CN206233082U CN201621315180.3U CN201621315180U CN206233082U CN 206233082 U CN206233082 U CN 206233082U CN 201621315180 U CN201621315180 U CN 201621315180U CN 206233082 U CN206233082 U CN 206233082U
Authority
CN
China
Prior art keywords
bridge
culvert pipe
trash rack
dam base
poured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621315180.3U
Other languages
Chinese (zh)
Inventor
杜发兴
肖博文
吴贺林
戈春华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201621315180.3U priority Critical patent/CN206233082U/en
Application granted granted Critical
Publication of CN206233082U publication Critical patent/CN206233082U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of culvert pipe formula overflow bridge, it includes bridge dam base, the bridge dam base is using concrete structure pouring on riverbed, bridge pier has been poured on the bridge dam base, many culvert pipe side by side are poured inside the bridge pier, bridge floor is formed on the top of the bridge pier, and trash rack structure is provided with the upstream of bridge dam base.The bridge is applied to:Plain and some flood plain type rivers of slow mound area, river discharge are seasonal substantially, and embankment is very low or without obvious embankment, small traffic volume.

Description

A kind of culvert pipe formula overflow bridge
Technical field
The utility model belongs to hydraulic engineering and traffic engineering design field, is a kind of culvert pipe formula overflow bridge.
Background technology
With developing rapidly for rural economy and social cause, motor vehicles, large-scale agricultural machinery quickly increase, in addition closely The strong propulsion of sensible engineering in several years, road situation constantly improves, and the vast original bridge in rural area can not meet people group All living creatures produce, the need for life and traffic, while external image is also poor, it is difficult to the throwing people that attracts foreign investment, constrain in various degree through The development of Ji.At present, rural area bridge is broadly divided into the types such as beam bridge, arch bridge, slab bridge, cable-stayed bridge and suspension bridge, these species according to Different physical features or demand application and give birth to, have respective advantage and disadvantage, but the requirement of some middle and small rivers can not be met.For flat Former and some flood plain type rivers of slow mound area, they are located in rural area, and river discharge is seasonal substantially, and embankment is very low or without obvious Embankment, small traffic volume, if or it is high with common above-mentioned bridge type construction cost, or technical difficulty is big.
Utility model content
The purpose of this utility model is to provide a kind of simple, practical, overflow bridge of low cost.The bridge is applied to:Plain and Some flood plain type rivers of slow mound area, river discharge is seasonal substantially, and embankment is very low or without obvious embankment, and the volume of traffic is not Greatly.
In order to solve the above-mentioned technical problem, the utility model proposes following technical scheme:A kind of culvert pipe formula overflow bridge, it is wrapped Bridge dam base is included, the bridge dam base on riverbed, bridge pier, institute has been poured on the bridge dam base using concrete structure pouring State and many culvert pipe side by side are poured inside bridge pier, bridge floor is formed on the top of the bridge pier, is provided with the upstream of bridge dam base Trash rack structure.
The trash rack structure includes side column, and many crossbeams are welded between the side column, and the crossbeam uses I-steel It is made, many grizzly bars is welded with by grizzly bar connecting plate on the crossbeam, the whole trash rack structure is inserted into blocks dirt On grid chute, the trash rack chute is cast in the both sides of bridge dam base.
The culvert pipe is formed using concreting, and many reinforcing bars have been poured inside it.
The hardware outer surface of the trash rack structure is all coated with antirust paint and carries out anti-corrosion treatment.
The utility model has the advantages that:
The culvert pipe formula overflow bridge being made according to such scheme, debris blocked water culvert pipe in can preventing water.In the akhet Section, unnecessary flow can be by bridge floor above by general season river passes through from culvert pipe.Program construction cost is low, typically 10 meters of wide river courses build the overflow bridge, cost at more than 10,000 yuan, in vast Plain and slow hilly area, can yet be regarded as it is a kind of it is economical, applicable, Lifetime type of bridge long.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is overall structure diagram of the present utility model.
Fig. 2 is culvert pipe of the present utility model and cloth muscle schematic diagram.
Fig. 3 is trash rack side view of the present utility model.
Fig. 4 is trash rack left view of the present utility model.
Fig. 5 is trash rack chute of the present utility model and trash rack structure mounting structure schematic diagram.
In figure:Bridge floor 1, bridge pier 2, culvert pipe 3, bridge dam base 4, trash rack structure 5, trash rack chute 6, side column 501, crossbeam 502nd, grizzly bar connecting plate 503, grizzly bar 504.
Specific embodiment
Implementation method of the present utility model is described further below in conjunction with the accompanying drawings.
Such as Fig. 1-5, a kind of culvert pipe formula overflow bridge, it includes bridge dam base 4, and the bridge dam base 4 uses concrete structure It is cast on riverbed, bridge pier 2 has been poured on the bridge dam base 4, many culvert pipe 3 side by side, institute is poured inside the bridge pier 2 Bridge floor 1 is formed on the top for stating bridge pier 2, and trash rack structure 5 is provided with the upstream of bridge dam base 4.
Wherein, bridge floor is convex-shaped, the material thickness of bridge floor to culvert pipe to take into full account road surface communications and transportation situation and The stressing conditions of culvert pipe;Culvert pipe is reinforcement prestressing force prefabricated component, and culvert pipe internal diameter and culvert pipe mouthful number mainly by water flow and cross water There is certain connection that width is installed depending on section width, between culvert pipe and culvert pipe;Bridge dam base is supported for whole pontic stress, Stressing conditions are taken into full account, bridge dam base bottom is excavated and need to carried out by specification.
Further, the trash rack structure 5 includes side column 501, and many crossbeams 502 are welded between the side column 501, The crossbeam 502 is made of I-steel, and many grizzly bars are welded with by grizzly bar connecting plate 503 on the crossbeam 502 504, the whole trash rack structure 5 is inserted on trash rack chute 6, and the trash rack chute 6 is cast in the two of bridge dam base 4 Side.
The culvert pipe formula overflow bridge being made according to such scheme, debris blocked water culvert pipe in can preventing water.In the akhet Section, unnecessary flow can be by bridge floor above by general season river passes through from culvert pipe.Program construction cost is low, typically 10 meters of wide river courses build the overflow bridge, cost at more than 10,000 yuan, in vast Plain and slow hilly area, can yet be regarded as it is a kind of it is economical, applicable, Lifetime type of bridge long.
Further, the culvert pipe 3 is formed using concreting, and many reinforcing bars 301 have been poured inside it.Above-mentioned culvert Pipe 3 can not only bear certain bridge floor pressure, and can play the purpose of draining, accordingly, it would be desirable to be made using built-in reinforcing bar For skeleton is fastened.
Further, the hardware outer surface of the trash rack structure 5 is all coated with antirust paint and carries out at anti-corrosion Reason.Its service life can be extended by antirust treatment.
The course of work of the present utility model and operation principle are:
The culvert pipe formula overflow bridge being made according to such scheme, debris blocked water culvert pipe in can preventing water.In the akhet Section, unnecessary flow can be by bridge floor above by general season river passes through from culvert pipe.Program construction cost is low, typically 10 meters of wide river courses build the overflow bridge, cost at more than 10,000 yuan, in vast Plain and slow hilly area, can yet be regarded as it is a kind of it is economical, applicable, Lifetime type of bridge long.
By above-mentioned description, those skilled in the art completely can be without departing from this utility model technological thought In the range of, carry out various changes and amendments all within protection domain of the present utility model.It is of the present utility model not most Matters, belong to the common knowledge of those skilled in the art.

Claims (3)

1. a kind of culvert pipe formula overflow bridge, it includes bridge dam base(4), the bridge dam base(4)Existed using concrete structure pouring On riverbed, the bridge dam base(4)On poured bridge pier(2), it is characterised in that:The bridge pier(2)Inside has poured many simultaneously The culvert pipe of row(3), the bridge pier(2)Top formed bridge floor(1), in bridge dam base(4)Upstream trash rack structure is installed (5);
The trash rack structure(5)Including side column(501), the side column(501)Between be welded with many crossbeams(502), it is described Crossbeam(502)It is made of I-steel, the crossbeam(502)It is upper to pass through grizzly bar connecting plate(503)It is welded with many grizzly bars (504), the whole trash rack structure(5)It is inserted into trash rack chute(6)On, the trash rack chute(6)It is cast in bridge dam Base(4)Both sides.
2. a kind of culvert pipe formula overflow bridge according to claim 1, it is characterised in that:The culvert pipe(3)Poured using concrete Build and form, many reinforcing bars have been poured inside it(301).
3. a kind of culvert pipe formula overflow bridge according to claim 1, it is characterised in that:The trash rack structure(5)Metal Structural member outer surface is all coated with antirust paint and carries out anti-corrosion treatment.
CN201621315180.3U 2016-12-02 2016-12-02 A kind of culvert pipe formula overflow bridge Expired - Fee Related CN206233082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621315180.3U CN206233082U (en) 2016-12-02 2016-12-02 A kind of culvert pipe formula overflow bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621315180.3U CN206233082U (en) 2016-12-02 2016-12-02 A kind of culvert pipe formula overflow bridge

Publications (1)

Publication Number Publication Date
CN206233082U true CN206233082U (en) 2017-06-09

Family

ID=58977747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621315180.3U Expired - Fee Related CN206233082U (en) 2016-12-02 2016-12-02 A kind of culvert pipe formula overflow bridge

Country Status (1)

Country Link
CN (1) CN206233082U (en)

Similar Documents

Publication Publication Date Title
CN101775788B (en) Block stone-reinforced concrete piling composite groyne bank protection structure
CN103362103B (en) Steel membrane step-type overflow dam
CN103821180A (en) Double-water stop structure for concrete expansion joint and manufacturing and construction method for double-water stop structure
CN113136845A (en) Migration type ecological fishway and construction method
CN107486940A (en) A kind of water channel is passed by one's way the production method of prefabricated component
CN106759095A (en) Arcuately aluminium alloy flood control plate
CN206233082U (en) A kind of culvert pipe formula overflow bridge
CN105540859B (en) A kind of dystopy original position coupling gravel bed Water Ecological Recovery system
CN207452828U (en) One kind pours assembled dykes and dams concrete protection dam layer in advance
CN104032741B (en) The rapid constructing method of a kind of hydraulic engineering large volume temperature control
CN200967925Y (en) Improved structure of bridge abutment
JP6272602B2 (en) How to modify underwater structures
CN207003719U (en) A kind of prefabricated steel faced wall with steel bar girder
CN205399343U (en) Reinforcement type waterproof and anti -seepage bank protection
CN107471404A (en) A kind of water channel gool side leads to the production method of prefabricated component
CN107938845A (en) A kind of concrete prefabricated assembling combining structures of FRP
CN107443548A (en) A kind of production method of water channel gool prefabricated component
CN208309792U (en) A kind of template combining short girder construction for bolumn cap
CN207633303U (en) The orthogonal abatis of armored concrete
CN207003738U (en) A kind of prefabricated steel faced wall with stirrup
CN207310186U (en) A kind of water channel gool side leads to prefabricated-member mould
CN204662629U (en) A kind of overflow well derrick
CN206428864U (en) A kind of inner wall structure
CN206309016U (en) A kind of post-cast strip side form and waterproof construction
CN205804278U (en) A kind of assembled long piled wharf superstructure system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609