CN206220127U - Inspection shaft well seat - Google Patents

Inspection shaft well seat Download PDF

Info

Publication number
CN206220127U
CN206220127U CN201621223347.3U CN201621223347U CN206220127U CN 206220127 U CN206220127 U CN 206220127U CN 201621223347 U CN201621223347 U CN 201621223347U CN 206220127 U CN206220127 U CN 206220127U
Authority
CN
China
Prior art keywords
plate
pieces
unit
inspection shaft
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621223347.3U
Other languages
Chinese (zh)
Inventor
谭江南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LOUDI CITY ZHAOYANG PLASTIC CO Ltd
Original Assignee
LOUDI CITY ZHAOYANG PLASTIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LOUDI CITY ZHAOYANG PLASTIC CO Ltd filed Critical LOUDI CITY ZHAOYANG PLASTIC CO Ltd
Priority to CN201621223347.3U priority Critical patent/CN206220127U/en
Application granted granted Critical
Publication of CN206220127U publication Critical patent/CN206220127U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model discloses a kind of inspection shaft well seat, including at least two boards blade unit, pieces unit of plate is integral along the circumference splicing of inspection shaft well seat, connects assembled by splicing body between adjacent two boards blade unit, and splicing body is in rotation angle position or in plate face;Pieces unit of plate uses flat board, arc, groove type plate, L shaped plate or U-board;At least one piece pieces unit of plate is provided with the pipe socket for accepting underground piping, or at least one piece pieces unit of plate is provided with the bell and spigot of pipe socket or socket joint underground piping for socket joint split.Inspection shaft well holder structure is simple, assembled convenient;The selection of pieces unit of plate, combination and erection method are flexible and changeable, the need for can meeting various design and construction.

Description

Inspection shaft well seat
Technical field
The utility model is related to manhole shaft technical field, especially, is related to a kind of inspection shaft well seat.
Background technology
Inspection shaft is constructed for rainwater, sewage vent line and offer maintenance workman inspection, cleaning the attached of foreign matter Thing, inspects periodically, safeguards, changes and dredging pipeline to facilitate.Inspection shaft well seat be in inspection shaft pipeline cross position, turn Curved position, caliber or the gradient change position and the lower support structure for carrying whole inspection shaft.
Existing inspection shaft well seat is carried to scene using overall structure mostly, or the side for being built by laying bricks or stones by fragment of brick at the scene Formula makes shaping.
Type checking well well seat is fabricated to by the way of scene is built by laying bricks or stones by fragment of brick, whether for large-scale inspection shaft or For a large amount of inspection shafts, speed of application is slow, and the construction period is long, and construction cost is high.
Using integrated manhole shaft well seat, when in face of large-scale inspection shaft, the manufacture difficulty of inspection shaft well seat can be increased, removed Fortune difficulty and hoisting difficulty, while can also increase cost of labor, construction cost;In a large amount of inspections in face of same construction site When well lays building site, a large amount of making integrated manhole shaft well seat difficulty are big, it is big to carry difficulty.
Utility model content
The utility model provides a kind of inspection shaft well seat, and to solve existing inspection shaft well seat, manufacture difficulty is big, make speed Degree is slow, installation rate is slow, the technical problem of high cost.
A kind of inspection shaft well seat of the present utility model, including at least two boards blade unit, pieces unit of plate is along inspection shaft well seat Circumference splicing it is integral, connect assembled by splicing body between adjacent two boards blade unit, splicing body is in corner portion Position or in plate face;Pieces unit of plate uses flat board, arc, groove type plate, L shaped plate or U-board;At least one piece plate list Unit is provided with the pipe socket for accepting underground piping, or at least one piece pieces unit of plate is provided with the pipe for socket joint split The bell and spigot of road bellmouth or socket joint underground piping.
Further, splicing body includes the Z-shaped interface of the edges of boards for being respectively arranged on adjacent two boards blade unit, adjacent two pieces Pieces unit of plate is mutually fitted together to by Z-shaped interface;Also anchoring has a rivet on mutually chimeric Z-shaped interface, or mutually chimeric Z-shaped The plug connector set along the chimeric direction of Z-shaped interface and for being mutually inserted cooperation is additionally provided between interface.
Further, splicing body includes the dovetail groove being opened in respectively on adjacent two boards blade unit and caters to swallow Agree with block in stern notch, two dovetail grooves are fastened and are connected into overall structure by agreeing with block relatively.
Further, splicing body includes equidistantly being arranged in the dovetails of pieces unit of plate edges of boards, between adjacent dovetails Constitute dovetail groove;Adjacent two boards blade unit is chimeric each other with dovetail groove by dovetails, and the overall structure of conjunction is mutually held in formation.
Further, the end of dovetails is provided with to be slipped into each other for adjacent two boards blade unit and is fitted together to and reduces corner portion The taper protuberance of the collision injury that the acute angle of position is produced.
Further, splicing body includes multiple wedgings in the voussoir on the joint close of adjacent two boards blade unit, voussoir The two-end thickness being respectively in adjacent two boards blade unit plate face is big, the joint close position in adjacent two boards blade unit Interior thickness is small, connection formed for by drawknot mechanism from adjacent two boards blade unit to joint close drawknot.
Further, internal face wedging of the voussoir from pieces unit of plate and/or the outside wall surface wedging from pieces unit of plate.
Further, splicing body uses the male and female groove of the connection that is fitted to each other, or is plugged in adjacent two boards piece respectively H-shaped socket joint groove on the wooden partition of unit.
Further, pipe socket uses and uses and divide with the integrally formed overall structure of pieces unit of plate, or pipe socket System is made and is assemblied in the Split type structure on pieces unit of plate;Pipe socket is integrally located on a wall for pieces unit of plate, or Pipe socket is respectively arranged on adjacent two using the relative split part for fastening formation of two and half side members, two split parts On pieces unit of plate.
Further, interaction force is reduced when being arranged with bell and spigot for connecting pipe bellmouth or socket joint underground piping And the sealing buffering collar sealed to connecting portion.
Further, the joint close between adjacent two boards blade unit and the splicing body on joint close be vertically Arrangement is diagonally arranged.
The utility model has the advantages that:
The utility model inspection shaft well seat, assembled by polylith pieces unit of plate, the making of pieces unit of plate is simpler, and And being capable of conveniently transport and now assembly.Can be needed according to design and site operation situation flexibly selects plate of different shapes Blade unit carries out assembling combination by splicing body, so as to meet design and site operation needs, simple structure, conveniently makes With.Splicing body is in rotation angle position or in plate face, by splicing body and joint close combine to form rotation angle position or The structure Auxiliary support of person's plate face, it is possible to increase overall bearing capacity.Selection can be needed to be held with pipeline according to design and construction Mouthful or the pieces unit of plate of bell and spigot be combined assembly, so as to meet the need for pipeline splicing installs.The plate of inspection shaft well seat The selection of blade unit, combination and erection method are flexible and changeable, the need for can meeting various design and construction.
In addition to objects, features and advantages described above, the utility model also has other purposes, feature and excellent Point.Below with reference to figure, the utility model is described in further detail.
Brief description of the drawings
The accompanying drawing for constituting the part of the application is used for providing being further understood to of the present utility model, of the present utility model Schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model.In accompanying drawing In:
Fig. 1 is one of structural representation of inspection shaft well seat of the utility model preferred embodiment;
Fig. 2 is the two of the structural representation of the inspection shaft well seat of the utility model preferred embodiment;
Fig. 3 is the three of the structural representation of the inspection shaft well seat of the utility model preferred embodiment;
Fig. 4 is the structural representation of the sealing buffering collar in Fig. 3;
Fig. 5 is one of structural representation of split type pipe socket of the utility model preferred embodiment;
Fig. 6 is the two of the structural representation of the split type pipe socket of the utility model preferred embodiment;
Fig. 7 is the three of the structural representation of the split type pipe socket of the utility model preferred embodiment;
Fig. 8 is the four of the structural representation of the split type pipe socket of the utility model preferred embodiment;
Fig. 9 is the four of the structural representation of the inspection shaft well seat of the utility model preferred embodiment;
Figure 10 is the structural representation of the sealing buffering collar in Fig. 9;
Figure 11 is the five of the structural representation of the split type pipe socket of the utility model preferred embodiment;
Figure 12 is the five of the structural representation of the inspection shaft well seat of the utility model preferred embodiment;
Figure 13 is the six of the structural representation of the inspection shaft well seat of the utility model preferred embodiment;
Figure 14 is the seven of the structural representation of the inspection shaft well seat of the utility model preferred embodiment;
Figure 15 is the eight of the structural representation of the inspection shaft well seat of the utility model preferred embodiment;
Figure 16 is the nine of the structural representation of the inspection shaft well seat of the utility model preferred embodiment.
Marginal data:
1st, pieces unit of plate;2nd, splicing body;201st, Z-shaped interface;202nd, plug connector;203rd, dovetail groove;204th, block is agreed with; 205th, dovetails;2051st, taper protuberance;206th, voussoir;207th, male and female groove;208th, H-shaped socket joint groove;3rd, pipe socket;301、 Split part;4th, bell and spigot;5th, the sealing buffering collar;6th, joint close.
Specific embodiment
Embodiment of the present utility model is described in detail below in conjunction with accompanying drawing, but the utility model can be by following The multitude of different ways for limiting and covering is implemented.
Fig. 1 is one of structural representation of inspection shaft well seat of the utility model preferred embodiment;Fig. 2 is the utility model The two of the structural representation of the inspection shaft well seat of preferred embodiment;Fig. 3 is the inspection shaft well seat of the utility model preferred embodiment Structural representation three;Fig. 4 is the structural representation of the sealing buffering collar in Fig. 3;Fig. 5 is the utility model preferred embodiment One of the structural representation of split type pipe socket;Fig. 6 is the split type pipe socket of the utility model preferred embodiment The two of structural representation;Fig. 7 is the three of the structural representation of the split type pipe socket of the utility model preferred embodiment;Fig. 8 It is the four of the structural representation of the split type pipe socket of the utility model preferred embodiment;Fig. 9 is preferably real the utility model Apply the four of the structural representation of the inspection shaft well seat of example;Figure 10 is the structural representation of the sealing buffering collar in Fig. 9;Figure 11 is this The five of the structural representation of the split type pipe socket of utility model preferred embodiment;Figure 12 is the utility model preferred embodiment Inspection shaft well seat structural representation five;Figure 13 is the structural representation of the inspection shaft well seat of the utility model preferred embodiment The six of figure;Figure 14 is the seven of the structural representation of the inspection shaft well seat of the utility model preferred embodiment;Figure 15 is new this practicality The eight of the structural representation of the inspection shaft well seat of type preferred embodiment;Figure 16 is the inspection shaft well of the utility model preferred embodiment The nine of the structural representation of seat.
As shown in figure 1, the inspection shaft well seat of the present embodiment, including at least two boards blade unit 1, pieces unit of plate 1 is along inspection The circumference splicing of well well seat is integral, assembly is connected by splicing body 2 between adjacent two boards blade unit 1, at splicing body 2 In rotation angle position or in plate face;Pieces unit of plate 1 is using flat board, arc, groove type plate, L shaped plate or U-board;At least One piece of pieces unit of plate 1 is provided with the pipe socket 3 for accepting underground piping, or at least one piece pieces unit of plate 1 is provided with use In the pipe socket 3 or the bell and spigot 4 of socket joint underground piping of socket joint split.Alternatively, pipe socket 3 is pipe bellmouth, square tube Bellmouth, Rhizoma Sparganii tube faucet, trapezoidal tube faucet, oval tube faucet or polygonal tube bellmouth.The utility model inspection shaft well seat, by many Block pieces unit of plate 1 is assembled, and the making of pieces unit of plate 1 is simpler, and being capable of conveniently transport and now assembly.Can be with root Needed according to design and site operation situation flexibly selects the pieces unit of plate of different shapes 1 to carry out assembled group by splicing body 2 Close, so as to meet design and site operation needs, simple structure, convenient use.Splicing body 2 is in rotation angle position or place In in plate face, the structure Auxiliary support of rotation angle position or plate face, Neng Gouti are combined to form by splicing body 2 and joint close 6 Overall bearing capacity high.Can be carried out according to design and construction needs pieces unit of plate 1 of the selection with pipe socket or bell and spigot 4 Composite assembly, so as to meet pipeline splicing install the need for.Inspection shaft well seat pieces unit of plate 1 selection, combination and assembly side Formula is flexible and changeable, the need for can meeting various design and construction.It