CN105370028A - Connecting buckle for scaffold installation - Google Patents

Connecting buckle for scaffold installation Download PDF

Info

Publication number
CN105370028A
CN105370028A CN201510804581.9A CN201510804581A CN105370028A CN 105370028 A CN105370028 A CN 105370028A CN 201510804581 A CN201510804581 A CN 201510804581A CN 105370028 A CN105370028 A CN 105370028A
Authority
CN
China
Prior art keywords
hollow
buckle
spanners
fixture block
buckle closure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510804581.9A
Other languages
Chinese (zh)
Other versions
CN105370028B (en
Inventor
王金聚
王淑君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Wenyuan Construction Co.,Ltd.
Original Assignee
王金聚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王金聚 filed Critical 王金聚
Priority to CN201510804581.9A priority Critical patent/CN105370028B/en
Publication of CN105370028A publication Critical patent/CN105370028A/en
Application granted granted Critical
Publication of CN105370028B publication Critical patent/CN105370028B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention relates to a connecting buckle for scaffold installation. The connecting buckle comprises two connecting mechanisms, wherein the connecting mechanisms comprise clamping blocks, buckle covers and hollow spanners; the two ends of the hollow spanners are respectively hinged with the clamping blocks and the buckle covers; the clamping blocks and the buckle covers are respectively provided with arc clamping grooves I and arc clamping grooves II connected in a sleeving manner to form scaffold steel pipe clamping cavities; two chutes are symmetrically arranged on the side walls of the hollow spanners in the axial direction; compression springs are arranged in the hollow spanners; one ends, near the clamping blocks, of the compression springs are fixedly connected with the hollow spanners, and the other ends of the compression springs are connected with spring push pressing blocks; the spring push pressing blocks are provided with holes matched with pin shafts I; the pin shafts I penetrate through the chutes and the holes in the spring push pressing blocks to hinge the buckle covers with the hollow spanners; and the scaffold steel pipe clamping cavities of the two connecting mechanisms are arranged in a perpendicular manner. The connecting buckle for scaffold installation is convenient for disassembly, and saves both time and labors.

Description

A kind of junction button installed for scaffold
Technical field
The present invention relates to a kind of junction button, be specifically related to a kind of junction button installed for scaffold.
Background technology
For a long time, eminence building operations all needs to scaffold erecting with convenient construction person works.Existing assembly for scaffold generally includes steel pipe and junction button, utilizes junction button to be vertically fixedly connected with by two steel pipes.And current this junction button needs the screw bolt and nut instrument of junction button tighten or unclamp when installing or removing, not only workload large, expend man-hour, and installation quality is poor, easily causes potential safety hazard.
Summary of the invention
The object of this invention is to provide a kind of junction button installed for scaffold, this junction button easy disassembling, time saving and energy saving, safe ready.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of junction button installed for scaffold, comprise Liang Ge bindiny mechanism, described bindiny mechanism comprises fixture block, buckle closure and hollow spanner, the two ends of hollow spanner respectively by pin shaft II and bearing pin I and fixture block and buckle closure hinged, fixture block one end corresponding with pin shaft II is provided with draw-in groove, buckle closure is provided with the buckle matched with draw-in groove, arc-shaped slot I and the arc-shaped slot II in scaffolding steel pipe clamping chamber can be formed after described fixture block and buckle closure are respectively arranged with docking, Compress Spring is provided with in hollow spanner, described Compress Spring is fixedly connected with hollow spanner near one end of fixture block, the other end of Compress Spring is connected with spring pushing block, the sidewall symmetry of described hollow spanner is provided with two sliding trays arranged vertically, described spring pushing block is provided with the hole matched with bearing pin I, bearing pin I through the hole on sliding tray and spring pushing block by buckle closure and hollow spanner hinged, be vertical setting between the scaffolding steel pipe clamping chamber of described Liang Ge bindiny mechanism.
Compared with prior art, the present invention has following beneficial effect: a kind of junction button installed for scaffold of the present invention, can the steel pipe of connecting pin hand cradle fast, and easy accessibility is time saving and energy saving.Improve the quality of scaffold, safe ready.
Accompanying drawing explanation
Fig. 1 is the structural representation of the bindiny mechanism of the junction button that the present invention installs for scaffold;
Fig. 2 is the sectional view of the bindiny mechanism of the junction button that the present invention installs for scaffold;
Mark in figure: 1, bindiny mechanism, 2, fixture block, 201, draw-in groove, 3, buckle closure, 301, buckle, 4, hollow spanner, 5, Compress Spring, 6, spring pushing block, 7, bearing pin I, 8, sliding tray, 9, pin shaft II.
Detailed description of the invention
Elaborate to the present invention below in conjunction with the drawings and specific embodiments, the present embodiment, premised on technical solution of the present invention, give detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
As shown in the figure, a kind of junction button installed for scaffold, comprise Liang Ge bindiny mechanism 1, described bindiny mechanism 1 comprises fixture block 2, buckle closure 3 and hollow spanner 4, the two ends of hollow spanner 4 respectively by pin shaft II 9 and bearing pin I 7 and fixture block 2 and buckle closure 3 hinged, fixture block 2 one end corresponding with pin shaft II 9 is provided with draw-in groove 201, buckle closure 3 is provided with the buckle 301 matched with draw-in groove 201, arc-shaped slot I and the arc-shaped slot II in scaffolding steel pipe clamping chamber can be formed after described fixture block 2 and buckle closure 3 are respectively arranged with docking, Compress Spring 5 is provided with in hollow spanner 4, described Compress Spring 5 is fixedly connected with hollow spanner 4 near one end of fixture block 2, the other end of Compress Spring 5 is connected with spring pushing block 6, the sidewall symmetry of described hollow spanner 4 is provided with two sliding trays arranged vertically 8, described spring pushing block 6 is provided with the hole matched with bearing pin I 7, bearing pin I 7 through the hole on sliding tray 8 and spring pushing block 6 by buckle closure 3 and hollow spanner 4 hinged, be vertical setting between the scaffolding steel pipe clamping chamber of described Liang Ge bindiny mechanism 1.
The course of work of junction button of the present invention is: be stuck on scaffolding steel pipe by the arc-shaped slot I of the fixture block 2 of a bindiny mechanism 1, rotating hollow spanner 4 is stuck in draw-in groove 201 by the buckle 301 on buckle closure 3, reversely rotating hollow spanner 4 again drives buckle closure 3 to rotate, and makes arc-shaped slot I and arc-shaped slot II dock rear formation scaffolding steel pipe clamping chamber and tightly clamps a scaffolding steel pipe.Another bindiny mechanism 1 is tightly clamped another root scaffolding steel pipe with identical process, completes the vertical connection of two scaffolding steel pipes, easy for installation, time saving and energy saving.After connecting scaffolding steel pipe, the stress point of the buckle 301 of bindiny mechanism 1 and the axial connecting line of bearing pin I 7 are in inside the axis of pin shaft II, under the effect of Compress Spring 5 elastic force, bindiny mechanism 1 is made tightly to clamp scaffolding steel pipe, can not automatically unclamp, thus make the scaffold quality that installs good, safety and stability.Reverse cocked hollow spanner 4 is only needed to drive buckle closure 3 away from scaffolding steel pipe and make buckle 301 depart from draw-in groove 201 during dismounting junction button, without the need to by other instrument, convenient and swift.

Claims (1)

1. the junction button installed for scaffold, it is characterized in that: comprise Liang Ge bindiny mechanism (1), described bindiny mechanism (1) comprises fixture block (2), buckle closure (3) and hollow spanner (4), the two ends of hollow spanner (4) respectively by pin shaft II (9) and bearing pin I (7) and fixture block (2) and buckle closure (3) hinged, fixture block (2) is provided with draw-in groove (201) with pin shaft II (9) corresponding one end, buckle closure (3) is provided with the buckle (301) matched with draw-in groove (201), arc-shaped slot I and the arc-shaped slot II in scaffolding steel pipe clamping chamber can be formed after described fixture block (2) and buckle closure (3) are respectively arranged with docking, Compress Spring (5) is provided with in hollow spanner (4), described Compress Spring (5) is fixedly connected with hollow spanner (4) near one end of fixture block (2), the other end of Compress Spring (5) is connected with spring pushing block (6), the sidewall symmetry of described hollow spanner (4) is provided with two sliding trays arranged vertically (8), described spring pushing block (6) is provided with the hole matched with bearing pin I (7), bearing pin I (7) through the hole on sliding tray (8) and spring pushing block (6) by buckle closure (3) and hollow spanner (4) hinged, be vertical setting between the scaffolding steel pipe clamping chamber of described Liang Ge bindiny mechanism (1).
CN201510804581.9A 2015-11-20 2015-11-20 A kind of junction button installed for scaffold Active CN105370028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510804581.9A CN105370028B (en) 2015-11-20 2015-11-20 A kind of junction button installed for scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510804581.9A CN105370028B (en) 2015-11-20 2015-11-20 A kind of junction button installed for scaffold

Publications (2)

Publication Number Publication Date
CN105370028A true CN105370028A (en) 2016-03-02
CN105370028B CN105370028B (en) 2017-10-17

Family

ID=55372607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510804581.9A Active CN105370028B (en) 2015-11-20 2015-11-20 A kind of junction button installed for scaffold

Country Status (1)

Country Link
CN (1) CN105370028B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107901197A (en) * 2017-11-07 2018-04-13 内蒙古路桥集团有限责任公司 A kind of prefabricated case beam square steel tube core
CN110145111A (en) * 2019-05-27 2019-08-20 合肥星光冶金设备有限公司 A kind of scaffold of fast quick-detach

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2282177B (en) * 1993-09-24 1996-11-20 Standards Inst Singapore Improvements in or relating to scaffolding
CN201391084Y (en) * 2009-04-22 2010-01-27 张永春 Steel tube scaffold fastener
CN203213574U (en) * 2013-03-04 2013-09-25 刘小明 Fixing device
CN204112704U (en) * 2014-09-02 2015-01-21 宋金泉 A kind of scaffold high speed fastener
CN205206288U (en) * 2015-11-20 2016-05-04 王金聚 A connector link for scaffold installation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2282177B (en) * 1993-09-24 1996-11-20 Standards Inst Singapore Improvements in or relating to scaffolding
CN201391084Y (en) * 2009-04-22 2010-01-27 张永春 Steel tube scaffold fastener
CN203213574U (en) * 2013-03-04 2013-09-25 刘小明 Fixing device
CN204112704U (en) * 2014-09-02 2015-01-21 宋金泉 A kind of scaffold high speed fastener
CN205206288U (en) * 2015-11-20 2016-05-04 王金聚 A connector link for scaffold installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107901197A (en) * 2017-11-07 2018-04-13 内蒙古路桥集团有限责任公司 A kind of prefabricated case beam square steel tube core
CN110145111A (en) * 2019-05-27 2019-08-20 合肥星光冶金设备有限公司 A kind of scaffold of fast quick-detach

Also Published As

Publication number Publication date
CN105370028B (en) 2017-10-17

Similar Documents

Publication Publication Date Title
CN203752083U (en) Bearing pulling device
CN211761249U (en) Pipeline flange bolt extracting tool
CN205206288U (en) A connector link for scaffold installation
CN105370028A (en) Connecting buckle for scaffold installation
CN204108942U (en) A kind of standby cap dismantling device
CN204662939U (en) A kind of bidirectional locking quickly dismantled scaffold clasp
CN203566581U (en) Sleeve wrench for disassembling and installing basin-type water faucet
CN206234320U (en) A kind of device of rapid abutting joint conveyer belt
CN205206290U (en) A cam connector link for scaffold installation
CN203627495U (en) Polished rod clamp rapid assembling and disassembling nut with handle
CN203622341U (en) Gear or bearing disassembling tool
CN103074997B (en) Steel tube scaffold wall connecting piece
CN211081035U (en) Tool for disassembling aluminum template
CN105442830A (en) Cam connection buckle for scaffold installation
CN211439803U (en) Disassembling tool
CN202671409U (en) Multi-head glass cutter
CN103267191A (en) Quick connection device for flexible pipes
CN204135972U (en) Centrifugal valve lining specific purpose tool
CN202228549U (en) Rapid disassembly and assembly type motor belt pulley structure
CN112283478A (en) Steel-plastic composite pipe connecting mechanism
CN103753486A (en) Pipe withdrawing tongs
CN202174547U (en) Device for quickly and safely disassembling end cover of reverse osmosis membrane shell
CN104690545B (en) A kind of assembling pipe joint
CN211841811U (en) Disassembling tool
CN203141441U (en) Special tool for assembling and disassembling gas-pipeline flexible connector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210520

Address after: 223001 No.1, Kaiming Road, Huai'an Economic and Technological Development Zone, Huai'an City, Jiangsu Province

Patentee after: Jiangsu Wenyuan Construction Co.,Ltd.

Address before: 467200 No. 426, North Gate West Road, Kunyang Town, Yexian County, Pingdingshan City, Henan Province

Patentee before: Wang Jinju