CN206222675U - A kind of beforehand instant double-mode water heater - Google Patents

A kind of beforehand instant double-mode water heater Download PDF

Info

Publication number
CN206222675U
CN206222675U CN201621075657.5U CN201621075657U CN206222675U CN 206222675 U CN206222675 U CN 206222675U CN 201621075657 U CN201621075657 U CN 201621075657U CN 206222675 U CN206222675 U CN 206222675U
Authority
CN
China
Prior art keywords
water
pipe
water inlet
inner bag
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621075657.5U
Other languages
Chinese (zh)
Inventor
游庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan Pro Electric Water Heater Technology Co Ltd
Original Assignee
Zhongshan Pro Electric Water Heater Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Pro Electric Water Heater Technology Co Ltd filed Critical Zhongshan Pro Electric Water Heater Technology Co Ltd
Priority to CN201621075657.5U priority Critical patent/CN206222675U/en
Application granted granted Critical
Publication of CN206222675U publication Critical patent/CN206222675U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of beforehand instant double-mode water heater, belong to field of water heaters, beforehand instant double-mode water heater includes storage-type hot water apparatus, Instant heating type hot water apparatus, pipe valve component and the voltage regulation cylinder for saving pressure and the whole beforehand instant double-mode water heater entirety pressure-bearing of reduction, the storage-type hot water apparatus is connected by the pipe valve component with the Instant heating type hot water apparatus, the storage-type hot water apparatus includes inner bag, the inner bag is connected with the pipe valve component, the voltage regulation cylinder is directly connected or connects the inner bag or the voltage regulation cylinder by water inlet pipe and water outlet pipe and directly connects or by the water inlet pipe and water outlet pipe connection pipe valve component.The beforehand instant double-mode water heater that the utility model is provided, its water storage liner is chronically at low-pressure state, is not in hot water return problem, the problems such as can effectively solve the problem that the easy fouling of double-mode electric water heater and service life not long.

Description

A kind of beforehand instant double-mode water heater
Technical field
The utility model is related to field of water heaters, more particularly to a kind of beforehand instant double-mode water heater.
Background technology
Beforehand instant double-mode water heater belongs to one kind of quick electric water heater, with i.e. heat, two kinds of heating modes of preheating.
Beforehand instant double-mode water heater had both overcome the defects such as storage-type electric water heater volume is big, heating is slow, energy consumption is high, overcame again Powerful installation bottleneck the need for instant electric water heater, with good market popularization value.But beforehand instant double-mode is warm The fatal problem of hydrophone is exactly it so that the inner bag of storage-type hot water apparatus and housing where the calandria of Instant heating type hot water apparatus Connection, Instant heating type hot water apparatus is sometimes for bearing pressure and temperature from inner bag hot water, and long-term its heater is immersed in In warm water, its heater easily produces incrustation scale, and the easy drainage of pipe valve component and its junction, and service life is shorter.
For example:Chinese patent literature publication number CN101608825 discloses a kind of beforehand instant double-mode electric water heater, instant heating inner bag Delivery port be respectively communicated with the first magnetic valve and the second magnetic valve, the other end of the second magnetic valve and the water inlet phase of water storage liner Logical, the other end of the delivery port of water storage liner and the first magnetic valve is communicated with outlet pipe, the first magnetic valve and the second magnetic valve Interlocking, the second magnetic valve be normally open solenoid valve, and the first magnetic valve and the second magnetic valve interlocking.Although this interlocking structure is to solution Certainly water outlet of water heater water temperature is unstable certain facilitation, but also causes the water storage liner of beforehand instant double-mode electric water heater and be Hot inner bag is conducted, and when pressure is higher in water storage liner, hot water can be back to instant heating inner bag, so that inside instant heating inner bag Calandria long period of soaking in warm water, be also easy to produce the problems such as above-mentioned incrustation scale and leakage.
The content of the invention
In order to overcome the defect of prior art, technical problem to be solved in the utility model is to propose that one kind is pre- i.e. double Mould water heater, its water storage liner is chronically at low-pressure state, is not in hot water return problem, can effectively solve the problem that bimodulus electric heating The problems such as easy fouling of hydrophone and service life not long.
It is that, up to this purpose, the utility model uses following technical scheme:
The utility model provide a kind of beforehand instant double-mode water heater, including storage-type hot water apparatus, Instant heating type hot water apparatus, Pipe valve component and the voltage regulation cylinder for saving pressure and the whole beforehand instant double-mode water heater entirety pressure-bearing of reduction, the water storage Formula hot water apparatus is connected by the pipe valve component with the Instant heating type hot water apparatus, and the storage-type hot water apparatus includes interior Courage, the inner bag is connected with the pipe valve component, and the voltage regulation cylinder directly connects the inner bag or the voltage regulation cylinder passes through Water inlet pipe and water outlet pipe connects the inner bag or the voltage regulation cylinder directly connects the pipe valve component or the voltage regulation cylinder by described Water inlet pipe and water outlet pipe connects the pipe valve component.Voltage regulation cylinder has the function of savings absorption pressure, and it can effectively reduce beforehand instant double-mode Water heater entirety pressure-bearing so that the hydraulic pressure inside beforehand instant double-mode water heater is constantly in low-pressure state.
In order to enhanced voltage regulation cylinder absorbs and saves the ability of pressure, in the utility model further technical scheme, The voltage regulation cylinder includes the first cylinder body, piston, pull bar and drive mechanism, and the piston is located in first cylinder body, and with First cylinder body is slidably matched, and the drive mechanism is located at the first end of first cylinder body, and by the pull bar and institute State piston to be fixedly connected, there is intake-outlet at the second end of first cylinder body, and the intake-outlet directs or through Inlet and outlet water Pipe is connected with the inner bag and the/pipe valve component.Due to the relative motion of piston and the first cylinder body, voltage regulation cylinder can be realized Into and out is inhaled to hot water, the effective inner bag and Instant heating type hot water apparatus internal hot-water hydraulic pressure for alleviating beforehand instant double-mode water heater is long Phase is in the problem of high pressure conditions, so that beforehand instant double-mode water heater maintains low-pressure state, extends its service life.
In order to enhanced voltage regulation cylinder absorbs and saves the ability of pressure, in the utility model further technical scheme, The voltage regulation cylinder includes the second cylinder body, water reservoir, push rod and drive mechanism, and the water reservoir is located in second cylinder body, The push rod, the drive mechanism are located at the side of the water reservoir, and the drive mechanism is used to drive the push rod translation, institute Stating the opposite side of water reservoir has an intake-outlet, the intake-outlet direct or through water inlet pipe and water outlet pipe and the inner bag and/it is described Pipe valve component is connected.Stretching motion is carried out due to push rod compressing water reservoir, can realize that voltage regulation cylinder is sucked and flowed to hot water Go out, the effective inner bag and Instant heating type hot water apparatus internal hot-water hydraulic pressure for alleviating beforehand instant double-mode water heater is chronically at high pressure conditions Problem so that beforehand instant double-mode water heater maintain low-pressure state, extend its service life.
In order to by the Stress control inside beforehand instant double-mode water heater in reasonable low pressure range, it is further in the utility model Technical scheme in, by the aeration quantity of the type selecting of the voltage regulation cylinder, the amount of piston displacement or the water reservoir decrement Regulation, by the hydraulic pressure control in the inner bag and the/pipe valve component in 0.1Mpa -0.45Mpa.
Cause that beforehand instant double-mode water heater is in low-pressure state ability in order that obtaining voltage regulation cylinder and both having had, avoid voltage regulation cylinder long again Time is in hot environment, influences its life-span.In the utility model further technical scheme, the pipe valve component includes courage Water inlet pipe, courage outlet pipe, chamber water inlet pipe, chamber outlet pipe, connecting tube and water pipe is used, the Instant heating type hot water apparatus includes heating Chamber, the chamber water inlet pipe, the chamber outlet pipe are respectively positioned on one end of the heating chamber, and are connected with the heating chamber, described Courage outlet pipe, the courage water inlet pipe are each attached to one end of the inner bag, are connected with the inner bag, and the courage outlet pipe A part insert the inside of the inner bag, the first valve water inlet of the water mixing valve is connected by the courage outlet pipe, and it the Two valve water inlets are connected by the connecting tube with the chamber outlet pipe, and the valve delivery port of the water mixing valve is connected with water pipe, The courage water inlet pipe is connected with the connecting tube, and the intake-outlet of the voltage regulation cylinder is directly connected or by the water inlet pipe and water outlet pipe Connect the connecting tube.
Cause that beforehand instant double-mode water heater is in low-pressure state ability in order that obtaining voltage regulation cylinder and both having had, avoid voltage regulation cylinder long again Time is in hot environment, influences its life-span.In the utility model further technical scheme, the pipe valve component includes courage Water inlet pipe, courage outlet pipe, chamber water inlet pipe, chamber outlet pipe, the first connecting tube, the second connecting tube and water pipe is used, it is described Instant heating type Hot water apparatus includes heating chamber, and the chamber water inlet pipe, the chamber outlet pipe are respectively positioned on one end of the heating chamber, and add with described Hot chamber is connected, and the courage outlet pipe, the courage water inlet pipe are each attached to one end of the inner bag, are connected with the inner bag It is logical, and a part for the courage outlet pipe inserts the inside of the inner bag, the first valve water inlet and the courage of the water mixing valve Outlet pipe is connected, and its second valve water inlet is connected by first connecting tube with the chamber outlet pipe, the valve of the water mixing valve Delivery port is connected with water pipe, and the courage water inlet pipe is connected by second connecting tube with the chamber water inlet pipe, the pressure regulation The intake-outlet of cylinder is directly connected or connects second connecting tube by the water inlet pipe and water outlet pipe.
Cause that beforehand instant double-mode water heater is in low-pressure state ability in order that obtaining voltage regulation cylinder and both having had, avoid voltage regulation cylinder long again Time is in hot environment, influences its life-span.The pipe valve component includes courage water inlet pipe, courage outlet pipe, chamber water inlet pipe, chamber water outlet Pipe, connecting tube and water pipe is used, the Instant heating type hot water apparatus includes heating chamber, and the chamber water inlet pipe, the chamber outlet pipe are equal Positioned at one end of the heating chamber, and it is connected with the heating chamber, the courage outlet pipe, the courage water inlet pipe are each attached to institute One end of inner bag is stated, is connected with the inner bag, and a part for the courage outlet pipe inserts the inside of the inner bag, it is described First valve water inlet of water mixing valve is connected with the courage outlet pipe, and its second valve water inlet is connected with the courage water inlet pipe, described The valve delivery port of water mixing valve is connected by the connecting tube with the chamber water inlet pipe, and the intake-outlet of the voltage regulation cylinder is directly connected Or the courage water inlet pipe is connected by the water inlet pipe and water outlet pipe.
In the utility model further technical scheme, also including the first temperature sensor, second temperature sensor, Three-temperature sensor, flowmeter and control panel, first temperature sensor are located at described with water pipe, the second temperature Sensor is located on the chamber water inlet pipe, and the three-temperature sensor is located on the chamber outlet pipe, and first temperature is passed Sensor, the second temperature sensor and the three-temperature sensor are electrically connected with the control panel, the flowmeter On the chamber water inlet pipe, the flowmeter is electrically connected with the control panel.First temperature sensor is mainly used in inspection Survey conduit temperature, namely domestic hot-water temperature;What the second temperature sensor detected Instant heating type hot water apparatus enters water temperature Degree;The three-temperature sensor is used to detect the leaving water temperature of Instant heating type hot water apparatus;Flowmeter is used to detect beforehand instant double-mode The inflow of water heater.
Because beforehand instant double-mode water heater is configured to low-pressure water heater, in the utility model further technical scheme, institute State inner bag material and be configured to enamel material, stainless steel and non-metallic material, the non-metallic material include plastic material, Ceramic material and glass material.The pressure for reducing only is subjected only to due to inner bag, therefore the inner bag in the application can be configured to by non- The relatively low material of structural strength of metal material composition, is greatly reduced the manufacturing cost of water heater liner.
In the utility model further technical scheme, the storage-type hot water apparatus includes electromagnetic heater, described The fever tablet of electromagnetic heater is located at the inside of the inner bag, and the electromagnetic wire coil of the electromagnetic heater is fixed on the inner bag On outer wall, the storage-type hot water apparatus is heated using Electromagnetic Heating mode.For most inner bags, born at it Pressure is larger, easily causes the rupture of inner bag according to Electromagnetic Heating mode, and the low pressure storage-type provided in the present embodiment Hot water apparatus does not exist similar problem then, because the pressure-bearing of its inner bag is smaller.
In the utility model further technical scheme, the storage-type hot water apparatus also includes blow-off pipe, the row Dirty pipe is fixed on the bottom of the inner bag, and is connected with the inner bag.Blow-off pipe is used to discharge the storage-type hot water apparatus Impurity, sewage and incrustation scale.
In the utility model further technical scheme, the water mixing valve is configured to the thermostatic valve of adjusting water outlet water temperature, The thermostatic valve is mainly used in solving the beforehand instant double-mode unbalanced problem of water heater cold-hot water water temperature.
The beneficial effects of the utility model are:
The beforehand instant double-mode water heater that the utility model is provided, including storage-type hot water apparatus and Instant heating type hot water apparatus, storage Voltage regulation cylinder is provided between ability of swimming hot water apparatus and Instant heating type hot water apparatus, voltage regulation cylinder is used to save and absorption pressure, and can drop The low whole beforehand instant double-mode water heater entirety pressure-bearing, it is ensured that water storage liner is chronically at low-pressure state, from without heat Water is back to Instant heating type hot water apparatus problem, can effectively solve the problem that the easy fouling of double-mode electric water heater and service life is not long etc. Problem.The pressure for reducing pressure-bearing or is not only subjected only to due to inner bag, therefore inner bag in the application can be nonmetallic using plastics etc. Material, non-metallic material can be greatly reduced the manufacturing cost of water heater liner.The low pressure storage-type heat provided in the present embodiment The pressure-bearing of water installations its inner bags is smaller, even if being also difficult to cause the rupture of inner bag using common material.Additionally, thermostatic valve is in inner bag And pipe valve component pressure-bearing it is higher when, easily occur damaged, and the low pressure storage-type hot water apparatus provided in the present embodiment is not deposited then In similar problem.
Brief description of the drawings
Fig. 1 is the structural representation of the beforehand instant double-mode water heater of offer in the utility model embodiment one.
Fig. 2 is the structural representation of the beforehand instant double-mode water heater of offer in the utility model embodiment two.
Fig. 3 is the structural representation of the beforehand instant double-mode water heater of offer in the utility model embodiment three.
Fig. 4 is the structural representation of the beforehand instant double-mode water heater of offer in the utility model example IV.
Fig. 5 is the structural representation of the beforehand instant double-mode water heater of offer in the utility model embodiment five.
In figure:
1st, storage-type hot water apparatus;2nd, Instant heating type hot water apparatus;11st, inner bag;4th, voltage regulation cylinder;41st, the first cylinder body;42nd, it is living Plug;43rd, pull bar;44th, drive mechanism;45th, intake-outlet;46th, the second cylinder body;47th, water reservoir;48th, push rod;37th, water mixing valve; 31st, courage water inlet pipe;32nd, courage outlet pipe;33rd, chamber water inlet pipe;34th, chamber outlet pipe;35th, connecting tube;36th, water pipe is used;21st, heat Chamber;351st, the first connecting tube;352nd, the second connecting tube;5th, the first temperature sensor;6th, second temperature sensor;7th, the 3rd temperature Sensor;8th, flowmeter;91st, fever tablet;92nd, electromagnetic wire coil;100th, storage-type temperature controller;200th, Instant heating type temperature controller;300、 Temperature probe;400th, heating tube;500th, blow-off pipe;600th, heat-insulation layer;700th, housing.
Specific embodiment
Further illustrate the technical solution of the utility model below in conjunction with the accompanying drawings and by specific embodiment.
Embodiment one
As shown in figure 1, a kind of beforehand instant double-mode water heater provided in embodiment one, including housing 700, storage-type hot water dress 1, Instant heating type hot water apparatus 2, pipe valve component and voltage regulation cylinder 4 are put, storage-type hot water apparatus 1 passes through pipe valve component and Instant heating type heat Water installations 2 are connected, and storage-type hot water apparatus 1 is respectively positioned in housing 700 with Instant heating type hot water apparatus 2.Storage-type hot water apparatus 1 Including inner bag 11, inner bag 11 is connected with pipe valve component.Voltage regulation cylinder 4 is used to save pressure and reduces whole beforehand instant double-mode water heater Overall pressure-bearing, voltage regulation cylinder 4 directly connects the inner bag or voltage regulation cylinder 4 and connects the inner bag 11 by water inlet pipe and water outlet pipe, or adjusts Cylinder pressure 4 directly connects the pipe valve component or voltage regulation cylinder and connects the pipe valve component by the water inlet pipe and water outlet pipe.Prior art In, the grade dropping equipment of voltage regulation cylinder 4 is not applied to beforehand instant double-mode water heater, Instant heating type hot water apparatus 2 usually needs to bear to come from The pressure and temperature of the hot water of inner bag 11, and its heater soaks in a tepid bath for a long time, is also easy to produce incrustation scale and drainage, uses the longevity Life is shorter, and market public praise is poor.And the beforehand instant double-mode water heater provided in the present embodiment is due to being provided with voltage regulation cylinder 4, voltage regulation cylinder 4 The suction of hot water can be realized and excluded, effectively reduce the overall pressure-bearing of beforehand instant double-mode water heater, improve beforehand instant double-mode hot water Device service life.
In order that obtaining voltage regulation cylinder 4 realizes pressure regulation and the effect of water storage.As the further technical scheme of the present embodiment, pressure regulation Cylinder 4 includes the first cylinder body 41, piston 42, pull bar 43 and drive mechanism 44, and piston 42 is located in the first cylinder body 41, and with first Cylinder body 41 is slidably matched, and drive mechanism 44 is located at the first end of the first cylinder body 41, and drive mechanism 44 can be configured to stepper motor, subtract One or more combinations in speed motor and spring, drive mechanism 44 is fixedly connected by pull bar 43 with piston 42, the first cylinder There is intake-outlet 45 at second end of body 41, and intake-outlet 45 is directly connected with inner bag or intake-outlet 45 passes through Inlet and outlet water Pipe is connected with inner bag 1 or intake-outlet 45 is directly connected with pipe valve component or intake-outlet 45 passes through water inlet pipe and water outlet pipe It is connected with pipe valve component.Due to the first cylinder body 41 and the relative motion of piston 42, when the inner bag 11 and/pipe valve component of electric heater Hypertonia when, drive mechanism 44 by pull bar 43 drive piston 42 on move so that hot water by intake-outlet 45 enter adjust Cylinder pressure 4, so as to play a part of retaining and step-down;When the inner bag 11 of electric heater and the pressure of/pipe valve component become hour, drive Mechanism 44 drives piston 42 to move down with by pull bar 43, and the water in tank body 41 is extruded to inner bag 11 and/pipe valve component.
In order that obtain beforehand instant double-mode water heater is in low-pressure state for a long time, as the further preferred technology of the present embodiment Scheme, is adjusted by the type selecting of voltage regulation cylinder 4 and the displacement of piston 42, and the hydraulic pressure control in inner bag 11 and/pipe valve component is existed 0.1Mpa -0.45Mpa.《Water supply engineering plans specification》(GB 50282-98)The 4.0.5 articles regulation:Water distribution pipe in city The water supply pressure of net preferably meets the requirement of service head 28m at user's take-over point, namely 0.28Mpa, by actual multiple survey Amount will also realize that, the scope 0.2Mpa-0.3Mpa of domestic running hydraulic pressure, hot water heating to domestic hot-water generally boost 1Mpa with On, thus by dropping equipment 2 by inner bag 11 and/pipe valve component in hydraulic pressure control be very desirable in 0.1Mpa-0.45Mpa , as long as such dropping equipment 2 needs to be worked when pressure is higher than 0.3Mpa, the hydraulic pressure control of electric heater can just be existed 0.1Mpa-0.45Mpa, even if the temperature of water heater is set as highest by user, also will not generally cross 0.45Mpa on this Limit value.
In order to effectively reduce the pressure of inner bag 11, heating chamber 21 and pipe valve component internal, one is entered as the present embodiment Step optimal technical scheme, pipe valve component includes water mixing valve 37, courage water inlet pipe 31, courage outlet pipe 32, chamber water inlet pipe 33, chamber outlet pipe 34th, connecting tube 35 and with water pipe 36, Instant heating type hot water apparatus 2 includes heating chamber 21, chamber water inlet pipe 33, the equal position of chamber outlet pipe 34 In one end of heating chamber 21, and it is connected with heating chamber 21, courage outlet pipe 32, courage water inlet pipe 31 are each attached to the one of inner bag 11 End, be connected with inner bag 11, and courage outlet pipe 32 a part insertion inner bag 11 inside, water mixing valve 37 the first valve water inlet Mouth is connected by courage outlet pipe 32, and its second valve water inlet is connected by connecting tube 35 with chamber outlet pipe 34, the valve of water mixing valve 37 Delivery port is connected with water pipe 36, and courage water inlet pipe 31 is connected with connecting tube 35, and the intake-outlet 44 of voltage regulation cylinder 4 directly connects connection Pipe 35 connects connecting tube 35 by water inlet pipe and water outlet pipe.Also will Instant heating type hot water apparatus 2 chamber outlet pipe 34 pass through connecting tube 35 are connected with water mixing valve 37, and the courage water inlet pipe 31 of storage-type hot water apparatus 1 is directly connected with connecting tube 35, the turnover of voltage regulation cylinder 4 The mouth of a river 44 directly with connecting tube 35, the hot water that the Instant heating type hot water apparatus 2 of this connected mode working method is produced passes through water mixing valve 37 hot water produced with storage-type hot water apparatus 1 are mixed, so as to reach the prolonged purpose for providing stabilization stabilization hot water, Voltage regulation cylinder 4 connects with connecting tube 35 and can be good at alleviating pressure too high in inner bag 11, heating chamber 21 and pipe valve component, and By Stress control in rational scope.
For Real-time Collection temperature information, to control storage-type hot water apparatus 1 and the temperature of Instant heating type hot water apparatus 2 and mixed Composition and division in a proportion example, as the further preferred technical scheme of the present embodiment, beforehand instant double-mode water heater also include the first temperature sensor 5, Second temperature sensor 6, three-temperature sensor 7, flowmeter 8 and control panel, the first temperature sensor 5 is located at uses water pipe 36 On, second temperature sensor 6 is located on chamber water inlet pipe 33, and three-temperature sensor 7 is located on chamber outlet pipe 34, and the first temperature is passed Sensor 5, second temperature sensor 6 and three-temperature sensor 7 are electrically connected with control panel, and flowmeter 8 is located at chamber water inlet pipe On 33, flowmeter 8 is electrically connected with control panel.
Additionally, storage-type hot water apparatus 1 also includes storage-type temperature controller 100, temperature probe 300, heating tube 400, blowdown Pipe 500 and heat-insulation layer 600, Instant heating type hot water apparatus 2 also include Instant heating type temperature controller 200.Storage-type temperature controller 100, temperature Probe 300 and heating tube 400 are each attached in inner bag 11, and temperature probe 300 is located at the side of storage-type temperature controller 100, plus Heat pipe 400 is located at the periphery of storage-type temperature controller 100, and Instant heating type temperature controller 200 is located in heating chamber 21.Storage-type temperature controller 100 are used to controlling water temperatures in inner bag 11 to be in stabilization or gradient constant-temperatureactivation state, and temperature probe 300 is used to detecting in inner bag 11 Water temperature, the water that heating tube 400 is used for inside heating inner liner 11, heat-insulation layer 600 is used to reduce the thermal losses of inner bag 11.In addition, i.e. Hot type temperature controller 200 is used to maintain heating chamber 21 to be in stable state or gradient constant-temperatureactivation state.
Embodiment two
As shown in Fig. 2 a kind of beforehand instant double-mode water heater provided in embodiment two, including housing 700, storage-type hot water dress 1, Instant heating type hot water apparatus 2, pipe valve component and voltage regulation cylinder 4 are put, storage-type hot water apparatus 1 passes through pipe valve component and Instant heating type heat Water installations 2 are connected, and storage-type hot water apparatus 1 is respectively positioned in housing 700 with Instant heating type hot water apparatus 2.Storage-type hot water apparatus 1 Including inner bag 11, storage-type temperature controller 100, temperature probe 300, heating tube 400, blow-off pipe 500 and heat-insulation layer 600, inner bag 11 are connected with pipe valve component, and storage-type temperature controller 100, temperature probe 300 and heating tube 400 are each attached in inner bag 11, Temperature probe 300 is located at the side of storage-type temperature controller 100, and heating tube 400 is located at the periphery of storage-type temperature controller 100.It is i.e. hot Formula hot water apparatus 2 includes Instant heating type temperature controller 200 and heating chamber 21, and Instant heating type temperature controller 200 is located in heating chamber 21.
Embodiment one is with the difference of embodiment two:Pipe valve component includes that water mixing valve 37, courage water inlet pipe 31, courage go out Water pipe 32, chamber water inlet pipe 33, chamber outlet pipe 34, the first connecting tube 351, the second connecting tube 352 and with water pipe 36, chamber water inlet pipe 33rd, chamber outlet pipe 34 is respectively positioned on one end of heating chamber 21, and is connected with heating chamber 21, and courage outlet pipe 32, courage water inlet pipe 31 are equal Be fixed on one end of inner bag 11, be connected with inner bag 11, and courage outlet pipe 32 a part insertion inner bag 11 inside, mix water First valve water inlet of valve 37 is connected with courage outlet pipe 32, and its second valve water inlet is by the first connecting tube 351 and chamber outlet pipe 34 are connected, and the valve delivery port of water mixing valve 37 is connected with water pipe 36, and courage water inlet pipe 31 is by the second connecting tube 352 and chamber water inlet pipe 33 are connected, and the intake-outlet 44 of voltage regulation cylinder 4 is directly connected or connects the second connecting tube 352 by water inlet pipe and water outlet pipe.This connection Mode working method is again such that the hot water that Instant heating type hot water apparatus 2 is produced is produced by water mixing valve 37 with storage-type hot water apparatus 1 Raw hot water is mixed, but its hot water for flowing out the courage water inlet pipe 31 of storage-type hot water apparatus 1 is filled with Instant heating type hot water The chamber outlet pipe 34 for putting 2 flows out and by the hot water mixing of the first connecting tube 351, so as to reach prolonged offer stabilization stabilization Hot water purpose.In addition, by the courage water inlet pipe 31 of storage-type hot water apparatus 1 and chamber water inlet pipe with Instant heating type hot water apparatus 2 33 are connected by the second connecting tube 352, and the intake-outlet 44 of voltage regulation cylinder 4 is directly connected or by water inlet pipe and water outlet pipe and second Connecting tube 352 is connected so that voltage regulation cylinder 4 carries out step-down pressure on water inlet direction to inner bag 1, heating chamber 21 and pipe valve component Power, using the principle of linker, the position that inner bag 1 is installed has little to no effect to the effect that it is depressured, but this connected mode So that voltage regulation cylinder 4 is on courage water inlet pipe 31, this low temperature water route of chamber water inlet pipe 33, be conducive to extending the use longevity of voltage regulation cylinder 4 Life.
Embodiment three
As shown in figure 3, a kind of beforehand instant double-mode water heater provided in embodiment three, including housing 700, storage-type hot water dress 1, Instant heating type hot water apparatus 2, pipe valve component and voltage regulation cylinder 4 are put, storage-type hot water apparatus 1 passes through pipe valve component and Instant heating type heat Water installations 2 are connected, and storage-type hot water apparatus 1 is respectively positioned in housing 700 with Instant heating type hot water apparatus 2.Storage-type hot water apparatus 1 Including inner bag 11, storage-type temperature controller 100, temperature probe 300, heating tube 400, blow-off pipe 500 and heat-insulation layer 600, inner bag 11 are connected with pipe valve component, and storage-type temperature controller 100, temperature probe 300 and heating tube 400 are each attached in inner bag 11, Temperature probe 300 is located at the side of storage-type temperature controller 100, and heating tube 400 is located at the periphery of storage-type temperature controller 100.It is i.e. hot Formula hot water apparatus 2 includes Instant heating type temperature controller 200 and heating chamber 21, and Instant heating type temperature controller 200 is located in heating chamber 21.
Embodiment three is with the difference of embodiment one:Pipe valve component includes that water mixing valve 37, courage water inlet pipe 31, courage go out Water pipe 32, chamber water inlet pipe 33, chamber outlet pipe 34, connecting tube 35 and with water pipe 36, Instant heating type hot water apparatus 2 includes heating chamber 21, chamber water inlet pipe 33, chamber outlet pipe 34 are respectively positioned on one end of heating chamber 21, and are connected with heating chamber 21, courage outlet pipe 32, courage Water inlet pipe 31 is each attached to one end of inner bag 11, is connected with inner bag 11, and a part for courage outlet pipe 32 inserts inner bag 11 Inside;First valve water inlet of water mixing valve 37 is connected with courage outlet pipe 32, and its second valve water inlet is connected with courage water inlet pipe 31, The valve delivery port of water mixing valve 37 is connected by connecting tube 35 with chamber water inlet pipe 33, the intake-outlet 44 of voltage regulation cylinder 4 directly connect or Person connects courage water inlet pipe 31 by water inlet pipe and water outlet pipe.This structure has necessarily with the beforehand instant double-mode water heater principle of above two kinds of structures Difference, be not that the hot water that the hot water that produces storage-type hot water apparatus 1 and Instant heating type hot water apparatus 2 are produced passes through water mixing valve 37 Mixing, and mixed with running water by the hot water that 37 storage-type hot water apparatus of water mixing valve 1 is produced, preheating water is formed, then pass through Instant heating type hot water apparatus 2 carries out reheating to preheating water, so as to provide the user the domestic hot-water of stabilization.The of water mixing valve 37 Two valve water inlets are connected with courage water inlet pipe 31, and the valve delivery port of water mixing valve 37 is connected by connecting tube 35 with chamber water inlet pipe 33, adjust The intake-outlet 44 of cylinder pressure 4 is directly connected or connects courage water inlet pipe 31 by water inlet pipe and water outlet pipe.Because the source of pressure is mainly Inner bag 11 is produced, therefore voltage regulation cylinder 4 is arranged on into courage water inlet pipe 31 can not only effectively reduce the pressure of inner bag 11, and its own On temperature inlet channel not high, beneficial to its service life of enhancing.Instant heating type hot water apparatus 2 only needs to add warm water Heat, thus its heating power can set must be smaller than traditional heating water heater so that the use work(of the beforehand instant double-mode water heater for reducing Rate.
Example IV
As shown in figure 4, a kind of beforehand instant double-mode water heater provided in example IV, including housing 700, storage-type hot water dress 1, Instant heating type hot water apparatus 2, pipe valve component and voltage regulation cylinder 4 are put, storage-type hot water apparatus 1 passes through pipe valve component and Instant heating type heat Water installations 2 are connected, and storage-type hot water apparatus 1 is respectively positioned in housing 700 with Instant heating type hot water apparatus 2.Storage-type hot water apparatus 1 Including inner bag 11, storage-type temperature controller 100, temperature probe 300, heating tube 400, blow-off pipe 500 and heat-insulation layer 600, inner bag 11 are connected with pipe valve component, and storage-type temperature controller 100, temperature probe 300 and heating tube 400 are each attached in inner bag 11, Temperature probe 300 is located at the side of storage-type temperature controller 100, and heating tube 400 is located at the periphery of storage-type temperature controller 100.It is i.e. hot Formula hot water apparatus 2 includes Instant heating type temperature controller 200 and heating chamber 21, and Instant heating type temperature controller 200 is located in heating chamber 21.
Embodiment five is not in together with embodiment one:Voltage regulation cylinder 4 include the second cylinder body 46, water reservoir 47, push rod 48 with And drive mechanism 44, in the second cylinder body 46, push rod 48, drive mechanism 44 are located at the side of water reservoir 47 to water reservoir 47, drive Motivation structure 44 is used for the translation of driving push rod 48, and drive mechanism 44 can be configured in stepper motor, reducing motor and spring Plant or several combinations.The opposite side of water reservoir 47 has intake-outlet 45, and intake-outlet 45 is directly connected or enters with inner bag 1 Delivery port 45 is connected by water inlet pipe and water outlet pipe with inner bag 1 or intake-outlet 45 is directly connected or passes in and out with pipe valve component The mouth of a river 45 is connected by water inlet pipe and water outlet pipe with pipe valve component.The carrying out of water reservoir 47 is oppressed by push rod 48 due to drive mechanism 44 Stretching motion, can realize that voltage regulation cylinder 4 inhales into and out water reservoir 47 to hot water, when the inner bag 11 and/pipe valve group of electric heater During the hypertonia of part, moved in the driving push rod 48 of drive mechanism 44, water reservoir 47 is expanded under heat hydraulic pressure so that hot water passes through Intake-outlet 45 enters water reservoir 47, so as to play a part of retaining and step-down;When the inner bag 11 and/pipe valve component of electric heater Pressure become hour, the driving push rod 48 of drive mechanism 44 moves down, and compressing water reservoir 47 extrudes to inner bag the water in water reservoir 47 11 and/pipe valve component in.
In order that obtain beforehand instant double-mode water heater is in low-pressure state for a long time, as the further preferred technology of the present embodiment Scheme, is adjusted, by the hydraulic pressure control in inner bag 11 and/pipe valve component by the type selecting of voltage regulation cylinder 4 and the stroke of water reservoir 47 In 0.1Mpa -0.45Mpa.As long as so dropping equipment 2 needs to be worked when pressure is higher than 0.3Mpa, just can be by electric heater Hydraulic pressure control in 0.1Mpa-0.45Mpa, even if the temperature of water heater is set as highest by user, also will not generally cross 0.45Mpa this higher limit.
Embodiment five
As shown in figure 5, embodiment five exists with embodiment one, embodiment two, the difference of embodiment three, example IV In:The material of inner bag 11 is configured to enamel material, stainless steel and non-metallic material, non-metallic material include plastic material, Ceramic material and glass material.Due to using low-pressure designs, even if inner bag 1 is configured to the non-metallic materials such as plastics and also still has There is service life more long, this significantly saves the manufacturing cost of electric heater.
Storage-type hot water apparatus 1 includes electromagnetic heater, and the fever tablet 91 of electromagnetic heater is located at the inside of inner bag 11, electricity The electromagnetic wire coil 92 of magnetic heater is fixed on the outer wall of the inner bag 11, and fever tablet 91 is oppositely arranged with electromagnetic wire coil 92.By Can be heated using the mode of heating for passing through magnetic energy using the non-metallic materials such as plastics, non-metallic material in inner bag 11. Therefore, low-voltage electric water heater can effectively lift the applicability of its Electromagnetic Heating, and real electricity separation, its water heater is more pacified Entirely.
The utility model is described with reference to the preferred embodiments, and those skilled in the art know, is not departing from this reality In the case of with new spirit and scope, various changes or equivalence replacement can be carried out to these features and embodiment.This reality It is not limited to the particular embodiment disclosed with new, other embodiments fallen into claims hereof all belong to In the scope of the utility model protection.

Claims (10)

1. a kind of beforehand instant double-mode water heater, including storage-type hot water apparatus(1), Instant heating type hot water apparatus(2)And pipe valve component, The storage-type hot water apparatus(1)By the pipe valve component and the Instant heating type hot water apparatus(2)It is connected, the storage-type heat Water installations(1)Including inner bag(11), the inner bag(11)It is connected with the pipe valve component, it is characterised in that:
Also include for saving pressure and reducing the voltage regulation cylinder of the whole beforehand instant double-mode water heater entirety pressure-bearing(4);
The voltage regulation cylinder(4)Directly connect or the inner bag is connected by water inlet pipe and water outlet pipe(11);Or
The voltage regulation cylinder(4)Directly connect or the pipe valve component is connected by the water inlet pipe and water outlet pipe.
2. beforehand instant double-mode water heater according to claim 1, it is characterised in that:
The voltage regulation cylinder(4)Including the first cylinder body(41), piston(42), pull bar(43)And drive mechanism(44);
The piston(42)Positioned at first cylinder body(41)It is interior, and with first cylinder body(41)It is slidably matched;
The drive mechanism(44)Positioned at first cylinder body(41)First end, and by the pull bar(43)With the piston (42)It is fixedly connected;
First cylinder body(41)The second end have intake-outlet(45), the intake-outlet(45)Direct or through Inlet and outlet water Pipe is connected with the inner bag and the/pipe valve component.
3. beforehand instant double-mode water heater according to claim 1, it is characterised in that:
The voltage regulation cylinder(4)Including the second cylinder body(46), water reservoir(47), push rod(48)And drive mechanism(44);
The water reservoir(47)Positioned at second cylinder body(46)It is interior;
The push rod(48), the drive mechanism(44)Positioned at the water reservoir(47)Side;
The water reservoir(47)Opposite side have intake-outlet(45), the intake-outlet(45)Direct or through water inlet pipe and water outlet pipe It is connected with the inner bag and the/pipe valve component.
4. the beforehand instant double-mode water heater according to Claims 2 or 3, it is characterised in that:
By the voltage regulation cylinder(4)Type selecting, by the inner bag(11)With the hydraulic pressure control in the/pipe valve component in 0.1Mpa -0.45Mpa。
5. the beforehand instant double-mode water heater according to any one of claim 1, it is characterised in that:
The pipe valve component includes water mixing valve(37), courage water inlet pipe(31), courage outlet pipe(32), chamber water inlet pipe(33), chamber water outlet Pipe(34), connecting tube(35)And use water pipe(36);
The Instant heating type hot water apparatus(2)Including heating chamber(21), the chamber water inlet pipe(33), the chamber outlet pipe(34)Equal position In the heating chamber(21)One end, and with the heating chamber(21)It is connected;
The courage outlet pipe(32), the courage water inlet pipe(31)It is each attached to the inner bag(11)One end, with the inner bag (11)It is connected, and the courage outlet pipe(32)A part insert the inner bag(11)Inside;
The water mixing valve(37)The first valve water inlet pass through the courage outlet pipe(32)It is connected, its second valve water inlet passes through institute State connecting tube(35)With the chamber outlet pipe(34)It is connected, the water mixing valve(37)Valve delivery port with use water pipe(36)It is connected;
The courage water inlet pipe(31)With the connecting tube(35)It is connected, the voltage regulation cylinder(4)Intake-outlet(45)Directly connect Or the connecting tube is connected by the water inlet pipe and water outlet pipe(35).
6. the beforehand instant double-mode water heater according to any one of claim 1, it is characterised in that:
The pipe valve component includes water mixing valve(37), courage water inlet pipe(31), courage outlet pipe(32), chamber water inlet pipe(33), chamber water outlet Pipe(34), the first connecting tube(351), the second connecting tube(352)And use water pipe(36);
The Instant heating type hot water apparatus(2)Including heating chamber(21), the chamber water inlet pipe(33), the chamber outlet pipe(34)Equal position In the heating chamber(21)One end, and with the heating chamber(21)It is connected;
The courage outlet pipe(32), the courage water inlet pipe(31)It is each attached to the inner bag(11)One end, with the inner bag (11)It is connected, and the courage outlet pipe(32)A part insert the inner bag(11)Inside;
The water mixing valve(37)The first valve water inlet and the courage outlet pipe(32)It is connected, its second valve water inlet is by described First connecting tube(351)With the chamber outlet pipe(34)It is connected, the water mixing valve(37)Valve delivery port with use water pipe(36)Phase Even;
The courage water inlet pipe(31)By second connecting tube(352)With the chamber water inlet pipe(33)It is connected, the voltage regulation cylinder (4)Intake-outlet(45)Directly connect or second connecting tube is connected by the water inlet pipe and water outlet pipe(352).
7. beforehand instant double-mode water heater according to claim 1, it is characterised in that:
The pipe valve component includes water mixing valve(37), courage water inlet pipe(31), courage outlet pipe(32), chamber water inlet pipe(33), chamber water outlet Pipe(34), connecting tube(35)And use water pipe(36);
The Instant heating type hot water apparatus(2)Including heating chamber(21), the chamber water inlet pipe(33), the chamber outlet pipe(34)Equal position In the heating chamber(21)One end, and with the heating chamber(21)It is connected;
The courage outlet pipe(32), the courage water inlet pipe(31)It is each attached to the inner bag(11)One end, with the inner bag (11)It is connected, and the courage outlet pipe(32)A part insert the inner bag(11)Inside;
The water mixing valve(37)The first valve water inlet and the courage outlet pipe(32)It is connected, its second valve water inlet and the courage Water inlet pipe(31)It is connected, the water mixing valve(37)Valve delivery port by the connecting tube(35)With the chamber water inlet pipe(33)Phase Even;
The voltage regulation cylinder(4)Intake-outlet(45)Directly connect or the courage water inlet pipe is connected by the water inlet pipe and water outlet pipe (31).
8. the beforehand instant double-mode water heater according to claim 5 or 6 or 7, it is characterised in that:
Also include the first temperature sensor(5), second temperature sensor(6), three-temperature sensor(7), flowmeter(8)And Control panel;
First temperature sensor(5)Water pipe is used positioned at described(36)On, the second temperature sensor(6)Positioned at the chamber Water inlet pipe(33)On, the three-temperature sensor(7)Positioned at the chamber outlet pipe(34)On, first temperature sensor (5), the second temperature sensor(6)And the three-temperature sensor(7)Electrically connected with the control panel;
The flowmeter(8)Positioned at the chamber water inlet pipe(33)On, the flowmeter(8)Electrically connected with the control panel.
9. beforehand instant double-mode water heater according to claim 1, it is characterised in that:
The inner bag(11)Material is configured to enamel material, stainless steel and non-metallic material;
The non-metallic material includes plastic material, ceramic material and glass material.
10. beforehand instant double-mode water heater according to claim 1, it is characterised in that:
The storage-type hot water apparatus(1)Including electromagnetic heater;
The fever tablet of the electromagnetic heater(91)Positioned at the inner bag(11)Inside, the electromagnetic wire coil of the electromagnetic heater (92)It is fixed on the inner bag(11)Outer wall on, the fever tablet(91)With the electromagnetic wire coil(92)It is oppositely arranged.
CN201621075657.5U 2016-09-25 2016-09-25 A kind of beforehand instant double-mode water heater Expired - Fee Related CN206222675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621075657.5U CN206222675U (en) 2016-09-25 2016-09-25 A kind of beforehand instant double-mode water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621075657.5U CN206222675U (en) 2016-09-25 2016-09-25 A kind of beforehand instant double-mode water heater

Publications (1)

Publication Number Publication Date
CN206222675U true CN206222675U (en) 2017-06-06

Family

ID=58783077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621075657.5U Expired - Fee Related CN206222675U (en) 2016-09-25 2016-09-25 A kind of beforehand instant double-mode water heater

Country Status (1)

Country Link
CN (1) CN206222675U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106369812A (en) * 2016-09-25 2017-02-01 中山市亲泉电热水器科技有限公司 Pre-heating and instant heating dual-mode water heater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106369812A (en) * 2016-09-25 2017-02-01 中山市亲泉电热水器科技有限公司 Pre-heating and instant heating dual-mode water heater

Similar Documents

Publication Publication Date Title
CN106369812A (en) Pre-heating and instant heating dual-mode water heater
CN102374655B (en) Air energy heat pump and water-heating integrated device
CN206300332U (en) A kind of electric heater
CN200968704Y (en) Volume various electric water heater
CN206222675U (en) A kind of beforehand instant double-mode water heater
CN202328770U (en) Air energy heat pump hot water integrative machine
CN106642647A (en) Low-pressure electric water heater
CN201628392U (en) Water tank and heat pump water heater
CN204494672U (en) Heat pump type hot water aircondition
CN207293087U (en) A kind of hot-water cylinder electronic temperature controller of improvement
CN206222671U (en) A kind of beforehand instant double-mode water heater
CN201909448U (en) Cold water tap recycling device
CN209386397U (en) A kind of graphene electric heating system based on solar energy auxiliary heating
CN204063256U (en) A kind of wall-hung boiler assisted solar hot water supply system
CN208349384U (en) A kind of heating system of solar energy heat-storage combination water earth source heat pump
CN104633950B (en) A kind of solar energy/air energy Vacuum Heat hydrophone
CN206724295U (en) A kind of heating electric heater
CN202177218U (en) Intelligent constant temperature water-saving device for water heater
CN205351805U (en) Solar water dispenser
CN201425345Y (en) Full automatic constant temperature and pressure hot water supply system
CN204987437U (en) Hydrologic cycle water heater
CN201025411Y (en) A novel solar heat collector
CN205372703U (en) Hanging stove hot -water circulation device
CN206531294U (en) A kind of electromagnetic heating boiler with double-layer heating structure
CN203550205U (en) Integral air source heat pump hot water unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20200925

CF01 Termination of patent right due to non-payment of annual fee