is alternatively possible to bell and spigot 4 is closed using hush panel, to meet For some reason and without bell and spigot 4 or the situation of pipe socket 3 in application process.Alternatively, bell and spigot 4 is circular hole, side Hole, rectangular opening, tri-angle-holed, trapezoidal hole, polygonal hole or slotted eye.It is alternatively possible to pass through the wall of control pipeline bellmouth 3 Thickness adapts to different radial dimension of socket joint pipelines.It is alternatively possible to the pipe socket 3 by assembling different wall in bell and spigot 4, To be adapted to different radial dimension of socket joint pipelines.Alternatively, pit shaft is also equipped with inspection shaft well seat, pit shaft can be used and divided Package assembly after system work, the overall structure that pit shaft can also be formed as one using the pieces unit of plate 1 with inspection shaft well seat.Can Selection of land, the whole board structure that pieces unit of plate 1 can be formed in one, it would however also be possible to employ by vertical and/or laterally assembled assembled knot Structure, it would however also be possible to employ by the iterative structure of stacking multilayer boards.Alternatively, as shown in Fig. 2 the opening of pipe socket 3 radially Size is become larger from inside to outside by inspection shaft well seat, horn mouth is formed, to be adapted to the undertaking of the underground piping of different bores.Can Selection of land, as shown in figure 13, the opening of pipe socket 3 is stepped from inside to outside by inspection shaft well seat, the underground piping of different bores Corresponding to the different component levels of the opening of pipe socket 3, to be adapted to the undertaking of the underground piping of different bores.
As shown in figure 1, in the present embodiment, splicing body 2 includes the Z of the edges of boards for being respectively arranged on adjacent two boards blade unit 1 Shape interface 201, adjacent two boards blade unit 1 is mutually chimeric by Z-shaped interface 201.Anchor is gone back on mutually chimeric Z-shaped interface 201 It is additionally provided between intrinsic rivet, or the Z-shaped interface 201 being mutually fitted together to and is set and for phase along the chimeric direction of Z-shaped interface 201 The plug connector 202 that mutual grafting coordinates.
As shown in Fig. 2 and Figure 13, in the present embodiment, splicing body 2 includes being opened in respectively on adjacent two boards blade unit 1 Dovetail groove 203 and cater in dovetail groove 203 and agree with block 204, two dovetail grooves 203 are relative to be fastened and by agreeing with block 204 are connected into overall structure.
As Fig. 3, Fig. 4, Fig. 5, Fig. 6, shown in Fig. 7 and Fig. 8, in the present embodiment, splicing body 2 includes equidistantly being arranged in The dovetails 205 of the edges of boards of pieces unit of plate 1.Dovetail groove 203 is constituted between adjacent dovetails 205.Adjacent two boards blade unit 1 passes through Dovetails 205 are chimeric each other with dovetail groove 203, and the overall structure of conjunction is mutually held in formation.
As shown in Fig. 9, Figure 10 and Figure 11, in the present embodiment, the end of dovetails 205 is provided with for adjacent two boards piece list Unit 1 slips into the taper protuberance 2051 of the collision injury that acute angle that is chimeric and reducing rotation angle position is produced each other.
As shown in figure 12, in the present embodiment, splicing body 2 includes multiple wedgings in the engagement of adjacent two boards blade unit 1 Voussoir 206 on seam 6.The two-end thickness that voussoir 206 is respectively in the adjacent plate face of two boards blade unit 1 is big, in adjacent two The interior thickness at the position of joint close 6 of block pieces unit of plate 1 is small, and connection is formed to be used for adjacent two boards blade unit 1 to joint close 6 The drawknot mechanism of drawknot.
As shown in figure 14, in the present embodiment, voussoir 206 is from the internal face wedging of pieces unit of plate 1 and/or from pieces unit of plate 1 Outside wall surface wedging.Can be wedged from inside and outside wall as needed, it is convenient assembled, it is possible to increase the assembled stability of structure.
As shown in figure 15, in the present embodiment, splicing body 2 uses the male and female groove 207 of the connection that is fitted to each other, or inserts respectively It is connected to the H-shaped socket joint groove 208 on the wooden partition of adjacent two boards blade unit 1.Different splicing bodies 2 is used as needed, with full Foot makes, on-site consolidation needs.
As shown in Figure 1, Figure 2, shown in Figure 13 and Figure 15, in the present embodiment, pipe socket 3 is used and is integrally formed with pieces unit of plate 1 Overall structure.Good integrity.As shown in Fig. 3, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 11, Figure 12 and Figure 16, pipe socket 3 is adopted With split production and the Split type structure that is assemblied on pieces unit of plate 1.Facilitate structure fabrication, transport, assembly.Pipe socket 3 is overall On a wall for pieces unit of plate 1, as shown in figure 14, pipe socket 3 fastens what is formed using two and half side members are relative Split part 301.Two split parts 301 are respectively arranged on two adjacent pieces unit of plate 1.Facilitate structure fabrication, transport, spell Dress.
As shown in Fig. 3, Fig. 4, Fig. 9, Figure 10, Figure 12 and Figure 16, in the present embodiment, it is arranged with for connecting on bell and spigot 4 Interaction force and the sealing buffering collar 5 sealed to connecting portion are reduced when pipe socket 3 or socket joint underground piping.Can Selection of land, the sealing buffering collar 5 is annulus, Q-RING, straight-flanked ring, rhombus ring, vesica piscis, triangular loop or polygon ring.Can With the wall thickness control by sealing the buffering collar 5, to be adapted to different radial dimension of pipe sockets 3 or socket joint underground piping Assembling.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 9, Figure 12 and Figure 13, in the present embodiment, connecing between adjacent two boards blade unit 1 Joint close 6 and the splicing body on joint close 62 are vertically arranged.Splicing body 2 can serve as vertical load mechanism assists Stress, it is possible to increase vertical applied force performance.As shown in figure 16, between adjacent two boards blade unit 1 joint close 6 and in connecing Splicing body 2 on joint close 6 is diagonally arranged.It is convenient for assembly, it is not easy to deviate from.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (10)

1. a kind of inspection shaft well seat, including at least two boards blade unit (1),
Characterized in that,
The pieces unit of plate (1) is integral along the circumference splicing of inspection shaft well seat,
Connect assembled by splicing body (2) between adjacent two pieces of pieces unit of plate (1),
The splicing body (2) is in rotation angle position or in plate face;
The pieces unit of plate (1) is using flat board, arc, groove type plate, L shaped plate or U-board;
At least one piece pieces unit of plate (1) is provided with the pipe socket (3) for accepting underground piping, or
At least one piece pieces unit of plate (1) is provided with for the pipe socket (3) of socket joint split or holding for socket joint underground piping Socket (4).
2. inspection shaft well according to claim 1 seat, it is characterised in that
The splicing body (2) including being respectively arranged on the Z-shaped interface (201) of the edges of boards of adjacent two pieces of pieces unit of plate (1),
Adjacent two pieces of pieces unit of plate (1) are mutually chimeric by the Z-shaped interface (201);
Also anchoring has rivet on mutually chimeric described Z-shaped interface (201), or
It is additionally provided with to be set along the chimeric direction of the Z-shaped interface (201) between mutually chimeric described Z-shaped interface (201) and is used in combination In the plug connector (202) for being mutually inserted cooperation.
3. inspection shaft well according to claim 1 seat, it is characterised in that
The splicing body (2) includes the dovetail groove (203) being opened in respectively on adjacent two pieces of pieces unit of plate (1) and contract Agree with block (204) together in the dovetail groove (203),
Two dovetail grooves (203) fasten and are connected into overall structure by the block (204) that agrees with relatively.
4. inspection shaft well according to claim 1 seat, it is characterised in that
The splicing body (2) including being equidistantly arranged in the dovetails (205) of the pieces unit of plate (1) edges of boards,
Dovetail groove (203) is constituted between the adjacent dovetails (205);
Adjacent two pieces of pieces unit of plate (1) are chimeric each other with the dovetail groove (203) by the dovetails (205), formed Mutually hold the overall structure of conjunction.
5. inspection shaft well according to claim 4 seat, it is characterised in that
The end of the dovetails (205) is provided with to slip into be fitted together to and reduce each other for the adjacent two pieces pieces unit of plate (1) and turns The taper protuberance (2051) of the collision injury that the acute angle of angular position is produced.
6. inspection shaft well according to claim 1 seat, it is characterised in that
The splicing body (2) is including multiple wedgings in the voussoir on the adjacent two pieces joint closes (6) of the pieces unit of plate (1) (206),
The two-end thickness that the voussoir (206) is respectively in adjacent two pieces of pieces unit of plate (1) plate faces is big, in adjacent two The interior thickness at joint close (6) position of pieces unit of plate described in block (1) is small, and connection is formed to be used for the adjacent two pieces plate lists First (1) to the joint close (6) drawknot drawknot mechanism;
Internal face wedging and/or outside wall surface from the pieces unit of plate (1) of the voussoir (206) from the pieces unit of plate (1) Wedging.
7. inspection shaft well according to claim 1 seat, it is characterised in that
The splicing body (2) uses the male and female groove (207) of the connection that is fitted to each other, or is plugged in adjacent two boards piece list respectively H-shaped socket joint groove (208) on the wooden partition of first (1).
8. inspection shaft well according to any one of claim 1 to 7 seat, it is characterised in that
Pipe socket (3) use and the pieces unit of plate (1) integrally formed overall structure, or
The pipe socket (3) is using split production and the Split type structure that is assemblied on the pieces unit of plate (1);
The pipe socket (3) is integrally located on a wall for the pieces unit of plate (1), or
The pipe socket (3) is using the relative split part (301) for fastening formation of two and half side members, two split portions Part (301) is respectively arranged on the pieces unit of plate (1) of adjacent two.
9. inspection shaft well according to any one of claim 1 to 7 seat, it is characterised in that
It is arranged with the bell and spigot (4) for connecting the pipe socket (3) or reducing mutual during underground piping described in socket joint Active force and the sealing buffering collar (5) sealed to connecting portion.
10. inspection shaft well according to any one of claim 1 to 7 seat, it is characterised in that
Joint close (6) between adjacent two pieces of pieces unit of plate (1) and the splicing machine on the joint close (6) Structure (2) is vertically arranged or diagonally arranges.
CN201621223347.3U 2016-11-14 2016-11-14 Inspection shaft well seat Active CN206220127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621223347.3U CN206220127U (en) 2016-11-14 2016-11-14 Inspection shaft well seat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621223347.3U CN206220127U (en) 2016-11-14 2016-11-14 Inspection shaft well seat

Publications (1)

Publication Number Publication Date
CN206220127U true CN206220127U (en) 2017-06-06

Family

ID=58792217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621223347.3U Active CN206220127U (en) 2016-11-14 2016-11-14 Inspection shaft well seat

Country Status (1)

Country Link
CN (1) CN206220127U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833028A (en) * 2021-10-15 2021-12-24 杭州金盟道路设施有限公司 A concatenation type wiring wall body for borehole operation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833028A (en) * 2021-10-15 2021-12-24 杭州金盟道路设施有限公司 A concatenation type wiring wall body for borehole operation

Similar Documents

Publication Publication Date Title
CN105839666A (en) Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN105839667A (en) Construction and manufacturing process of total-prefabricated superimposed assembly type underground pipe gallery
CN201232197Y (en) Combined inspection well
CN109440903A (en) A kind of prefabricated concrete inspection well and its construction method
CN206220127U (en) Inspection shaft well seat
CN103628509A (en) Double-casing structure formed by inner casing and outer casing for pile foundation bearing capacity test and made of different materials, and construction method thereof
CN103334440A (en) Detachable circular foundation pit supporting device and equipment
CN205893934U (en) Assembled underground box culvert restores and uses structure
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN108396777A (en) Meet the big cross section tube coupling of segmentation prefabricating on-site consolidation
CN105297706B (en) Double-lock-catch flat steel pipe pile used for foundation pit support
CN104180077B (en) Pipeline runs through concrete floor waterproof construction
CN207685864U (en) Combined type underground pipe gallery
CN206220126U (en) Inspection shaft well seat
CN208136954U (en) Precast splice type Pipe rack
CN203096721U (en) Novel cofferdam fore shaft steel sheet pile
CN202629380U (en) Water drainage pipeline
CN205938218U (en) Compound pipe lining structure of fibre reinforced plastic concrete
CN213358683U (en) Prefabricated integral type reinforced concrete inspection shaft
CN209443551U (en) A kind of prefabricated concrete inspection well
CN107769119A (en) A kind of cable protection stopple and cable laying built-in groove
CN210684662U (en) Steel-pipe pile enclosure grouting water stop joint and steel-pipe pile enclosure structure
CN209975565U (en) Prefabricated round section utility tunnel of assembling
CN104099923B (en) Cast-type external prestressing steel tube concrete pile and construction method thereof and supporting piling wall
CN206844276U (en) A kind of pit shaft mounting structure of road inspection well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant