CN206267145U - A kind of anchor cable construction Integral jack-ups - Google Patents

A kind of anchor cable construction Integral jack-ups Download PDF

Info

Publication number
CN206267145U
CN206267145U CN201621427160.5U CN201621427160U CN206267145U CN 206267145 U CN206267145 U CN 206267145U CN 201621427160 U CN201621427160 U CN 201621427160U CN 206267145 U CN206267145 U CN 206267145U
Authority
CN
China
Prior art keywords
piston
oil cylinder
top pressure
left end
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621427160.5U
Other languages
Chinese (zh)
Inventor
高建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Navigation Construction Co Ltd
Original Assignee
Beijing Navigation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Navigation Construction Co Ltd filed Critical Beijing Navigation Construction Co Ltd
Priority to CN201621427160.5U priority Critical patent/CN206267145U/en
Application granted granted Critical
Publication of CN206267145U publication Critical patent/CN206267145U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of anchor cable construction Integral jack-ups, including oil cylinder and the piston being arranged inside oil cylinder, the oil cylinder is provided with A oil circuits and B oil circuits, rear sealing plate is provided between the piston and oil cylinder, the rear sealing plate right side is provided with rear hold-down ring, the rear hold-down ring right side is additionally provided with anti-rotation device, the right-hand member of the piston is connected with instrument anchor assemblies, the left end of the piston is connected with big plug, location nut is provided with the left of the big plug, the big plug and internal piston are also cased with punching set, the location nut left side is provided with top pressure oil cylinder, the top pressure oil cylinder is provided with C oil circuits and D oil circuits, top pressure piston is provided with inside the top pressure oil cylinder, the left end of the top pressure piston is connected with top pressure block, the top pressure oil cylinder left end is provided with footstock, the footstock left end is connected with work anchor assemblies.The effective loss of prestress problem for overcoming prestressed anchor cable stretching, with practicality very high.

Description

A kind of anchor cable construction Integral jack-ups
Technical field
The utility model is related to top pressing device technical field, specially a kind of anchor cable construction Integral jack-ups.
Background technology
Urban construction is the important component of city management.Urban construction to be planned to foundation, by construction project pair Human settlement environment in city is transformed, and each physical facilities in city system is built, and the content of urban construction includes city system The row state in kind of each physical facilities in system, is basic, the stage sex work created good conditions for management city, is process Property and a kind of periodically obvious special economic work.City is put into operation and function by after planning, construction, is carried It is real that good human settlement is created for citizen for service, ensure citizen's normal life, serving urban socio-economic development.Cause This, it with urban planning is according to finally serving city operations that urban construction is.Wherein it is divided into Urban Spirit civilization construction construction With building practice construction.
With the development and the expansion of capital construction scale of economic construction, the construction land in city is fewer and feweri, building Height is being wanted in the design of thing upwards, and the building foundation pit of depth, China is wanted downwards is becoming increasingly deeper, and more red near land used Line, this proposes requirement higher to Base hole supporting technology.Deep big foundation pit is frequently with pile-anchor retaining mode, and prestressing force among these The construction of anchor cable is most important to deep pit monitor, and prestressed anchor cable stretching is even more the most important thing, and the pre- of prestressed anchor cable stretching should Power loss problem never has and is effectively solved.
The content of the invention
The purpose of this utility model is to provide a kind of anchor cable construction Integral jack-ups, with solving above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of anchor cable construction Integral jack-ups, bag Oil cylinder and the piston being arranged inside oil cylinder are included, the oil cylinder is provided with A oil circuits and B oil circuits, between the piston and oil cylinder Rear sealing plate is provided with, the rear sealing plate right side is provided with rear hold-down ring, and the rear hold-down ring right side is additionally provided with anti-rotation device, described The right-hand member of piston is connected with instrument anchor assemblies, and the left end of the piston is connected with big plug, is provided with fixed on the left of the big plug Position nut, the big plug and internal piston are also cased with punching set, and the location nut left side is provided with top pressure oil cylinder, the top pressure Oil cylinder is provided with C oil circuits and D oil circuits, and top pressure piston is provided with inside the top pressure oil cylinder, and the left end of the top pressure piston is connected with Top pressure block, the top pressure oil cylinder left end is provided with footstock, and the footstock left end is connected with work anchor assemblies.
Preferably, the punching set and big plug clamping, and the left end of punching set is connected to location nut.
Preferably, the location nut is bolted to connection oil cylinder.
Preferably, the axis of the piston and top pressure piston is on same straight line.
Preferably, the matching relationship of the punching set and piston is gap cooperation.
Compared with prior art, the beneficial effects of the utility model are:A kind of anchor cable construction of the utility model is pushed up with overall Depressor, structure is novel, easy to operate, and B oil circuits are opened, and A oil circuits are closed, and now controls A oil circuits, and to oil cylinder fuel feeding, piston is uniform Move out, it is ensured that oil pressure is steady, tensioning speed is uniform, instrument anchor assemblies meeting Automatic-clamping steel strand wires, work anchor assemblies can be suitable Can be carried over a certain distance along tensioning direction, until contacted with top pressure block, but will not be carried over work anchor assemblies, when reaching During to value of thrust, A oil circuits convolution, fuel cut-off, C oil circuits are opened, and D oil circuits are closed, control D oil circuit work, are supplied to top pressure oil cylinder Oil, top pressure piston is moved out, and work anchor assemblies are headed into anchor hole, and after pressure value reaches, D oil circuits are opened, and C oil circuits are closed, By top pressure backward stroke of the piston to original position, B oil circuits are opened, control A oil circuits are closed, and piston top is returned into original position, effective gram The loss of prestress problem of prestressed anchor cable stretching has been taken, with practicality very high, a kind of anchor cable construction has been greatly improved With the use feature of Integral jack-ups, it is ensured that its using effect and utilization benefit, it is adapted to be widely popularized.
Brief description of the drawings
Fig. 1 is a kind of structural representation of anchor cable construction Integral jack-ups of the utility model;
Structural representation when Fig. 2 is a kind of tensioning sheet clamping type group anchor of anchor cable construction Integral jack-ups of the utility model;
Fig. 3 is structural representation when a kind of work clip sheet of anchor cable construction Integral jack-ups of the utility model heads into anchor hole Figure.
In figure:1 footstock, 2 top pressure blocks, 3 top pressure pistons, 4 top pressure oil cylinders, 5 location nuts, 6 big plugs, 7 punching sets, 8 are lived Hold-down ring behind sealing plate, 11,12 anti-rotation devices, 13 work anchor assemblies, 14 C oil circuits, 15 D oil circuits, 16 A behind plug, 9 oil cylinders, 10 Oil circuit, 17 B oil circuits, 18 instrument anchor assemblies.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of anchor cable construction Integral jack-ups, including Oil cylinder 9 and the piston 8 being arranged inside oil cylinder 9, the oil cylinder 9 are provided with A oil circuits 16 and B oil circuits 17, the piston 8 and oil Rear sealing plate 10 is provided between cylinder 9, the right side of the rear sealing plate 10 is provided with rear hold-down ring 11, and the right side of the rear hold-down ring 11 also sets The right-hand member for having anti-rotation device 12, the piston 8 is connected with instrument anchor assemblies 18, and the left end of the piston 8 is connected with big plug 6, The left side of the big plug 6 is provided with location nut 5, and punching set 7, the positioning spiral shell are also cased with inside the big plug 6 and piston 8 Female 5 left side is provided with top pressure oil cylinder 4, and the top pressure oil cylinder 4 is provided with C oil circuits 14 and D oil circuits 15, is set inside the top pressure oil cylinder 4 The left end for having top pressure piston 3, the top pressure piston 3 is connected with top pressure block 2, and the left end of top pressure oil cylinder 4 is provided with footstock 1, described The left end of footstock 1 is connected with work anchor assemblies 13, and the punching covers 7 and the clamping of big plug 6, and the left end of punching set 7 is connected To location nut 5, the location nut 5 is bolted to connection the axis of oil cylinder 9, the piston 8 and top pressure piston 3 On same straight line, the matching relationship of the punching set 7 and piston 8 is gap cooperation.
Operation principle:A kind of anchor cable construction Integral jack-ups of the utility model, when using, B oil circuits 17 are opened, A oil circuits 16 are closed, and now control A oil circuits 16, and to the fuel feeding of oil cylinder 9, piston 8 is uniformly moved out, it is ensured that oil pressure is steady, and tensioning speed is equal Even, the meeting Automatic-clamping steel strand wires of instrument anchor assemblies 18, work anchor assemblies 13 can be certain along that can be carried over along tensioning direction Distance, until being contacted with top pressure block 2, but will not be carried over work anchor assemblies 13, and when value of thrust is reached, A oil circuits 16 circle round, and stop Only fuel feeding, C oil circuits 14 are opened, and D oil circuits 15 are closed, and control D oil circuits 15 work, and to the fuel feeding of top pressure oil cylinder 4, top pressure piston 3 is outside Work anchor assemblies 13 are headed into anchor hole by motion, and after pressure value reaches, D oil circuits 15 are opened, and C oil circuits 14 are closed, by top pressure piston 3 backhauls open B oil circuits 17 to original position, and control A oil circuits are closed, and piston 8 is pushed up back into original position, are effectively overcome pre- The loss of prestress problem of stress anchorage cable stretching.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out various changes in the case where principle of the present utility model and spirit is not departed from, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of anchor cable construction Integral jack-ups, including oil cylinder(9)And it is arranged at oil cylinder(9)Internal piston(8), it is special Levy and be:The oil cylinder(9)It is provided with A oil circuits(16)With B oil circuits(17), the piston(8)And oil cylinder(9)Between be provided with rear close Shrouding(10), the rear sealing plate(10)Right side is provided with rear hold-down ring(11), the rear hold-down ring(11)Right side is additionally provided with anti-rotation Device(12), the piston(8)Right-hand member be connected with instrument anchor assemblies(18), the piston(8)Left end be connected with big plug (6), the big plug(6)Left side be provided with location nut(5), the big plug(6)And piston(8)Inside is also cased with punching set (7), the location nut(5)Left side is provided with top pressure oil cylinder(4), the top pressure oil cylinder(4)It is provided with C oil circuits(14)With D oil circuits (15), the top pressure oil cylinder(4)Inside is provided with top pressure piston(3), the top pressure piston(3)Left end be connected with top pressure block(2), The top pressure oil cylinder(4)Left end is provided with footstock(1), the footstock(1)Left end is connected with work anchor assemblies(13).
2. a kind of anchor cable construction Integral jack-ups according to claim 1, it is characterised in that:The punching set(7)With Big plug(6)Clamping, and the punching set(7)Left end be connected to location nut(5).
3. a kind of anchor cable construction Integral jack-ups according to claim 1, it is characterised in that:The location nut(5) It is bolted to connection oil cylinder(9).
4. a kind of anchor cable construction Integral jack-ups according to claim 1, it is characterised in that:The piston(8)And top Pressure piston(3)Axis on same straight line.
5. a kind of anchor cable construction Integral jack-ups according to claim 1, it is characterised in that:The punching set(7)With Piston(8)Matching relationship be gap coordinate.
CN201621427160.5U 2016-12-23 2016-12-23 A kind of anchor cable construction Integral jack-ups Expired - Fee Related CN206267145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621427160.5U CN206267145U (en) 2016-12-23 2016-12-23 A kind of anchor cable construction Integral jack-ups

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621427160.5U CN206267145U (en) 2016-12-23 2016-12-23 A kind of anchor cable construction Integral jack-ups

Publications (1)

Publication Number Publication Date
CN206267145U true CN206267145U (en) 2017-06-20

Family

ID=59048035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621427160.5U Expired - Fee Related CN206267145U (en) 2016-12-23 2016-12-23 A kind of anchor cable construction Integral jack-ups

Country Status (1)

Country Link
CN (1) CN206267145U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004926A (en) * 2019-04-21 2019-07-12 河北建科唐秦建筑科技有限公司 A kind of fluid pressure type anchor rod prestress stops loss device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004926A (en) * 2019-04-21 2019-07-12 河北建科唐秦建筑科技有限公司 A kind of fluid pressure type anchor rod prestress stops loss device

Similar Documents

Publication Publication Date Title
CN103801931B (en) What diesel engine cylinder cover oil thrower copper overlapped press-fits external member
CN206267145U (en) A kind of anchor cable construction Integral jack-ups
CN204381921U (en) Cylinder cap face miller fixture
CN207244631U (en) A kind of building huge deep foundation pit construction Quick support changing structure for use
CN203614277U (en) Fuel-saving device for fuel engine
CN102218494B (en) Hydraulic rapid forging press
CN202129757U (en) Installing tool for O-shaped sealing ring
CN204458156U (en) Custom Prosthesis high-power diesel plunger coupled parts
CN202215348U (en) Four-stroke internal-combustion engine with high power compression ratio
CN202387731U (en) Anti-rotating device
CN207195414U (en) A kind of formula T-bolt component free of demolition
CN104832183A (en) Method for transforming shield tunneling system adapting to 36-degree pipe segments into shield tunneling system adapting to 22.5-degree pipe segments
CN2443195Y (en) Composite sealing ring
CN204966268U (en) Transformer advancing device that takes one's place that unloads and system thereof
CN203171800U (en) Mold for prefabricated concrete structure
CN204677334U (en) A kind of end cap of fuel rail of direct spray petrol engine in cylinder
CN203756358U (en) Engine air cylinder gasket
CN202659360U (en) Cylinder body structure of diesel engine
CN203470846U (en) Integrated mold switching device for core-manufacturing machine
CN203420793U (en) Efficient engine piston
CN204082366U (en) Internal-combustion engine piston ring group oil ring
CN201627649U (en) Piston type internal combustion engine
CN201539553U (en) Indirect type seamless energy-saving piston ring
CN203004340U (en) An oil hydraulic press structure
CN202087810U (en) Cylinder sleeve column structure of die casting mold of four-cylinder engine cylinder body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620

Termination date: 20181223

CF01 Termination of patent right due to non-payment of annual fee