CN206233347U - A kind of prefabricated assembled tunnel drainage gutter - Google Patents

A kind of prefabricated assembled tunnel drainage gutter Download PDF

Info

Publication number
CN206233347U
CN206233347U CN201621294030.9U CN201621294030U CN206233347U CN 206233347 U CN206233347 U CN 206233347U CN 201621294030 U CN201621294030 U CN 201621294030U CN 206233347 U CN206233347 U CN 206233347U
Authority
CN
China
Prior art keywords
gutter
prefabricated
prefabricated assembled
tunnel drainage
assembled tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621294030.9U
Other languages
Chinese (zh)
Inventor
路平
韩大千
侯豪斌
郑齐银
李永永
米东阳
刘志
张波
闫立来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201621294030.9U priority Critical patent/CN206233347U/en
Application granted granted Critical
Publication of CN206233347U publication Critical patent/CN206233347U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The utility model is related to a kind of prefabricated assembled tunnel drainage gutter in tunnels and underground engineering, mainly it is made up of water leg, osculum and prefabricated casting concrete, be prefabricated in the factory completion, and an inverted trapezoidal water leg is stayed on gutter top, and inverted trapezoidal groove top is catchmented than following slightly wide being beneficial to.The gradient in the middle of gutter upper surface two is lateral is 1~4%, flows to the surface gathered water at gutter and is flowed in osculum by water leg, is then discharged out.Gutter side is concave head, and opposite side is plush copper.The plush copper of upper section gutter is embedded in the concave head of lower section gutter, and smears waterproofing tack coat in concavo-convex head seam crossing.Compared with existing construction technology, the utility model can be high with prefabrication, intensity, and in-site installation is convenient, and practical, applied widely, cost performance is high, there is good promotion prospect.

Description

A kind of prefabricated assembled tunnel drainage gutter
Technical field
The utility model is related to drainage system technical field, is to be related to a kind of prefabricated assembled tunnel to arrange more specifically Waterside ditch, is characterized in that site operation is convenient, and prefabrication causes that gutter is more standardized, it is easy to ensure construction quality, it is to avoid row Water hole undergauge occurs, it is to avoid the generation in temperature change harmomegathus crack, reduces on-site construction processes, is easily repaired after damage, together When also beneficial to scene safety construction.
Background technology
Often construction is completed at the scene for tunnel and other underground engineering gutters, and Specific construction operation includes colligation steel Muscle-formwork supporting plate-casting concrete-vibrate-conserve the working procedures such as shaping.Cast-in-place integral gutter easily produce with Lower problem:1st, because construction site condition is limited, easily there are various mass defects in cast in situs gutter, such as losing fangle, rise Husky scaling, voids and pits, slag inclusion, cavity, insufficient or cross to shake of vibrating isolation, reinforcing bar transposition, protective layer thickness deficiency and section Error etc..2nd, because construction site condition is limited, osculum undergauge is also easy to produce, influences the drainability of gutter.3rd, scene Pour monoblock type gutter general more long, temperature change easily produces harmomegathus crack.4th, cast-in-place integral gutter Due to needing site operation and maintenance, construction speed is influenceed.5th, cast-in-place integral gutter is unfavorable for the safety at scene Civilized construction.6th, cast-in-place integral gutter is poured again if any generation seepage, reparation is damaged after need to cutting damaged section Construction, operation is more complicated.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of simple and practical prefabricated assembled tunnel drainage side Ditch.
A kind of prefabricated assembled tunnel drainage gutter, be prefabricated in the factory completion, after the good reinforcing bar of factory's colligation, pours coagulation Soil, vibrating and conserving is formed, including water leg, osculum and prefabricated casting concrete, and an inverted trapezoidal collection is stayed on gutter top Tank, is flowed to the surface gathered water at gutter and is flowed in osculum by water leg, is then discharged out.
Further, gutter side is concave head, and opposite side is plush copper, and the plush copper of upper section gutter is embedded in lower section gutter Concave head, and concavo-convex head seam crossing smear waterproofing tack coat.
Further, the lateral middle gradient in gutter upper surface two is 1~4%, gutter single-unit length range It is 50~200cm.
Further, the inverted trapezoidal water leg top is beneficial to than lower hem width and catchments.
Further, the inverted trapezoidal is isosceles trapezoid, and trapezoidal oblique angle is 60~75 °.
Further, the osculum is circle, and radius is 10~20cm.
Further, the head fall of the gutter is identical with road gradient.
Compared with prior art, prefabricated assembled tunnel drainage gutter described in the utility model has the following advantages that:It is logical Cross batch production prefabricated, various mass defects can be prevented effectively from and forming errors are reduced;Osculum undergauge is avoided to occur, it is ensured that draining Ability;The seam of prefabricated assembled gutter avoids the generation in temperature stress harmomegathus crack;Reduce on-site construction processes and Curing time, accelerates speed of application;After breakage, damaged section, process is simple and short time limit are directly changed.
Brief description of the drawings
Fig. 1 is the prefabricated assembled gutter schematic cross-sectional view of the utility model.
Fig. 2 is the prefabricated assembled gutter concave head structural map of the utility model.
Fig. 3 is the prefabricated assembled gutter plush copper structural map of the utility model.
In figure:Water leg -1, osculum -2, prefabricated casting concrete -3.
Specific embodiment
The utility model provides a kind of simple and practical prefabricated assembled tunnel drainage gutter, including water leg 1, draining Hole 2 and prefabricated casting concrete 3 etc., be prefabricated in the factory completion, after the good reinforcing bar of factory's colligation, casting concrete, vibrates and supports Shield is formed.An inverted trapezoidal water leg is stayed on gutter top, is flowed to the surface gathered water at gutter and is flowed to row by water leg In water hole, it is then discharged out.Gutter side is concave head, and opposite side is plush copper.The plush copper of upper section gutter is embedded in lower section gutter Concave head, and concavo-convex head seam crossing smear waterproofing tack coat.The gradient in the middle of gutter upper surface two is lateral is 1~4%, Gutter single-unit length is according to single-unit gutter weight and the determination of mechanization of building operation degree, generally 50~200cm;The ladder Catchmented than following slightly wide being beneficial to shape groove top;The inverted trapezoidal is isosceles trapezoid, and trapezoidal oblique angle is 60~75 °;Osculum is Circle, radius is 10~20cm according to flow.The head fall of gutter is identical with road gradient.
Preferred embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings:
As shown in figure 1, the prefabricated assembled gutter of the utility model it is main by water leg 1, osculum 2, prefabricated pour Concrete 3 is constituted.
In factory by after the assembling reinforcement-formwork supporting plate-casting concrete-working procedures such as shaping that vibrate-conserve, being transported to tunnel Assembling construction is carried out in road.Gutter concave head groove is deep and plush copper goes out height of projection and is 5cm, and the plush copper of upper section gutter is embedded In the concave head of lower section gutter, and waterproofing tack coat is smeared in concavo-convex head seam crossing.
For ease of manually being installed using simple crane gear, while also reducing gutter joint quantity, prefabricated draining side Ditch length × width × height is 100 × 50 × 50cm, osculum internal diameter 15cm, and armored concrete grade and arrangement of reinforcement are true according to actual conditions It is fixed.
Detailed construction operation is as follows:1. constructing tunnel place is transported to after gutter prefabrication.2. gutter soil excavation And apply 10cm hassocks layer along the Tunnel Design gradient.3. gutter is installed, the plush copper of upper section gutter is embedded in lower section gutter Concave head, and smear waterproofing tack coat in concavo-convex head seam crossing.
Compared with prior art, prefabricated assembled tunnel drainage gutter described in the utility model has the following advantages that:It is logical Cross batch production prefabricated, various mass defects can be prevented effectively from and forming errors are reduced;Osculum undergauge is avoided to occur, it is ensured that draining Ability;The seam of prefabricated assembled gutter avoids the generation in temperature stress harmomegathus crack;Reduce on-site construction processes and Curing time, accelerates speed of application;After breakage, damaged section, process is simple and short time limit are directly changed.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.It is retouched State more specific and in detail, but therefore can not be interpreted as the limitation to the utility model the scope of the claims.It should be pointed out that For the person of ordinary skill of the art, without departing from the concept of the premise utility, some changes can also be made Shape and improvement, these belong to protection domain of the present utility model.The claimed scope of the utility model will by appended right Ask book and its equivalent thereof.

Claims (7)

1. a kind of prefabricated assembled tunnel drainage gutter, it is characterised in that be prefabricated in the factory completion, in the good reinforcing bar of factory's colligation Afterwards, casting concrete, vibrating and conserving forms, including water leg, osculum and prefabricated casting concrete, gutter top is stayed One inverted trapezoidal water leg, is flowed to the surface gathered water at gutter and is flowed in osculum by water leg, is then discharged out.
2. prefabricated assembled tunnel drainage gutter according to claim 1, it is characterised in that gutter side is recessed Head, opposite side is plush copper, and the plush copper of upper section gutter is embedded in the concave head of lower section gutter, and it is viscous to smear waterproof in concavo-convex head seam crossing Connect layer.
3. prefabricated assembled tunnel drainage gutter according to claim 2, it is characterised in that gutter upper surface both sides It is 1~4% to the middle gradient, gutter single-unit length range is 50~200cm.
4. the prefabricated assembled tunnel drainage gutter according to any one in claims 1 to 3, it is characterised in that described Inverted trapezoidal water leg top is beneficial to than lower hem width catchments.
5. prefabricated assembled tunnel drainage gutter according to claim 4, it is characterised in that the inverted trapezoidal is isosceles ladder Shape, trapezoidal oblique angle is 60~75 °.
6. prefabricated assembled tunnel drainage gutter according to claim 1, it is characterised in that the osculum is circle, Radius is 10~20cm.
7. prefabricated assembled tunnel drainage gutter according to claim 6, it is characterised in that the longitudinal direction of the gutter The gradient is identical with road gradient.
CN201621294030.9U 2016-11-30 2016-11-30 A kind of prefabricated assembled tunnel drainage gutter Expired - Fee Related CN206233347U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621294030.9U CN206233347U (en) 2016-11-30 2016-11-30 A kind of prefabricated assembled tunnel drainage gutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621294030.9U CN206233347U (en) 2016-11-30 2016-11-30 A kind of prefabricated assembled tunnel drainage gutter

Publications (1)

Publication Number Publication Date
CN206233347U true CN206233347U (en) 2017-06-09

Family

ID=58980756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621294030.9U Expired - Fee Related CN206233347U (en) 2016-11-30 2016-11-30 A kind of prefabricated assembled tunnel drainage gutter

Country Status (1)

Country Link
CN (1) CN206233347U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643317A (en) * 2018-05-16 2018-10-12 安徽省交通控股集团有限公司 A kind of discharge structure for superelevation road section surface

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643317A (en) * 2018-05-16 2018-10-12 安徽省交通控股集团有限公司 A kind of discharge structure for superelevation road section surface

Similar Documents

Publication Publication Date Title
CN103015719B (en) Preliminary work for spudding steel concrete wastewater disposal basin monobloc cast technique
CN104631475A (en) Safe and fast construction method of down-traversing river shallow depth bored tunnel
CN104846841B (en) Anti-floating construction method for basements without uplift piles
CN108374319A (en) A kind of through tied arch bridge structural unit and arch bridge structure and its construction method
CN109826084A (en) A kind of aqueduct method for repairing seepage
CN109236367A (en) A kind of tunnel structure and its frozen construction method with antiseepage drain function
CN101597888A (en) Construction method of municipal drainage culvert sinking trough
CN104652371A (en) Overflow cemented rock-fill dam established based on old dam and construction method thereof
CN208982109U (en) A kind of tunnel structure with antiseepage drain function
CN107988895A (en) A kind of bridge and its construction method
CN206233347U (en) A kind of prefabricated assembled tunnel drainage gutter
CN108824240A (en) A kind of pipe culvert construction method and auxiliary device
CN107663863A (en) A kind of Permafrost Area pile foundation and its construction technology
CN202440766U (en) Water-drainage open cut tunnel aqueduct of road cut section
CN105926665A (en) Large block assembled type prefabricated concrete drainage pipeline base and construction method thereof
CN106638544A (en) Anti-seepage and anti-cracking construction method for ultra-large reinforced concrete bio-oxidation pond in cold area
CN113235646B (en) Construction method for crossing subway station on comprehensive pipe rack
CN110273435A (en) A kind of construction of city open trench tunnel
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN206829176U (en) A kind of prefabricated block brick assembled plastic drainage pipeline basis
CN103866787A (en) Process for constructing impervious concrete wall by using open excavation and inverted construction method
CN208415309U (en) A kind of shield export & import soil body end ruggedized construction
CN208899257U (en) A kind of low drain structure between setting structure location line of magnetic levitation track traffic
CN208009242U (en) A kind of architectural engineering bridge drain pipeline structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

Termination date: 20181130

CF01 Termination of patent right due to non-payment of annual fee