CN201187145Y - Suspension platform for building construction and cleaning - Google Patents
Suspension platform for building construction and cleaning Download PDFInfo
- Publication number
- CN201187145Y CN201187145Y CNU200820057812XU CN200820057812U CN201187145Y CN 201187145 Y CN201187145 Y CN 201187145Y CN U200820057812X U CNU200820057812X U CN U200820057812XU CN 200820057812 U CN200820057812 U CN 200820057812U CN 201187145 Y CN201187145 Y CN 201187145Y
- Authority
- CN
- China
- Prior art keywords
- rope
- cape
- suspended platform
- negative pressure
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a platform support used for building construction and cleaning, in particular to a suspended platform used for tall building construction and cleaning. The suspended platform comprises a suspended platform body, a suspended platform rope and a rope retracting and releasing device; the suspended platform body is composed of a base plate and a guard rail arranged around the base plate, rope connection parts are arranged in the corresponding positions on the two sides of the suspended platform body, and the rope connected with the rope connection parts is winded on the rope retracting and releasing device. The suspended platform is characterized in that a negative pressure sucker is installed on the front side of the base plate of the suspended platform body, and the rear end of the negative pressure sucker is connected with a negative pressure generating device through an air pipe. The utility model mainly solves the problems that in the prior structure, the suspended platform body can only be maintained to be stable in the vertical direction at most, and external natural forces (such as the wind force) which can cause the swinging of the suspended platform can not be eliminated during the operation, therefore, the construction danger caused by the problems is avoided, and the construction difficulty is reduced.
Description
Technical field
The utility model relates to architecture construction and Clean-platform support, particularly a kind of high building construction, Clean-cape.
Background technology
Cape is an equipment commonly used in architecture construction and the cleaning, particularly rebuild at outer surface of wall to building, when paint and cleaning, the construction workman will stand in the enterprising line operate of cape, and because cape has certain length and width, the constructor can also carry out laterally moving in the above, be convenient to enlarge the area of construction, help improving the speed of construction like this.
The structure of existing cape is such: it comprises a cape body, cape rope and rope draw off gear.This cape body is made of a base plate and the guardrail that is arranged on around the base plate usually; The corresponding position of these cape body both sides is provided with the rope connecting portion, the rope that is connected with this rope connecting portion can winding on the rope draw off gear, this rope draw off gear is exactly a kind of Guiding wheel structure of the rope of can reeling usually.During use, the rope draw off gear can be fixed on certain position of roof, and then the cape body that will be connected in rope one end puts down from roof, when the rope draw off gear down puts down rope, cape also will steadily put down, so, the constructor just can stand on the cape and has carried out safer constructing operation.
Existing cape but has such defective: the suspension force of this cape body is that the rope by vertical setting provides fully, therefore it can only guarantee that at the most in the vertical direction keeps stable, and owing to the cape construction is generally all carried out on the outdoor architecture thing, having extraneous natural force (as: wind-force) effect in the operation unavoidably makes cape rock (teeter), not only increase the difficulty of construction easily, but also cause certain danger easily.
The utility model content
The purpose of this utility model is to provide a kind of high building construction, Clean-cape, the cape body that mainly solves in the existing structure can only guarantee that at the most in the vertical direction keeps stable, have extraneous natural force (as: wind-force) effect in its operation unavoidably and make the technical problem that cape rocks, avoid the construction danger that causes thus, reduced difficulty of construction.
For addressing the above problem, the utility model is achieved in that
A kind of high building construction, Clean-cape, it comprises a cape body, cape rope and rope draw off gear; This cape body is made of a base plate and the guardrail that is arranged on around the base plate, and the corresponding position of these cape body both sides is provided with the rope connecting portion, and the rope winding that is connected with the rope connecting portion is on the rope draw off gear; It is characterized in that: the base plate installed in front of this cape body has negative pressure sucker, and this negative pressure sucker rear end connects the negative pressure generation device by tracheae.
Described high building construction, Clean-cape, it is characterized in that: a plurality of negative pressure suckers equidistantly are arranged in the base plate front side of cape body at same horizontal level.
Described high building construction, Clean-cape, it is characterized in that: this rope draw off gear is the Guiding wheel structure of a coiling rope.
By technique scheme, the utlity model has following advantage:
The utility model can produce negative pressure by the negative pressure generation device, and by negative pressure sucker the cape body is adsorbed on the building wall, so just can avoid the cape body to rock owing to the effect of other external force (as: wind-force) produces.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Among the figure:
1-cape body;
The 11-base plate;
The 12-guardrail;
13-rope connecting portion;
The 2-rope;
3-rope draw off gear;
The 4-negative pressure sucker;
5-negative pressure generation device.
The specific embodiment
See also Fig. 1, the utility model discloses a kind of high building construction, Clean-cape.As shown in the figure: it comprises a cape body 1, cape rope 2 and rope draw off gear 3.This cape body 1 is made of a base plate 11 and the guardrail 12 that is arranged on around the base plate 11, the corresponding position of these cape body 11 both sides is provided with rope connecting portion 13, rope 2 windings that are connected with rope connecting portion 13 are on rope draw off gear 3, and this rope draw off gear is the Guiding wheel structure of a coiling rope.Base plate 11 installed in front of this cape body 1 have negative pressure sucker 4, and these negative pressure sucker 4 rear ends connect negative pressure generation device 5 by tracheae.
During use, rope draw off gear 3 can be fixed on certain position of roof, and then put down from roof by the cape body 1 that rope draw off gear 3 will be connected in rope 2 one ends, so, the constructor just can stand on the cape and has carried out safer constructing operation.Stable in order to ensure cape body 1 holding position when constructing, can produce negative pressure by negative pressure generation device 4, and by negative pressure sucker 4 cape body 1 is adsorbed on the building wall, so just can avoid cape body 1 to rock owing to the effect of other external force (as: wind-force) produces.After finishing in certain position construction, can close the negative pressure generation device earlier, the cape body can continue again to put down or pack up like this.
A plurality of negative pressure suckers 4 equidistantly are arranged in base plate 11 front sides of cape body 1 at same horizontal level, can increase the firmness of absorption like this.
Being preferred embodiment of the present utility model only in sum, is not to be used for limiting practical range of the present utility model.Be that all equivalences of doing according to the content of the utility model claim change and modification, all should be technology category of the present utility model.
Claims (3)
1, a kind of high building construction, Clean-cape, it comprises a cape body (1), cape rope (2) and rope draw off gear (3); This cape body (1) is by a base plate (11) and be arranged on base plate (11) guardrail (12) formation all around, the corresponding position of these cape body (11) both sides is provided with rope connecting portion (13), and rope (2) winding that is connected with rope connecting portion (13) is on rope draw off gear (3); It is characterized in that: base plate (11) installed in front of this cape body (1) has negative pressure sucker (4), and this negative pressure sucker (4) rear end connects negative pressure generation device (5) by tracheae.
2, high building construction according to claim 1, Clean-cape, it is characterized in that: a plurality of negative pressure suckers (4) equidistantly are arranged in base plate (11) front side of cape body (1) at same horizontal level.
