CN206298902U - A kind of concrete pile foundation structure with inside and outside ventilation duct - Google Patents

A kind of concrete pile foundation structure with inside and outside ventilation duct Download PDF

Info

Publication number
CN206298902U
CN206298902U CN201621396133.6U CN201621396133U CN206298902U CN 206298902 U CN206298902 U CN 206298902U CN 201621396133 U CN201621396133 U CN 201621396133U CN 206298902 U CN206298902 U CN 206298902U
Authority
CN
China
Prior art keywords
pile foundation
ventilation duct
earth
transmission line
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621396133.6U
Other languages
Chinese (zh)
Inventor
邵珠山
刘凤云
刘华
张硕成
袁俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201621396133.6U priority Critical patent/CN206298902U/en
Application granted granted Critical
Publication of CN206298902U publication Critical patent/CN206298902U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a kind of concrete pile foundation structure with inside and outside ventilation duct, including a power transmission line cone pillar pile foundation, the power transmission line cone pillar pile foundation matrix is embedded under the earth's surface of Permafrost Area, and power transmission line cone pillar pile foundation top is in earth's surface;The central tube of ventilation duct is communicated with along power transmission line cone pillar pile foundation center;If through the ventilation duct for thering is dried layer to be distributed up and down and be connected with central tube on power transmission line cone pillar pile foundation perisporium, power transmission line cone pillar pile foundation in earth's surface is provided with the earth's surface ventilation duct being connected with central tube, the earth's surface ventilation duct mouth of pipe is provided with the brim of a hat, and water receiving tank is respectively arranged below with the correspondence earth's surface ventilation duct mouth of pipe.This structure can quickly disperse the heat of hydration after pile foundation is poured, pile foundation crack is reduced, foundation soil body temperature is effectively reduced, foundation bearing capacity is improved, the effective lifting to the artificial upper limit of ever-frozen ground is realized, while the engineering problem caused to prevent and preventing and treating body frost heaving and thaw collapse provides technical support.

Description

A kind of concrete pile foundation structure with inside and outside ventilation duct
Technical field
The utility model belong to be related to one kind inside and outside gas friendship can be carried out in the pile foundation engineering of Permafrost Area The structure changed, is particularly applicable to a kind of pile foundation knot of constructional concrete ventilation duct of high-grade overhead transmission line column foot Structure.
Background technology
The stability on basis directly affects the service life of buildings or structures.The stability of foundation pair of overhead transmission line Play the role of in the stability of overall circuit especially important.Because power transmission line column foot excavation scope is larger, concreting amount Larger particularity, its influence to ever-frozen ground around is very big.Therefore transmission line of electricity column foot is carried out in Permafrost Area During construction, most important task is the stability for ensureing column foot and column foot surrounding soil.In Frozen Ground Area, the uplift load on basis Frost heave load superposition with surrounding soil threatens huge to the stability on basis, but the resistance to plucking of Frozen Ground Area transmission line foundation The research of failure mode, prophylactico-therapeutic measures etc. is not perfect, therefore the stability of column foot still needs and carries out substantial amounts of research.
Show for the result of column foot stability study at present, it is ensured that the stability of column foot, foundation soil will meet following It is required that:
1. ever-frozen ground bearing capacity higher is ensured, it is necessary to assure freeze the frozen state of the soil body;
2. the cooling measure taken the initiative, prevents the thawing of ground and surrounding soil, reduces engineering construction activity to for many years The interference of frozen soil, improve ever-frozen ground freezes the upper limit;
3. the contact risk of rupture in interaction between pile and soil problem can be weakened using the higher-strength for freezing the soil body.
The cone pillar pile foundation scale of construction is big in addition, belongs to mass concrete, can be produced in its concrete construction big The heat of hydration of amount, aquation heat localization causes concrete temperature too high, and temperature is higher, and temperature stress is also bigger, when temperature stress is big Concrete can be caused to produce crack to a certain extent, and often depth is larger in this crack, has larger prestige to the bearing capacity of structure The side of body, and in rainfall, rainwater can be entered inside pile foundation by crack, cause the reduction of bearing capacity of foundation slab around.It is special It is not that, in Permafrost Area, when moisture enters pile foundation inside, the frost heave of moisture also results in concrete pile foundation crack Become big, its structure is seriously damaged, until losing bearing capacity.
Generally speaking, in the electric power pylon column foot work progress of Permafrost Area, using the radiating of ventilation duct, can be effective Temperature rise caused by the concrete construction phase heat of hydration is cut down, the maximum temperature for lowering concrete always controls the generation of thermal cracking, The colder air of Winter Qinghai Xizang Plateau can be utilized simultaneously so that cross-ventilation heat exchange effectively reduces pile foundation surrounding soil Temperature, the preventing and treating to engineering problems such as frost heave, thaw collapses in the pile foundation engineering of Permafrost Area provides technical support.
Utility model content
The purpose of this utility model is to provide a kind of succinct, easy gentle concrete hydrating in ventilation duct active cooling ground The concrete ventilation duct piling strtucture of heat.Using this structure, the heat of hydration after can pile foundation be poured is quick by hollow cylinder Disperse, crack of the pile foundation caused by the heat of hydration radiates more slowly is reduced, while during basic use, can effectively reduce Foundation soil body temperature, improves foundation bearing capacity, realizes the effective lifting to the artificial upper limit of ever-frozen ground, while for prevention and preventing and treating The engineering problem that body frost heaving and thaw collapse cause provides technical support.
The purpose of this utility model is realized by following technical proposals.
According to one embodiment that the utility model is provided, the utility model provides a kind of with inside and outside ventilation duct Concrete pile foundation structure, including a power transmission line cone pillar pile foundation, the power transmission line cone pillar pile foundation matrix are embedded in for many years Under permafrost region earth's surface, power transmission line cone pillar pile foundation top is in earth's surface;It is communicated with leading to along power transmission line cone pillar pile foundation center The central tube of airduct;If through the ventilation for thering is dried layer to be distributed up and down and be connected with central tube on power transmission line cone pillar pile foundation perisporium Pipe, the power transmission line cone pillar pile foundation in earth's surface is provided with the earth's surface ventilation duct being connected with central tube, on the earth's surface ventilation duct mouth of pipe The brim of a hat is provided with, water receiving tank is respectively arranged below with the correspondence earth's surface ventilation duct mouth of pipe.
Further, the power transmission line cone pillar pile foundation bottom under the earth's surface is provided with pile foundation pedestal, and ventilation duct is distributed to stake On base pedestal, and on pile foundation pedestal ventilation length of tube more than upper strata power transmission line cone pillar pile foundation on ventilation length of tube.
Further, the ventilation duct is in cross distribution along power transmission line cone pillar pile foundation center, and bottom ventilation ducts pass through stake Base pedestal is penetrated in foundation soil.
Further, the ventilation duct and the equal level of earth's surface ventilation duct are to setting.
Further, the earth's surface ventilation duct pipe is coated with heat-insulation layer.
Further, the earth's surface ventilation duct uses corrugated metal pipe.
Further, the water receiving tank is corresponding with the mozzle that drips that the brim of a hat lower section is set.
The characteristics of the utility model is:
The structure makes full use of concrete pile foundation in itself, adds the construction measure of ventilation duct, can mitigate concrete water Change the invasion of the destruction and the heat of hydration of the pile foundation that heat localization is caused to ever-frozen ground around.
Operation principle using ventilation duct can accelerate the heat exchanging process of deep soil.
The brim of a hat is set and measure of dripping by saying Entry Interface in side Puncture Tube, air condensed water can be reduced to ground Invasion.
The ventilation duct for elevating above the soil is from the corrugated metal pipe being easily changed, the certain thickness heat-insulated material of its outer wrap Material, the durability and Years Of Service that improve the engineering measure can effectively cut down heat of hydration generation in the concrete pile foundation construction time Intensification, lower concrete maximum temperature, be a kind of measure of concrete pile foundation construction time temperature controlled anticracking.
Brief description of the drawings
Fig. 1 is the concrete ventilation pipe pile foundation cross-sectional structure schematic diagram of reserving hole channel of the present utility model;
Fig. 2 is the schematic top plan view of the concrete ventilation duct pile foundation structure of reserving hole channel of the present utility model.
In figure:1. the brim of a hat;2. water receiving tank;3. drip mozzle;4. earth's surface ventilation duct;5. heat-insulation layer;6. ventilation duct;7. defeated Electric wire bores pillar pile foundation;8. pile foundation pedestal;9. central tube.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
As shown in figure 1, the concrete pile foundation structure of inside and outside ventilation duct should be carried, including a power transmission line cone pillar stake Base 7, the matrix of power transmission line cone pillar pile foundation 7 is embedded under the earth's surface of Permafrost Area, and the top of power transmission line cone pillar pile foundation 7 is located at earth's surface On;If being transmitted electricity through thering is dried layer to be distributed up and down and extending the ventilation duct 6 of its side wall along the perisporium of power transmission line cone pillar pile foundation 7 The center of line cone pillar pile foundation 7 is communicated with the central tube 9 of ventilation duct 6, and pile foundation indoor design ventilation duct 6 is used as construction measure.Ground Power transmission line cone pillar pile foundation 7 on table is provided with the earth's surface ventilation duct 4 being connected with central tube 9, is set on the mouth of pipe of earth's surface ventilation duct 4 There is the brim of a hat 1, water receiving tank 2, water receiving tank 2 and dripping that the lower section of the brim of a hat 1 is set are respectively arranged below with the mouth of pipe of correspondence earth's surface ventilation duct 4 Mozzle 3 is corresponding.
The bottom of power transmission line cone pillar pile foundation 7 under earth's surface is provided with pile foundation pedestal 8, and ventilation duct 6 is distributed to pile foundation pedestal 8 On, and the length of ventilation duct 6 on pile foundation pedestal 8 is more than the length of ventilation duct 6 in upper strata power transmission line cone pillar pile foundation 7.
Earth's surface ventilation duct 4 is vertically arranged with the tube wall of ventilation duct 6, and the pipe of earth's surface ventilation duct 4 is coated with heat-insulation layer 5.
Fig. 2 illustrates the ventilation duct 6 of the concrete ventilation duct pile foundation structure in the internal reservation duct with active cooling And earth's surface peripheral hardware ventilation tubular construction.Ventilation duct 6 is along the center of power transmission line cone pillar pile foundation 7 in cross distribution, and bottom ventilation ducts 6 In foundation soil being penetrated through pile foundation pedestal 8.Cylindrical high intensity hollow cylinder extends to inside soil body in itself through pile foundation, in soil In bury certain length.Ventilation duct 6 and the equal level of earth's surface ventilation duct 4 are to setting.
In the structure, earth's surface ventilation duct 4 uses corrugated metal pipe.
This structure is embodied as, and during pillar pile foundation construction is bored, cylindrical high intensity pre-buried in advance is hollow Cylinder (paper web, pvc pipe etc.), forms bottom, middle part, the ventilation duct of upper cross shape, and ventilation duct is formed by several pipelines, one Vertical ventilation duct cone pillar pile foundation shaft centre, two cone the bottom spread foundation of pillar pile foundation inside, Vertical ventilation duct is connected with some of middle part ventilation duct and top laterally has and external two external pipelines being connected, external pipeline The side at the top of cone pillar pile foundation is embedded in, its mouth of pipe is provided with the brim of a hat, and the brim of a hat can prevent the invasion of outside rainwater, while can be with When dissipation basic internal heat.Pre-buried cylindrical high intensity hollow cylinder can effectively cut down hydration heat of concrete, contribute to Foundation soil body and the gas exchanges of air, the heat in foundation soil are constantly distributed and make the reduction of foundation soil temperature, many Year permafrost region is using can effectively improve the anthropogenic heating that surrounding foundation soil freezes the soil body for many years;Lower the highest temperature of concrete Degree, to prevent the generation in concrete construction phase temperature control crack.
Principle of the present utility model is to set ventilation duct, the diameter of ventilation duct and basis inside cone pillar pile foundation Bearing capacity determine, larger diameter is selected in the case where bearing capacity is not influenceed.Can be provided according to the wind speed on the ground simultaneously Material, sets two earth's surface ventilation ducts of horizontal direction and elevates above the soil in maximum wind direction, effectively can be adjusted using chimney operation principle Section heat exchanging process.In level to the setup of entrances and exits the brim of a hat and the guiding gutter facility that drips, concrete can be set under the guiding gutter that drips Water receiving tank, purpose is to reduce invasion of the condensed water to permanent frozen soil foundation in air.Elevate above the soil part ventilation tube material choosing Take the corrugated metal pipe being easily changed, the certain thickness heat resistant material of outer wrap.
Inside pile foundation, in the concrete construction of pile foundation, high intensity hollow cylinder can have the structure setting Effect ground slows down the intensification of hydration heat of concrete generation, reduces product of the concrete pile foundation because of thermal cracking caused by the heat of hydration It is raw.During pile foundation works, winter can utilize extraneous colder temperature to pass through master of the vertical ventilation duct enhancing to foundation soil body Dynamic cooling.This structure can realize the effective temperature-reducing to the high-grade power transmission line column foot in Permafrost Area, and inside setting ventilation duct can accelerate greatly Gas improves the anthropogenic heating of ever-frozen ground with the heat exchange of ever-frozen ground, strengthens the stability and foundation bearing capacity of column foot, reduces Possibility and engineering freeze injury are pulled out on column foot.
The above, only the utility model preferably specific embodiment, but protection domain of the present utility model is not This is confined to, any one skilled in the art can readily occur in the technical scope that the utility model is disclosed Change or replacement, should all cover within protection domain of the present utility model.

Claims (7)

1. a kind of concrete pile foundation structure with inside and outside ventilation duct, an including power transmission line cone pillar pile foundation, its feature It is:The power transmission line cone pillar pile foundation matrix is embedded under the earth's surface of Permafrost Area, and power transmission line cone pillar pile foundation top is located at In earth's surface;The central tube of ventilation duct is communicated with along power transmission line cone pillar pile foundation center;Passed through on power transmission line cone pillar pile foundation perisporium If being installed with the ventilation duct that dried layer is distributed and is connected with central tube up and down, the power transmission line cone pillar pile foundation in earth's surface is provided with The earth's surface ventilation duct that heart pipe is connected, the earth's surface ventilation duct mouth of pipe is provided with the brim of a hat, below the correspondence earth's surface ventilation duct mouth of pipe respectively It is provided with water receiving tank.
2. a kind of concrete pile foundation structure with inside and outside ventilation duct according to claim 1, it is characterised in that: Power transmission line cone pillar pile foundation bottom under the earth's surface is provided with pile foundation pedestal, and ventilation duct is distributed to pile foundation pedestal, and pile foundation base Ventilation length of tube on seat is more than the ventilation length of tube in upper strata power transmission line cone pillar pile foundation.
3. a kind of concrete pile foundation structure with inside and outside ventilation duct according to claim 2, it is characterised in that:Institute Ventilation duct is stated along power transmission line cone pillar pile foundation center in cross distribution, and bottom ventilation ducts penetrate foundation soil through pile foundation pedestal In.
4. a kind of concrete pile foundation structure with inside and outside ventilation duct according to claim 1, it is characterised in that:Institute Ventilation duct and the equal level of earth's surface ventilation duct are stated to setting.
5. a kind of concrete pile foundation structure with inside and outside ventilation duct according to claim 1, it is characterised in that:Institute State earth's surface ventilation duct pipe and be coated with heat-insulation layer.
6. a kind of concrete pile foundation structure with inside and outside ventilation duct according to claim 1, it is characterised in that:Institute State earth's surface ventilation duct and use corrugated metal pipe.
7. a kind of concrete pile foundation structure with inside and outside ventilation duct according to claim 1, it is characterised in that:Institute It is corresponding with the mozzle that drips that the brim of a hat lower section is set to state water receiving tank.
CN201621396133.6U 2016-12-19 2016-12-19 A kind of concrete pile foundation structure with inside and outside ventilation duct Expired - Fee Related CN206298902U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621396133.6U CN206298902U (en) 2016-12-19 2016-12-19 A kind of concrete pile foundation structure with inside and outside ventilation duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621396133.6U CN206298902U (en) 2016-12-19 2016-12-19 A kind of concrete pile foundation structure with inside and outside ventilation duct

Publications (1)

Publication Number Publication Date
CN206298902U true CN206298902U (en) 2017-07-04

Family

ID=59213992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621396133.6U Expired - Fee Related CN206298902U (en) 2016-12-19 2016-12-19 A kind of concrete pile foundation structure with inside and outside ventilation duct

Country Status (1)

Country Link
CN (1) CN206298902U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080212A (en) * 2019-05-27 2019-08-02 国网四川省电力公司经济技术研究院 A kind of alpine meadow region concrete pipe base
CN112064627A (en) * 2019-06-10 2020-12-11 中国科学院寒区旱区环境与工程研究所 Freeze-proofing taper cylinder pile foundation in frozen soil area and construction process thereof
CN113235492A (en) * 2021-05-12 2021-08-10 湖南省怀化公路桥梁建设总公司 Highway assembly type landscape guardrail and installation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080212A (en) * 2019-05-27 2019-08-02 国网四川省电力公司经济技术研究院 A kind of alpine meadow region concrete pipe base
CN110080212B (en) * 2019-05-27 2021-05-11 国网四川省电力公司经济技术研究院 Concrete pile foundation in high and cold frozen soil area
CN112064627A (en) * 2019-06-10 2020-12-11 中国科学院寒区旱区环境与工程研究所 Freeze-proofing taper cylinder pile foundation in frozen soil area and construction process thereof
CN113235492A (en) * 2021-05-12 2021-08-10 湖南省怀化公路桥梁建设总公司 Highway assembly type landscape guardrail and installation method thereof

Similar Documents

Publication Publication Date Title
CN206298902U (en) A kind of concrete pile foundation structure with inside and outside ventilation duct
CN201221044Y (en) Reverse T-shaped efficient ventiduct roadbed
CN103485355B (en) Frame-heat anchor pipe structure for preventing and treating cold-region slope collapse due to freeze thawing and construction method
CN211258650U (en) Wall-separating type lining insulation structure
CN202543904U (en) Screw-in wall-post-grouting precast pile device for ground-source heat energy conversion
CN105113489A (en) Method of reducing concrete hydration heat of cast-in-place pile in permafrost region
CN102304926B (en) Method for fixing telegraph pole on wetland
CN102322276A (en) Tunneling engineering freeze-proofing structure in seasonally frozen ground region
CN101289830A (en) Duct-ventilated embankment with chimney
CN103938658A (en) Structure capable of avoiding cold damage to high-temperature and unstable freeze soil area tunnel portal side slope
CN106567393A (en) Collapsible loess deep foundation pit support construction method
CN103485354A (en) Frame-aeration cooling anchor pipe structure for keeping frozen soil slope stable and construction method
RU2318098C1 (en) Seasonal freezing retarding method
CN109944467B (en) Reconstruction and reinforcement construction method for rock wool prefabricated house
CN201195817Y (en) Convection current-ventilation combined subgrade
CN204000834U (en) A kind of " chimney type " air chimney assembling piling strtucture
US11851826B2 (en) Subsurface warming system for an athletic field
CN202250107U (en) Tunneling anti-freezing structure in seasonally frozen ground district
CN109546365A (en) The well head of deep-well type earthing pole
CN209702332U (en) A kind of buried under earth type sewage treatment equipment
CN113944480A (en) Temperature control anti-cracking method for door wall of shield working well
CN103644672B (en) One vertically source heat pump heat exchanging pipe is drowned oneself and is pushed up pressure down pipe construction method
CN206667280U (en) Radiating and cooling basis for frozen soil foundation
CN209194628U (en) A kind of severe cold area winter water intake facilities
CN208251136U (en) A kind of concrete pile foundation structure with inside and outside ventilation duct

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170704

Termination date: 20201219

CF01 Termination of patent right due to non-payment of annual fee