CN206234320U - A kind of device of rapid abutting joint conveyer belt - Google Patents
A kind of device of rapid abutting joint conveyer belt Download PDFInfo
- Publication number
- CN206234320U CN206234320U CN201620875507.6U CN201620875507U CN206234320U CN 206234320 U CN206234320 U CN 206234320U CN 201620875507 U CN201620875507 U CN 201620875507U CN 206234320 U CN206234320 U CN 206234320U
- Authority
- CN
- China
- Prior art keywords
- clamp system
- clamping plate
- turnbuckle
- belt
- conveyer belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Belt Conveyors (AREA)
Abstract
The utility model discloses a kind of device of rapid abutting joint conveyer belt, including:First clamp system;Second clamp system;First turnbuckle, its first screw end is articulated with the side of first clamp system, and the second screw end is articulated with the side of second clamp system;And second turnbuckle, its first screw end is articulated with the opposite side of first clamp system, and the second screw end is articulated with the opposite side of second clamp system so that form installing space between first turnbuckle and second turnbuckle.Belt two ends are put into two clamp systems when using, are tightened screw and is stepped up belt, twist turnbuckle, by turnbuckle tightening belt to estimating position, belt two ends are then fixed, unclamp screw, belt installation, uses the device that belt is installed time saving and energy saving, convenient and swift.
Description
Technical field
The utility model is related to conveyer belt installing area, more particularly to a kind of device of rapid abutting joint conveyer belt.
Background technology
When the belt fracture on pipeline, it is necessary to re-replace belt, service worker cuts belt in maintenance shop
After the completion of, fixation clamp is installed at belt two ends, pipeline installation is taken, because needing tightening belt to be docked to one in installation process
Rise, so waste time and energy, it is very inconvenient.
The information for being disclosed in the background section is merely intended to increase the understanding to general background of the present utility model, and
It is not construed as recognizing or implying in any form that the information structure has been existing well known to persons skilled in the art
Technology.
Utility model content
The purpose of this utility model is to provide a kind of device of rapid abutting joint conveyer belt, so as to overcome pipeline upper belt
The shortcoming for wasting time and energy is reinstalled after fracture.
To achieve the above object, the utility model provides a kind of device of rapid abutting joint conveyer belt, including:First clamps
Mechanism;Second clamp system;First turnbuckle, its first screw end is articulated with the side of first clamp system, second
Screw end is articulated with the side of second clamp system;And second turnbuckle, its first screw end is articulated with described
The opposite side of one clamp system, the second screw end is articulated with the opposite side of second clamp system so that first gaily decorated basket
Installing space is formed between screw and second turnbuckle.
Preferably, in above-mentioned technical proposal, first clamp system is consistent with the second clamp system structure, respectively
The second clamping plate linked together with the first clamping plate including first clamping plate and by way of bolt is with plate face correspondence plate face.
Preferably, in above-mentioned technical proposal, the bolt is multiple, and multiple bolts are set in mode side by side respectively
In the both sides of the first clamping plate.
Preferably, in above-mentioned technical proposal, the first clamping plate and the second clamping plate are made of stainless steel.
Preferably, in above-mentioned technical proposal, the first clamping plate and the second clamping plate are rectangular.
Preferably, in above-mentioned technical proposal, the length of the first clamping plate and the second clamping plate is 5-10cm, and width is
5-10cm。
Compared with prior art, the utility model has the advantages that:
1. be put into two clamp systems at belt two ends by the utility model, bolts on and steps up belt, twists gaily decorated basket spiral shell
Silk, by turnbuckle tightening belt to estimating position, then fixes belt two ends, unclamps bolt, belt installation, using this
It is time saving and energy saving that device causes belt to install, convenient and swift.
2. turnbuckle is increased as two and be placed in device both sides, both sides turnbuckle is used simultaneously when installing belt
Power, prevents crooked situation from occurring, while can share onto two turnbuckles pulling force, works well.
Brief description of the drawings
Fig. 1 is the structure chart of the device according to the utility model rapid abutting joint conveyer belt.
Main Reference Numerals explanation:
The clamp systems of 1- first, 11- first clamping plates, 12- second clamping plates, the clamp systems of 2- second, the turnbuckles of 3- first,
4- bolts, the turnbuckles of 5- second.
Specific embodiment
Below in conjunction with the accompanying drawings, specific embodiment of the present utility model is described in detail, it is to be understood that this practicality
New protection domain is not limited by specific embodiment.
Explicitly indicated that unless otherwise other, otherwise in entire disclosure and claims, term " including " or its change
Change such as "comprising" or " including " etc. and will be understood to comprise stated element or part, and do not exclude other units
Part or other parts.
Fig. 1 shows the structural representation of the device of the rapid abutting joint conveyer belt according to the utility model preferred embodiment
Figure.
As shown in figure 1, the device of rapid abutting joint conveyer belt includes:First clamp system 1, the second clamp system 2, first are spent
The turnbuckle 5 of basket screw 3 and second;In the embodiment, the first clamp system 1 is consistent with the structure of the second clamp system 2, respectively
The second clamping plate linked together with first clamping plate 11 including first clamping plate 11 and by way of bolt 4 is with plate face correspondence plate face
12;Preferably, first clamping plate 11 and second clamping plate 12 are made of stainless steel the embodiment, and first clamping plate 11 and second clamping plate 12 are in
The length of rectangle, first clamping plate 11 and second clamping plate 12 is 5-10cm, and width is 5-10cm;First spiral shell of the first turnbuckle 3
Silk end is articulated with the side of the first clamping plate 11 of the first clamp system 1, and the second screw end is articulated with the first of the second clamp system 2
The side of clamping plate;First screw end of the second turnbuckle 5 is articulated with the opposite side of the first clamping plate 11 of the first clamp system 1,
Second screw end is articulated with the opposite side of the first clamping plate of the second clamp system 2 so that the first turnbuckle 3 and the second gaily decorated basket spiral shell
Installing space is formed between silk 5.The embodiment is preferred, and bolt 4 is multiple, and multiple bolts 4 are set in mode side by side respectively
In the both sides of first clamping plate 11, so as to increase by two clamping forces of clamping plate;The embodiment is it is further preferred that the first clamp system
The bottom of the second clamping plate of 1 second clamping plate and the second clamp system 2 is with can slidably on the line slideway so that two
Individual clamping plate is difficult skew during tension on belt, more stablizes.
Belt two ends are put into two installing spaces of clamp system when using, are bolted on and 4 is stepped up belt, while turning round
Two turnbuckles 3,5 are moved, turnbuckle is increased as two and device both sides are placed in, both sides turnbuckle when installing belt
3rd, 5 exert oneself simultaneously, prevent crooked situation from occurring, while pulling force can be shared onto two turnbuckles 3,5, work well.
By turnbuckle 3,5 tightening belts to estimating position, belt two ends are then fixed, unclamp bolt 4, belt installation is used
It is time saving and energy saving that the device causes belt to install, convenient and swift.
The foregoing description to specific illustrative embodiment of the present utility model be in order to illustrate and illustration purpose.These
Description is not wishing to for the utility model to be defined to disclosed precise forms, and it will be apparent that according to above-mentioned teaching, can carry out
It is many to change and change.The purpose of selecting and describing the exemplary embodiment is that explaining certain principles of the present utility model
And its practical application, so that those skilled in the art can realize and utilize a variety of examples of the present utility model
Property embodiment and a variety of selections and change.Scope of the present utility model is intended to by claims and its waits similar shape
Formula is limited.
Claims (6)
1. a kind of device of rapid abutting joint conveyer belt, it is characterised in that including:
First clamp system (1);
Second clamp system (2);
First turnbuckle (3), its first screw end is articulated with the side of first clamp system (1), the second screw end hinge
It is connected to the side of second clamp system (2);And
Second turnbuckle (5), its first screw end is articulated with the opposite side of first clamp system (1), the second screw end
It is articulated with the opposite side of second clamp system (2) so that first turnbuckle (3) and second turnbuckle
(5) installing space is formed between.
2. the device of rapid abutting joint conveyer belt according to claim 1, it is characterised in that first clamp system (1)
It is consistent with the second clamp system (2) structure, respectively including first clamping plate (11) with by bolt (4) with the corresponding plate face of plate face
The second clamping plate (12) that is linked together with the first clamping plate (11) of mode.
3. the device of rapid abutting joint conveyer belt according to claim 2, it is characterised in that the bolt (4) is multiple, many
The individual bolt (4) is arranged at the both sides of the first clamping plate (11) in mode side by side respectively.
4. the device of rapid abutting joint conveyer belt according to claim 2, it is characterised in that the first clamping plate (11) and institute
Second clamping plate (12) is stated to be made of stainless steel.
5. the device of rapid abutting joint conveyer belt according to claim 2, it is characterised in that the first clamping plate (11) and institute
State second clamping plate (12) rectangular.
6. the device of rapid abutting joint conveyer belt according to claim 5, it is characterised in that the first clamping plate (11) and institute
The length of second clamping plate (12) is stated for 5-10cm, width is 5-10cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620875507.6U CN206234320U (en) | 2016-08-12 | 2016-08-12 | A kind of device of rapid abutting joint conveyer belt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620875507.6U CN206234320U (en) | 2016-08-12 | 2016-08-12 | A kind of device of rapid abutting joint conveyer belt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206234320U true CN206234320U (en) | 2017-06-09 |
Family
ID=58989100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620875507.6U Expired - Fee Related CN206234320U (en) | 2016-08-12 | 2016-08-12 | A kind of device of rapid abutting joint conveyer belt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206234320U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110081127A (en) * | 2019-05-10 | 2019-08-02 | 中冶宝钢技术服务有限公司 | A kind of belt lacings centralising device and its working method |
CN111706598A (en) * | 2020-06-02 | 2020-09-25 | 毛尘 | Bolt |
CN115892851A (en) * | 2022-11-22 | 2023-04-04 | 江苏奥斯达带业有限公司 | High-temperature-resistant tear-resistant conveying belt easy to assemble |
-
2016
- 2016-08-12 CN CN201620875507.6U patent/CN206234320U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110081127A (en) * | 2019-05-10 | 2019-08-02 | 中冶宝钢技术服务有限公司 | A kind of belt lacings centralising device and its working method |
CN111706598A (en) * | 2020-06-02 | 2020-09-25 | 毛尘 | Bolt |
CN115892851A (en) * | 2022-11-22 | 2023-04-04 | 江苏奥斯达带业有限公司 | High-temperature-resistant tear-resistant conveying belt easy to assemble |
CN115892851B (en) * | 2022-11-22 | 2024-04-12 | 江苏奥斯达带业有限公司 | High temperature resistant tearing-resistant conveyer belt of easy assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206234320U (en) | A kind of device of rapid abutting joint conveyer belt | |
CN204793916U (en) | Cable fastening clip | |
CN203907113U (en) | Leakage stoppage device for pipe leakage hole | |
CN202219503U (en) | Oil pipe line cutting strip | |
CN209820911U (en) | Device is applyed to test piece boundary constraint in anti side impact experiment | |
CN206036127U (en) | Device of quickmelt conveyer belt | |
CN206246601U (en) | A kind of device of rapid abutting joint conveyer belt | |
CN206036125U (en) | Device of quickmelt conveyer belt | |
CN105570544A (en) | One-side hinged winding pipe hoop | |
CN105370028B (en) | A kind of junction button installed for scaffold | |
CN215631668U (en) | Splicing type building template capable of being recycled | |
CN205780173U (en) | A kind of modified form unilateral bolt fastener of easy accessibility | |
CN202324775U (en) | Fixing device used for mounting equipment on power transmission tower | |
CN103433339B (en) | Adjustable bending bilge radius formula Simple pipe bender | |
CN208331643U (en) | One kind being used for internet sensitive information monitoring device | |
CN206036126U (en) | Device of quickmelt conveyer belt | |
CN206036124U (en) | Device of quickmelt conveyer belt | |
CN201896415U (en) | Assembly type handrail structure | |
CN206361290U (en) | Metering and measuring equipment pipeline rapid abutting joint flange assembly | |
CN215371327U (en) | Indoor water supply pipe fixing device for green building | |
CN220094386U (en) | Workpiece fixing clamp | |
CN218335230U (en) | Intensive insulation type bus duct convenient to detect | |
CN103411466A (en) | Clamping device for plate heat exchanger | |
CN216010092U (en) | Support arrangement for pipeline inspection probe uses | |
CN211287477U (en) | But reuse's a string ladder that is used for steel construction installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170609 Termination date: 20180812 |
|
CF01 | Termination of patent right due to non-payment of annual fee |