3, high building construction according to claim 1 and 2, Clean-cape, it is characterized in that: this rope draw off gear is the Guiding wheel structure of a coiling rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820057812XU CN201187145Y (en) | 2008-04-28 | 2008-04-28 | Suspension platform for building construction and cleaning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820057812XU CN201187145Y (en) | 2008-04-28 | 2008-04-28 | Suspension platform for building construction and cleaning |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201187145Y true CN201187145Y (en) | 2009-01-28 |
Family
ID=40310163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200820057812XU Expired - Fee Related CN201187145Y (en) | 2008-04-28 | 2008-04-28 | Suspension platform for building construction and cleaning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201187145Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104120872A (en) * | 2014-08-05 | 2014-10-29 | 山西省宏图建设集团有限公司 | Novel enclasping locking device |
CN105649353A (en) * | 2016-04-05 | 2016-06-08 | 许昌学院 | Novel pyramidal building structure spire rising and lowering rope unreeling mechanism |
CN107268968A (en) * | 2017-06-28 | 2017-10-20 | 太仓秦风广告传媒有限公司 | One kind automation work high above the ground wind-proof device |
CN109944432A (en) * | 2019-03-26 | 2019-06-28 | 中铁建设集团设备安装有限公司 | A kind of architectural engineering personal protection means |
CN110409786A (en) * | 2019-07-16 | 2019-11-05 | 王世栋 | A kind of multifunctional building nacelle construction device |
CN110863439A (en) * | 2019-12-04 | 2020-03-06 | 胡妹芳 | Bridge construction that can control flexible is with hanging basket |
-
2008
- 2008-04-28 CN CNU200820057812XU patent/CN201187145Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104120872A (en) * | 2014-08-05 | 2014-10-29 | 山西省宏图建设集团有限公司 | Novel enclasping locking device |
CN105649353A (en) * | 2016-04-05 | 2016-06-08 | 许昌学院 | Novel pyramidal building structure spire rising and lowering rope unreeling mechanism |
CN107268968A (en) * | 2017-06-28 | 2017-10-20 | 太仓秦风广告传媒有限公司 | One kind automation work high above the ground wind-proof device |
CN109944432A (en) * | 2019-03-26 | 2019-06-28 | 中铁建设集团设备安装有限公司 | A kind of architectural engineering personal protection means |
CN110409786A (en) * | 2019-07-16 | 2019-11-05 | 王世栋 | A kind of multifunctional building nacelle construction device |
CN110409786B (en) * | 2019-07-16 | 2020-12-18 | 王世栋 | Multi-functional hanging flower basket construction equipment for building |
CN110863439A (en) * | 2019-12-04 | 2020-03-06 | 胡妹芳 | Bridge construction that can control flexible is with hanging basket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201187145Y (en) | Suspension platform for building construction and cleaning | |
CN206233419U (en) | A kind of wind-proof glass architecture curtain wall | |
CN105674196A (en) | Energy conservation and environment protection LED street lamp | |
CN206341631U (en) | One kind suspension vertical greening device | |
CN205743235U (en) | A kind of self-supporting anemometer tower | |
CN205935286U (en) | Damping device is used in electric power engineering reconnaissance | |
CN207365244U (en) | A kind of supporting structure for building | |
CN205846663U (en) | A kind of height-adjustable overhead line structures | |
CN215594477U (en) | Anticollision mechanism of building | |
CN204785076U (en) | Easily adjust cable support of height | |
CN204138250U (en) | A kind of cell curtain wall lifting trolley | |
CN102817611A (en) | Suspension type tunneling frontal dust removal device | |
CN203361032U (en) | Road windbreak | |
CN207647451U (en) | A kind of water conservancy work climbing ladder being easily installed dismounting | |
CN206624365U (en) | A kind of reinforcing bar automatic feed dividing equipment | |
CN205155349U (en) | Novel be convenient for drag crane span structure ladder of line | |
CN103731644A (en) | Informatization real-time monitoring device for underground engineering construction | |
CN205638454U (en) | Stretching device is retrieved to dryer | |
CN201710273U (en) | Pitching stand column mechanism of window cleaning machine | |
CN206385772U (en) | One kind exempts from welding steel structure attachment structure | |
CN206014109U (en) | Solar powered netting twine automatic rolling device | |
CN203486817U (en) | Automatic steel wire rope reeling and unreeling machine | |
CN203896439U (en) | Underground engineering construction informationized real-time monitoring device | |
CN204112794U (en) | Vertical sleeping foldable garage | |
CN203783162U (en) | Glass curtain wall lifting bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090128 Termination date: 20110428 |