CN206202852U - Recheck pack thread - Google Patents

Recheck pack thread Download PDF

Info

Publication number
CN206202852U
CN206202852U CN201621144350.6U CN201621144350U CN206202852U CN 206202852 U CN206202852 U CN 206202852U CN 201621144350 U CN201621144350 U CN 201621144350U CN 206202852 U CN206202852 U CN 206202852U
Authority
CN
China
Prior art keywords
reinspection
pack thread
recheck
frame
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621144350.6U
Other languages
Chinese (zh)
Inventor
刘惠明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN XINBAOLI METAL PRODUCTS CO Ltd
Original Assignee
JIANGYIN XINBAOLI METAL PRODUCTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN XINBAOLI METAL PRODUCTS CO Ltd filed Critical JIANGYIN XINBAOLI METAL PRODUCTS CO Ltd
Priority to CN201621144350.6U priority Critical patent/CN206202852U/en
Application granted granted Critical
Publication of CN206202852U publication Critical patent/CN206202852U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of reinspection pack thread that the utility model is related to, it is characterised in that it includes the reinspection pack thread frame being longitudinally arranged(3.1), recheck pack thread frame(3.1)Crown center be provided with from front to back reinspection pack thread roller-way(3.2), recheck pack thread frame(3.1)Top left side and right side be respectively arranged with reinspection pack thread table top(3.3), recheck pack thread frame(3.1)Rear be provided with baling press(3.7), baling press(3.7)Right side be provided with weighing instrument(3.8), weighing instrument(3.8)Right side be provided with small handcart(3.9).The turbine of the utility model assembling rechecks system has orderliness clear, and floor space is small, and compactedness is good, rechecks the advantage of efficiency high.

Description

Recheck pack thread
Technical field
The utility model is related to a kind of reinspection pack thread.
Background technology
Need to carry out the reinspection of batch after the completion of turbine production, traditional reinspection does not have good continuous productive process effect, it is multiple Inspection efficiency is low, and floor space is big, rechecks process more mixed and disorderly.Therefore a kind of orderliness is sought clear, floor space is small, compactedness Good, the turbine reinspection system for rechecking efficiency high is particularly important.
The content of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, there is provided one kind is clear for assembling orderliness, and floor space is small, Compactedness is good, and the turbine for rechecking efficiency high rechecks the reinspection pack thread of system.
What the purpose of this utility model was realized in:
One kind rechecks pack thread, and it includes the reinspection pack thread frame being longitudinally arranged, in the top of reinspection pack thread frame Between be provided with from front to back reinspection pack thread roller-way, recheck pack thread frame top left side and right side be respectively arranged with reinspection beat Envelope curve table top, the rear and front end of the reinspection pack thread table top in left side is respectively arranged with the first reinspection packing laterally arranged to the right Material roller-way and second recheck packing charging roller, first rechecks packing charging roller and second recheck packing charging roller Side is provided with feeding revolution trolley, and the stage casing of the reinspection pack thread table top on right side is respectively arranged with the 3rd for arranging laterally to the left Packing charging roller is rechecked, the rear for rechecking pack thread frame is provided with baling press, weighing instrument is provided with the right side of baling press, claims Small handcart is provided with the right side of weight instrument.
The feeding revolution trolley includes vehicle frame, and the bottom of the vehicle frame is provided with four universal wheels, the top of the vehicle frame Portion is provided with placement table, and placement table includes the housing of rectangle, and the middle setting of housing has a buttress brace for longitudinal direction, described to shelve The front and back of platform is respectively arranged with front panel and squab panel, and the left of the placement table is provided with left coaming plate, the front wall The right-hand member of plate and squab panel is stretched out to the right beyond the right hand edge of placement table, and being set up between the front panel and the right-hand member of squab panel has The deflector roll being longitudinally arranged, the height of the height higher than placement table of deflector roll, the size of placement table is exactly a size for magazine, when After magazine is positioned on placement table, front panel, squab panel, left coaming plate and deflector roll are carried out to four sides all around of magazine respectively It is spacing.
Compared with prior art, the beneficial effects of the utility model are:
The turbine of the utility model assembling rechecks system has orderliness clear, and floor space is small, and compactedness is good, rechecks efficiency Advantage high.
Brief description of the drawings
Fig. 1 is the top view that turbine rechecks system.
Fig. 2 is that the reinspection in Fig. 1 is got the raw materials ready line schematic diagram.
Fig. 3 is the A-A sectional views of Fig. 2.
Fig. 4 is the lift beam raised configuration schematic diagram in Fig. 3.
Fig. 5 is the schematic diagram of placement magazine on line roller-way of being got the raw materials ready in Fig. 3.
The schematic diagram that Fig. 6 lifts the magazine got the raw materials ready on line roller-way for roller in Fig. 4.
Fig. 7 is the reinspection streamline schematic diagram in Fig. 1.
Fig. 8 is the schematic diagram that Fig. 7 removes ceiling.
Fig. 9 is the B-B sectional views of Fig. 7.
Figure 10 is the schematic diagram of the reinspection pack thread in Fig. 1.
Figure 11 is the feeding revolution trolley schematic diagram in Fig. 1.
Figure 12 is the C-C sectional views of Figure 11.
Wherein:
Get the raw materials ready line 1, reinspection of reinspection is got the raw materials ready line frame 1.1, line roller-way 1.2 of getting the raw materials ready, line blanking device 1.3, bottom girder of getting the raw materials ready 1.31st, pedal 1.32, source of the gas 1.33, intermediate beam 1.34, cylinder block 1.35, cylinder 1.36, guide rail 1.37, lift beam 1.38, rolling Wheel support 1.39, roller 1.310, tracheae 1.311
Streamline 2 is rechecked, streamline frame 2.1 is rechecked, is rechecked streamline roller-way 2.2, rechecks streamline table top 2.3, multiple Inspection platform 2.4, reinspection station board 2.41, bench 2.5, ceiling 2.6, inclined-plane 2.7, blend stop 2.8, crossbeam 2.9, fluorescent lamp 2.10
Pack thread 3 is rechecked, pack thread frame 3.1 is rechecked, is rechecked pack thread roller-way 3.2, rechecks pack thread table top 3.3, the One rechecks packing charging roller 3.4, second rechecks the packing reinspection packing charging roller 3.6, baling press of charging roller the 3.5, the 3rd 3.7th, weighing instrument 3.8, small handcart 3.9
Feeding revolution trolley 4, vehicle frame 4.1, placement table 4.2, housing 4.21, buttress brace 4.22, front panel 4.3, squab panel 4.4th, left coaming plate 4.5, deflector roll 4.6, universal wheel 4.7
Magazine 5.
Specific embodiment
Referring to Fig. 1 ~ Figure 12, a kind of turbine that the utility model is related to rechecks system, it including reinspection get the raw materials ready line 1, recheck Streamline 2, recheck pack thread 3 and many feeding revolution trolleys 4, it is described reinspection the lateral arrangement of streamline 2 in the middle part in room, The line 1 of getting the raw materials ready of rechecking is longitudinally arranged the right side that line 1 of getting the raw materials ready is rechecked in the right for rechecking streamline 2, and in order to save floor occupying area The front end abutment room front side wall of line 1 of getting the raw materials ready, the longitudinal cloth of the reinspection pack thread 3 are rechecked against room right side wall in edge It is placed in the left for rechecking streamline 2.
Reinspection line 1 of getting the raw materials ready includes that the reinspection that is longitudinally arranged is got the raw materials ready line frame 1.1, and the reinspection is got the raw materials ready line frame 1.1 Top be provided with line roller-way 1.2 of getting the raw materials ready from rear to preceding, getting the raw materials ready multiple of be provided with line 1 of the reinspection is got the raw materials ready line blanking device 1.3, the side of line blanking device 1.3 of getting the raw materials ready is provided with feeding revolution trolley 4, as it is a kind of preferably, drawing be provided with three groups it is standby Stockline blanking device 1.3, has one group to be arranged at reinspection and gets the raw materials ready the rear end of line frame 1.1, has two groups to be arranged at reinspection and gets the raw materials ready line frame 1.1 stage casing, the bottom girder 1.31 of the line blanking device 1.3 including lateral arrangement of getting the raw materials ready, bottom girder 1.31 is set up in reinspection and gets the raw materials ready Between the bottom of line frame 1.1, the left end on the bottom girder 1.31 is provided with pedal 1.32, the bottom girder 1.31 of the right of pedal 1.32 On be provided with source of the gas 1.33, pedal 1.32 is connected with the gas source switch of source of the gas 1.33, and the line blanking device 1.3 of getting the raw materials ready also includes Three intermediate beams 1.34 of lateral arrangement, three intermediate beams 1.34 are set up between the middle part for rechecking line frame 1.1 of getting the raw materials ready, and often The lengthwise position of root intermediate beam 1.34 is located between the front and rear two neighboring conveying roller of line roller-way 1.2 of getting the raw materials ready, the intermediate beam A cylinder block 1.35 is respectively arranged with left section and right section of 1.34, upward cylinder 1.36 is provided with cylinder block 1.35, The left end and right-hand member of the intermediate beam 1.34 have set up guide rail 1.37 respectively, and guide rail 1.37 is vertically fixed on reinspection gets the raw materials ready line In frame 1.1, the lift beam 1.38 of lateral arrangement, bottom and the left side of lift beam 1.38 are equipped between the guide rail 1.37 of left and right two The top connection of two cylinders 1.36 of right arrangement, the top of lift beam 1.38 is provided with multiple rolling wheel supports from left to right 1.39, figure only show the every top of lift beam 1.38 and is provided with four rolling support 1.39, rolling wheel support from left to right The row's roller 1.310 being provided with 1.39 on the roller 1.310 of lateral arrangement, that is, each lift beam 1.38 is located at standby Between the front and rear two neighboring conveying roller of stockline roller-way 1.2, the gas outlet of source of the gas 1.33 is connected respectively by many tracheaes 1.311 Each cylinder 1.36, when pedal 1.32 is not stepped on, the height of roller 1.310 is less than the conveying roller of line roller-way 1.2 of getting the raw materials ready highly, When pedal 1.32 is stepped on, source of the gas 1.33 is supplied to cylinder 1.36, and lift beam 1.38 rises so that the height of roller 1.310 is high In line roller-way 1.2 of getting the raw materials ready conveying roller highly.The magazine 5 on line roller-way 1.2 that is now placed in getting the raw materials ready is lifted by roller 1.310, material Box 5 can be moved to the left along roller 1.310, and the purpose of blanking is easy to so as to reach.
The streamline 2 of rechecking includes the reinspection streamline frame 2.1 of lateral arrangement, rechecks the top of streamline frame 2.1 Reinspection streamline roller-way 2.2 is provided with the middle of portion from right to left, the top front side and rear side for rechecking streamline frame 2.1 set respectively Reinspection streamline table top 2.3 is equipped with, the right-hand member for rechecking streamline table top 2.3 and the right-hand member for rechecking streamline roller-way 2.2 are flushed, multiple The left end of inspection streamline roller-way 2.2 is stretched out beyond the left end for rechecking streamline table top 2.3, the reinspection streamline frame 2.1 Front and rear outside(Namely recheck the outside of streamline table top 2.3)It is close to reinspection streamline table top 2.3 and is provided with three reinspection platforms 2.4, each right for rechecking platform 2.4 is provided with bench 2.5, and the left end for rechecking platform 2.4 is provided with upward reinspection station Board 2.41, the outside for rechecking platform 2.4 is provided with feeding revolution trolley 4.The reinspection streamline frame 2.1 is located at rechecks streamline Roller-way 2.2 and recheck the region of the top of streamline table top 2.3 and be provided with ceiling 2.6, the ceiling 2.6 from crown center forward Inclined-plane 2.7 obliquely is provided with backward, and the least significant end on inclined-plane 2.7 is provided with horizontal blend stop 2.8, in use, Empty magazine 5 can be positioned on the inclined-plane 2.7 of the top of blend stop 2.8, by the spacing of blend stop 2.8 so that magazine 5 is held on On the inclined-plane of ceiling 2.6.The lower section of the ceiling 2.6 is additionally provided with crossbeam 2.9, and being provided with multiple on crossbeam 2.9 is longitudinally arranged Fluorescent lamp 2.10.
The pack thread 3 of rechecking includes the reinspection pack thread frame 3.1 being longitudinally arranged, and rechecks the top of pack thread frame 3.1 Reinspection pack thread roller-way 3.2 is provided with the middle of portion from front to back, the top left side and right side for rechecking pack thread frame 3.1 set respectively Reinspection pack thread table top 3.3 is equipped with, the rear and front end of the reinspection pack thread table top 3.3 in left side is respectively arranged with laterally to be arranged to the right First reinspection packing charging roller 3.4 and second recheck packing charging roller 3.5, first recheck packing charging roller 3.4 And second recheck packing charging roller 3.5 side be provided with feeding revolution trolley 4, the reinspection pack thread table top 3.3 on right side Stage casing be respectively arranged with arrange laterally to the left the 3rd reinspection packing charging roller 3.6, the 3rd recheck packing charging roller 3.6 Position it is corresponding with the right end position for rechecking streamline roller-way 2.2, the rear of reinspection pack thread frame 3.1 is provided with baling press 3.7, the right side of baling press 3.7 is provided with weighing instrument 3.8, and the right side of weighing instrument 3.8 is provided with small handcart 3.9.
The feeding revolution trolley 4 includes vehicle frame 4.1, and the bottom of the vehicle frame 4.1 is provided with four universal wheels 4.7, institute The top for stating vehicle frame 4.1 is provided with placement table 4.2, and placement table 4.2 includes the housing 4.21 of rectangle, the middle setting of housing 4.21 The front and back for having a buttress brace for longitudinal direction 4.22, the placement table 4.2 is respectively arranged with front panel 4.3 and squab panel 4.4, the left of the placement table 4.2 is provided with left coaming plate 4.5, and the right-hand member of the front panel 4.3 and squab panel 4.4 stretches out to the right The deflector roll for having and being longitudinally arranged is set up beyond the right hand edge of placement table 4.2, between the right-hand member of the front panel 4.3 and squab panel 4.4 4.6, the height of the height higher than placement table 4.2 of deflector roll 4.6, the size of placement table 4.2 is exactly a size for magazine 5, when After magazine 5 is positioned on placement table 4.2, front panel 4.3, squab panel 4.4, left coaming plate 4.5 and deflector roll 4.6 are respectively to magazine 5 Four sides all around carry out it is spacing.
Operation principle:
Recheck and place the turbine for filling magazine to be rechecked on line of getting the raw materials ready, blank stock line blanking device gets the raw materials ready reinspection Magazine push-in feeding revolution trolley on line, then feeding revolution trolley is pushed into the feeding revolution trolley work for rechecking streamline Position, the turbine that workman takes in magazine nearby is rechecked, and empty magazine can be positioned on the inclined-plane of ceiling temporarily, rechecked Into turbine reload magazine be incorporated to be put into reinspection streamline roller-way enter it is lower recheck operation together, wait to recheck and all terminate Afterwards, the magazine for filling turbine delivers to the 3rd reinspection packing charging roller for rechecking pack thread, coordinates from first and rechecks packing feeding The packing case that roller-way and the second reinspection packing charging roller are sent, carries out vanning, by rechecking packing after the completion of vanning Line roller-way is delivered to baling press and is packed, and is then weighed successively, is finally transported with small handcart.

Claims (2)

1. it is a kind of to recheck pack thread, it is characterised in that it includes the reinspection pack thread frame being longitudinally arranged(3.1), recheck pack thread Frame(3.1)Crown center be provided with from front to back reinspection pack thread roller-way(3.2), recheck pack thread frame(3.1)Top Portion left side and right side are respectively arranged with reinspection pack thread table top(3.3), the reinspection pack thread table top in left side(3.3)Rear and front end It is respectively arranged with the first reinspection packing charging roller laterally arranged to the right(3.4)And second recheck packing charging roller (3.5), first rechecks packing charging roller(3.4)And second recheck packing charging roller(3.5)Side be provided with feeding Revolution trolley(4), the reinspection pack thread table top on right side(3.3)Stage casing be respectively arranged with arrange laterally to the left the 3rd reinspection beat Bag charging roller(3.6), recheck pack thread frame(3.1)Rear be provided with baling press(3.7), baling press(3.7)Right side It is provided with weighing instrument(3.8), weighing instrument(3.8)Right side be provided with small handcart(3.9).
2. one kind according to claim 1 rechecks pack thread, it is characterised in that the feeding revolution trolley(4)Including vehicle frame (4.1), the vehicle frame(4.1)Bottom be provided with four universal wheels(4.7), the vehicle frame(4.1)Top be provided with and shelve Platform(4.2), placement table(4.2)Housing including rectangle(4.21), housing(4.21)Middle setting have a reinforcement for longitudinal direction Beam(4.22), the placement table(4.2)Front and back be respectively arranged with front panel(4.3)And squab panel(4.4), it is described to put Put platform(4.2)Left be provided with left coaming plate(4.5), the front panel(4.3)And squab panel(4.4)Right-hand member stretch out put to the right Put platform(4.2)Right hand edge beyond, the front panel(4.3)And squab panel(4.4)Right-hand member between set up have what is be longitudinally arranged Deflector roll(4.6), deflector roll(4.6)Height be higher than placement table(4.2)Height, placement table(4.2)Size be exactly a material Box(5)Size, work as magazine(5)It is positioned over placement table(4.2)After upper, front panel(4.3), squab panel(4.4), left coaming plate (4.5)And deflector roll(4.6)Respectively to magazine(5)Four sides all around carry out it is spacing.
CN201621144350.6U 2016-10-21 2016-10-21 Recheck pack thread Active CN206202852U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621144350.6U CN206202852U (en) 2016-10-21 2016-10-21 Recheck pack thread

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621144350.6U CN206202852U (en) 2016-10-21 2016-10-21 Recheck pack thread

Publications (1)

Publication Number Publication Date
CN206202852U true CN206202852U (en) 2017-05-31

Family

ID=58758443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621144350.6U Active CN206202852U (en) 2016-10-21 2016-10-21 Recheck pack thread

Country Status (1)

Country Link
CN (1) CN206202852U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11859267B2 (en) 2016-10-12 2024-01-02 Oxford University Innovation Limited Nickel-based alloy

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11859267B2 (en) 2016-10-12 2024-01-02 Oxford University Innovation Limited Nickel-based alloy

Similar Documents

Publication Publication Date Title
CN106379617B (en) Reinspection stock line
CN206202853U (en) Reinspection is got the raw materials ready line
CN106965253A (en) A kind of photo frame cornering machine of full-automatic double-ended cutting
CN107572179A (en) Large Copacity frame loader
CN206202852U (en) Recheck pack thread
CN206485680U (en) Recheck streamline
CN206327914U (en) Turbine rechecks system
CN205771969U (en) Upper glass mechanism
CN203033456U (en) Stacking device for large aluminum profiles
CN106315234B (en) Turbine rechecks system
CN106395034B (en) Recheck assembly line
CN202864439U (en) Movable type side body assembly material receiving device
CN211766528U (en) Tobacco shred boxing and transferring system
CN207580754U (en) A kind of mining scanning machine of weighing
CN207373327U (en) A kind of photo frame cornering machine of full-automatic double-ended cutting
CN105438544A (en) Automatic packaging line for back-end process of white spirit
CN206427333U (en) A kind of carton boxing apparatus
CN105501534A (en) Automatic box separation device
CN207479298U (en) A kind of conveyor type self-emptying rescinded angle swage tool
CN205952485U (en) On / underlay mechanism
CN204913154U (en) Visitor car roof skeleton welding frock
CN205521613U (en) Cardboard rolls angle machine
CN214418033U (en) Multi-head spot welding machine
CN210501630U (en) Automatic shoe box forming machine
CN207390503U (en) Automatic Code bottle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant