CN206289941U - A kind of horizontal support structure for construction - Google Patents

A kind of horizontal support structure for construction Download PDF

Info

Publication number
CN206289941U
CN206289941U CN201621447710.XU CN201621447710U CN206289941U CN 206289941 U CN206289941 U CN 206289941U CN 201621447710 U CN201621447710 U CN 201621447710U CN 206289941 U CN206289941 U CN 206289941U
Authority
CN
China
Prior art keywords
expansion link
supporting plate
connecting rod
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621447710.XU
Other languages
Chinese (zh)
Inventor
陈乾超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonghui Changyuan Engineering Design Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621447710.XU priority Critical patent/CN206289941U/en
Application granted granted Critical
Publication of CN206289941U publication Critical patent/CN206289941U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a kind of horizontal support structure for construction,Including supporting plate,The upper surface of the supporting plate is formed around guardrail,The safety of workmen can be protected,The upper surface right front of the supporting plate is provided with ash hopper,The top of the guardrail is provided with electric light by connecting rod,The lower surface of the supporting plate is provided with the first expansion link,Second expansion link,3rd expansion link and the 4th expansion link,Four expansion links move up and down the lifting for realizing supporting plate,First expansion link,Second expansion link,The lower end of the 3rd expansion link and the 4th expansion link is equipped with movable pulley,Movable pulley can move whole device,Convenient construction personnel are operated in different places,Head rod is provided between first expansion link and the second expansion link,The second connecting rod is provided between 3rd expansion link and the 4th expansion link,Structure installation and removal are convenient,Simple structure,Low cost,Improve operating efficiency.

Description

A kind of horizontal support structure for construction
Technical field
The utility model is related to a kind of architectural support structure, more particularly to a kind of horizontal support knot for construction Structure.
Background technology
Much needed by support meanss during construction, traditional supporting way is to build branch by steel pipe Support is constructed, and such support frame has many inconvenience when installation and dismounting, expend substantial amounts of manpower and Material resources, such installation and removal mode not only influences efficiency of construction, and workmen to need to carry out operation in high-altitude, increases Security risk is added.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect, there is provided a kind of level for construction Supporting construction, this structure moves up and down the lifting for realizing supporting plate by expansion link, and movable pulley can move whole device, Convenient construction personnel are operated in different places, and electric light convenient construction personnel's evening works, this structure installation and removal side Just, simple structure, low cost improves operating efficiency, in can effectively solving the problems, such as background technology.
In order to solve the above-mentioned technical problem, the utility model provides following technical scheme:
The utility model provides a kind of horizontal support structure for construction, including supporting plate, the supporting plate Upper surface is formed around guardrail, and the upper surface right front of the supporting plate is provided with ash hopper, and the top of the guardrail is by connection Bar is provided with electric light, and the lower surface of the supporting plate is provided with the first expansion link, the second expansion link, the 3rd expansion link and the 4th and stretches Bar, is provided with head rod between first expansion link and the second expansion link, the 3rd expansion link and the 4th expansion link it Between be provided with the second connecting rod, the upper surface of the head rod is provided with first through hole, and the first through hole coordinates and is provided with work Lever.
As a kind of optimal technical scheme of the present utility model, first expansion link, the second expansion link, the 3rd expansion link Lower end with the 4th expansion link is equipped with movable pulley.
Used as a kind of optimal technical scheme of the present utility model, the upper surface of second connecting rod is provided with the second through hole.
As a kind of optimal technical scheme of the present utility model, spiral shell is passed through between the head rod and the second connecting rod Tether and connect.
The beneficial effect that the utility model is reached compared with prior art is:The utility model is upper and lower by expansion link The lifting of supporting plate is realized in movement, and movable pulley can move whole device, and convenient construction personnel carry out work in different places Make, electric light convenient construction personnel's evening works, installation and removal are convenient, simple structure, low cost improves operating efficiency.
Brief description of the drawings
Accompanying drawing is used for providing being further understood to of the present utility model, and constitutes a part for specification, with this practicality New embodiment is used to explain the utility model together, does not constitute to limitation of the present utility model.
In the accompanying drawings:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is polycrystalline substance schematic diagram of the present utility model.
Label in figure:1st, supporting plate;2nd, ash hopper;3rd, head rod;4th, the second connecting rod;5th, motion bar;6th, first Expansion link;7th, movable pulley;8th, electric light;9th, guardrail;10th, the 3rd expansion link;11st, the 4th expansion link;12nd, the second expansion link.
Specific embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
Embodiment:As shown in Figure 1-2, the utility model provides a kind of horizontal support structure for construction, including Supporting plate 1, the upper surface of supporting plate 1 is formed around guardrail 9, can protect the safety of workmen, and the upper surface of supporting plate 1 is right Front is provided with ash hopper 2, and the top of guardrail 9 is provided with electric light 8 by connecting rod, and the convenient construction personnel's evening of electric light 8 works, branch The lower surface of fagging 1 is provided with the first expansion link 6, the second expansion link 12, the 3rd expansion link 10 and the 4th expansion link 11, and four are stretched Bar moves up and down the lifting for realizing supporting plate 1, and the first expansion link 6, the second expansion link 12, the 3rd expansion link 10 and the 4th be flexible The lower end of bar 11 is equipped with movable pulley 7, and movable pulley 7 can move whole device, and convenient construction personnel enter in different places Row work, is provided with head rod 3, the 3rd expansion link 10 and the 4th expansion link between the first expansion link 6 and the second expansion link 12 The second connecting rod 4 is provided between 11, is bolted between the connecting rod 4 of head rod 3 and second, the second connecting rod 4 Upper surface is provided with the second through hole, and the upper surface of head rod 3 is provided with first through hole, and first through hole cooperation is provided with motion bar 5, The two ends of motion bar 5 are logical with first respectively and the second through hole coordinates installation, fix the position of four expansion links, and the structure is installed And convenient disassembly, simple structure, low cost, improve operating efficiency.
Operation principle:During utility model works, workmen is shifted onto the lower section to be constructed, workmen by whole device On in supporting plate, moving up for the first expansion link 6, the second expansion link 12, the 3rd expansion link 10 and the 4th expansion link 11 will Workmen takes the height for wanting operation to.
The utility model is upper by the first expansion link 6, the second expansion link 12, the 3rd expansion link 10 and the 4th expansion link 11 The lifting of supporting plate 1 is realized in lower movement, and movable pulley 7 can move whole device, and convenient construction personnel enter in different places Row work, the convenient construction personnel's evening of electric light 8 works, and installation and removal are convenient, simple structure, low cost, improves work effect Rate.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, this is not limited to Utility model, although being described in detail to the utility model with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic Carry out equivalent.It is all it is of the present utility model spirit and principle within, any modification, equivalent substitution and improvements made etc., Should be included within protection domain of the present utility model.

Claims (4)

1. a kind of horizontal support structure for construction, including supporting plate (1), it is characterised in that the supporting plate (1) Upper surface is formed around guardrail (9), and the upper surface right front of the supporting plate (1) is provided with ash hopper (2), the guardrail (9) Top is provided with electric light (8) by connecting rod, and the lower surface of the supporting plate (1) is provided with the first expansion link (6), the second expansion link (12), the 3rd expansion link (10) and the 4th expansion link (11), are provided between first expansion link (6) and the second expansion link (12) Head rod (3), is provided with the second connecting rod (4), described between the 3rd expansion link (10) and the 4th expansion link (11) The upper surface of one connecting rod (3) is provided with first through hole, and the first through hole cooperation is provided with motion bar (5).
2. a kind of horizontal support structure for construction according to claim 1, it is characterised in that described first stretches The lower end of contracting bar (6), the second expansion link (12), the 3rd expansion link (10) and the 4th expansion link (11) is equipped with movable pulley (7).
3. a kind of horizontal support structure for construction according to claim 1, it is characterised in that described second connects The upper surface of extension bar (4) is provided with the second through hole.
4. a kind of horizontal support structure for construction according to claim 1, it is characterised in that described first connects It is bolted between extension bar (3) and the second connecting rod (4).
CN201621447710.XU 2016-12-27 2016-12-27 A kind of horizontal support structure for construction Expired - Fee Related CN206289941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621447710.XU CN206289941U (en) 2016-12-27 2016-12-27 A kind of horizontal support structure for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621447710.XU CN206289941U (en) 2016-12-27 2016-12-27 A kind of horizontal support structure for construction

Publications (1)

Publication Number Publication Date
CN206289941U true CN206289941U (en) 2017-06-30

Family

ID=59155026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621447710.XU Expired - Fee Related CN206289941U (en) 2016-12-27 2016-12-27 A kind of horizontal support structure for construction

Country Status (1)

Country Link
CN (1) CN206289941U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447972A (en) * 2017-08-16 2017-12-08 苏州市名志金属装饰工程有限公司 A kind of interior decoration lifting platform
CN109339454A (en) * 2018-11-30 2019-02-15 中国冶集团有限公司 Interlayer secondary structure concrete pours device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447972A (en) * 2017-08-16 2017-12-08 苏州市名志金属装饰工程有限公司 A kind of interior decoration lifting platform
CN109339454A (en) * 2018-11-30 2019-02-15 中国冶集团有限公司 Interlayer secondary structure concrete pours device and method

Similar Documents

Publication Publication Date Title
CN202440279U (en) Tower drum climbing machine
CN206289941U (en) A kind of horizontal support structure for construction
CN103848358B (en) A kind of double cylinder jacking mechanism of tower crane tower body
CN203222917U (en) Novel archaistic slope roof of net rack structure
CN206341631U (en) One kind suspension vertical greening device
CN201187145Y (en) Suspension platform for building construction and cleaning
CN107059689A (en) The electronic fence of telescopic lifting
CN202417280U (en) Multifunctional hanging ladder
CN206815220U (en) A kind of electronic fence of the telescopic lifting with current limiting bar for large-scale activity
CN206948242U (en) A kind of flexible photovoltaic support for roof
CN205791236U (en) Horizontal double bundle conductor travelling robot walking obstacle crossing device
CN205314515U (en) Scaffold of building a wall
CN104859792B (en) A kind of washing of tanks ladder
CN204098607U (en) A kind of wind-proof dust-suppression net of ascending/decending
CN207647451U (en) A kind of water conservancy work climbing ladder being easily installed dismounting
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN202865743U (en) Dragline device of large-scale bridge girder
CN105752843A (en) Anti-shake gantry crane
CN204265249U (en) A kind of transfer crane and portal frame thereof
CN206368682U (en) A kind of climbing instrument for overhauling power transmission tower pike pole Beam
CN205653070U (en) Tensile gantry crane can monitor
CN205889510U (en) Automatic cover mould system of taking off of concrete pipe pile
CN202594571U (en) Suspension cage automatic telescopic platform
CN201485236U (en) Construction lift working platform
CN2890551Y (en) Cable hook for mine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171201

Address after: 610000 North Road No. 99, Chenghua District construction, Chengdu, Sichuan

Patentee after: Chengdu Changyuan Architecture Design Institute Co. Ltd.

Address before: 362600 No. 198 Nakamura Zhong village, Quanzhou, Yongchun, Fujian

Patentee before: Chen Qianchao

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: No. 99, No. 1 North Road, construction of Chengdu City, Sichuan Province

Patentee after: Zhonghui Changyuan Engineering Design Group Co., Ltd.

Address before: 610000 Chenghua District, Chengdu City, Sichuan Province, No. 99, Section 1 of Jianbei Road

Patentee before: Chengdu Changyuan Architecture Design Institute Co. Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20191227

CF01 Termination of patent right due to non-payment of annual fee