CN206283942U - The vertical green wall system that a kind of prefabricated flower trough is formed - Google Patents

The vertical green wall system that a kind of prefabricated flower trough is formed Download PDF

Info

Publication number
CN206283942U
CN206283942U CN201621400556.0U CN201621400556U CN206283942U CN 206283942 U CN206283942 U CN 206283942U CN 201621400556 U CN201621400556 U CN 201621400556U CN 206283942 U CN206283942 U CN 206283942U
Authority
CN
China
Prior art keywords
prefabricated
flower
groove
green wall
flower trough
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621400556.0U
Other languages
Chinese (zh)
Inventor
李峰
杨扬
佘龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southwest Architectural Design and Research Institute Co Ltd
Original Assignee
China Southwest Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southwest Architectural Design and Research Institute Co Ltd filed Critical China Southwest Architectural Design and Research Institute Co Ltd
Priority to CN201621400556.0U priority Critical patent/CN206283942U/en
Application granted granted Critical
Publication of CN206283942U publication Critical patent/CN206283942U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses the vertical green wall system that a kind of prefabricated flower trough is formed, prefabricated flower groove including some staggeredly overlap joints, the position of the overlap joint is in prefabricated flower groove, the reserved structure hole of the vertical green wall of insertion, the vertical steel construction pierced by the reserved structure hole in prefabricated flower groove is fixedly connected to form the masonry construction system of stabilization with prefabricated flower groove, the groove for extending transversely through is reserved with the prefabricated flower groove bottom, the pipeline that drips is provided with the groove and forms irrigation system, it is reserved with the prefabricated flower groove bottom and looks for slope and draining hole, it is provided with the top of the vertical green wall and is beared down on one.The utility model is designed by simple and reliable structure and tectonic relationship, extend the type of green plant wall, so that vertical green wall turns into a kind of complete structure construction and ergasia in itself, and with armored concrete industryization precasting process perfect adaptation, standardized designs production higher is realized, vertical blank of the green wall in this technical system both at home and abroad has been filled up.

Description

The vertical green wall system that a kind of prefabricated flower trough is formed
Technical field
The utility model is related to the vertical green wall system that a kind of prefabricated flower trough is formed, and this System Design is applied to The prefabricated green wall that prefabricated flower groove in blocks is formed in prefabricated concrete structure.
Background technology
Development prefabricated assembled concrete structure, can be improved material and is being realized building section with effectively save resource and the energy Requirement of the site operation to environmental conditions such as places can be reduced with the efficiency in terms of structural behaviour, reduce building waste and to ring The harmful effect in border, improves building function and structural behaviour, realizes the building course of low energy consumption, low emission, promotes China's building The overall development of industry, realizes predetermined energy-conservation, emission reduction targets, is to promote construction industry from extensive to fine development, lifting building work Cheng Zhiliang and safely, realize that construction industry economizes on resources the important directions of the energy and environmental protection, be Large scale construction quantities, labour Shortage and the pressing needs of improvement work situation, are the main ways for realizing building industry transition and upgrade and building industry modernization Footpath and means.
The prefabricated green wall for being formed by prefabricated flower groove in blocks at present, after the completion of construction, plants green plants, can both meet and build Landscape requirement is built, and elevation of building can be enriched, moreover it is possible to adjust outdoor environment, resource is viewed and admired in increase, be that one kind has promotional value very much Prefabricated assembled go along with sb. to guard him construction style.And the connecting structure design studies at home and abroad of existing prefabricated flower groove in blocks belong to empty In vain.
Utility model content
Goal of the invention of the present utility model is:For above-mentioned problem, there is provided one kind meets structure safety, and Meet architectural effect, while meeting plant daylighting, ventilation, irrigation, the requirement of water drainage, and be easy to the flower trough of prefabrication and assembly construction to be formed Vertical green wall system.
What the technical solution of the utility model was realized in:The vertical green wall that a kind of prefabricated flower trough is formed System, it is characterised in that:Prefabricated flower grooves including some staggeredly overlap joints, the position of the overlap joint in prefabricated flower groove, insertion it is vertical The reserved structure hole of green wall, the vertical steel construction pierced by the reserved structure hole in prefabricated flower groove is fixed with prefabricated flower groove and connected Connect the masonry construction system to form stabilization, prefabricated flower groove middle part is reserved plantation cavity, some prefabricated flower grooves are interlocked overlap joint The plantation space with lighting and ventilation effect is formed afterwards, the groove for extending transversely through is reserved with the prefabricated flower groove bottom, in institute State and be provided with groove pipeline formation irrigation system of dripping, be reserved with the prefabricated flower groove bottom and look for slope and draining hole, lead to Cross and look for slope and draining hole successively to drain flooded fields downwards, be provided with the top of the vertical green wall and beared down on one, at the lateral connection that bears down on one Reserved steel bar, makes structure receive head at handing-over position of bearing down on one.
The vertical green wall system that prefabricated flower trough described in the utility model is formed, its described prefabricated flower groove includes mark Quasi- flower trough, termination flower trough and corner flower trough, the termination flower trough are arranged on the end of vertical green wall, and the corner flower trough sets Put in the corner of vertical green wall, when vertical green wall does not have corner structure, the standard flower trough is arranged on two side ends headdress flower groove Between, when vertical green wall has corner structure, the standard flower trough is arranged between termination flower trough and corner flower trough.
The vertical green wall system that prefabricated flower trough described in the utility model is formed, bears down on one including standard pressure described in it Top, termination is beared down on one and corner bears down on one, the standard is beared down on one, termination is beared down on one and corner bears down on one respectively with the standard of prefabricated flower groove Flower trough, termination flower trough and corner flower trough corresponding matching.
The vertical green wall system that prefabricated flower trough described in the utility model is formed, its described prefabricated flower groove is in outside Prominent structural form.
The vertical green wall system that prefabricated flower trough described in the utility model is formed, its described vertical steel construction with it is pre- Flower trough processed fills real and is fixed together by cast-in-place concrete.
The utility model forms vertical green wall system by prefabricated flower groove unit, and this design architecture is safe and reliable, and Meet building aesthetic, facilitate factorial praluction prefabricated and prefabricated construction, while meeting plant daylighting, ventilation, irrigation, row The requirement of flood, has filled up the blank of domestic and international prefabricated flower groove interconnection technique.
Brief description of the drawings
Fig. 1 is the mounting plane schematic diagram of the green wall system of the utility model.
Fig. 2 is the floor map of bearing down on one of the green wall system of the utility model.
Fig. 3 is the elevational schematic view of the green wall system of the utility model.
Fig. 4 and Fig. 5 are that the utility model Plays flower trough is interlocked the schematic diagram of overlap joint.
Fig. 6 is the structural representation of the utility model Plays flower trough.
Fig. 7 is the structural representation of the utility model middle-end headdress flower groove.
Fig. 8 is the structural representation of the utility model transfer corner piece groove.
Fig. 9 is the structural representation that the utility model Plays bear down on one.
Figure 10 is the structural representation that termination is beared down on one in the utility model.
Figure 11 is the structural representation that corner bears down on one in the utility model.
Marked in figure:1 is prefabricated flower groove, and 1a is standard flower trough, and 1b is termination flower trough, and 1c is corner flower trough, and 2 is reserved knot Structure hole, 3 is vertical steel construction, and 4 to reserve plantation cavity, and 5 is plantation space, and 6 is groove, and 7 is the pipeline that drips, and 8 is to look for slope And draining hole, 9 to bear down on one, and 9a bears down on one for standard, and 9b bears down on one for termination, and 9c bears down on one for corner.
Specific embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing, to this reality It is further elaborated with new technique.It should be appreciated that specific implementation accompanying drawing described herein is only used to explain this Utility model, is not used to limit the utility model.
As shown in figs. 1-11, the vertical green wall system that a kind of prefabricated flower trough is formed, including some staggeredly overlap joints Prefabricated flower groove 1, the prefabricated flower groove 1 in structural form outwardly, the position of the overlap joint in prefabricated flower groove 1, insertion The reserved structure hole 2 of vertical green wall, the vertical steel construction 3 and prefabricated flower passed through by the reserved structure hole 2 in prefabricated flower groove 1 Groove 1 is fixedly connected to form the masonry construction system of stabilization, and the vertical steel construction 3 is filled with prefabricated flower groove 1 by cast-in-place concrete It is fixed together in fact, the masonry construction system that the prefabricated flower groove is formed is needed by Structure Calculation, it is ensured that structure safety;It is described The middle part of prefabricated flower groove 1 is reserved plantation cavity 4, and for loading planting soil, some prefabricated flower grooves 1 are formed after staggeredly overlapping to be had The plantation space 5 of lighting and ventilation effect, the groove 6 for extending transversely through is reserved with the bottom of the prefabricated flower groove 1, in the groove 6 Inside it is provided with the pipeline 7 that drips and forms irrigation system, is reserved with the bottom of the prefabricated flower groove 1 and looks for slope and draining hole 8, by looking for The successively water drainage downwards of slope and draining hole 8, vertical Lv Qiang bottoms are connected with basis, pass through(Building)The drainage system on ground completes green Wall Overflow drainage, is provided with the top of the vertical green wall and bears down on one 9, and reserved steel bar at 9 lateral connections that bear down on one makes structure exist Bear down on one 9 handing-over positions receive head, bear down on one be also green wall moulding top profile and receive head.
Wherein, the prefabricated flower groove 1 includes standard flower trough 1a, termination flower trough 1b and corner flower trough 1c, the termination flower Groove 1b is arranged at the receipts head of vertical green wall, and the corner flower trough 1c is arranged on the corner of vertical green wall, makes vertical green wall Type can smoothly complete the transition variation of variform, and when vertical green wall does not have corner structure, the standard flower trough 1a is set Between two side ends headdress flower groove 1b, when vertical green wall has corner structure, the standard flower trough 1a be arranged on termination flower trough 1b with Between corner flower trough 1c;Described bearing down on one 9 bears down on one 9b and corner bears down on one 9c including bear down on one 9a, termination of standard, and the standard is beared down on one 9a, termination bear down on one 9b and corner bears down on one standard flower trough 1a, termination flower trough 1bs and corner flower trough of the 9c respectively with prefabricated flower groove 1 1c corresponding matchings.
In the utility model, termination flower trough, corner flower trough, termination are beared down on one to bear down on one with corner and are variant structure design, can Adjusted according to turning angle;The masonry construction system that prefabricated flower groove is formed has length, height, moulding when splicing is built by laying bricks or stones Flexibility spatially, can according to design, place and using etc. need to make respective change.Wherein, prefabricated flower groove and bear down on one Standardization level it is high, can high-volume plant produced, it is ensured that the quality of production and speed, assembled in situ degree are high, can height Control construction precision, assembling speed is fast, and job site safety is clean and tidy.
Preferred embodiment of the present utility model is the foregoing is only, is not used to limit the utility model, it is all at this Any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (5)

1. the vertical green wall system that a kind of prefabricated flower trough is formed, it is characterised in that:Including the prefabricated of some staggeredly overlap joints Flower trough(1), the position of the overlap joint is prefabricated flower groove(1)The reserved structure hole of the vertical green wall of upper, insertion(2), by prefabricated flower Groove(1)On reserved structure hole(2)The vertical steel construction for passing through(3)With prefabricated flower groove(1)It is fixedly connected to form the block of stabilization Building structure system, the prefabricated flower groove(1)Middle part is reserved plantation cavity(4), some prefabricated flower grooves(1)Formed after staggeredly overlapping Plantation space with lighting and ventilation effect(5), in the prefabricated flower groove(1)Bottom is reserved with the groove for extending transversely through(6), The groove(6)Inside it is provided with the pipeline that drips(7)Irrigation system is formed, in the prefabricated flower groove(1)Bottom be reserved with look for slope and Draining hole(8), by looking for slope and draining hole(8)Successively water drainage downwards, is provided with the top of the vertical green wall and bears down on one (9), it is described to bear down on one(9)Reserved steel bar at lateral connection, makes structure bear down on one(9)Receive head in handing-over position.
2. the vertical green wall system that prefabricated flower trough according to claim 1 is formed, it is characterised in that:It is described prefabricated Flower trough(1)Including standard flower trough(1a), termination flower trough(1b)And corner flower trough(1c), the termination flower trough(1b)It is arranged on vertical The end of straight green wall, the corner flower trough(1c)The corner of vertical green wall is arranged on, when vertical green wall does not have corner structure When, the standard flower trough(1a)It is arranged on two side ends headdress flower groove(1b)Between, when vertical green wall has corner structure, the standard Flower trough(1a)It is arranged on termination flower trough(1b)With corner flower trough(1c)Between.
3. the vertical green wall system that prefabricated flower trough according to claim 2 is formed, it is characterised in that:It is described to bear down on one (9)Bear down on one including standard(9a), termination bears down on one(9b)And corner bears down on one(9c), the standard bears down on one(9a), termination bears down on one (9b)And corner bears down on one(9c)Respectively with prefabricated flower groove(1)Standard flower trough(1a), termination flower trough(1b)And corner flower trough (1c)Corresponding matching.
4. the vertical green wall system that prefabricated flower trough according to claim 1 is formed, it is characterised in that:It is described prefabricated Flower trough(1)In structural form outwardly.
5. the vertical green wall system that prefabricated flower trough as claimed in any of claims 1 to 4 is formed, its feature It is:The vertical steel construction(3)With prefabricated flower groove(1)Fill real by cast-in-place concrete to be fixed together.
CN201621400556.0U 2016-12-20 2016-12-20 The vertical green wall system that a kind of prefabricated flower trough is formed Active CN206283942U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621400556.0U CN206283942U (en) 2016-12-20 2016-12-20 The vertical green wall system that a kind of prefabricated flower trough is formed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621400556.0U CN206283942U (en) 2016-12-20 2016-12-20 The vertical green wall system that a kind of prefabricated flower trough is formed

Publications (1)

Publication Number Publication Date
CN206283942U true CN206283942U (en) 2017-06-30

Family

ID=59104254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621400556.0U Active CN206283942U (en) 2016-12-20 2016-12-20 The vertical green wall system that a kind of prefabricated flower trough is formed

Country Status (1)

Country Link
CN (1) CN206283942U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107853008A (en) * 2017-10-27 2018-03-30 上海市政工程设计研究总院(集团)有限公司 Prefabricated assembled plant walls
CN110366981A (en) * 2019-07-19 2019-10-25 深圳市铁汉一方环境科技有限公司 A kind of green wall of wall surface

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107853008A (en) * 2017-10-27 2018-03-30 上海市政工程设计研究总院(集团)有限公司 Prefabricated assembled plant walls
CN110366981A (en) * 2019-07-19 2019-10-25 深圳市铁汉一方环境科技有限公司 A kind of green wall of wall surface

Similar Documents

Publication Publication Date Title
CN102444233A (en) Multifunctional assembling and pouring type templated block, use method and use thereof
CN207435896U (en) A kind of Collison fence for bridge of the plug-in planting groove of prefabricated
CN202559377U (en) Mutually-embedded ecological building block
CN206283942U (en) The vertical green wall system that a kind of prefabricated flower trough is formed
CN108207400A (en) A kind of skyscraper facade greening device and its construction method
CN203821961U (en) Assembled-type wall
CN201473850U (en) Prefabricated concrete member of playground drainage ditch
CN204645387U (en) A kind of stable building heat preservation connects brick
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN203238661U (en) Reinforced retaining wall ecological panel structure with self-interlocking function
CN109653191A (en) Prefabricated PC continuous underground wall structure and its construction method
CN206309126U (en) Assembled vertical greening spends ware enclosure member
CN204238193U (en) Underground Hydro-electric Power Station fitting structure
CN103733900A (en) Greening exterior wall tile and building exterior wall long-acting greening system
CN209369016U (en) A kind of prefabricated balcony structure and its building
CN210140746U (en) Water collection type precast concrete pavement
CN203924411U (en) Prefabricated assembled fire wall
CN111395160A (en) Rapid construction method for bridge guardrail with flower bed and prefabricated external flower bed
CN203701716U (en) Transformer substation enclosure pre-cast concrete coping
CN207484827U (en) A kind of efficiently measuring body roof truss beam precast concrete
CN207032655U (en) A kind of movable greening enclosing wall plate
CN202635197U (en) Prefabricated planter
CN102972222A (en) Prefabricated flower groove
CN211369010U (en) Green ecological building
CN206554116U (en) A kind of alternating expression underground traffic piping lane vehicle in and out port structure