CN206190325U - A damping door that gives sound insulation for boring explode interval construction of method subway - Google Patents

A damping door that gives sound insulation for boring explode interval construction of method subway Download PDF

Info

Publication number
CN206190325U
CN206190325U CN201621262202.4U CN201621262202U CN206190325U CN 206190325 U CN206190325 U CN 206190325U CN 201621262202 U CN201621262202 U CN 201621262202U CN 206190325 U CN206190325 U CN 206190325U
Authority
CN
China
Prior art keywords
construction
doorframe
door
tunnel
sound insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621262202.4U
Other languages
Chinese (zh)
Inventor
井文君
赵岩
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201621262202.4U priority Critical patent/CN206190325U/en
Application granted granted Critical
Publication of CN206190325U publication Critical patent/CN206190325U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a damping door that gives sound insulation for boring explode interval construction of method subway, including the door frame that suits with subway tunnel construction and with the articulated door leaf of being connected of door frame, the upper portion of door frame is equipped with gliding upper portion expansion plate along the door frame about, and tunnel construction's top both sides respectively are equipped with the fixed pulley, the bottom both sides respectively are equipped with the hoist engine, on upper portion expansion plate both sides are passed the fixed pulley and are fixed in the hoist engine through steel strand wires respectively, it reserves the hole still to be equipped with a plurality of on the door frame. The utility model discloses the effectual adverse effect of construction noise to all ring edge borders that has reduced through the various pipeline holes reserved and the switching of door leaf, can guarantee going on smoothly of daily construction, does not reduce construction efficiency, and the top door frame can freely go up and down, is favorable to blasting back harmful gas to discharge naturally along tunnel vault, for the good production environment of scene creation.

Description

A kind of sound insulation vibration damping door for the construction of drilling and blasting method Subway Tunnel
Technical field
The utility model is related to underground construction equipment field, especially a kind of sound insulation for the construction of drilling and blasting method Subway Tunnel Vibration damping door.
Background technology
Drilling and blasting method, be by drilling, powder charge, Blasting Excavation rock method, abbreviation drilling and blasting method.This method is from early days Pricker, hammering are punchinged by artificial hand, ignites single pack one by one with blasting cap, developed into and bored with drill jumbo or multi-boom jumbo Hole, using blasting techniques such as millisecond blasting, presplit blasting and photoface exploisions.Before construction, according to geological conditions, section size, The condition such as support pattern, construction period and construction equipment, technology, selectes tunneling method.
Drilling and blasting method is a kind of construction method that current domestic city Subway Tunnel construction is generally used, it is adaptable to various geology Condition and groundwater condition.With suitable various form of fractures(Single line, two-wire and multi-thread, station etc.)With change section(Transition Section, many sections etc.)High degree of flexibility.By partial excavation and auxiliary method, surface subsidence can be efficiently controlled and caved in. Compare with shield method, very economical is used in shorter excavation location.Compare with tunnel boring machine method, to country rock homogeneity no requirement (NR).With Cut and cover method compares, and can greatly reduce the influence to traffic above-ground and business activity, it is to avoid substantial amounts of removal.From comprehensive benefit Viewpoint is seen, is a kind of more economical method.It has excavated section flexible form, and construction equipment is relatively easy, by outside geology The advantages of condition influence is relatively small.
But used as the construction method of city underground, its defect is also fairly obvious, i.e., larger noise is produced in work progress And shock wave(Such as explosion and rock drill drilling operation), larger is influenceed on the life of periphery existing building and resident, disturb residents Seriously, it is unfavorable for being smoothed out for construction.
Utility model content
The weak point in city is applied to for current drill bursting construction, the one kind mentioned by the utility model is used to bore quick-fried The sound insulation vibration damping door of method Subway Tunnel construction, can be effective to reduce ground anvil on the premise of normal construction work efficiency is not influenceed Influence of the quick-fried method construction to surrounding enviroment and resident living, for favourable external environment condition is created in construction.
The utility model solves the technical scheme that its technical problem used:
A kind of sound insulation vibration damping door for the construction of drilling and blasting method Subway Tunnel, the sound insulation vibration damping door is perpendicular to construction tunnel axle Line direction;The sound insulation vibration damping door includes doorframe and and doorframe that outer contour shape is adapted with construction tunnel Internal periphery shape The door leaf of connection;The top of the doorframe is provided with the top expansion plate slided up and down along doorframe, and the top both sides of construction tunnel are each It is provided with fixed pulley, two bottom sides and is respectively provided with hoist engine;The top expansion plate both sides pass through fixed pulley simultaneously by steel strand wires respectively It is fixed on hoist engine;The hoist engine drives the top expansion plate integrally to slide up and down, and makes the harmful gas produced after explosion Naturally drained in the gap that body is formed between the top expansion plate and tunnel Internal periphery;Several are additionally provided with the doorframe For the reserving hole that various pipelines and cable pass through;Position inside and outside the doorframe and door leaf in addition to reserving hole is equal It is covered with sound-absorbing material, the sound-absorbing material is by drawing fixing device to be strained and fixed.
The utility model also has following additional technical feature:
Further specifically optimize as the utility model scheme, the both sides of the doorframe are provided with oblique and mutually friendship Pitch the drawing fixing device of distribution;The reserving hole includes reserved ventilation duct hole, reserved high-pressure air hose hole, reserved upper water Pore hole and reserved drainpipe hole.
Further specifically optimize as the utility model scheme, the doorframe is with construction tunnel Internal periphery abutment wall by swollen Swollen bolt connection is simultaneously welded on expansion bolt head;It is articulated and connected by vertical rotating axle between the doorframe and door leaf.
Further specifically optimize as the utility model scheme, the height and width of the door leaf are meeting Subway Tunnel Construction equipment in construction tunnel passes through and is defined;The top expansion plate is below construction tunnel Internal periphery in the range of three meters Doorframe, the other parts of the top expansion plate and doorframe are not in same vertical plane.
Further specifically optimize as the utility model scheme, the fixed pulley is installed on construction tunnel using expansion bolt Road top concrete surface;The hoist engine is installed on construction tunnel lower concrete surface using expansion bolt.
Further specifically optimize as the utility model scheme, the doorframe and the door leaf, the inwall of construction tunnel Between gap in be equipped with sound-absorbing material.
Compared to the prior art the utility model, the advantage is that:A kind of sound insulation for the construction of drilling and blasting method Subway Tunnel Vibration damping door, when entering the larger working procedure of Row noise in Subway Tunnel construction tunnel(Such as explosion, rock drill drilling), will can be somebody's turn to do Sound insulation vibration damping door is closed, effectively to reduce the influence of construction noise and shock wave to surrounding enviroment and resident living.By pre- The opening and closing of the various pipeline holes and door leaf that stay, it is ensured that being smoothed out for daily construction, does not reduce construction efficiency, and top Doorframe can be freely lifted, and be conducive to the natural excrement of pernicious gas after explosion, be that good production environment is created at scene.
Additional aspect of the present utility model and advantage will be set forth in part in the description, partly by from following description In become obvious, or by it is of the present utility model practice recognize.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the utility model planar structure schematic diagram;
Description of reference numerals:
Doorframe 1;Vertical rotating axle 2;Sound-absorbing material 3;Door leaf 4;Hoist engine 5;Fixed pulley 6;Reserved ventilation duct hole 7;In advance Stay high-pressure air hose hole 8;Reserved upper hose hole 9;Reserved drainpipe hole 10;To drawing fixing device 11.
Specific embodiment
The embodiment of this programme is more fully described below with reference to accompanying drawings.Although showing the example of the disclosure in accompanying drawing Property embodiment, it being understood, however, that may be realized in various forms the disclosure without that should be limited by embodiments set forth here. Conversely, there is provided these embodiments are able to be best understood from the disclosure, and can be complete by the scope of the present disclosure Convey to those skilled in the art.
In description of the present utility model, it is to be understood that term " longitudinal direction ", " transverse direction ", " on ", D score, " preceding ", " afterwards ", the orientation or position relationship of the instruction such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " be based on Orientation shown in the drawings or position relationship, are for only for ease of description the utility model, rather than the dress for indicating or implying meaning Put or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to the utility model Limitation.
A kind of sound insulation vibration damping door for the construction of drilling and blasting method Subway Tunnel, includes the door being adapted with construction tunnel shape Frame 1, doorframe 1 is connected and is welded on expansion bolt head with construction tunnel abutment wall by expansion bolt, doorframe 1 and construction tunnel side Wall is stable to be integrally fixed, prevent the shock wave produced during explosion destroy by rush of water sound insulation vibration damping door.
The both sides of doorframe 1 are provided with oblique and cross-cutting distribution to drawing fixing device 11.Doorframe 1 is with door leaf 4 by welding The steel pipe skeleton and sound-absorbing material 3 for connecing are constituted, and sound-absorbing material 3 is by drawing fixing device 11 to be fixed on steel pipe skeleton. Sound-absorbing material 3 is equipped with the front and back expansion face of doorframe 1, in the gap between the inwall of the construction tunnel of doorframe 1 Sound-absorbing material 3 is provided with, to ensure soundproof effect.
The middle and lower part of doorframe 1 is provided with the door leaf 4 being hingeably secured to by vertical rotating axle 2 on doorframe 1, and 4 points of door leaf is a left side Right two parts, can close completely, and can be rotated along the vertical rotating axle 2 for being fixed on the inner side of doorframe 1, and door leaf 4 is highly and wide Degree disclosure satisfy that construction equipment mini-excavator in Subway Tunnel construction tunnel, small sized loader, small-sized slag-soil truck and The current condition of the equipment such as air compressor machine.Door leaf 4 is provided with handle for door leaf 4 to be fixed on into doorframe 1, in addition, doorframe 1 and door Sound-absorbing material 3 is equipped with gap between fan 4, setting for sound-absorbing material 3 can be carried out effectively to the sound that explosion is produced Absorb and shield.
The top of doorframe 1 is provided with the top expansion plate slided up and down along doorframe 1, the shape and construction tunnel of top expansion plate Top shape be engaged, between also be provided with one layer of sound-absorbing material 3, good sealing effectiveness can be formed.The top of construction tunnel Portion both sides are respectively provided with fixed pulley 6, two bottom sides and are respectively provided with hoist engine 5, and fixed pulley is firmly installed on construction tunnel using expansion bolt Road top concrete surface, hoist engine 5 is firmly installed on construction tunnel lower concrete surface using expansion bolt.Stretch on top Plate both sides are respectively by the way that steel strand wires are through fixed pulley 6 and are fixed on hoist engine 5.When hoist engine 5 rotates forward work, steel strand wires are shunk And then drive top expansion plate along the vertical direction upward sliding of doorframe 1, make the top phase of top expansion plate and construction tunnel Coordinate.During the reversion work of hoist engine 5, steel strand wires are released, top expansion plate is under gravity along the vertical direction of doorframe 1 Slide downward.Pernicious gas is naturally drained along tunnel vault after this working method is conducive to explosion, is that scene creation is good Production environment.
Several reserving holes are also installed with doorframe 1 in advance, reserving hole includes reserved ventilation duct hole 7, reserved height Pressure ventilation pipe hole 8, reserved upper hose hole 9 and reserved drainpipe hole 10.
In actual use, sound-absorbing material 3 is made up of the raw material of following parts by weight:Polyvinyl chloride resin 30-45 parts, ternary second Third rubber 15-25 parts, magnesia 2-8 parts, glass fibre 5-11 parts, calcium carbonate 2-6 parts, the different phenylpropyl alcohol crosslinking agent 8-15 of peroxidating two Part, coalescents 2-8 parts, 1-2 parts, waterproofing agent 5-10 parts of stearic acid active lubricant.
The preparation method of above-mentioned sound-absorbing material 3 is:
(1) raw material mixture:Polyvinyl chloride resin:Ethylene propylene diene rubber:Magnesia is 1.5:1.2:0.4, ball milling 40-55min is standby With.The different phenylpropyl alcohol crosslinking agent of peroxidating two, stearic acid active lubricant, coalescents are put into homogenizer with rotating speed 1200- After 1400rpm mixing 5-7min, add coalescents continue mix 3min, add glass fibre, calcium carbonate, irgasfos 168, Talcum powder, polyoxyethylene laural acidic group ether continue mixed at high speed until temperature reaches 100-110 DEG C, discharging.
(2) extruding pelletization:The good raw material of mixture is added into double screw extruder, each section of temperature of extruder:120℃;130 ℃;130℃;130℃;140 DEG C of mouth mold;Screw speed:30-45rpm.
(3) by feeding after above-mentioned pellet addition single screw extrusion machine fusion plastification to calendering formation in tri-roll press machine:Squeeze Go out each section of temperature of machine:130℃;140℃;135℃;135℃;145 DEG C of mouth mold;Screw speed:30-45rpm.The roller of re-entrant trough profiled steel sheeting three Temperature is 65 DEG C, sheet thickness 1.5mm, width 100mm, hauling speed 4-5m/min.
A kind of installation method of sound insulation vibration damping door for the construction of drilling and blasting method Subway Tunnel, it comprises the following steps:
(1)According to design and construction tunnel profile, the specific chi of sound insulation vibration damping door different parts steel pipe skeleton is determined It is very little, complete former material blanking;(2)Sound insulation vibration damping door is divided into door leaf, doorframe, the part of top expansion plate three, welding, shape is respectively completed Into skeleton;(3)Expansion bolt is set on the wall that construction tunnel intends installation site, for fixing doorframe skeleton;(4)By doorframe bone Frame and expansion bolt firm welding;(5)Respectively door leaf skeleton and top expansion plate are estimated to be attached to design attitude;(6)To inhale Sound material is fixed on sound insulation vibration damping door skeleton, using the fixing means punched to drawing;(7)According to design in sound-absorbing material On cut out reserving hole, and penetrate construction tunnel construction pipeline used;(8)Top fixed pulley and hoist engine are installed, and are twisted with steel Line is connected with top expansion plate.The door installation of sound insulation vibration damping.
Embodiment 1
A kind of sound insulation vibration damping door for the construction of drilling and blasting method Subway Tunnel, mainly by sound insulation vibration damping door frame 1(It is divided to two Point, it is attached sound-absorbing material 3 on the skeleton of welded still pipe composition), it is attached sound-absorbing material 3 on the welded still pipe of door leaf 4 composition skeleton, perpendicular To rotary shaft 2, hoist engine 5 and to drawing fixing device 11 to constitute.
Sound insulation vibration damping door is installed at the transverse passage-way between Subway Tunnel vertical shaft and main track ingate, and direction is perpendicular to applying Work tunnel axis direction, is broadly divided into doorframe 1 and the two parts of door leaf to be opened/closed 4, the outline of doorframe 1 and tunnel Internal periphery phase Together, it is fixed on tunnel inner wall using expansion bolt.The periphery of doorframe 1 is reserved with reserved ventilation duct hole 7, reserved high-pressure blast pore Hole 8, reserved upper hose hole 9 and reserved drainpipe hole 10.4 points of door leaf is left and right two parts, can be closed completely, and can Rotated along the vertical axis for being fixed on the inner side of doorframe 1, door leaf 4 is highly and width disclosure satisfy that the construction in Subway Tunnel construction tunnel The current condition of the equipment such as plant equipment mini-excavator, small sized loader, small-sized slag-soil truck and air compressor machine.
Doorframe 1 is made up of two parts, and other departments of the doorframe 1 below vault in the range of three meters and doorframe 1 are not same Plane, can carry out integral elevating by being fixed on the fixed pulley 6 of vault using hoist engine 5, harmful after explosion to facilitate Gas is naturally drained along tunnel vault.
It is hinged by vertical rotating axle 2 between doorframe 1 and door leaf 4, except reserved inside and outside doorframe 1 and door leaf 4 Outside hole, it is covered with such as thick-layer sponge of sound-absorbing material 3, sound-absorbing material 3 is used to drawing fixing device 11(Such as split bolt and pad Deng)It is strained and fixed.
According to above mentality of designing, in Shandong Province Subway Tunnel construction tunnel job site processed it is a set of should be every Sound vibration damping door be installed at the interval construction tunnel, by using hand-held decibel instrument respectively at sound insulation vibration damping door 2 meters of front, Carry out testing the noise decibel value on periphery at 100 meters of 2 meters of rear and rear, explosion position and blasting scheme are completely the same, lead to Experimental data below crossing is it can be shown that sound insulation vibration damping door is effectively reduced unfavorable shadow of the construction noise to surrounding enviroment Ring.
The sound insulation vibration damping of table 1 door explosion test data comparative analysis statistical form.
Test number (TN) 1st time 2nd time 3rd time The 4th The 5th 6th time
Sound insulation vibration damping is tested in front of the door(Decibel) 115dB 120dB 113dB 115dB 109dB 118dB
Sound insulation vibration damping is tested behind the door(Decibel) 90dB 92dB 84edB 88dB 85dB 92dB
100m is tested at a distance(Decibel) 75dB 72dB 69dB 73dB 70dB 73dB
A kind of sound insulation vibration damping door for the construction of drilling and blasting method Subway Tunnel, enters Row noise larger in Subway Tunnel construction tunnel Working procedure when(Such as explosion, rock drill drilling), can by the sound insulation vibration damping door close, with effectively reduce construction noise and Influence of the shock wave to surrounding enviroment and resident living.The opening and closing of various pipeline holes and door leaf 4 by reserving, it is ensured that Being smoothed out for daily construction, does not reduce construction efficiency, and top doorframe 1 can be freely lifted, and gas is harmful to after being conducive to explosion Body is naturally drained along construction tunnel vault, is that good production environment is created at scene.
While there has been shown and described that embodiment of the present utility model, it will be understood by those skilled in the art that: In the case where principle of the present utility model and objective is not departed from various changes, modification, replacement can be carried out to these embodiments And modification, scope of the present utility model limits by claim and its equivalent.

Claims (6)

1. it is a kind of for drilling and blasting method Subway Tunnel construction sound insulation vibration damping door, it is characterised in that:Sound insulation vibration damping door perpendicular to Construction tunnel axis direction;The sound insulation vibration damping door includes the door that outer contour shape is adapted with construction tunnel Internal periphery shape Frame(1)And and doorframe(1)The door leaf of connection(4);
The top both sides of construction tunnel are respectively provided with fixed pulley(6), two bottom sides be respectively provided with hoist engine(5);The doorframe(1)It is upper Portion is provided with along doorframe(1)Slided through fixed by steel strand wires respectively the top expansion plate for sliding up and down, the top expansion plate both sides Wheel(6)And it is fixed on hoist engine(5)On;The hoist engine(5)Drive the top expansion plate integrally to slide up and down, produced after explosion Naturally drained in the gap that raw pernicious gas is formed between the top expansion plate and construction tunnel Internal periphery;
The doorframe(1)On be additionally provided with several reserving holes passed through for various pipelines and cable;The doorframe(1)And door Fan(4)Inside and outside position in addition to reserving hole be covered with sound-absorbing material(3), the sound-absorbing material(3)By solid to drawing Determine device(11)It is strained and fixed.
2. it is according to claim 1 it is a kind of for drilling and blasting method Subway Tunnel construction sound insulation vibration damping door, it is characterised in that:Institute State to drawing fixing device(11)In oblique and cross-cutting distribution in doorframe(1)Both sides;The reserving hole includes reserved Ventilation duct hole(7), reserved high-pressure air hose hole(8), reserved upper hose hole(9)With reserved drainpipe hole(10).
3. it is according to claim 1 it is a kind of for drilling and blasting method Subway Tunnel construction sound insulation vibration damping door, it is characterised in that:Institute State doorframe(1)It is connected and is welded on expansion bolt head by expansion bolt with construction tunnel Internal periphery abutment wall;The doorframe(1) And door leaf(4)Between pass through vertical rotating axle(2)It is articulated and connected.
4. it is according to claim 1 it is a kind of for drilling and blasting method Subway Tunnel construction sound insulation vibration damping door, it is characterised in that:Institute State door leaf(4)Height and width to meet, the construction equipment in Subway Tunnel construction tunnel is current to be defined;The top Expansion plate is the doorframe in the range of three meters below construction tunnel Internal periphery(1), the top expansion plate and doorframe(1)Other portions Divide not in same vertical plane.
5. it is according to claim 1 it is a kind of for drilling and blasting method Subway Tunnel construction sound insulation vibration damping door, it is characterised in that:Institute State fixed pulley(6)Construction tunnel top concrete surface is installed on using expansion bolt;The hoist engine(5)Use expansion bolt It is installed on construction tunnel lower concrete surface.
6. it is according to claim 1 it is a kind of for drilling and blasting method Subway Tunnel construction sound insulation vibration damping door, it is characterised in that:Institute State doorframe(1)With the door leaf(4), the construction tunnel inwall between gap in be equipped with sound-absorbing material(3).
CN201621262202.4U 2016-11-24 2016-11-24 A damping door that gives sound insulation for boring explode interval construction of method subway Expired - Fee Related CN206190325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621262202.4U CN206190325U (en) 2016-11-24 2016-11-24 A damping door that gives sound insulation for boring explode interval construction of method subway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621262202.4U CN206190325U (en) 2016-11-24 2016-11-24 A damping door that gives sound insulation for boring explode interval construction of method subway

Publications (1)

Publication Number Publication Date
CN206190325U true CN206190325U (en) 2017-05-24

Family

ID=58724783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621262202.4U Expired - Fee Related CN206190325U (en) 2016-11-24 2016-11-24 A damping door that gives sound insulation for boring explode interval construction of method subway

Country Status (1)

Country Link
CN (1) CN206190325U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401647A (en) * 2016-11-24 2017-02-15 中国石油大学(华东) Sound insulation and vibration reduction door for drilling and blasting method metro section construction and mounting method thereof
CN111691745A (en) * 2020-05-07 2020-09-22 中铁十八局集团有限公司 Be used for subway station to seal construction sound insulation and enclose fender structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401647A (en) * 2016-11-24 2017-02-15 中国石油大学(华东) Sound insulation and vibration reduction door for drilling and blasting method metro section construction and mounting method thereof
CN111691745A (en) * 2020-05-07 2020-09-22 中铁十八局集团有限公司 Be used for subway station to seal construction sound insulation and enclose fender structure
CN111691745B (en) * 2020-05-07 2021-10-29 中铁十八局集团有限公司 Be used for subway station to seal construction sound insulation and enclose fender structure

Similar Documents

Publication Publication Date Title
CN103470267B (en) The one Rapid Construction of Tunnels technique of growing up
CN110230499B (en) Active protection structure of shield near-penetration operation tunnel in water-rich soft soil area and construction method
CN102418531B (en) Tunneling construction method for directly removing overpass group piles by using shield machine
LU101977B1 (en) Shield system capable of effectively reducing disturbance of surrounding rocks
CN111706350B (en) Plugging side wall breaking method for communication of newly-built transfer hall and existing tunnel
CN206190325U (en) A damping door that gives sound insulation for boring explode interval construction of method subway
CN105571415B (en) Precise control method for smooth surface blasting of fractured rock mass of highway tunnel
CN106869946B (en) Make bottom frozen construction method in a kind of sand-pebble layer tunneling subway station
CN106401647B (en) A kind of sound insulation vibration damping door and its installation method for the construction of drilling and blasting method Subway Tunnel
CN111305877A (en) Construction method for strong rockburst section tunnel in high-altitude area
CN106368715B (en) A kind of slag tapping method constructed during double-shielded TBM assembling
CN210264750U (en) Opening structure of highway tunnel
Song et al. The overall design of Qingdao Jiaozhou Bay subsea tunnel
CN106869959A (en) The interflow of semicircle shield machine construction regulate and store moldeed depth layer tunnel
CN110469358A (en) Main return remodeling method suitable for underground centralized return air system
CN109630157A (en) A kind of regulator control system of Tunnel Engineering and ground water regime
CN210195753U (en) Tunnel blasting excavation system
CN113323680A (en) Disposal method for long-time shutdown of shield machine in tunneling tunnel
CN214062960U (en) Construction system for shield to pass through irregular barrier below operation station
CN114837729A (en) Gas treatment device and method for open TBM to penetrate through coal measure stratum
CN114607833A (en) Vertical curve downward-penetrating construction method for rectangular jacking pipe meeting obstacle
CN108590655A (en) Assemble the method that wall realizes gob side entry retaining
CN111101950B (en) Freezing method construction freezing pipe arrangement optimization method based on BIM technology
CN112761704A (en) Ground horizontal well dust removal method and device for coal mine roadway driving working face
CN201982103U (en) Construction structure of channel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

Termination date: 20201124