CN207195414U - A kind of formula T-bolt component free of demolition - Google Patents

A kind of formula T-bolt component free of demolition Download PDF

Info

Publication number
CN207195414U
CN207195414U CN201721189204.XU CN201721189204U CN207195414U CN 207195414 U CN207195414 U CN 207195414U CN 201721189204 U CN201721189204 U CN 201721189204U CN 207195414 U CN207195414 U CN 207195414U
Authority
CN
China
Prior art keywords
bolt
punching block
bolt body
demolition
guide sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721189204.XU
Other languages
Chinese (zh)
Inventor
李小松
施海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Revzone Industry Corp
Original Assignee
Shanghai Revzone Industry Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Revzone Industry Corp filed Critical Shanghai Revzone Industry Corp
Priority to CN201721189204.XU priority Critical patent/CN207195414U/en
Application granted granted Critical
Publication of CN207195414U publication Critical patent/CN207195414U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

It the utility model is related to manufacturing technology field, more particularly to a kind of formula T-bolt component free of demolition;Including punching block, installation through-hole is provided with punching block;Pre-buried channel flow and T-bolt, T-bolt include bolt body and are arranged at the T connector of bolt body end, and T connector is fastened in pre-buried channel flow, and bolt body is fixed on the surface of punching block by penetrating installation through-hole by pre-buried channel flow;Guide sleeve and stop nut, be may be contained within bolt body and guide sleeve is bonded with the surface of punching block;Spring, it is set in bolt body, and spring is arranged between guide sleeve and stop nut;The utility model formula T-bolt modular construction free of demolition is simple and convenient to operate, and without adjusting T-bolt repeatedly, can be effectively improved installation built-in groove and be dismantled the operating efficiency of template.

Description

A kind of formula T-bolt component free of demolition
Technical field
It the utility model is related to manufacturing technology field, more particularly to a kind of formula T-bolt component free of demolition.
Background technology
Built-in groove obtains perfect application in the Tunnel Engineering of developed country, is mainly used in installation fixation in railway tunnel and connects Net-fault, power line, pipeline etc. act on, and pre-buried rooved face has corrosion-inhibiting coating, therefore installation process must protect conduit surface not It is damaged, in order to avoid influence the Corrosion Protection of conduit.
Before in construction, template assemblies are completed, T-bolt is pre-installed in template, T heads point are (i.e. vertical with bolt Part metals, form T-type structure, referred to as T-bolt with bolt on the whole) at template finish side, will according to design size Built-in groove is seated to specified location, and the one side with foam adhesive tape is close into template during placement penetrates T-bolt T heads in notch Portion, then T-bolt is rotated by 90 ° to the right and lifting clamp nut makes conduit be fixed in template, and built-in groove answers closely connected template, pours After the completion of building, T-bolt nut is unclamped first, and being then rotated by 90 ° to the left makes T heads parallel with notch, to ensure that the demoulding is smooth;It is existing There is the angle position that the design in technology needs repeatedly adjustment T-bolt so that built-in groove is fastened in template, is not only grasped Make relatively complicated, and cannot be guaranteed the closely connected template of built-in groove, and also there is the risk on damage conduit surface.
Utility model content
The utility model is in view of above-mentioned technical problem, there is provided a kind of formula T-bolt component free of demolition;The formula T free of demolition Concrete technical scheme is used by type bolt assembly:
A kind of formula T-bolt component free of demolition, it is characterised in that the component includes:
Punching block, installation through-hole is provided with the punching block;
Pre-buried channel flow and T-bolt, the T-bolt include bolt body and are arranged at the T of bolt body end Type head, the T connector are fastened in the pre-buried channel flow, and the bolt body will be described pre-buried by penetrating the installation through-hole Conduit is fixed on the surface of the punching block;
Guide sleeve and stop nut, be may be contained within the bolt body and guide sleeve is bonded with the surface of the punching block;
Spring, it is set in the bolt body, and the spring is arranged between the guide sleeve and stop nut.
Above-mentioned technical proposal has the following advantages that or beneficial effect:
The utility model formula T-bolt modular construction free of demolition is simple and convenient to operate, can without adjusting T-bolt repeatedly Effectively improve installation built-in groove and dismantle the operating efficiency of template.
Brief description of the drawings
By reading the detailed description made with reference to the following drawings to non-limiting example, the utility model and its spy Sign, profile and advantage will become more apparent.The identical mark instruction identical part in whole accompanying drawings.Can be by Accompanying drawing is drawn according to ratio, it is preferred that emphasis is purport of the present utility model is shown.
Fig. 1 is the structural representation of the utility model formula T-bolt component free of demolition.
Embodiment
The utility model is further described with specific embodiment below in conjunction with the accompanying drawings, but not as this practicality New restriction.
As shown in figure 1, the utility model formula T-bolt component concrete structure free of demolition includes:
Punching block 1, installation through-hole is provided with punching block 1.
Pre-buried channel flow 2 and T-bolt, T-bolt include bolt body 3 and are arranged at the T-shaped of bolt body end First 31, T connector is fastened in the pre-buried channel flow 2, and pre-buried channel flow 2 is fixed on by bolt body by penetrating the installation through-hole The surface of punching block 1.
Guide sleeve 6 and stop nut 4, be may be contained within bolt body and guide sleeve 6 is bonded with the surface of punching block 1.
Spring 5, is set in bolt body, and spring 5 is arranged between guide sleeve 6 and stop nut 4.
The utility model formula T-bolt component free of demolition is provided with spring in bolt body, and fastening locknut compresses Spring causes spring to be compressed so as to shorten stroke so that stop nut is pressed on the end of guide sleeve, to realize built-in groove The fastening in road and punching block, so as to carry out cast in situs.Spring is constantly in T connector to rise after the utility model unclamps stop nut Under tight state and make angle specific, when needing to tighten or loosen, to the right or turn left 90 °, there are construction and installation just Victory, the advantages of without confirming T head positions repeatedly, while improve worker's labor style, improve the efficiency of installation built-in groove.
In summary, the utility model formula T-bolt modular construction free of demolition is simple and convenient to operate, without adjusting T repeatedly Type bolt, installation built-in groove can be effectively improved and dismantle the operating efficiency of template.
It should be appreciated by those skilled in the art that those skilled in the art combine prior art and above-described embodiment can be with The change case is realized, will not be described here.Such change case has no effect on substantive content of the present utility model, refuses herein Repeat.
Preferred embodiment of the present utility model is described above.It is to be appreciated that the utility model not office It is limited to above-mentioned particular implementation, wherein the equipment and structure be not described in detail to the greatest extent are construed as using the common side in this area Formula is practiced;Any those skilled in the art, in the case where not departing from technical solutions of the utility model ambit, all may be used Technical solutions of the utility model are made with many possible changes and modifications using the methods and technical content of the disclosure above, or is repaiied The equivalent embodiment of equivalent variations is changed to, this has no effect on substantive content of the present utility model.Therefore, it is every without departing from this practicality The content of new technique scheme, according to the technical essence of the utility model to any simple modification made for any of the above embodiments, etc. With change and modification, still fall within technical solutions of the utility model protection in the range of.

Claims (1)

1. a kind of formula T-bolt component free of demolition, it is characterised in that the component includes:
Punching block, installation through-hole is provided with the punching block;
Pre-buried channel flow and T-bolt, the T-bolt include bolt body and are arranged at the T connector of bolt body end, The T connector is fastened in the pre-buried channel flow, and the bolt body is by penetrating the installation through-hole by the pre-buried channel flow It is fixed on the surface of the punching block;
Guide sleeve and stop nut, be may be contained within the bolt body and guide sleeve is bonded with the surface of the punching block;
Spring, it is set in the bolt body, and the spring is arranged between the guide sleeve and stop nut.
CN201721189204.XU 2017-09-17 2017-09-17 A kind of formula T-bolt component free of demolition Active CN207195414U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721189204.XU CN207195414U (en) 2017-09-17 2017-09-17 A kind of formula T-bolt component free of demolition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721189204.XU CN207195414U (en) 2017-09-17 2017-09-17 A kind of formula T-bolt component free of demolition

Publications (1)

Publication Number Publication Date
CN207195414U true CN207195414U (en) 2018-04-06

Family

ID=61788299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721189204.XU Active CN207195414U (en) 2017-09-17 2017-09-17 A kind of formula T-bolt component free of demolition

Country Status (1)

Country Link
CN (1) CN207195414U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442697A (en) * 2018-06-06 2018-08-24 河南厚德电力科技有限公司 It is accurately positioned type Quick Release template and its assembly and disassembly methods suitable for pre-buried channel flow

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442697A (en) * 2018-06-06 2018-08-24 河南厚德电力科技有限公司 It is accurately positioned type Quick Release template and its assembly and disassembly methods suitable for pre-buried channel flow

Similar Documents

Publication Publication Date Title
CN204899938U (en) Tunnel secondary lining formworking jumbo bulkhead
CN107023163A (en) Fiberglass in Round Column Formwork system and its construction method
CN207195414U (en) A kind of formula T-bolt component free of demolition
CN210621517U (en) Totally closed sound barrier of adjustable error
CN202467179U (en) Adjustable column hoop
CN206325737U (en) A kind of construction site water injector
CN106758663B (en) Buried rubber fastening band installs positioning construction method in one kind
CN208052299U (en) Beam bottom bar planting hole forming device
CN206562774U (en) Pump line damping device
CN202582546U (en) Embedded settlement observation point connection fixing device
CN206567353U (en) A kind of Simple steel plate coalignment
CN211923047U (en) Water stopping device for concrete construction joint
CN214005409U (en) Prestressed tensioning end anchorage device for concrete combined box girder bridge
CN203668779U (en) Double-block type ballastless track sleeper interval adjusting device
CN206873909U (en) A kind of construction steel pipe combining mechanism
CN204855891U (en) Steerable optic fibre bend radius's protection device
CN201214736Y (en) Emergency bolt
CN103574166B (en) Pipe fitting clamping device for motor vehicle
CN213015477U (en) Steel structure positioning device for prefabricated building
CN204163194U (en) Embedding anchor bolts device
CN205591357U (en) Telescopic is connecting device for construction
CN204098471U (en) A kind of detachable suspension scaffold fastening devices
CN214839266U (en) Pipeline leak source prosthetic devices
CN205401960U (en) Pipeline mounting structure
CN202893889U (en) Simple device for matching with fire adjustment leveling of upper building surrounding wall boards

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant