CN206285380U - Nuclear power station carbon dioxide extinguisher installation - Google Patents

Nuclear power station carbon dioxide extinguisher installation Download PDF

Info

Publication number
CN206285380U
CN206285380U CN201621298020.2U CN201621298020U CN206285380U CN 206285380 U CN206285380 U CN 206285380U CN 201621298020 U CN201621298020 U CN 201621298020U CN 206285380 U CN206285380 U CN 206285380U
Authority
CN
China
Prior art keywords
carbon dioxide
power station
nuclear power
gas pipeline
brine tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621298020.2U
Other languages
Chinese (zh)
Inventor
俞栋雷
李国平
胡庆荣
罗进城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai East Edge Mechanical And Electrical Equipment Co Ltd
Original Assignee
Shanghai East Edge Mechanical And Electrical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai East Edge Mechanical And Electrical Equipment Co Ltd filed Critical Shanghai East Edge Mechanical And Electrical Equipment Co Ltd
Priority to CN201621298020.2U priority Critical patent/CN206285380U/en
Application granted granted Critical
Publication of CN206285380U publication Critical patent/CN206285380U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of nuclear power station carbon dioxide extinguisher installation, including:Carbon dioxide cartridge, brine tank, gas pipeline, gas cylinder relief valve and release valve control system.Carbon dioxide cartridge is provided with relief valve;Brine tank is provided with salt sprinkler head;Gas pipeline one end Connection Release valve, other end conducting brine tank;Release valve control system includes toggle, and electromagnet apparatus, balance weight, CCTV camera, server-centric is tensioned line, pin and support body;Server-centric is electrically connected with CCTV camera and electromagnet apparatus respectively, and toggle one end connects gas cylinder relief valve, other end connection balance weight;Tensioning line one end connection balance weight, the other end are fixed on support body by pin, and tensioning line passes through electromagnet apparatus.The utility model can immediately start in the reactor coolant pump of nuclear power station and when above filling the pump generation condition of a fire.And manually booted under powering-off state.For nuclear plant safety operation provides safeguard.

Description

Nuclear power station carbon dioxide extinguisher installation
Technical field
The utility model is related to fire plant technical field, relates in particular to a kind of nuclear power station carbon-dioxide fire engine dress Put, be applied to the reactor of nuclear power station advocate peace on fill in the fire-fighting safety system of pump.
Background technology
With the continuous progress of technology.Nuclear power station gradually obtains general as a kind of emerging energy resource supply mode in China And.In nuclear power station, reactor coolant pump and above fill pump security it is extremely important, therefore, built in the safety to nuclear power station If on, it is desirable to when reactor coolant pump and above filling extinguishing device when pump occurs the condition of a fire can immediately be actuated for fire extinguishing.But All to there is a certain amount of reaction time in the fire pump that existing nuclear power station is configured poor in actual applications, it is impossible to which satisfaction is opened immediately Dynamic requirement;If nuclear power station occurs station blackout occur during accident, the problem that fire pump cannot start is also resulted in.So that now Nuclear power station there is larger potential safety hazard.Therefore, a kind of new fire fighting extinguisher how is developed, can be in nuclear power station Reactor coolant pump and above fill pump occur the condition of a fire when start immediately.And unaffected by removing electrical power can work independently.It is core It is the direction that those skilled in the art need research that power plant safety operation provides sound assurance.
Utility model content
The utility model provides a kind of nuclear power station carbon dioxide extinguisher installation, can immediately start when there is the condition of a fire, The defect for overcoming existing like product to exist.
The concrete technical scheme that it is used is as follows:
A kind of nuclear power station carbon dioxide extinguisher installation, including:Carbon dioxide cartridge, brine tank, gas pipeline, gas cylinder is released Put valve and release valve control system.Storage has carbon dioxide compression gas, the carbon dioxide in the carbon dioxide cartridge Gas cylinder is provided with relief valve;Storage has salt solution in the brine tank, and brine tank is provided with salt sprinkler head;The gas pipeline one End is connected on relief valve, the other end is conducted in brine tank;The release valve control system includes toggle, electromagnetism Iron device, balance weight, CCTV camera, server-centric is tensioned line, pin and support body;The CCTV camera is used for Shoot the monitoring image at nuclear power station scene;The server-centric is electrically connected with CCTV camera and electromagnet apparatus respectively, is led to Cross the power-up/down of monitoring camera machine monitoring nuclear power station scene and remote control electromagnet apparatus;The toggle one End connects gas cylinder relief valve, other end connection balance weight;Tensioning line one end connection balance weight, the other end pass through pin Son is fixed on support body, and the electromagnet apparatus are connected on tensioning line, pull tensioning to connect on the electromagnet apparatus during electricity Line, make pin be come off from support body, make balance weight fall from support body, drive toggle open gas cylinder relief valve.
By using this technical scheme:Server-centric is cooled down by CCTV camera to the reactor at nuclear power station scene Agent pump and above fill pump and carry out remote monitoring.Reactor coolant pump is found when the server-centric very first time and above fills at pump occur The condition of a fire, electricity on remote control electromagnet apparatus pulls during electricity on the electromagnet apparatus and is tensioned line, makes pin be taken off from support body Fall, make balance weight fall from support body, driving toggle to open gas cylinder relief valve.Carbon dioxide cartridge is opened Release carbon dioxide to enter in brine tank, the salt solution that will store in brine tank is urged to salt sprinkler head forming salt water spray, It is used to protect reactor coolant pump and above fills pump.The fire demand water of first stage fire extinguishing is provided for fire-fighting system.Thus overcome To there is the reaction time in the fire pump that existing nuclear power station is configured poor in actual applications, it is impossible to the problem that starts immediately.
Preferably, in above-mentioned nuclear power station carbon dioxide extinguisher installation:The release valve control system also includes terminal box, The terminal box is provided with pulling wire handle, and the tensioning line is wrapped on pulling wire handle.
By using this technical scheme:When blackout condition occurs in nuclear power station, pulling wire handle, order can be manually pulled Line is close to pulling wire handle displacement, makes pin be come off from support body, balance weight falls from support body, drive toggle Open gas cylinder relief valve.Realize the technique effect of the manually opened fire-fighting fire extinguishing under powering-off state.
It is further preferred that in above-mentioned nuclear power station carbon dioxide extinguisher installation:Also include leakage detector;The leak detection Device is installed on gas pipeline, for detecting the amount of carbon dioxide entered in gas pipeline by carbon dioxide cartridge, and at this Amount of carbon dioxide sends alarm signal when reaching threshold value.
By using this technical scheme:With leakage detector detect dioxide bottle relief valve leakage rate, when plus When the leak pressure of pressure device reaches the setting value of leakage detector, leakage alarm signal can be in time sent.
It may further be preferable that in above-mentioned nuclear power station carbon dioxide extinguisher installation:Also include explosion diaphragm, the rupture disk Piece is installed on gas pipeline, and the explosion diaphragm is located between gas cylinder and brine tank.
By using this technical scheme:Set explosion diaphragm prevent system misoperation cause leakage carbon dioxide Into in fire water box.And rupture disk rupture under the burst pressure of setting enters carbon dioxide when there is fire In brine tank, the salt solution stored in brine tank is extruded from salt sprinkler head and implements fire extinguishing.
It is even furthermore preferable that in above-mentioned nuclear power station carbon dioxide extinguisher installation:Also include pressure reducing orifice, the decompression Orifice plate is installed on gas pipeline, and the pressure reducing orifice is located between explosion diaphragm and brine tank.
By using this technical scheme:After dioxide bottle starts carbon dioxide gas, with pressure reducing orifice Being input into sweet-water tank after the carbon dioxide decompression of release, to realize the premise in the water spray intensity for ensuring salt sprinkler head Under, reach the lasting water spraying time of certain time length.
Still further preferably, in above-mentioned nuclear power station carbon dioxide extinguisher installation:Also include extinguishing action indicator, institute Extinguishing action indicator is stated to be installed on gas pipeline, and the extinguishing action indicator be located at explosion diaphragm and brine tank it Between;Its transmission is gone out when increasing occur in air pressure in the extinguishing action pointer detection gas pipeline, the air pressure in feed channel Fiery actuating signal, the air pressure in gas pipeline send leakage alarm signal when increasing to limit value.
By using this technical scheme:Detection to air pressure in gas pipeline is realized with extinguishing action indicator and is directed to Carbon dioxide leakage in gas pipeline realizes alarm.
It is even furthermore preferable that in above-mentioned nuclear power station carbon dioxide extinguisher installation:The release valve control system is also wrapped Include protective glass plate;The terminal box and protective glass plate are all fixed on support body, and the terminal box is shielded in cover plate After plate.
By using this technical scheme:Terminal box is covered with protective glass plate, when preventing staff from maloperation occur The pulling wire handle left behind on terminal box.And when needing to leave behind pulling wire handle, staff need to only break protective glass plate into pieces The operation of correlation is carried out to terminal box.
It is even furthermore preferable that in above-mentioned nuclear power station carbon dioxide extinguisher installation:The work of the dioxide bottle Pressure is 15MPa, bottle volume is 70L, rushes loading amount for 42kg, environment temperature requirement are 0 DEG C~49 DEG C, and it is 0.6kg/ that standard is filled L。
It is even furthermore preferable that in above-mentioned nuclear power station carbon dioxide extinguisher installation:The explosion design of the explosion diaphragm Pressure is 1MPa.
Compared with prior art, the utility model simple structure, it is easy to prepare.Can be in the reactor coolant of nuclear power station Pump and above fill pump occur the condition of a fire when start immediately.And manually booted under powering-off state.For nuclear plant safety operation is provided with The guarantee of power.
Brief description of the drawings
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings:
Fig. 1 is structured flowchart of the present utility model;
Fig. 2 is the partial structural diagram of the utility model embodiment 1, and leakage detector, rupture disk are eliminated in this figure Piece, pressure reducing orifice, pin;
Fig. 3 is the structural representation of electromagnet apparatus;
Each reference is as follows with component names corresponding relation:
1st, carbon dioxide cartridge;2nd, brine tank;3rd, gas pipeline;11st, relief valve;4th, valve control system is discharged;6th, let out Leak detection device;7th, explosion diaphragm;8th, pressure reducing orifice;41st, toggle;42nd, electromagnet apparatus;43rd, balance weight;44、 CCTV camera;45th, server-centric;46th, it is tensioned line;47th, pin;48th, support body;49th, terminal box;491st, pulling wire handle.
Specific embodiment
In order to illustrate more clearly of the technical solution of the utility model, the utility model is made into one below in conjunction with accompanying drawing Step description.
As Figure 1-3:
A kind of nuclear power station carbon dioxide extinguisher installation, including:Carbon dioxide cartridge 1, brine tank 2, gas pipeline 3, release Put valve control system 4, leakage detector 5, explosion diaphragm 6, pressure reducing orifice 7 and extinguishing action indicator 8.
Wherein, storage has carbon dioxide compression gas and the carbon dioxide cartridge in the carbon dioxide cartridge 1 1 is provided with relief valve 11.Storage has salt solution in the brine tank 2, and brine tank 2 is provided with salt sprinkler head.The gas pipeline 3 Input is connected on relief valve 11, output end is conducted to brine tank 2.The release valve control system 4 includes crank connecting link machine Structure 41, electromagnet apparatus 42, balance weight 43, CCTV camera 44, server-centric 45 is tensioned line 46, pin 47 and frame Body 48;The CCTV camera 44 is used to shoot the monitoring image at nuclear power station scene;The server-centric 45 respectively with monitoring Video camera 44 and electromagnet apparatus 42 are electrically connected, and monitor nuclear power station scene by CCTV camera 41 and remote control electromagnet is filled Put 42 power-up/down;The one end of the toggle 41 connection gas cylinder relief valve 11, other end connection balance weight 43; The tensioning line 46 one end connection balance weight 43, other end is fixed on support body 48 by pin 47, the electromagnet dress 42 are put to be connected on tensioning line 46, pull tensioning line 46 on the electromagnet apparatus 42 during electricity, make pin 47 from support body 48 On come off, make balance weight 43 fall from support body 48, drive toggle 41 to open gas cylinder relief valve 11.The leakage Detector 5 is installed on gas pipeline 3, for detecting the amount of carbon dioxide entered in gas pipeline 3 by carbon dioxide cartridge, And send alarm signal when the amount of carbon dioxide reaches threshold value.The explosion diaphragm 6 is installed on gas pipeline 3, and described Explosion diaphragm 6 is located between gas cylinder 1 and brine tank 2.The pressure reducing orifice 7 is installed on gas pipeline 3, and the pressure reducing orifice 7 are located between explosion diaphragm 6 and brine tank 2.The extinguishing action indicator 8 is installed on gas pipeline 3, and the fire extinguishing is dynamic Make indicator 8 to be located between explosion diaphragm 7 and brine tank 2;Air pressure in the extinguishing action indicator 9 detection gas pipeline 3, It sends extinguishing action signal, the air pressure in gas pipeline 3 when increasing occurs in air pressure in feed channel 3 increases to limit value When send leakage alarm signal.Wherein, the operating pressure of the dioxide bottle be 15MPa, bottle volume be 70L, rush loading amount For 42kg, environment temperature requirement are 0 DEG C~49 DEG C, it is 0.6kg/L that standard is filled.The explosion design pressure of the explosion diaphragm 7 It is 1MPa.Additionally, also including terminal box 49 on the release valve control system 4, the terminal box 49 is provided with pulling wire handle 491, the tensioning line 46 is through terminal box 49 and is wrapped on pulling wire handle 491.For prevention work personnel's maloperation is left behind Pulling wire handle 491 on terminal box 49, the release valve control system 4 also includes protective glass plate 410;The He of the terminal box 49 After protective glass plate 410 is all fixed on support body 48, and the terminal box 49 is shielded in protective glass plate 410.
In practice, its course of work is as follows:Server-centric 45 is by CCTV camera 4 to the live reactor of nuclear power station Cooling medium pump and above fill pump and carry out remote monitoring.When server-centric 45 finds reactor coolant pump by CCTV camera 4 The generation condition of a fire at pump is above filled, electricity on the remote control electromagnet apparatus 42 of server-centric 45, electricity on the electromagnet apparatus 42 Shi Ladong tensionings line 46, make pin 47 be come off from support body 48, make the balance weight that balance weight 43 falls from support body, falls Hammer 43 drives toggle 41 to rotate and open the relief valve 11 on carbon dioxide cartridge 1.By carbon dioxide cartridge 1 Open, releasing carbon dioxide enters in gas pipeline 3, through entering in brine tank 2, the salt hydraulic pressure that will store in brine tank 2 Compel to salt sprinkler head forming salt water spray to put out a fire scene.And when blackout condition occurs in nuclear power station, staff is first Break protective glass plate 410 into pieces, pulling wire handle 491 of then leaving behind.So that the tensioning line 46 mutually wound with pulling wire handle 491 is received Tightly, the balance weight 43 for make pin 47 be come off from support body 48, making balance weight 43 be come off from support body 48, coming off drives crank Linkage 41 moves, opens the relief valve 11 of gas cylinder.The carbon dioxide that will store in carbon dioxide cartridge 1 is by gas transmission Pipeline 3 is input into brine tank 2, and the salt solution stored in brine tank 2 is urged into salt sprinkler head forming salt water spray
The above, only specific embodiment of the utility model, but protection domain of the present utility model is not limited to This, any those skilled in the art in technical scope disclosed in the utility model, the change that can be readily occurred in Or replace, should all cover within protection domain of the present utility model.Protection domain of the present utility model is with claims Protection domain is defined.

Claims (9)

1. a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that including:
Carbon dioxide cartridge(1), the carbon dioxide cartridge(1)Interior storage has carbon dioxide compression gas, the dioxy Change carbon gas cylinder(1)It is provided with relief valve(11);
Brine tank(2), the brine tank(2)Interior storage has salt solution, brine tank(2)It is provided with salt sprinkler head;
Gas pipeline(3), the gas pipeline(3)One end is connected to relief valve(11)The upper, other end is conducted to brine tank(2) It is interior;
Release valve control system(4), the release valve control system(4)Including toggle(41), electromagnet apparatus (42), balance weight(43), CCTV camera(44), server-centric(45), it is tensioned line(46), pin(47)And support body (48);The CCTV camera(44)Monitoring image for shooting nuclear power station scene;The server-centric(45)Respectively with CCTV camera(44)And electromagnet apparatus(42)Electrical connection, by CCTV camera(41)Simultaneously remotely control at monitoring nuclear power station scene Electromagnet apparatus processed(42)Power-up/down;The toggle(41)One end connects gas cylinder relief valve(11), the other end Connection balance weight(43);The tensioning line(46)One end connects balance weight(43), the other end pass through pin(47)It is fixed In support body(48)On, the electromagnet apparatus(42)It is connected to tensioning line(46)The upper, electromagnet apparatus(42)When upper electric Pull tensioning line(46), make pin(47)From support body(48)On come off, make balance weight(43)From support body(48)Upper whereabouts, band Dynamic toggle(41)Open gas cylinder relief valve(11).
2. as claimed in claim 1 a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that:The release valve control system (4)Also include terminal box(49), the terminal box(49)It is provided with pulling wire handle(491), the tensioning line(46)It is wrapped in Pulling wire handle(491)On.
3. as claimed in claim 2 a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that:Also include leakage detector (5);The leakage detector(5)It is installed on gas pipeline(3)On, gas pipeline is entered by carbon dioxide cartridge for detecting (3)In amount of carbon dioxide, and send alarm signal when the amount of carbon dioxide reaches threshold value.
4. as claim 3 states a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that:Also include explosion diaphragm(6), institute State explosion diaphragm(6)It is installed on gas pipeline(3)On, and the explosion diaphragm(6)Positioned at gas cylinder(1)And brine tank (2) between.
5. as claimed in claim 4 a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that:Also include pressure reducing orifice(7), The pressure reducing orifice(7)It is installed on gas pipeline(3)On, and the pressure reducing orifice(7)Positioned at explosion diaphragm(6)And brine tank (2) between.
6. as claimed in claim 5 a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that:Also indicated including extinguishing action Device(8), the extinguishing action indicator(8)It is installed on gas pipeline(3)On, and the extinguishing action indicator(8)Positioned at quick-fried Rupture of membranes piece(7)And brine tank (2) between;The extinguishing action indicator(9)Detection gas pipeline(3)Interior air pressure, in tracheae Road(3)When increasing occurs in interior air pressure its send extinguishing action signal, in gas pipeline(3)When interior air pressure increases to limit value Send leakage alarm signal.
7. as claimed in claim 6 a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that:The release valve control system (4)Also include protective glass plate(410);The terminal box(49)And protective glass plate(410)All it is fixed on support body(48)On, and The terminal box(49)It is shielded in protective glass plate(410)Afterwards.
8. as claimed in claim 4 a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that:The dioxide bottle Operating pressure be 15MPa, bottle volume be 70L, to rush loading amount be 42kg, environment temperature requirement for 0 DEG C~49 DEG C, standard fill for 0.6kg/L。
9. as claimed in claim 4 a kind of nuclear power station carbon dioxide extinguisher installation, it is characterised in that:The explosion diaphragm(7)'s Explosion design pressure is 1MPa.
CN201621298020.2U 2016-11-30 2016-11-30 Nuclear power station carbon dioxide extinguisher installation Active CN206285380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621298020.2U CN206285380U (en) 2016-11-30 2016-11-30 Nuclear power station carbon dioxide extinguisher installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621298020.2U CN206285380U (en) 2016-11-30 2016-11-30 Nuclear power station carbon dioxide extinguisher installation

Publications (1)

Publication Number Publication Date
CN206285380U true CN206285380U (en) 2017-06-30

Family

ID=59096174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621298020.2U Active CN206285380U (en) 2016-11-30 2016-11-30 Nuclear power station carbon dioxide extinguisher installation

Country Status (1)

Country Link
CN (1) CN206285380U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108939379A (en) * 2018-04-11 2018-12-07 中国核电工程有限公司 A kind of fire fighting extinguisher
CN108969950A (en) * 2018-08-14 2018-12-11 中国船舶重工集团公司第七〇九研究所 A kind of sea floating heap containment high pressure water spraying fire fighting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108939379A (en) * 2018-04-11 2018-12-07 中国核电工程有限公司 A kind of fire fighting extinguisher
CN108969950A (en) * 2018-08-14 2018-12-11 中国船舶重工集团公司第七〇九研究所 A kind of sea floating heap containment high pressure water spraying fire fighting system

Similar Documents

Publication Publication Date Title
CN104524734B (en) The data information acquisition method and apparatus of fire fighting device system
CN106410298B (en) Intelligent fire-fighting and rescue system of lithium ion battery energy storage unit
CN206285380U (en) Nuclear power station carbon dioxide extinguisher installation
CN102657922B (en) Nitrogen automatic fire fighting system for sealed cable tunnel
CN106267659B (en) A kind of standby pressure type Fire-extinguishing System of Septenary-Fluorine Propane
CN203525189U (en) Water supply monitoring system for fire protection
WO2020051972A1 (en) Intelligent fire protection system
CN105169584A (en) Multistage response type automatic extinguishing device and use method
CA2874830A1 (en) Electrically operated gas vents for fire protection sprinkler systems and related methods
JP2013192583A (en) Sprinkler fire extinguishing equipment
CN112604209B (en) Superfine dry powder intelligent fire extinguishing system and fire extinguishing method thereof
CN103480102A (en) Dry powder extinguishing device and method for intelligent patrol equipment in tunnel
CN207883080U (en) A kind of video fire hazard alarm system
CN113872083A (en) Safe power consumption protective housing with function of putting out a fire
CN202942566U (en) Automatic fire extinguishing device for fan electric cabinet
CN210806515U (en) Unattended indoor transformer substation cooling equipment
CN111632329A (en) Automatic fire extinguishing method and device
CN115607892B (en) Controlled fire-fighting equipment in fire-fighting monitoring system
CN206381522U (en) It is a kind of can manually, the fire-fighting spraying head tele-control system that automatically controls
CN201500407U (en) Foam spraying fire-extinguishing device
CN205886022U (en) Extinguishing device for building site
CN205862504U (en) City complex fire management system
CN203620126U (en) Thin water mist automatic fire extinguishing device in engine room of wind generating set
CN211132823U (en) Cabinet type superfine dry powder automatic fire extinguishing device
CN201469951U (en) Fire extinguishing apparatus used in fire protection engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant