CN206220536U - 3D builds print job platform - Google Patents

3D builds print job platform Download PDF

Info

Publication number
CN206220536U
CN206220536U CN201621113087.4U CN201621113087U CN206220536U CN 206220536 U CN206220536 U CN 206220536U CN 201621113087 U CN201621113087 U CN 201621113087U CN 206220536 U CN206220536 U CN 206220536U
Authority
CN
China
Prior art keywords
axis
leg
climbs
print job
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621113087.4U
Other languages
Chinese (zh)
Inventor
蒋旭峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bo Pai construction technology (Shanghai) Co., Ltd.
Original Assignee
蒋旭峰
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 蒋旭峰 filed Critical 蒋旭峰
Priority to CN201621113087.4U priority Critical patent/CN206220536U/en
Application granted granted Critical
Publication of CN206220536U publication Critical patent/CN206220536U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of 3D builds print job platform, printing mechanism is built including 3D and build the climbing device that printing mechanism is connected with 3D, the climbing device is arranged on the inside of building, including support column, climbed leg with second leg and first that climbs alternately being fixedly connected with wall to climb, support column is connected with 3D building printing mechanisms, first climb leg positioned at second climb leg lower section, first leg that climbs can climb leg jack-up support column 21 and second when being fixedly connected with wall, after jack-up second climb leg be fixedly connected with wall after can by first climb leg lifting, after lifting first leg that climbs is fixedly connected with wall.3D is built the continuous lifting of printing mechanism by 3D building print job platforms of the present utility model by being arranged on the climbing device of building interior, realizes the 3D printing of skyscraper, simple structure, low cost and efficiency high.

Description

3D builds print job platform
Technical field
The utility model belongs to construction equipment field, more particularly to a kind of 3D building print jobs of skyscraper are put down Platform.
Background technology
At present, domestic skyscraper is rised sheer from level ground like the mushrooms after rain, has just like turned into a mark for urban construction And symbol.High-rise particularly high-rise building is again in the majority with Core Walls Structure+outer framed-tube structure at present, is usually used in Super High main building Creeping formwork, sliding formwork, put forward the systems such as mould and cannot adapt to that the modern architecture duration is tight, complex structure is changeable due to a variety of limitation, apply The high grade of work standard requires;Meanwhile, it is just like a raging fire with the building industry 4.0 that 3D buildings print to representative, under this present situation, one New column foot and mould bases integrated intelligent lifting operation system suitable for 3D building printings is planted, is arisen at the historic moment.
Existing 3D builds printing device, it is adaptable to which the building of layer 2-3, the mobile gantry lifting capacity of this equipment has Limit, and limited height system.More than general two-layer, if without extra support or lifting device, just having no idea to carry out again Operation, even and if have a support, stability can be very poor.And extra support or lifting device, when being operated, than It is relatively time consuming laborious.And existing high-rise 3D building printing device, due to the shortcoming at existing 3D building printings gantry, climb wall when Wait, track is supported without place, it is necessary to many attachment points, mounting-dismounting programme is cumbersome, and weight capacity and jacking when erection track All poor with hoisting power, work high above the ground danger coefficient is big;Wall printing is separated with subsequent decorations, tedious process.Column Gantry supports, limited height system, and is separated with die body, and fitness is poor.
Utility model content
The purpose of this utility model is the defect for overcoming prior art, there is provided a kind of simple structure, the 3D of efficiency high build Build print job platform.
To achieve the above object, the utility model employs following technical scheme:
A kind of 3D builds print job platform, including 3D building printing mechanisms 1 and with climbing that 3D building printing mechanisms 1 are connected Mechanism 2 is risen, the climbing device 2 is arranged on the inside of building, including support column 21, and alternately is fixedly connected to climb with wall Second leg 22 and first that climbs climb leg 23, support column 21 is connected with 3D building printing mechanisms 1, and first leg 23 that climbs is located at the Two climb the lower section of leg 22, and first leg 23 that climbs can climb the jack-up of leg 22 support column 21 and second when being fixedly connected with wall, push up After rising second climbs can lift first leg 23 that climbs after leg 22 is fixedly connected with wall, first after lifting climb leg 23 and Wall is fixedly connected.
Preferably, including with the wall outer side face of building the Z axis support post 3 for coordinating, Z axis support post 3 is built with 3D Printing mechanism 1 is connected.
Preferably, the 3D buildings printing mechanism 1 includes X-axis horizontal frame 11, is arranged on the Y on X-axis horizontal frame 11 Axle crossbeam 12, Z axis elevating lever 13 and the printing head being arranged on Z axis elevating lever 13 on Y-axis crossbeam 12;X is to drive Motivation structure can drive Y-axis crossbeam 12 to drive Z axis elevating lever 13 and printing head to be moved along X-direction, and Y-direction drive mechanism can drive Z axis elevating lever 13 is moved on Y-axis crossbeam 12 along Y direction, and Z-direction drive mechanism can drive Z axis elevating lever 13 to be moved along Z-direction It is dynamic.
Preferably, described climbing device 2 includes hydraulic jack, and hydraulic jack climbs on leg 23 installed in first, hydraulic pressure The piston rod 24 of oil cylinder is connected with support column 21, and second climbs leg 22 installed in support column 21, and first leg 23 that climbs is climbed with second Leg 22 is risen to be arranged in parallel, and second climbs leg 22 and first leg 23 that climbs is vertically arranged with support column 21 respectively, support column 21 is pushed up Portion is connected with 3D building printing mechanisms 1.
Preferably, climb leg 22 second and the first two ends for climbing leg 23 are equipped with the fixed pin that is fixedly connected with wall 25, the fixed mount 26 coordinated with fixed pin 25 is installed on wall.
Preferably, X-axis horizontal frame 11 includes constituting the framework border of rectangle, and keel 14 are fixedly mounted on framework border On;The support column 21 of climbing device 2 is connected by keel 14 with X-axis horizontal frame 11, and keel 14 are vertically arranged with Y-axis crossbeam 12 And positioned at the centre of X-axis horizontal frame 11;Two Z axis elevating levers 13 are provided with Y-axis crossbeam 12, respectively positioned at the two of keel 14 Side.
Preferably, X-axis horizontal frame 11 includes constituting the framework border of rectangle, and keel 14 are by avoiding bar 18 and X-axis water Flat frame 11 is connected, and makes avoidance bar 18 higher than the maximum height that Z axis elevating lever 13 can rise.
Preferably, also including many Z axis support posts 3 being connected with X-axis horizontal frame 11, many Z axis support posts 3 are consolidated Whole 3D buildings print job platform is scheduled on wall and can support, climbing device 2 can shrink and be raised to Y-axis crossbeam 12 Above.
Preferably, X-axis slide rail 15, the upper correspondence position of Y-axis crossbeam 12 are provided with the framework border of X-axis horizontal frame 11 It is provided with the X-axis pulley 16 coordinated with X-axis slide rail 15;Z axis elevating lever 13 is connected by travel mechanism 17 with Y-axis crossbeam 12, mobile Mechanism 17 is arranged on Y-axis crossbeam 12 can drive Z axis elevating lever 13 to be moved along Y-axis, and Z axis elevating lever 13 can be driven to lift.
Preferably, wall outer side is provided with the support frame coordinated with Z axis support post 3, and support frame is provided with lifting rail, Z axis support post 3 is provided with the slide mechanism coordinated with lifting rail.
3D building print job platforms of the present utility model are beaten 3D buildings by being arranged on the climbing device 2 of building interior The continuous lifting of printing mechanism 1, realizes the 3D printing of skyscraper, simple structure, low cost and efficiency high.Printer is built using 3D Structure 1 carries out building printing, is particularly well-suited to build each Rotating fields difference, and the relative complex skyscraper of structure reduces high-altitude and changes The number of times of mould, the building frame without building complexity.3D building printing mechanisms 1 use modular frame structure, stabilized structure And be easy to support lifting.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model 3D builds print job platform;
Fig. 2 is the jack-up view of climbing that the utility model 3D builds print job platform;
Fig. 3 is the completion status schematic diagram that climbs that the utility model 3D builds print job platform;
Fig. 4 is the structural representation that the utility model 3D builds print job platform one embodiment;
Fig. 5 is the structural representation of another embodiment of the utility model 3D building print job platforms.
Specific embodiment
Below in conjunction with the embodiment that accompanying drawing 1 to 5 is given, 3D buildings print job platform of the present utility model is further illustrated Specific embodiment.3D buildings print job platform of the present utility model is not limited to the following description.
As Figure 1-5, a kind of 3D suitable for skyscraper builds print job platform, including 3D building printing mechanisms 1 and with the 3D building climbing devices 2 that are connected of printing mechanism 1.The climbing device 2, positioned at building inside, be fixed on ground, Or be fixed on wall, 3D is built the jacking of printing mechanism 1 to the top of building by being fixed on the wall of both sides successively to be climbed Printed.The climbing device 2 include support column 21, and alternately be fixedly connected with wall to climb second climb leg 22 and First climbs leg 23, and support column 21 is connected with 3D building printing mechanisms 1, and first leg 23 that climbs climbs below leg 22 positioned at second, And second climb leg 22 and first leg 23 that climbs is vertically arranged with support column 21 respectively, first leg 23 that climbs is fixedly connected with wall When support column 21 and second can be climbed the jack-up of leg 22, after jack-up second climb leg 22 be fixedly connected with wall after can be by first The leg 23 that climbs is lifted, and the leg 23 that climbs of first after lifting is fixedly connected with wall, realizes climbing device 2 and 3D building printing mechanisms 1 climbs.3D building print job platforms of the present utility model are beaten 3D buildings by being arranged on the climbing device 2 of building interior The continuous lifting of printing mechanism 1, realizes the 3D printing of skyscraper, simple structure, low cost and efficiency high.Printer is built using 3D Structure 1 carries out building printing, is particularly well-suited to build each Rotating fields difference, and the relative complex skyscraper of structure reduces high-altitude and changes The number of times of mould, the building frame without building complexity.
As illustrated in figures 4-5, the 3D buildings printing mechanism 1, for the printing of 3D buildings, it includes X-axis horizontal frame 11, The Y-axis crossbeam 12 on X-axis horizontal frame 11 is arranged on, the Z axis elevating lever 13 on Y-axis crossbeam 12 and Z axis liter is arranged on Printing head on drop bar 13;X can drive Y-axis crossbeam 12 to drive Z axis elevating lever 13 and printing head along X-axis side to drive mechanism To movement, Y-direction drive mechanism can drive Z axis elevating lever 13 to be moved along Y direction on Y-axis crossbeam 12, and Z-direction drive mechanism can drive Dynamic Z axis elevating lever 13 is moved along Z-direction.Printing head can be in X-axis horizontal frame 11, Y-axis crossbeam 12 and Z axis elevating lever 13 Moving range in the side of X-axis, Y-axis and Z axis move up complete 3D building print job.3D building printing mechanisms 1 are adopted Use modular frame structure, stabilized structure and be easy to support lifting.X is to drive mechanism, Y-direction drive mechanism and Z-direction driving machine Structure can be using any modes such as motor, cylinder, wheel belt, tooth bars, and printing head is also filled by pipeline with mixed mud, mortar feed Connection is put, pipeline can be soft rubber tube or rigid iron, steel pipe etc., will not be repeated here.Preferably, 3D buildings printing Job platform also include Z axis support post 3, with 3D building printing mechanism 1 X-axis horizontal frame 11 be connected, for building Wall outer side face coordinates, and plays the firm effect of support.
As Figure 1-3, the climbing device 2 can be using lifting bodies such as hydraulic jack, cylinders.The branch of climbing device 2 Dagger 21 is connected with the X-axis horizontal frame 11 of 3D building printing mechanisms 1, and the printing head of 3D building printing mechanisms 1 is according to building Design requirement moved up in the side of X-axis, Y-axis and Z axis and carry out building printing, alternating is fixedly connected to climb with wall. The incipient stage of 3D building printings, due to also without wall, first leg 23 that climbs can be fixed on ground by foundation bolt 231 On, support 3D building printing mechanisms 1.Referring to Fig. 2, (such as 3 after wall is printed to certain altitude by 3D building printing mechanisms 1 Layer after), the piston rod 24 of hydraulic jack stretches out, by support column 21, second climb leg 22 and 3D building the jack-up of printing mechanism 1.Ginseng See Fig. 3, the second of jack-up climbs after the two ends of leg 22 are fixedly connected with the wall (such as the 3rd layer) of both sides, first is climbed leg 23 The foundation bolt 231 being connected with ground unclamps, and the piston rod 24 of hydraulic jack shrinks, by first climb leg 23 lifted and and both sides Wall (such as the 2nd layer) be fixedly connected completion and climb.Next proceed through the building wall that 3D building printing mechanisms 1 print higher Body, repeats above-mentioned steps and climbs.
A kind of preferred embodiment, hydraulic jack climbs on leg 23 installed in first, piston rod 24 and the branch of hydraulic jack Dagger 21 is connected, and second climbs leg 22 installed in support column 21, and the X-axis level of printing mechanism 1 is built at the top of support column 21 with 3D Framework 11 is connected, and first leg 23 that climbs be arranged in parallel with second leg 22 that climbs.By support column 21 and second when hydraulic jack stretches out Climb the jack-up of leg 22, climbed after leg 22 fixes with wall second, release first and climb leg 23 and the connection of ground or wall, liquid Compressing cylinder shrinks and first leg 23 that climbs is lifted and is fixedly connected with the wall of last layer.Climbed leg in second leg 22 and first that climbs 23 two ends are equipped with the fixed pin 25 being fixedly connected with wall, and the fixed mount coordinated with fixed pin 25 is provided with wall 26, fixed pin 25 and fixed mount 26 coordinate climbing device 2 are fixed on wall.The fixed mount 26 can be in printing wall When be embedded into wall, it is also possible to print wall after be installed on wall.Preferably, the fixed pin 25 can stretch, Can be withdrawn into second leg 22 and first that climbs to climb and climb facilitating in leg 23, it is also possible to stretch out to be installed with fixed mount 26 and match somebody with somebody Close.Described climbing device 2 is placed in the inside of building, and one is to be placed in elevator the inside, particularly high-storey, is usually constructed with Elevator, is adapted to this kind of operating type, because in elevator, climbing up and down more convenient;Another is in floor plates Between, certain space is vacated, do not print, as passage, allow climbing device 2 in layer up to walk;After the completion of operation, fill Reinforcing bar and concreting.
As shown in figure 4, the utility model 3D building print job platform one embodiment, the structure in figure is only to illustrate. The 3D buildings printing mechanism 1 includes X-axis horizontal frame 11, the Y-axis crossbeam 12 on X-axis horizontal frame 11 is arranged on, installed in Y Z axis elevating lever 13 and the printing head being arranged on Z axis elevating lever 13 on axle crossbeam 12.X-axis horizontal frame 11 includes constituting The framework border of rectangle, keel 14 be arranged on framework border on, position in the middle of X-axis horizontal frame 11, as whole frame The attachment supporting core of frame, maintains static;Two support columns of hydraulic jack 21 of climbing device 2 are by keel 14 and X-axis water Flat frame 11 is connected, and keel 14 are vertically arranged and positioned at the centre of X-axis horizontal frame 11 with Y-axis crossbeam 12, on Y-axis crossbeam 12 Two Z axis elevating levers 13 are provided with, respectively positioned at the both sides of keel 14.3D building print jobs platform also includes many with X-axis water Flat frame 11 connection Z axis support post 3, Z axis support post 3 be attached to construction wall outside on play firm effect.
Four Z axis support posts 3 are provided with the present embodiment, respectively at the end angle of the framework border of rectangle, Z axis support The one end of column 3 is connected with framework border, and the other end is provided with the bindiny mechanism fixed with wall.When the height of building is increased to one When determining degree, when basic machine insufficient height, hydraulic jack plays jacking, so that whole 3D builds printing mechanism 1 Certain height is brought up to, there are enough spaces, the work of wall printing is carried out again;Can also be climbed by climbing device 2.When When hydraulic cylinder jacking plays whole 3D buildings printing mechanism 1, four Z axis support posts are attached on building, and are climbed Mechanism 2 together, forms a firm supporting construction for entirety, it is clear that can as needed use more Z axis support posts 3。
Preferably, wall outer side is provided with the support frame coordinated with Z axis support post 3, and support frame is arranged on wall outer side, Support frame is provided with lifting rail, and Z axis support post 3 is provided with the slide mechanism coordinated with lifting rail, when 3D building printings are made When industry platform is climbed by climbing device 2, Z axis support post 3 is climbed by slide mechanism along the lifting rail of support frame, is played The effect of guide support.Further, be provided with the guide rail of support frame only allow a slide mechanism climb upwards, it is impossible to rollback only Move back mechanism.Z axis support post 3 coordinates to lift steadiness by tripod structure with support frame.
As shown in figure 4, X-axis slide rail 15 is provided with the framework border of keel 14 and both sides in parallel, Y-axis crossbeam 12 Middle part and two ends correspondence position be provided with X-axis pulley 16, X-axis pulley 16 coordinates the effect in X to drive mechanism with X-axis slide rail 15 Under make Y-axis crossbeam 12 drive Z axis elevating lever 13 and printing head to be moved along X-direction, can be using rack-and-pinion or roller etc. Mode coordinates.Z axis elevating lever 13 is connected by travel mechanism 17 with Y-axis crossbeam 12, and travel mechanism 17 is arranged on Y-axis crossbeam 12 Z axis elevating lever 13 can be driven to be moved along Y-axis, and Z axis elevating lever 13 can be driven to lift.The travel mechanism 17 is enclosed within Y-axis crossbeam 12, the Y-axis pulley 171 in travel mechanism 17 coordinates with the Y-axis slide rail on Y-axis crossbeam 12, is driven under the driving of Y-direction drive mechanism Z axis elevating lever 13 is moved;The travel mechanism 17 is externally provided with the sliding block coordinated with the Z axis chute on Z axis elevating lever 13, and Z-direction is driven Motivation structure can drive Z axis elevating lever 13 to be moved along Z-direction.Z-direction drive mechanism can select cylinder to promote Z axis elevating lever 13 to slide It is dynamic, it is also possible to select motor to be lifted with rack mode, it is also possible to be lifted by way of motor and wheel belt.Z-direction drive mechanism can With in travel mechanism 17, it is also possible on Z axis elevating lever 13.
In the present embodiment, keel 14 have blocked the direction that Z axis elevating lever 13 is moved along Y-axis crossbeam 12 in Y-axis, therefore need to set Two Z axis elevating levers 13 and two printing heads are put, respectively positioned at the both sides of keel 14, the wall of the both sides of keel 14 is printed respectively Body, but still the blind area for having a keel siding size is difficult to print.
As shown in figure 5, the utility model 3D builds another embodiment of print job platform, general structure is with Fig. 4's Embodiment is essentially identical, and difference is that described keel 14 are connected by avoiding bar 18 with X-axis horizontal frame 11, makes avoidance bar 18 maximum heights that can rise higher than Z axis elevating lever 13, so that keel 14 avoid Z axis elevating lever 13, make the Z axis elevating lever 13 can edge Y-axis crossbeam 12 is moved in Y-axis.Specifically, the two ends of keel 14 are arranged on framework by two avoidance bars 18 respectively in the present embodiment On frame, an avoidance space for gate is formed, keel 14 are raised by avoiding bar 18.Meanwhile, can also increase Z axis support vertical The bracing force of post 3, many Z axis support posts 3 are fixed on printed wall, can increase Z axis support as requested The quantity of column 3, makes Z axis support post 3 support the weight that whole 3D builds print job platform enough so that climbing device 2 hydraulic jack can shrink and be raised to above Y-axis crossbeam 12, so only need to set a Z axis elevating lever 13, you can whole Individual plane is carried out the work, and greatly reduces the input and work facility of hardware, and without printing blind area.
The whole frame structure of the utility model 3D building print job platforms is modular, as the X of whole building thing, When the width of Y-axis is very big, a modular unit cover, the module number of 3D building print job platforms can be increased And the need for coupling together to adapt to operation, will whole building thing plane, be cut into the module of several frame structures, Last whole module covers the plane of building.The 3-4 jacking strong point can be set according to climbing device feature, it is maximum Limit reduction Z axis support post and the interactively point of Core Walls Structure wall, reduce climbing device change to the system to greatest extent Influence, realize the 3D printing of skyscraper.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to Assert that specific implementation of the present utility model is confined to these explanations.For the ordinary skill of the utility model art For personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, should all regarded To belong to protection domain of the present utility model.

Claims (10)

1. a kind of 3D buildings print job platform, including 3D builds printing mechanism (1) and builds what printing mechanism (1) was connected with 3D Climbing device (2), it is characterised in that:The climbing device (2) is arranged on the inside of building, including support column (21), and alternately It is fixedly connected to climb second leg (22) and first that climbs with wall to climb leg (23), support column (21) builds printer with 3D Structure (1) is connected, and first leg (23) that climbs climbs leg (22) lower section positioned at second, and first climbs leg (23) when being fixedly connected with wall Support column (21) and second can be climbed leg (22) jack-up, after jack-up second climb leg (22) be fixedly connected with wall after can be by First climbs leg (23) lifting, and after lifting first leg (23) that climbs is fixedly connected with wall.
2. 3D according to claim 1 builds print job platform, it is characterised in that:Including the wall outer side face with building The Z axis support post (3) of cooperation, Z axis support post (3) is built printing mechanism (1) and is connected with 3D.
3. 3D according to claim 1 and 2 builds print job platform, it is characterised in that:The 3D builds printing mechanism (1) including X-axis horizontal frame (11), the Y-axis crossbeam (12) on X-axis horizontal frame (11) is arranged on, installed in Y-axis crossbeam (12) On Z axis elevating lever (13) and the printing head that is arranged on Z axis elevating lever (13);X can drive Y-axis crossbeam to drive mechanism (12) Z axis elevating lever (13) and printing head is driven to be moved along X-direction, Y-direction drive mechanism can drive Z axis elevating lever (13) to exist Moved along Y direction on Y-axis crossbeam (12), Z-direction drive mechanism can drive Z axis elevating lever (13) to be moved along Z-direction.
4. 3D according to claim 1 and 2 builds print job platform, it is characterised in that:Described climbing device (2) bag Hydraulic jack is included, hydraulic jack climbs on leg (23) installed in first, the piston rod (24) of hydraulic jack is with support column (21) even Connect, second climbs leg (22) installed in support column (21), first leg (23) that climbs be arranged in parallel with second leg (22) that climbs, and Two climb leg (22) and first leg (23) that climbs is vertically arranged with support column (21) respectively, and support column (21) top is beaten with 3D buildings Printing mechanism (1) is connected.
5. 3D according to claim 4 builds print job platform, it is characterised in that:Climbed leg (22) and first second The climb two ends of leg (23) are equipped with the fixed pin (25) being fixedly connected with wall, are provided with wall and matched somebody with somebody with fixed pin (25) The fixed mount (26) of conjunction.
6. 3D according to claim 3 builds print job platform, it is characterised in that:X-axis horizontal frame (11) is including structure Rectangular framework border, keel (14) are fixedly mounted on framework border;The support column (21) of climbing device (2) is by keel (14) it is connected with X-axis horizontal frame (11), keel (14) are vertically arranged and positioned at X-axis horizontal frame (11) with Y-axis crossbeam (12) Centre;Two Z axis elevating levers (13) are provided with Y-axis crossbeam (12), respectively positioned at the both sides of keel (14).
7. 3D according to claim 3 builds print job platform, it is characterised in that:X-axis horizontal frame (11) is including structure Rectangular framework border, keel (14) are connected by avoiding bar (18) with X-axis horizontal frame (11), make the avoidance bar (18) be higher than The maximum height that Z axis elevating lever (13) can rise.
8. 3D according to claim 7 builds print job platform, it is characterised in that:Also include and X-axis horizontal frame (11) many Z axis support posts (3) of connection, many Z axis support posts (3) are fixed on wall and can support whole 3D and build Print job platform is built, climbing device (2) can shrink and be raised to above Y-axis crossbeam (12).
9. print job platform is built according to any described 3D of claim 6-8, it is characterised in that:In X-axis horizontal frame (11) framework border is provided with X-axis slide rail (15), and the upper correspondence position of Y-axis crossbeam (12) is provided with and coordinates with X-axis slide rail (15) X-axis pulley (16);Z axis elevating lever (13) is connected by travel mechanism (17) with Y-axis crossbeam (12), and travel mechanism (17) installs Z axis elevating lever (13) can be driven to be moved along Y-axis on Y-axis crossbeam (12), and Z axis elevating lever (13) can be driven to lift.
10. 3D according to claim 2 builds print job platform, it is characterised in that:Wall outer side is provided with and Z axis branch The support frame that support column (3) coordinates, support frame is provided with lifting rail, and Z axis support post (3) is provided with and lifting rail cooperation Slide mechanism.
CN201621113087.4U 2016-10-11 2016-10-11 3D builds print job platform Withdrawn - After Issue CN206220536U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621113087.4U CN206220536U (en) 2016-10-11 2016-10-11 3D builds print job platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621113087.4U CN206220536U (en) 2016-10-11 2016-10-11 3D builds print job platform

Publications (1)

Publication Number Publication Date
CN206220536U true CN206220536U (en) 2017-06-06

Family

ID=58782962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621113087.4U Withdrawn - After Issue CN206220536U (en) 2016-10-11 2016-10-11 3D builds print job platform

Country Status (1)

Country Link
CN (1) CN206220536U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320713A (en) * 2016-10-11 2017-01-11 蒋旭峰 3D construction printing operation platform
CN107419901A (en) * 2017-07-25 2017-12-01 上海建工集团股份有限公司 Architectural engineering integration 3D printing building system and its application method
CN108374675A (en) * 2018-02-11 2018-08-07 中煤能源研究院有限责任公司 Gob side entry driving 3D printing crossheading wall robot and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320713A (en) * 2016-10-11 2017-01-11 蒋旭峰 3D construction printing operation platform
CN106320713B (en) * 2016-10-11 2019-12-06 博湃建筑科技(上海)有限公司 3D building printing operation platform
CN107419901A (en) * 2017-07-25 2017-12-01 上海建工集团股份有限公司 Architectural engineering integration 3D printing building system and its application method
CN107419901B (en) * 2017-07-25 2019-06-07 上海建工集团股份有限公司 Architectural engineering integration 3D printing building system and its application method
CN108374675A (en) * 2018-02-11 2018-08-07 中煤能源研究院有限责任公司 Gob side entry driving 3D printing crossheading wall robot and construction method

Similar Documents

Publication Publication Date Title
CN106320713A (en) 3D construction printing operation platform
CN105297635B (en) Assembled lifting type construction platform for pier column construction and construction method thereof
CN206220536U (en) 3D builds print job platform
CN103061500A (en) Bowstring truss type fully-enclosed hydraulic climbing formwork system and application method for same
CN104533460B (en) Support replacement formula formwork jumbo and the construction method of underpass concreting
CN201620626U (en) Movable four-pillar three-dimensional parking garage
CN103806654A (en) Hydraulic support system for elevator shaft mold and operating method thereof
CN112177321B (en) Creeping formwork construction equipment and method for building external wall and floor slab
CN208329596U (en) A kind of semi-machine rail type subway station side wall template construction equipment
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN107724671B (en) Integral type sliding formwork system and construction method thereof
CN109778713A (en) A kind of steel truss girder bridge scene suspension and slipping assembly device and method
CN108005373B (en) Integrated lifting platform system and assembling method thereof
CN106150525A (en) A kind of rock anchorage beam construction trolley and construction method thereof
CN108118620A (en) For the whole self-crawling type integrated platform and its construction method of bridge tower construction
CN102587644B (en) Single-side side wall slip form and construction method
CN208072219U (en) Bridge High-pier template mutually climbs device with holder
CN217761022U (en) Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station
CN207727440U (en) Whole self-crawling type integrated platform for bridge tower construction
CN108756197A (en) A kind of construction method of hoistway operation platform
CN115306435A (en) Hydropower station air cushion type surge chamber construction comprehensive operation trolley and use method thereof
CN1048426A (en) Building cast-in-situ body of wall without climibing rack and its mould technology and mould
CN209722761U (en) A kind of steel truss girder bridge scene suspension and slipping assembly device
CN108660928A (en) Bridge High-pier turns over creeping formwork lifting device
CN113175201A (en) A operation platform that rises that slides for elevartor shaft construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170824

Address after: Castle Lake Street Xinggang road Ling'an city Hangzhou city Zhejiang province 311305 No. 618 building a layer of public record No. forty-nine to No. fifty-six space station

Patentee after: The land of innovation and Technology (Hangzhou) Co. Ltd.

Address before: 311301 Hangzhou, Zhejiang Province, Ling'an Province, 6 Pavilion Street, 2 blocks

Patentee before: Jiang Xufeng

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180929

Address after: 201401 Fengxian District 4, 3 floor, 1158 room, 469, Feng Jin Road, Fengxian District.

Patentee after: Bo Pai construction technology (Shanghai) Co., Ltd.

Address before: Workplace No. 49-56, Main Building No. 618 Xinggang Road, Qingshan Lake Street, Hangzhou City, Zhejiang Province

Patentee before: The land of innovation and Technology (Hangzhou) Co. Ltd.

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20170606

Effective date of abandoning: 20191206

AV01 Patent right actively abandoned