CN206245205U - A kind of spacing guidance set structure of bridge pier - Google Patents

A kind of spacing guidance set structure of bridge pier Download PDF

Info

Publication number
CN206245205U
CN206245205U CN201621301724.0U CN201621301724U CN206245205U CN 206245205 U CN206245205 U CN 206245205U CN 201621301724 U CN201621301724 U CN 201621301724U CN 206245205 U CN206245205 U CN 206245205U
Authority
CN
China
Prior art keywords
displacement
beam body
guide post
bridge pier
anchor ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621301724.0U
Other languages
Chinese (zh)
Inventor
文桃
赵成功
应赛
孙华银
李滟浩
向超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangtze Normal University
Original Assignee
Yangtze Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangtze Normal University filed Critical Yangtze Normal University
Priority to CN201621301724.0U priority Critical patent/CN206245205U/en
Application granted granted Critical
Publication of CN206245205U publication Critical patent/CN206245205U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of spacing guidance set structure of bridge pier, it is characterized in that, including an anchor ear for annular, anchor ear is installed and is fixed to bridge pier top near beam body position, each side self-retaining is provided with a displacement guide post for extending lateral out to anchor ear, upper end is connected to displacement following plate bottom in beam body has a pilot hole for insertion in left-right direction, displacement guide post coordinates in pilot hole horizontally slidablely, the left and right sides of displacement following plate is each provided with a limiting buffer spring being socketed on displacement guide post, limiting buffer both ends of the spring is connected to displacement following plate respectively and displacement is oriented on the fixed dam of boom end.The utility model can be installed based on bridge pier, can realize being oriented to the installation support and the power transmission of horizontal left and right directions of bridge beam body anti-deviation device elastic member, to facilitate the transmission of stress and preferably discharge stress, improve security.

Description

A kind of spacing guidance set structure of bridge pier
Technical field
The utility model is related in bridges in highway engineering field, more particularly to a kind of bridge beam body anti-deviation device what is used The spacing guidance set structure of bridge pier.
Background technology
At present, the in-service medium and small bridges of China's overwhelming majority(Especially continuous curved box girder bridges)Expansion joint is stuck, temperature Under the effect such as degree effect, bias of quiet dynamic load, its girder is susceptible to significantly lateral shift, and side-play amount is over time Passage gradually adds up.These bridges that beam body off normal occurs seriously have threaten the safety of road operation, and it is right to be highly desirable to It is targetedly repaired and is reinforced.Simultaneously for the research of bridge shift phenomenon, not only to study and cause what beam body offset The method of reason and Deviation Correction Construction and monitoring process, will also try every possible means fundamentally to solve beam body offset problem-i.e. pre- anti-offset Measure and correction after anti-inclined again measure research.
For the research of the anti-offset measure of bridge beam body, the method that the current country is frequently used has three kinds, three kinds of methods And its problem for existing is:(1)The method that lateral confinement is carried out using directional support.The method is mainly in the design process, Easily trigger off normal this problem in view of bridge type feature, by the susceptor design of easy off normal beam section it is in pairs to or three-dimensional about bundle branch Seat.The shortcoming of this method be preliminary examination phase constraint effect preferably, but at bearing beam body it may happen that larger constraint should Power;The problems such as follow-up phase is due to the corrosion of bearing itself, deformation, failure causes constraint to be failed, and such as changes not in time, may be right The safe handling of bridge causes a hidden trouble, and the replacing of bearing construction is pretty troublesome.(2)In beam body both sides, the anti-bias of rigid baffle is set Shifting method.The method is mainly the bar planting on beam bottom or bent cap, rigid baffle is set by bar planting, by the resistance by force of rigid baffle Gear prevents beam body from shifting.The above method is primarily present following unfavorable factor:First, anti-bias mode is excessively rigid, belong to strong Row obstruction formula it is anti-bias, this is not only possible to cause larger beam body internal stress, it is also possible to cause beam body bottom, pier top or bent cap top Damage;Second, this mode intensity is relatively low, normally only suitable for earthquake motion peak acceleration (Ag≤0.15g) area.(3) In beam body both sides, the Anti-deviation method of semi-rigid baffle plate is set.With the above method 2, difference is exactly in side to the principle of the method On the basis of method 2, in rigid baffle and obstacle(Beam body or pier top)Centre filling elastic filler realizes collision or extruding wink Between transition.Although the above method reduces the infringement of bridge structure part to a certain extent, exist with method 2 same Problem, i.e., be normally only applied to earthquake motion peak acceleration (Ag≤0.15g) area.
In order to the lateral confinement to bridge beam body is better achieved, and restraint stress can be discharged, reduce safety hidden Suffer from preventing bridge beam body from offseting.Applicant considers to devise a kind of bridge beam body anti-deviation device, and its feature is, including sets Two groups of beam body fixation kits of the left and right sides in beam body lower surface in the width direction are put, beam body fixation kit includes one piece of anchoring Base plate, anchoring base plate is set along beam body width and anchor connection is in beam body, vertical along beam body with one in anchoring base plate To the displacement following plate for setting straight down, flatly set flexible in the lateral direction between two displacement following plate lower sections Component, elastic component with the supporting member below beam body be install supporting base.So, anchoring base plate and beam body anchoring are one Body, can be delivered to displacement following plate, then discharge stress by elastic component by the skew stress concentration on beam body left and right directions And skew stress is delivered in the supporting member below beam body, therefore the lateral confinement to bridge beam body can be preferably realized, Release restraint stress, can effectively prevent skew occur, and can will anti-offset during to structure structure injure drop it is small.
But the beam body anti-deviation device, when being specifically applied to bridge pier type bridge, in addition it is also necessary to it may be further contemplated, how to realize it is right The installation support and the power transmission of horizontal left and right directions of elastic component are oriented to, to facilitate the transmission of stress and preferably discharge stress, Improve the problem of security.
Utility model content
The technical problems to be solved in the utility model is:How to provide a kind of based on bridge pier installation, can realize to bullet Property component installation support and horizontal left and right directions power transmission be oriented to, to facilitate the transmission of stress and preferably discharge stress, carry The spacing guidance set structure of bridge pier of high security.
In order to solve the above-mentioned technical problem, the utility model employs following technical scheme.It is related to direction in the application Description is main to describe basis by direction of beam body, and beam body is laterally left and right directions for width, and beam body is longitudinally its length side To i.e. fore-and-aft direction.
A kind of spacing guidance set structure of bridge pier, it is characterised in that including an anchor ear for annular, anchor ear is installed and is fixed to Near beam body position, each side self-retaining is provided with a displacement guide post for extending lateral out to anchor ear on bridge pier top, on End is connected to displacement following plate bottom in beam body has a pilot hole for insertion in left-right direction, and displacement guide post can water Flat to be fitted slidably within pilot hole, the left and right sides of displacement following plate is each provided with a limit being socketed on displacement guide post Bit buffering spring, limiting buffer both ends of the spring is connected to displacement following plate respectively and displacement is oriented on the fixed dam of boom end.
So, it is adaptable to bridge pier brace type bridge of the bridge beam body bottom without bent cap, can based on bridge pier component reality Now support is fixed, and beam body skew guiding in the horizontal direction is realized by displacement guide post, while can realize that displacement following plate exists Buffer limit damping in the both direction of left and right, prevents beam body horizontal-shift, and discharges beam body skew stress to arrive by spring force On bridge pier, it is to avoid beam body upper stress is concentrated causes beam body to crumble, and drastically increases beam body security.
Further, anchor ear is to connect installation by high-strength bolt at steel hoop, and anchor ear opening to be fixed on bridge pier.This Sample, improves the reliability that anchor ear and bridge pier are combined, it is ensured that stress can smoothly be delivered to bridge pier.
Further, fixed dam is further fixedly arranged on end on the displacement guide post in the outside of limiting buffer spring Stiffener, end stiffener plate is to be set along displacement guide post polylith circumferentially and along displacement guide post length direction.So, Can better assure that the transmission of the load intensity proof stress of fixed dam is reliable and stable.Further, fixed dam and end Portion's stiffener is stainless steel material and is obtained, and can better ensure that intensity and conveniently be welded and fixed and is integrated.
Further, displacement guide post is square steel, and pilot hole is corresponding square opening, and such square steel ensure that intensity, And rectangular in cross-section can avoid rotation, better ensure that function of the pilot hole to the horizontally-guided of displacement guide post.Further Ground, is additionally provided with square bar pad of the socket on displacement guide post between displacement following plate and limiting buffer spring end Piece, preferably to facilitate limiting buffer spring power transmission.
Further, limiting buffer spring is GB4361 oil hardening tempering silicomanganese spring/60Si2MnA, C classes or B class, spring 5 ~ 14cm of loop diameter, shear modulus G is 79000MPa;May insure the using effect of bumper and absorbing shock stress transmission.
In sum.The utility model can be installed based on bridge pier, can realize being hit by a bullet bridge beam body anti-deviation device Property component installation support and horizontal left and right directions power transmission be oriented to, to facilitate the transmission of stress and preferably discharge stress, carry High security.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the bridge beam body anti-deviation device for employing the utility model structure.
Fig. 2 is the side view of independent beam body fixation kit in Fig. 1.
Fig. 3 is the upward view of independent beam body fixation kit in Fig. 1.
Specific embodiment
With reference to a kind of bridge beam body anti-deviation device and its accompanying drawing for employing the utility model structure to this practicality It is new to be described in further detail.
Embodiment, referring to Fig. 1-3, a kind of bridge beam body anti-deviation device, including beam body lower surface is arranged on along width side To the left and right sides two groups of beam body fixation kits, beam body fixation kit include one piece anchoring base plate 1, anchoring base plate 1 along beam body Width is set and anchor connection is in beam body, has a position longitudinally set straight down along beam body in anchoring base plate 1 Move following plate 2, elastic member be flatly set in the lateral direction between the lower section of two displacement following plates 2, elastic component with Supporting member below beam body is installation supporting base.Supporting member is bridge pier 3 in the present embodiment.
So, anchoring base plate and beam body anchoring is integrated, and can transmit the skew stress concentration on beam body left and right directions To displacement following plate, then discharge stress by elastic component and skew stress is delivered in the supporting member below beam body, therefore Can preferably realize the lateral confinement to bridge beam body, discharge restraint stress, can effectively prevent skew from occurring, and can be by It is small to structure structure injury drop during anti-offset.
Wherein, in the beam body fixation kit, anchoring base plate 1 is anchored using chemical bolt 4.So, using chemical bolt Anchoring will not produce mount stress, improve anchoring strength and reliability, and both facilitate that set in bridge construction can also be rear Set when phase safeguards.Used as optimization, chemical bolt is multiple and in equidistant array arrangement, improves anchoring effect.
Wherein, the beam body fixation kit also includes being arranged on two pieces of displacements follow-up direction of both sides before and after displacement following plate Put more energy into side plate 5, the upper surface of side plate 5 is put more energy into displacement follow-up direction and the anchoring lower surface of base plate 1 is posted and fixed and is integrated, displacement with Enter that the medial surface of side plate 5 is put more energy into direction and the front/rear end of displacement following plate 2 is posted and fixed and is integrated.So, displacement follow-up direction Side plate 5 of putting more energy into enables that displacement following plate 2 is combined as a whole with anchoring base plate 1 so that whole anchoring base plate is in the horizontal Displacement can intactly be transmitted and fed back on displacement following plate, improve globality and uniformity.
Wherein, two pieces of displacements follow-up direction side plate 5 of putting more energy into left between the side of side before and after base plate 1 to each self-corresponding anchoring One segment distance of the spacing of side plate 5 of being put more energy into less than two pieces of displacement follow-up directions, longitudinal direction is additionally provided with the anchoring base plate 1 of the segment distance Stiffener 6, longitudinal stiffener 6 is to be arranged along the longitudinally disposed polylith of beam body and along beam body lateral separation, the upper table of longitudinal stiffener 6 Face and the anchoring lower surface of base plate 1 are posted and fixed and are integrated, and the inner side end of longitudinal stiffener 6 and corresponding displacement follow-up direction add The lateral surface of strength side plate 5 is posted and fixed and is integrated.So can further strengthen the globality of beam body fixation kit so that whole The displacement in the horizontal of anchoring base plate can intactly be transmitted and fed back on displacement following plate.In the present embodiment, anchoring base plate 1, Side plate 5 is put more energy into displacement following plate 2, displacement follow-up direction and longitudinal stiffener 6 is stainless-steel sheet and is obtained and is welded to each other It is fixed as one.So improve integral rigidity and convenient construction.Wherein, side plate 5 is put more energy into for pointed end in displacement follow-up direction It is located at and displacement following plate link position at triangle and tip, the lower end of longitudinal stiffener 6 is put more energy into without departing from displacement follow-up direction Side plate lower surface;So, the local intensity highest that beam body fixation kit load is most concentrated, and outwards gradually reduced with this so that Rigidity size and meet with stresses and be sized to preferably match everywhere, therefore there is enough rigidity in guarantee beam body fixation kit With globality to meet with stresses on the premise of at utmost reduce consumptive material.
Wherein, the spacing guidance set of bridge pier, institute are provided between the supporting member bridge pier and displacement following plate below beam body The spacing guidance set of bridge pier, including an anchor ear for annular 7 are stated, anchor ear 7 is installed and is fixed to the top of bridge pier 3 near beam body position, Each side self-retaining is provided with a displacement guide post 8 for extending lateral out to anchor ear, and upper end is connected to the displacement in beam body The bottom of following plate 2 has a pilot hole for insertion in left-right direction, and displacement guide post 8 coordinates and is being oriented to horizontally slidablely In hole, the left and right sides of displacement following plate 2 is each provided with a limiting buffer spring 9 being socketed on displacement guide post 8, spacing The two ends of buffer spring 9 are connected on the fixed dam 10 of displacement following plate 2 and the end of displacement guide post 8 respectively.Positioned at displacement with The limiting buffer spring entered on the inside of plate constitutes the elastic component.
So, it is adaptable to bridge pier brace type bridge of the bridge beam body bottom without bent cap, can based on bridge pier component reality Now support is fixed, and beam body skew guiding in the horizontal direction is realized by displacement guide post, while can realize that displacement following plate exists Buffer limit damping in the both direction of left and right, prevents beam body horizontal-shift, and discharges beam body skew stress to arrive by spring force On bridge pier, it is to avoid beam body upper stress is concentrated causes beam body to crumble, and drastically increases beam body security.
Wherein, anchor ear 7 is to connect installation by high-strength bolt 11 at steel hoop, and anchor ear opening to be fixed on bridge pier 3.This Sample, improves the reliability that anchor ear and bridge pier are combined, it is ensured that stress can smoothly be delivered to bridge pier.
Wherein, fixed dam 10 is further fixedly arranged on end and adds on the displacement guide post in the outside of limiting buffer spring Strength plate 12, end stiffener plate 12 is to be set along the polylith circumferentially of displacement guide post 8 and along displacement guide post length direction.This Sample, can better assure that the transmission of the load intensity proof stress of fixed dam is reliable and stable.Further, fixed dam 10 Stainless steel material is with end stiffener plate 12 to be obtained, can better ensure that intensity and conveniently be welded and fixed and be integrated.
In the present embodiment, displacement guide post 8 is square steel, and pilot hole is corresponding square opening, and such square steel ensure that by force Degree, and rectangular in cross-section can avoid rotation, better ensure that function of the pilot hole to the horizontally-guided of displacement guide post.Enter one Step ground, is additionally provided with square bar of the socket on displacement guide post between displacement following plate and the end of limiting buffer spring 9 Pad 13, preferably to facilitate limiting buffer spring power transmission.
Wherein, limiting buffer spring is GB4361 oil hardening tempering silicomanganese spring/60Si2MnA, C classes or B class, and spring coil is straight 5 ~ 14cm of footpath, shear modulus G is 79000MPa;May insure the using effect of bumper and absorbing shock stress transmission.
Wherein, graduated scale 14 is further fixedly arranged on anchoring base plate, the length direction of graduated scale 14 is along beam body right and left To setting;Beam body offset displacement reading can be conveniently better read out.

Claims (6)

1. a kind of spacing guidance set structure of bridge pier, it is characterised in that including an anchor ear for annular, anchor ear is installed and is fixed to bridge Near beam body position, each side self-retaining is provided with a displacement guide post for extending lateral out, upper end to anchor ear to socle Being connected to displacement following plate bottom in beam body has a pilot hole for insertion in left-right direction, and displacement guide post can level Be fitted slidably within pilot hole, the left and right sides of displacement following plate be each provided with one be socketed on displacement guide post it is spacing Buffer spring, limiting buffer both ends of the spring is connected to displacement following plate respectively and displacement is oriented on the fixed dam of boom end.
2. the spacing guidance set structure of bridge pier as claimed in claim 1, it is characterised in that anchor ear is steel hoop, and anchor ear is opened Installation is connected at mouthful by high-strength bolt to be fixed on bridge pier.
3. the spacing guidance set structure of bridge pier as claimed in claim 1, it is characterised in that fixed dam deviates from limiting buffer bullet Be further fixedly arranged on end stiffener plate on the displacement guide post in the outside of spring, end stiffener plate be along displacement guide post circumferentially Polylith and along displacement guide post length direction set.
4. the spacing guidance set structure of bridge pier as claimed in claim 3, it is characterised in that fixed dam and end stiffener plate are equal For stainless steel material is obtained.
5. the spacing guidance set structure of bridge pier as claimed in claim 1, it is characterised in that displacement guide post is square steel, is oriented to Hole is corresponding square opening.
6. the spacing guidance set structure of bridge pier as claimed in claim 5, it is characterised in that displacement following plate and limiting buffer bullet Square steel plate washer of the socket on displacement guide post is additionally provided between spring end.
CN201621301724.0U 2016-11-30 2016-11-30 A kind of spacing guidance set structure of bridge pier Expired - Fee Related CN206245205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621301724.0U CN206245205U (en) 2016-11-30 2016-11-30 A kind of spacing guidance set structure of bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621301724.0U CN206245205U (en) 2016-11-30 2016-11-30 A kind of spacing guidance set structure of bridge pier

Publications (1)

Publication Number Publication Date
CN206245205U true CN206245205U (en) 2017-06-13

Family

ID=59003190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621301724.0U Expired - Fee Related CN206245205U (en) 2016-11-30 2016-11-30 A kind of spacing guidance set structure of bridge pier

Country Status (1)

Country Link
CN (1) CN206245205U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396917A (en) * 2019-07-13 2019-11-01 济邦建设集团有限公司 A kind of spliced pier stud of viaduct
CN110761176A (en) * 2019-11-13 2020-02-07 中铁建安工程设计院有限公司 Horizontal stop device of adjacent beam-ends of bridge
CN111705615A (en) * 2020-06-15 2020-09-25 赵德新 Bridge reinforcing system capable of improving bearing capacity
CN111996903A (en) * 2020-08-27 2020-11-27 王一勋 A public road bridge roof beam buffer for municipal bridge engineering
CN111996925A (en) * 2020-08-18 2020-11-27 赵德新 Bridge reinforcing system capable of reducing bridge deck vibration

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396917A (en) * 2019-07-13 2019-11-01 济邦建设集团有限公司 A kind of spliced pier stud of viaduct
CN110396917B (en) * 2019-07-13 2021-02-05 成都市路桥工程股份有限公司 Overpass concatenation formula pier stud
CN110761176A (en) * 2019-11-13 2020-02-07 中铁建安工程设计院有限公司 Horizontal stop device of adjacent beam-ends of bridge
CN110761176B (en) * 2019-11-13 2021-07-06 中铁建安工程设计院有限公司 Horizontal stop device of adjacent beam-ends of bridge
CN111705615A (en) * 2020-06-15 2020-09-25 赵德新 Bridge reinforcing system capable of improving bearing capacity
CN111705615B (en) * 2020-06-15 2021-11-30 深圳麦普工程咨询有限公司 Bridge reinforcing system capable of improving bearing capacity
CN111996925A (en) * 2020-08-18 2020-11-27 赵德新 Bridge reinforcing system capable of reducing bridge deck vibration
CN111996903A (en) * 2020-08-27 2020-11-27 王一勋 A public road bridge roof beam buffer for municipal bridge engineering
CN111996903B (en) * 2020-08-27 2021-12-28 河南省诚建检验检测技术股份有限公司 A public road bridge roof beam buffer for municipal bridge engineering

Similar Documents

Publication Publication Date Title
CN206245205U (en) A kind of spacing guidance set structure of bridge pier
CN103088933B (en) A kind of collaborative power consumption curvature-prevention support component with large shake defencive function
CN106638273B (en) A kind of stub formula bridge anti-deviation device and its Anti-deviation method
CN207776545U (en) A kind of high-strength steel controller perturbation ductility construction
CN110258316A (en) A kind of bridge buffering pedestal
CN206219972U (en) A kind of bridge beam body anti-deviation device
CN205046755U (en) Harm controllable shake and decrease steel column that to repair
CN106958193B (en) Elasticity is from ramp type floating ice protective device
CN202519577U (en) Bridge cable earthquake-reducing limiter
CN208749371U (en) A kind of novel tunnel inverted arch structure
CN206219999U (en) A kind of bent cap limiting and guiding device
CN109322394A (en) A kind of connection structure of steel structure column and steel structure girder
CN105297616A (en) Box type steel pier capable of being repaired quickly in situ during earthquake damage
CN108118939A (en) A kind of high-strength steel controller perturbation ductility construction
KR101718139B1 (en) On-gutter installed type supporting sturucture for roadside vehicle barrier
CN103669592B (en) Bending resistance parts and beam-column connection
CN106758768A (en) A kind of bent cap formula bridge anti-deviation device and its Anti-deviation method
CN106320167A (en) Limiting device with energy absorption and buffer capability
CN105095585B (en) Anchor pole anti-floating basement overall coordination method for designing
CN208965507U (en) One kind leaning on ship anticollision device, collision-prevention device
CN210151587U (en) Offshore pier body protection support frame
CN209194371U (en) A kind of highway bridge foundation stabilization damping device
CN206015438U (en) A kind of device for preventing fastening elastic rod from twisting when installing
CN204225098U (en) Overweight reinforcing cage
CN207727421U (en) Repair structure in bridge floor expansion joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613

Termination date: 20201130

CF01 Termination of patent right due to non-payment of annual fee