffold 3, longitudinally connected axletree scaffold 4, wheel 5, hoist engine controlling switch 6, axletree 7, tiltedly To support scaffolding 8, fixed rig scaffold 9, horizontal scaffold 10, steel wire rope 11, hoist engine 12, wire rope hoist iron shelf 13rd, anchor bar 14, wherein, between scaffold (1,2,3,4,8,9,10) and scaffold (1,2,3,4,8,9,10), scaffold (1,2,4,8,9) are all connected, simple structure between axletree 7 using fastener, and selection is common, and workbench move up and down by Hoist engine 12 provides power, saves labour, while hoist engine 12 is controlled by two switches 6 being cascaded, only two people Operation simultaneously can just start hoist engine 12, and the security incident that single maloperation triggers is avoided to a certain extent.
Scaffolding steel pipe should use existing national standards《Vertical masonry joint electric welded steel pipe》(GB/T3092) No. 3 ordinary steels specified in Pipe, the overlap joint of scaffold should meet《Fastener type steel pipe scaffold specification》(JCJ130-2001), wheel, axletree are using on building site Trolley wheel, wheel diameter is unsuitable excessive.To ensure the normal lifting of workbench, the rated power of hoist engine should not be small In 1.5kw, while hoist engine switch should carry positive and negative rotating function, and two switches are connected with hoist engine, prevent single maloperation The accident for causing.The steel wire rope of platform should be with platform front axle fixation, its a diameter of 8mm.Workbench adds equipment personnel Weight be about 0.5 ton, according to active force and reaction force relation, the pulling force that the hoist engine of plain stage of slope is subject to is also about 0.5 Ton, to ensure that hoist engine is secured firmly to plain stage of slope, need to be welded an iron shelf and place hoist engine, as shown in figure 4, its reinforcing bar Using Φ 32, while iron shelf is fixed by three reinforcing bars of Φ 32 for going deep into plain stage of slope.
It is a kind of accelerate anchor shaft anchor cable panel grider pore-forming workbench implementation process be:First, to scaffold and wheel car Axle carries out assembly according to Fig. 1-Fig. 3, and down-the-hole drill is fixed on platform, welds iron shelf, and hoist engine is secured firmly to On iron shelf;Then, determine hoist engine in the fixed position of plain stage of slope, anchor along the vertical position of side slope according to anchor pole (anchor cable) Gu reinforcing bar insertion plain stage of slope depth should be determined that, if soil-slope, 3 reinforcing bar embedded depths of Φ 32 are not by slope geological situation 1.5m must be less than, if rock side-slope, 3 reinforcing bars of Φ 32 enter rock depth and cannot be less than 0.8m;Secondly, by before steel wire rope and platform Axle is fixed, and switch is installed on platform;Again, workmen enters platform, while Operation switch, hoist engine work, on platform Move, to anchor pole (anchor cable) into hole site, start rig, carry out pore-forming operation, treat after the completion of pore-forming, starting switch, platform continues Upper shifting, continues pore-forming;Finally, in side slope after a row anchor pole (anchor cable) whole pore-forming, starting switch, platform is descending, and platform is reached After original ground, at traveling hoisting machine to the corresponding plain stage of slope of next column anchor pole (anchor cable), continue operation.
A kind of above-mentioned workbench for accelerating anchor shaft anchor cable panel grider pore-forming answers main item when constructing:1. anchor bar Position should as far as possible be selected in platform inner side, and it is noted that the soil body, rock mass conditions around anchor bar, such as find the soil body, There is the phenomenons such as cracking in rock mass, should immediately stop construction, and anchor bar is reinforced;2. running check Φ 8mm steel wire ropes are answered Integrality, such as find steel wire rope section steel wire fracture, should be changed immediately.
In this example, a kind of workbench all parts connection for accelerating anchor shaft anchor cable panel grider pore-forming is reliable, knot Structure is simple, and simple assembling is only needed during construction, it is not necessary to when disassemble easily, workbench is used as to draw by hoist engine and is moved Power, it is to avoid workmen is in scaffold upper and lower.
In this example, designed by simple combination, the large area scaffold letter that former anchor shaft anchor cable panel grider pore-forming is needed Change is processed, and reduces personnel cost, enhances Saving in time costs, construction cost is reduced, with obvious economic benefit and society Benefit.
The preferred embodiment of this example is the foregoing is only, it is 1 that Fig. 1-3 illustrated dimensions are also only execavated rockmass:In the case of 1 (correspondence a=320cm, b=160cm, c=200cm, d=50cm, e=200cm), not does any limitation to the utility model, It is all that any simple modification, change and equivalent structure transformation are made to above example according to the utility model thinking and technical spirit, Still fall within the protection category of technical solutions of the utility model.

Claims (5)

1. it is a kind of accelerate anchor shaft anchor cable panel grider pore-forming workbench, it is characterised in that including:Oblique scaffold, vertical pin It is hand cradle, platform scaffold, longitudinally connected axletree scaffold, wheel, hoist engine controlling switch, axletree, skewed horizontal load scaffold, solid Determine rig scaffold, horizontal scaffold, steel wire rope, hoist engine, wire rope hoist brandreth, anchor bar and down-the-hole drill, it is above-mentioned It is attached by fastener between scaffold and scaffold, the oblique scaffold, vertical scaffold, longitudinally connected axletree pin hand It is attached by fastener respectively between frame, skewed horizontal load scaffold and fixed rig scaffold and axletree;Workbench is upper and lower Movement provides power by hoist engine.
2. it is according to claim 1 accelerate anchor shaft anchor cable panel grider pore-forming workbench, it is characterised in that hoist engine by Two switch controls being cascaded.
3. it is according to claim 2 accelerate anchor shaft anchor cable panel grider pore-forming workbench, it is characterised in that the work Platform is connected by two steel wire ropes with hoist engine.
4. according to claim 1 or 3 quickening anchor shaft anchor cable panel grider pore-forming workbench, it is characterised in that it is described Oblique scaffold, vertical scaffold, longitudinally connected axletree scaffold, skewed horizontal load scaffold and fixed rig scaffold are 2 Root, horizontal scaffold is 3.
5. it is according to claim 4 accelerate anchor shaft anchor cable panel grider pore-forming workbench, it is characterised in that anchor bar It is 3, every 1.8m long.
CN201621427164.3U 2016-12-23 2016-12-23 A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming Expired - Fee Related CN206299104U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621427164.3U CN206299104U (en) 2016-12-23 2016-12-23 A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621427164.3U CN206299104U (en) 2016-12-23 2016-12-23 A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming

Publications (1)

Publication Number Publication Date
CN206299104U true CN206299104U (en) 2017-07-04

Family

ID=59205226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621427164.3U Expired - Fee Related CN206299104U (en) 2016-12-23 2016-12-23 A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming

Country Status (1)

Country Link
CN (1) CN206299104U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107667629A (en) * 2017-08-16 2018-02-09 河南恒睿机械制造有限公司 A kind of high gradient slope draws walking spray shotcrete and broadcasts operation slope-climbing machine automatically

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107667629A (en) * 2017-08-16 2018-02-09 河南恒睿机械制造有限公司 A kind of high gradient slope draws walking spray shotcrete and broadcasts operation slope-climbing machine automatically

Similar Documents

Publication Publication Date Title
CN105220894B (en) Inner support rope saws lossless cutting disassembling structure and construction thereof
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN103291085A (en) Concrete static force cutting dismantling construction method
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN205557339U (en) From climbing formula pier stud template elevating gear
CN107419918A (en) A kind of Historical Buildings periphery single-layer frame retains method for dismounting
CN206299104U (en) A kind of workbench for accelerating anchor shaft anchor cable panel grider pore-forming
CN219241819U (en) Punching device for rectangular anti-slide piles
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN218893051U (en) Step stone traction track device
CN206941596U (en) A kind of shoulder pole boom device for lifting steel reinforcement cage
CN113668401B (en) Hoisting process based on installation and transportation platform on long-span bridge pier
CN203513129U (en) Lifting device for conveying digging pile construction materials
CN114541806A (en) Building displacement method used in project supervision construction
CN108755701A (en) The construction method of the support construction of deep basal pit
CN205296173U (en) Utilize structure of foundation ditch support system bearing tower crane
CN209637771U (en) The shield duct piece of service channel removes equipment in a kind of tunnel
CN218860185U (en) Deep basal pit concrete support overhead hoist
CN206545423U (en) A kind of building structure drag-line antidetonation system
CN105781610A (en) Safety cabin for manual hole digging operation
CN206903178U (en) Hoisting type elevator steel platform
CN207295733U (en) A kind of structure for being used to manually abolish inner support beam
CN218880875U (en) Structure is demolishd to pre-buried formula concrete waist rail
CN210263196U (en) Hydraulic grinding drill construction rack for manual hole digging pile
CN204703533U (en) A kind of lift-type discharging protection double-purpose platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170704

Termination date: 20181223

CF01 Termination of patent right due to non-payment of annual fee