CN206237048U - A kind of easy to operate elevator for lead of power overhauling tower - Google Patents
A kind of easy to operate elevator for lead of power overhauling tower Download PDFInfo
- Publication number
- CN206237048U CN206237048U CN201621264565.1U CN201621264565U CN206237048U CN 206237048 U CN206237048 U CN 206237048U CN 201621264565 U CN201621264565 U CN 201621264565U CN 206237048 U CN206237048 U CN 206237048U
- Authority
- CN
- China
- Prior art keywords
- horizontal stretcher
- arm
- column
- cross
- lead
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 abstract description 4
- 230000005611 electricity Effects 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a kind of easy to operate elevator for lead of power overhauling tower,Including by cross-arm,The cross-arm is made up of left horizontal stretcher and right horizontal stretcher,The left side of the left horizontal stretcher is fixedly connected with the top of left column,The right side of the right horizontal stretcher is fixedly connected with right column top,The right flank of the left horizontal stretcher connects the left surface of right horizontal stretcher by wire lifting device,The both sides of the wire lifting device are equipped with three grooves side by side,Three pairs of grooves of the wire lifting device are connected by three drum pin movable buckles,The cross-arm lower section is provided with interim crossbeam,The left end of the interim crossbeam is fixedly connected with left column,The right-hand member and right column of the interim crossbeam are flexibly connected by screw rod,The elevator for lead of power overhauling tower,Simple structure,Than traditional electric power first-aid tower convenient transportation,Simplify lifting wire operating process,Do not take considerable time on fixed door pillar.
Description
Technical field
The utility model is related to technical field of power rush-repair, specially a kind of easy to operate electric power first-aid tower lifting wire dress
Put.
Background technology
Power grid accident seriously threatens the safe operation of power network caused by major natural disasters.Electric power accident is the calamity of industry
Difficulty, pole collapse accident is even more the disaster of electric power accident, and tower not only causes the equipment heavy losses, power failure also to make electric power system stability
Point operation is on the hazard, and extensive damage is caused to electric power netting safe running and user security electricity consumption.The North Guangdong ice damage of 2008 is exactly
The typical case of the large area accident of falling tower.Power department is after it there is pole collapse accident in power system, it is necessary to be entered with most fast speed
Rob and repair, restore electricity and normal system operation mode.
Three transmission pressures tend not to break after the accident of falling tower occurs, and are needed three lifting wires when circuit is rushed to repair
It is installed on emergent repairing tower.Traditional emergent repairing tower does not have wire lifting device, it is necessary to fix door pillar by increasing zip, then goes
Lifting wire, the method can be expended into many times for rushing to repair work after falling cross-arm, the time that delay restores electricity.
Utility model content
The purpose of this utility model is to provide a kind of easy to operate elevator for lead of power overhauling tower, to solve
The problem proposed in above-mentioned background technology.
To achieve the above object, the utility model provides following technical scheme:A kind of easy to operate electric power first-aid tower wire
Lifting device, including cross-arm, the cross-arm are made up of left horizontal stretcher and right horizontal stretcher, the left side of the left horizontal stretcher and the top of left column
It is fixedly connected, the right side of the right horizontal stretcher is fixedly connected with right column top, the right flank of the left horizontal stretcher passes through lifting wire
Device connects the left surface of right horizontal stretcher, and the left and right sides of the wire lifting device is all three grooves side by side, and the wire is carried
Three pairs of grooves for rising device are connected by three drum pin movable buckles, and the cross-arm lower section is provided with interim crossbeam, described interim
The left end of crossbeam is fixedly connected with left column, and the right-hand member and right column of the interim crossbeam are flexibly connected by screw rod.
Preferably, the screw rod is provided with the swing handle of adjusting screw rod.
Preferably, the notch of three pairs of grooves is all parallel to each other opposition.
Preferably, the cross-arm is strengthened fixing with left column and right column by zip.
Compared with prior art, the beneficial effects of the utility model are:The elevator for lead of power overhauling tower, structure letter
It is single, than traditional electric power first-aid tower convenient transportation, simplify lifting wire operating process, without taking considerable time in fixed door pillar
On.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model A schematic enlarged-scale views;
Fig. 3 is the utility model B structure enlarged drawing.
In figure:1 zip, 2 left columns, 3 right columns, 4 cross-arms, 41 left horizontal stretchers, 42 right horizontal stretchers, 5 wire lifting devices, 6 are faced
When crossbeam, 8 screw rods, 9 swing handles.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of easy to operate electric power first-aid tower lifting wire
Device, including by cross-arm 4, the cross-arm 4 is made up of left horizontal stretcher 41 and right horizontal stretcher 42, the left side of the left horizontal stretcher 41 and left column
2 top is fixedly connected, and the right side of the right horizontal stretcher 42 is fixedly connected with the top of right column 3, and cross-arm 4 is vertical with left column 2 and the right side
Post 3 is strengthened fixing by zip 1, and the right flank of the left horizontal stretcher 41 connects a left side for right horizontal stretcher 42 by wire lifting device 5
Side, the left and right sides of the wire lifting device 5 is all three grooves 51 side by side, and the notch of three pairs of grooves 51 is all mutual
Parallel opposition, three pairs of grooves 51 of the wire lifting device are connected by three movable buckles of drum pin 52, because cross-arm 4 can
To be easily split as very much two halves, thus in the transportation of the emergent repairing tower also can easy access tower put, under the cross-arm 4
Side is provided with interim crossbeam 6, and the left end of the interim crossbeam 6 is fixedly connected with left column 2, the right-hand member of the interim crossbeam 6 and the right side
Column 3 is flexibly connected by screw rod 8, and the screw rod 8 is provided with the swing handle 9 of adjusting screw rod, the left end of interim crossbeam 6 with
Between right column 3 screw thread of two screwed holes be it is reverse, so by adjust swing handle 9 can just adjust left column 2 with
The distance between right column 3.
Operation principle:Repairing electricity tower is set up in the top of electrified wire, when below lifting wire to cross-arm 4, is installed additional
Interim crossbeam 6, rotates the swing handle 9 between interim crossbeam 6 and column to finely tune the distance between left column 2 and right column 3,
Stop regulation when between groove 51 and drum pin 52 without lateral pull and rotate handle 9, now take out three successively from top to bottom
Drum pin 52, now because the top of cross-arm 4 has zip 1 to fix and lower section has interim crossbeam 6 so left horizontal stretcher 41 and the meeting of right horizontal stretcher 42
Keep relative stability, allow wire from the gap between three pairs of grooves 51 by cross-arm 4, treat wire after again by drum pin 52
Put back to successively inside groove 51, now just complete the lifting process of wire.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out various changes in the case where principle of the present utility model and spirit is not departed from, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
1. a kind of easy to operate elevator for lead of power overhauling tower, including cross-arm (4), the cross-arm (4) is by left horizontal stretcher (41)
Constituted with right horizontal stretcher (42), it is characterised in that:The left side of the left horizontal stretcher (41) is fixedly connected with the top of left column (2), institute
The right side for stating right horizontal stretcher (42) is fixedly connected with right column (3) top, and the right flank of the left horizontal stretcher (41) passes through lifting wire
The left surface of device (5) connection right horizontal stretcher (42), the both sides of the wire lifting device (5) are equipped with three grooves side by side
(51), three pairs of grooves (51) of the wire lifting device (5) are connected by three drum pin (52) movable buckles, the cross-arm
(4) interim crossbeam (6) is provided with below, the left end of the interim crossbeam (6) is fixedly connected with left column (2), the interim horizontal stroke
The right-hand member and right column (3) of beam (6) are flexibly connected by screw rod (8).
2. a kind of easy to operate elevator for lead of power overhauling tower according to claim 1, the screw rod (8) is provided with
The swing handle (9) of adjusting screw rod.
3. a kind of easy to operate elevator for lead of power overhauling tower according to claim 1, three pairs of grooves (51)
Notch be all parallel to each other opposition.
4. a kind of easy to operate elevator for lead of power overhauling tower according to claim 1, the cross-arm (4) is stood with a left side
Post (2), right column (3) are strengthened fixing by zip (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621264565.1U CN206237048U (en) | 2016-11-24 | 2016-11-24 | A kind of easy to operate elevator for lead of power overhauling tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621264565.1U CN206237048U (en) | 2016-11-24 | 2016-11-24 | A kind of easy to operate elevator for lead of power overhauling tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206237048U true CN206237048U (en) | 2017-06-09 |
Family
ID=58980799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621264565.1U Active CN206237048U (en) | 2016-11-24 | 2016-11-24 | A kind of easy to operate elevator for lead of power overhauling tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206237048U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111017792A (en) * | 2019-11-29 | 2020-04-17 | 国网山东省电力公司临沂供电公司 | Wire lifting device of power first-aid repair tower and use method thereof |
-
2016
- 2016-11-24 CN CN201621264565.1U patent/CN206237048U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111017792A (en) * | 2019-11-29 | 2020-04-17 | 国网山东省电力公司临沂供电公司 | Wire lifting device of power first-aid repair tower and use method thereof |
CN111017792B (en) * | 2019-11-29 | 2020-12-29 | 国网山东省电力公司临沂供电公司 | Wire lifting device of power first-aid repair tower and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206467994U (en) | A kind of novel hanging basket support | |
CN206237048U (en) | A kind of easy to operate elevator for lead of power overhauling tower | |
CN210517683U (en) | Municipal works interlude cable special stand | |
CN204190262U (en) | A kind of top line device of angle pole replacing insulator | |
CN206806164U (en) | 10kv outdoor transformers install suspension rod | |
CN205135076U (en) | Change of current of extra -high voltage current conversion station becomes inlet wire rectangle lattice formula " pi " type framework | |
CN205025154U (en) | 330kVGIS distribution device place rigid connection sail formula framework | |
CN108879475B (en) | Special tool for checking double split conductor wiring of power transmission line | |
CN207782285U (en) | A kind of elevator for lead of power overhauling tower | |
CN203839836U (en) | Obstacle-crossing single-line overhead carriage used for overhead power transmission line maintenance | |
CN206323068U (en) | A kind of 10kV needle porcelain bottles wire fixing device | |
CN212862487U (en) | Split mounting type transportation frame for wind power base | |
CN103956687A (en) | Obstacle-crossing single cable fly cart for overhaul of overhead transmission line | |
CN210577381U (en) | Pulley for power construction cable | |
CN203685006U (en) | Insulated rope ladder for overhead power transmission lines | |
CN211114931U (en) | Anti-falling net for power transmission construction | |
CN208257263U (en) | A kind of elevator for lead of power overhauling tower | |
CN208939455U (en) | A kind of drainage plate fever processing specific purpose tool | |
CN204703578U (en) | Bar stepped on by gate framework type cable | |
CN206619824U (en) | A kind of architectural electricity power distribution cabinet | |
CN205283055U (en) | 110kV overhead line | |
CN218070561U (en) | Corner frame structure for transformer substation | |
CN204928040U (en) | Type type weight piece | |
CN212773763U (en) | High-low voltage distribution cabinet safety protective guard | |
CN205081357U (en) | Be applicable to indoor GIS electric substation engineering roof framework of being qualified for next round of competitions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |