CN204703578U - Bar stepped on by gate framework type cable - Google Patents

Bar stepped on by gate framework type cable Download PDF

Info

Publication number
CN204703578U
CN204703578U CN201520408603.5U CN201520408603U CN204703578U CN 204703578 U CN204703578 U CN 204703578U CN 201520408603 U CN201520408603 U CN 201520408603U CN 204703578 U CN204703578 U CN 204703578U
Authority
CN
China
Prior art keywords
platform
cable
rod
fixed
bodies
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520408603.5U
Other languages
Chinese (zh)
Inventor
杨诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Su Wen electric energy Polytron Technologies Inc
Original Assignee
Suwen Electric Energy Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suwen Electric Energy Science And Technology Co Ltd filed Critical Suwen Electric Energy Science And Technology Co Ltd
Priority to CN201520408603.5U priority Critical patent/CN204703578U/en
Application granted granted Critical
Publication of CN204703578U publication Critical patent/CN204703578U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of 110kV gate framework type cable and steps on bar, comprise two bodies of rod and a platform, described two bodies of rod are vertically arranged, two bodies of rod are through described platform, described platform is perpendicular to the described body of rod, platform base is fixed with two bodies of rod respectively by brace, one end and the body of rod of brace are fixed, the other end and the platform base of brace are fixed, platform base is also provided with three cable fixed bars vertically arranged, on described platform, plane is provided with three cable terminals and three arresters, threephase cable by cable fixed bar respectively to three cable terminals be above introduced on platform, cable terminal is connected with drainage thread again.Bar stepped on by the utility model 110kV gate framework type cable, arranges two bodies of rod and bears the tension force of trolley line and the gravity of platform, be placed on platform simultaneously by various electric fixtures, and sound construction is reliable, runs, overhauls conveniently.

Description

Bar stepped on by gate framework type cable
Technical field
The utility model relates to a kind of 110kV gate framework type cable and steps on bar.
Background technology
Existing 110kV cable is stepped on bar and is mostly various electric fixtures to be arranged on each cross-arm of shaft, and operating personnel operates various construction, maintenance mechanical difficulties, is unfavorable for the safe operation of circuit, maintenance.
Utility model content
The technical problems to be solved in the utility model is: in order to overcome the deficiencies in the prior art, and the utility model provides a kind of 110kV gate framework type cable to step on bar.
The utility model solves the technical scheme that its technical problem adopts: bar stepped on by a kind of gate framework type cable, described cable is 110kV threephase cable, cable is stepped on bar and is comprised two bodies of rod and a platform, described two bodies of rod are vertically arranged, two bodies of rod are through described platform, described platform is perpendicular to the described body of rod, platform base is fixed by brace and two bodies of rod, one end and the body of rod of brace are fixed, the other end and the platform base of brace are fixed, platform base is also provided with three cable fixed bars vertically arranged, on described platform, plane is provided with three cable terminals and three arresters, described threephase cable is three single-core cables, three single-core cables are upwards introduced into three cable terminals on platform respectively by cable fixed bar, cable terminal is connected with drainage thread.
A cross-arm is provided with between the upper end of two bodies of rod, described cross-arm is provided with strain insulator string, described strain insulator string is added is provided with aerial condutor, and aerial condutor is fixed by described strain insulator string and cross-arm, and one end of described drainage thread is connected with aerial condutor with described T-shaped wire clamp.
The other end of described drainage thread is by copper-aluminium transition equipment cable clamp stube cable terminals.
Described platform is rectangular platform, and the length and width of rectangular platform are 8000mm × 3200mm.
The center of described arrester and the center of cable terminal all with the distance 800mm of platform edges.
Described platform is fixed with every root body of rod respectively by two braces.
The beneficial effects of the utility model are, bar stepped on by 110kV gate framework type cable of the present utility model, arranges two bodies of rod and bears the tension force of trolley line and the gravity of platform, be placed on platform simultaneously by various electric fixtures, and sound construction is reliable, run, overhaul conveniently.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is the main TV structure schematic diagram that bar stepped on by gate framework type cable of the present utility model.
Fig. 2 is the side-looking structural representation that bar stepped on by gate framework type cable of the present utility model.
Fig. 3 is the plan structure schematic diagram that bar stepped on by gate framework type cable of the present utility model.
In figure 1, the body of rod, 2, platform, 3, brace, 4, cable fixed bar, 5, cable terminal, 6, arrester, 7, single-core cable, 8, drainage thread, 9, cross-arm, 10, strain insulator string, 11, T-shaped wire clamp, 12, copper-aluminium transition equipment cable clamp, 13, aerial condutor.
Detailed description of the invention
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
As shown in Figure 1 and Figure 2, bar stepped on by 110kV gate framework type cable of the present utility model, comprise two bodies of rod 1 and a platform 2, described two bodies of rod 1 are vertically arranged, and two bodies of rod 1 are through described platform 2, and described platform 2 is perpendicular to the described body of rod 1, platform 2 underrun brace 3 and two bodies of rod 1 are fixed, one end and the body of rod 1 of brace 3 are fixed, and the other end and platform 2 bottom surface of brace 3 are fixed, and platform 2 is fixed respectively at every root body of rod 1 by brace 3.
Platform 2 bottom surface is also provided with three and vertically arranges cable fixed bar 4, described platform 2 upper surface is provided with three cable terminals 5 and three arresters 6, threephase cable is three single-core cables 7, three single-core cables 7 are upwards introduced into three cable terminals 5 on platform 2 respectively by cable fixed bar 4, cable terminal 5 is connected with drainage thread 8.
A cross-arm 9 is provided with between the upper end of two bodies of rod 1, described cross-arm 9 is provided with strain insulator string 10, strain insulator string 10 is added is provided with aerial condutor 13, aerial condutor 13 is fixed by described strain insulator string 10 and cross-arm 9, described drainage thread 8 one end is by T-shaped wire clamp 11 link hollow wire 13, and the other end is by copper-aluminium transition equipment cable clamp 12 stube cable terminals 5.
Described platform 2 is rectangular platform, and the length and width of platform 2 are 8000mm × 3200mm, the center of arrester 6 and the center of cable terminal 5 all with the distance 800mm at platform 2 edge.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to right.

Claims (6)

1. bar stepped on by a gate framework type cable, described cable is 110kV threephase cable, it is characterized in that: comprise two bodies of rod (1) and a platform (2), described two bodies of rod (1) are vertically arranged, two bodies of rod (1) are through described platform (2), described platform (2) is perpendicular to the described body of rod (1), platform (2) underrun brace (3) is fixed with two bodies of rod (1), one end of brace (3) and the body of rod (1) are fixed, and the other end and platform (2) bottom surface of brace (3) are fixed; Platform (2) bottom surface is also provided with three cable fixed bars (4) vertically arranged, the upper plane of described platform (2) is provided with three cable terminals (5) and three arresters (6), described threephase cable is three single-core cables (7), three single-core cables (7) are upwards introduced into three cable terminals (5) on platform (2) respectively by cable fixed bar (4), cable terminal (5) is connected with drainage thread (8).
2. bar stepped on by gate framework type cable as claimed in claim 1, it is characterized in that: between the upper end of two bodies of rod (1), be provided with a cross-arm (9), described cross-arm (9) is provided with strain insulator string (10), described strain insulator string (10) is added is provided with aerial condutor (13), aerial condutor (13) is fixed by described strain insulator string (10) and cross-arm (9), and described drainage thread (8) one end is connected with aerial condutor (13) by T-shaped wire clamp (11).
3. bar stepped on by gate framework type cable as claimed in claim 2, it is characterized in that: the other end of described drainage thread (8) is by copper-aluminium transition equipment cable clamp (12) stube cable terminals (5).
4. bar stepped on by gate framework type cable as claimed in claim 1, and it is characterized in that: described platform (2) is rectangular platform, the length and width of platform (2) are 8000mm × 3200mm.
5. bar stepped on by gate framework type cable as claimed in claim 4, it is characterized in that: the center of described arrester (6) and the center of cable terminal (5) all with the distance 800mm at platform (2) edge.
6. bar stepped on by gate framework type cable as claimed in claim 1, it is characterized in that: platform (2) is fixed by two braces (3) with every root body of rod (1).
CN201520408603.5U 2015-06-12 2015-06-12 Bar stepped on by gate framework type cable Active CN204703578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520408603.5U CN204703578U (en) 2015-06-12 2015-06-12 Bar stepped on by gate framework type cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520408603.5U CN204703578U (en) 2015-06-12 2015-06-12 Bar stepped on by gate framework type cable

Publications (1)

Publication Number Publication Date
CN204703578U true CN204703578U (en) 2015-10-14

Family

ID=54283204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520408603.5U Active CN204703578U (en) 2015-06-12 2015-06-12 Bar stepped on by gate framework type cable

Country Status (1)

Country Link
CN (1) CN204703578U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105680390A (en) * 2016-03-09 2016-06-15 国家电网公司 Cable terminal pole and electrical support device therefor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105680390A (en) * 2016-03-09 2016-06-15 国家电网公司 Cable terminal pole and electrical support device therefor

Similar Documents

Publication Publication Date Title
CN204645808U (en) Bar stepped on by cement pole cable
CN104505766A (en) Tool and method for live replacement of 500kV strain insulator strings in substations
CN204703578U (en) Bar stepped on by gate framework type cable
CN103996469A (en) One-time forming pressing device for composite insulators
CN204552238U (en) A kind of wire is the compound cross-arm tangent tower that inverted triangle is arranged
CN207073321U (en) A kind of electric force pole tower cross-arm
CN103985509A (en) Rack for transformer
CN203932808U (en) Replacing insulator under electrified wire lifting device
CN203232067U (en) Support device for cable test
CN105133909A (en) Uplift-resistant linear tower in mountain area
CN105098694A (en) Overhead lightning line erection method based on typical design of power distribution network
CN203931680U (en) A kind of composite insulator one-shot forming compression bonding apparatus
CN204645804U (en) Four times overhead wire divides pole
CN202957524U (en) Spanning frame for aerial power lines
CN204941012U (en) Tangent tower is pulled out on mountain area is anti-
CN106602465A (en) Power transmission line tangent tower first insulator replacement tool
CN204126354U (en) A kind of high voltage power transmission tower
CN202882514U (en) 220-kilovolt all-angle single-circuit drilling cross tower
CN202474691U (en) Pulley component for overturning type tackle device
CN103147617B (en) The steel pipe pole that transmission pressure is buried can be realized
CN204899380U (en) A tower is striden to straight lines height in two return circuits for 330kV alternating current transmission line
CN204760874U (en) Distribution frame is used in distribution line construction
CN203982911U (en) Disc type synthetic insulator
CN203951149U (en) 220kV double loop cable terminal pole and corresponding transmission system
CN203755776U (en) 750kV double-loop composite material tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 213000 No. 3 sail Road, Wujin Economic Development Zone, Jiangsu, Changzhou

Patentee after: Su Wen electric energy Polytron Technologies Inc

Address before: 213000 Jiangsu city of Changzhou province Wujin Dragon Road Economic Development Zone No. 2

Patentee before: SUWEN ELECTRIC ENERGY SCIENCE AND TECHNOLOGY CO., LTD.