CN105370028B - A kind of junction button installed for scaffold - Google Patents

A kind of junction button installed for scaffold Download PDF

Info

Publication number
CN105370028B
CN105370028B CN201510804581.9A CN201510804581A CN105370028B CN 105370028 B CN105370028 B CN 105370028B CN 201510804581 A CN201510804581 A CN 201510804581A CN 105370028 B CN105370028 B CN 105370028B
Authority
CN
China
Prior art keywords
fixture block
buckle closure
hollow spanner
spanner
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510804581.9A
Other languages
Chinese (zh)
Other versions
CN105370028A (en
Inventor
王金聚
王淑君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Wenyuan Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510804581.9A priority Critical patent/CN105370028B/en
Publication of CN105370028A publication Critical patent/CN105370028A/en
Application granted granted Critical
Publication of CN105370028B publication Critical patent/CN105370028B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Electric Cable Installation (AREA)

Abstract

The present invention relates to a kind of junction button installed for scaffold, including Liang Ge bindiny mechanisms, the bindiny mechanism includes fixture block, buckle closure and hollow spanner, the two ends of hollow spanner are hinged with fixture block and buckle closure respectively, the arc-shaped slot I and arc-shaped slot II of scaffolding steel pipe holding chamber can be formed after docking is respectively arranged with the fixture block and buckle closure, the sidewall symmetry of the hollow spanner is provided with two axially disposed sliding grooves, compression spring is provided with hollow spanner, the compression spring is fixedly connected close to one end of fixture block with hollow spanner, the other end of compression spring is connected with spring pushing block, the hole matched with bearing pin I is provided with the spring pushing block, bearing pin I is hinged by buckle closure and hollow spanner through the hole on sliding groove and spring pushing block, it is vertical setting between the scaffolding steel pipe holding chamber of described two bindiny mechanisms.A kind of junction button installed for scaffold of the present invention, convenient disassembly is time saving and energy saving.

Description

A kind of junction button installed for scaffold
Technical field
The present invention relates to a kind of junction button, and in particular to a kind of junction button installed for scaffold.
Background technology
For a long time, eminence construction is required for building scaffold with convenient construction person works.Existing scaffold Component generally includes steel pipe and junction button, is vertically fixedly connected with two steel pipes using junction button.And this junction button exists at present Need that the screw bolt and nut of junction button is tightened or unclamped with instrument during installation or removal, not only workload is big, expend man-hour, and Installation quality is poor, easily causes potential safety hazard.
The content of the invention
It is an object of the invention to provide a kind of junction button installed for scaffold, the junction button easy disassembling, time saving province Power, safe ready.
In order to solve the above-mentioned technical problem, the technical solution adopted in the present invention is:A kind of company installed for scaffold Button, including Liang Ge bindiny mechanisms are met, the bindiny mechanism includes fixture block, buckle closure and hollow spanner, and the two ends of hollow spanner are distinguished It is hinged by pin shaft II and bearing pin I with fixture block and buckle closure, fixture block one end corresponding with pin shaft II is provided with neck, buckle closure and set Scaffolding steel pipe holding chamber can be formed after docking is respectively arranged with the buckle being engaged with neck, the fixture block and buckle closure by having Compression spring is provided with arc-shaped slot I and arc-shaped slot II, hollow spanner, the compression spring is close to one end of fixture block and sky Heart spanner is fixedly connected, and the other end of compression spring is connected with spring pushing block, and the sidewall symmetry of the hollow spanner is provided with The hole matched with bearing pin I is provided with two axially disposed sliding grooves, the spring pushing block, bearing pin I, which is passed through, to be slided Hole on groove and spring pushing block is hinged by buckle closure and hollow spanner, the scaffolding steel pipe folder of described two bindiny mechanisms Hold and be vertical setting between chamber.
Compared with prior art, the invention has the advantages that:A kind of scaffold that is used for of the present invention is installed Junction button, can quickly connect the steel pipe of scaffold, convenient disassembly is time saving and energy saving.Improve the quality of scaffold, secure side Just.
Brief description of the drawings
Fig. 1 is the structural representation of the bindiny mechanism for the junction button that the present invention is installed for scaffold;
Fig. 2 is the sectional view of the bindiny mechanism for the junction button that the present invention is installed for scaffold;
Marked in figure:1st, bindiny mechanism, 2, fixture block, 201, neck, 3, buckle closure, 301, buckle, 4, hollow spanner, 5, compression Spring, 6, spring pushing block, 7, bearing pin I, 8, sliding groove, 9, pin shaft II.
Embodiment
The present invention is elaborated with specific embodiment below in conjunction with the accompanying drawings, the present embodiment using technical solution of the present invention as Premise, gives detailed embodiment and specific operating process, but protection scope of the present invention is not limited to following implementations Example.
As illustrated, a kind of junction button installed for scaffold, including Liang Ge bindiny mechanisms 1, the bindiny mechanism 1 wraps Fixture block 2, buckle closure 3 and hollow spanner 4 are included, the two ends of hollow spanner 4 pass through pin shaft II 9 and bearing pin I 7 and fixture block 2 and buckle closure 3 respectively It is hinged, fixture block 2 is provided with neck 201, buckle closure 3 with the corresponding one end of pin shaft II 9 and is provided with the buckle being engaged with neck 201 301, it can form the arc-shaped slot I and arc of scaffolding steel pipe holding chamber after docking is respectively arranged with the fixture block 2 and buckle closure 3 Compression spring 5 is provided with neck II, hollow spanner 4, the compression spring 5 is fixed close to one end of fixture block 2 with hollow spanner 4 Connection, the other end of compression spring 5 is connected with spring pushing block 6, and the sidewall symmetry of the hollow spanner 4 is provided with two along axle To the sliding groove 8 of setting, the hole matched with bearing pin I 7 is provided with the spring pushing block 6, bearing pin I 7 passes through the He of sliding groove 8 Hole on spring pushing block 6 is hinged by buckle closure 3 and hollow spanner 4, the scaffolding steel pipe folder of described two bindiny mechanisms 1 Hold and be vertical setting between chamber.
The course of work of junction button of the present invention is:The arc-shaped slot I of the fixture block 2 of one bindiny mechanism 1 is stuck in scaffold On steel pipe, rotate hollow spanner 4 and the buckle 301 on buckle closure 3 is stuck in neck 201, then reversely rotate hollow spanner 4 and drive button Lid 3 is rotated, and arc-shaped slot I and arc-shaped slot II is formed scaffolding steel pipe holding chamber after docking and is tightly clamped a scaffold Steel pipe.Another bindiny mechanism 1 is tightly clamped into another scaffolding steel pipe with identical process, two scaffolding steel pipes are completed Vertical connection, it is easy for installation, it is time saving and energy saving.Connect the stress point and pin of the buckle 301 of bindiny mechanism 1 after scaffolding steel pipe The axial connecting line of axle I 7 is on the inside of the axis of pin shaft II, in the presence of the elastic force of compression spring 5, bindiny mechanism 1 is tightly pressed from both sides Scaffolding steel pipe is handled, will not be unclamped automatically, so that the scaffold quality installed is good, safety and stability.When dismantling junction button Only need reversely cocked hollow spanner 4 drive buckle closure 3 away from scaffolding steel pipe and buckle 301 is departed from neck 201, without by means of Other instruments are helped, it is convenient and swift.

Claims (1)

1. a kind of junction button installed for scaffold, it is characterised in that:Including Liang Ge bindiny mechanisms(1), the bindiny mechanism (1)Including fixture block(2), buckle closure(3)With hollow spanner(4), hollow spanner(4)Two ends pass through pin shaft II respectively(9)With bearing pin I (7)With fixture block(2)And buckle closure(3)It is hinged, fixture block(2)With pin shaft II(9)Corresponding one end is provided with neck(201), buckle closure(3) On be provided with and neck(201)The buckle being engaged(301), the fixture block(2)And buckle closure(3)On be respectively arranged with docking after can Form the arc-shaped slot I and arc-shaped slot II of scaffolding steel pipe holding chamber, hollow spanner(4)Inside it is provided with compression spring(5), institute State compression spring(5)Close to fixture block(2)One end and hollow spanner(4)It is fixedly connected, compression spring(5)The other end be connected with Spring pushing block(6), the hollow spanner(4)Sidewall symmetry be provided with two axially disposed sliding grooves(8), the bullet Spring pushing block(6)On be provided with and bearing pin I(7)The hole matched, bearing pin I(7)Through sliding groove(8)With spring pushing block(6) On hole by buckle closure(3)With hollow spanner(4)It is hinged, described two bindiny mechanisms(1)Scaffolding steel pipe holding chamber Between be vertical setting.
CN201510804581.9A 2015-11-20 2015-11-20 A kind of junction button installed for scaffold Active CN105370028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510804581.9A CN105370028B (en) 2015-11-20 2015-11-20 A kind of junction button installed for scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510804581.9A CN105370028B (en) 2015-11-20 2015-11-20 A kind of junction button installed for scaffold

Publications (2)

Publication Number Publication Date
CN105370028A CN105370028A (en) 2016-03-02
CN105370028B true CN105370028B (en) 2017-10-17

Family

ID=55372607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510804581.9A Active CN105370028B (en) 2015-11-20 2015-11-20 A kind of junction button installed for scaffold

Country Status (1)

Country Link
CN (1) CN105370028B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107901197A (en) * 2017-11-07 2018-04-13 内蒙古路桥集团有限责任公司 A kind of prefabricated case beam square steel tube core
CN110145111A (en) * 2019-05-27 2019-08-20 合肥星光冶金设备有限公司 A kind of scaffold of fast quick-detach

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2282177B (en) * 1993-09-24 1996-11-20 Standards Inst Singapore Improvements in or relating to scaffolding
CN201391084Y (en) * 2009-04-22 2010-01-27 张永春 Steel tube scaffold fastener
CN203213574U (en) * 2013-03-04 2013-09-25 刘小明 Fixing device
CN204112704U (en) * 2014-09-02 2015-01-21 宋金泉 A kind of scaffold high speed fastener
CN205206288U (en) * 2015-11-20 2016-05-04 王金聚 A connector link for scaffold installation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2282177B (en) * 1993-09-24 1996-11-20 Standards Inst Singapore Improvements in or relating to scaffolding
CN201391084Y (en) * 2009-04-22 2010-01-27 张永春 Steel tube scaffold fastener
CN203213574U (en) * 2013-03-04 2013-09-25 刘小明 Fixing device
CN204112704U (en) * 2014-09-02 2015-01-21 宋金泉 A kind of scaffold high speed fastener
CN205206288U (en) * 2015-11-20 2016-05-04 王金聚 A connector link for scaffold installation

Also Published As

Publication number Publication date
CN105370028A (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN105370028B (en) A kind of junction button installed for scaffold
CN205206288U (en) A connector link for scaffold installation
CN204108942U (en) A kind of standby cap dismantling device
CN206234320U (en) A kind of device of rapid abutting joint conveyer belt
CN201180371Y (en) Steel pipe fast chucking buckle
CN201776729U (en) Torque-type demounting tooling for membrane housing end plate of reverse osmosis system
CN203627495U (en) Polished rod checkpost quick assembly disassembly nut of taking handle
CN205206290U (en) A cam connector link for scaffold installation
CN203141430U (en) Mounting tool of filter press steel bush
CN204487442U (en) The auxiliary spanner that a kind of flanged dish Large Diameter Pipeline iron pipe is installed
CN103074997A (en) Steel tube scaffold wall connecting piece
CN203961088U (en) For the scaffolding steel pipe linkage of multistory building
CN204135972U (en) Centrifugal valve lining specific purpose tool
CN209110958U (en) A kind of self-locking sleeve
WO2013007125A1 (en) Fast removal device for torshear type bolt
CN202862077U (en) Wrench for disassembling and assembling roller
CN105697483A (en) Aluminum plate connecting piece capable of rotating
CN201950610U (en) Telescopic wrench
CN104690545B (en) A kind of assembling pipe joint
CN207538449U (en) A kind of seamless connection gib head
CN105442830A (en) Cam connection buckle for scaffold installation
CN205393931U (en) Twist and meet sb. at airport with convenient to detach formula jaw body
CN204263068U (en) A kind of metallurgical machinery equipment dismounting tool for circular nut
CN204003869U (en) A kind of notch bolt assembly that bears superimpose loads power
CN204533242U (en) A kind of coupling system of fast demountable and coupling thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210520

Address after: 223001 No.1, Kaiming Road, Huai'an Economic and Technological Development Zone, Huai'an City, Jiangsu Province

Patentee after: Jiangsu Wenyuan Construction Co.,Ltd.

Address before: 467200 No. 426, North Gate West Road, Kunyang Town, Yexian County, Pingdingshan City, Henan Province

Patentee before: Wang Jinju

TR01 Transfer of patent right