CN206190319U - Work platform is removed in leaky cable installation in tunnel - Google Patents

Work platform is removed in leaky cable installation in tunnel Download PDF

Info

Publication number
CN206190319U
CN206190319U CN201621157528.0U CN201621157528U CN206190319U CN 206190319 U CN206190319 U CN 206190319U CN 201621157528 U CN201621157528 U CN 201621157528U CN 206190319 U CN206190319 U CN 206190319U
Authority
CN
China
Prior art keywords
platform
support
tunnel
support tube
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621157528.0U
Other languages
Chinese (zh)
Inventor
申瑜
杜晓
欧盼
张恒志
廖阳春
张艳青
廖军华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority to CN201621157528.0U priority Critical patent/CN206190319U/en
Application granted granted Critical
Publication of CN206190319U publication Critical patent/CN206190319U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a work platform is removed in leaky cable installation in tunnel. The utility model discloses a first support, second support, upper end platform, balance weight platform, lower extreme platform, draw -in groove and cable duct, its characterized in that: A. First support includes the frame that first stay tube, second stay tube and third stay tube are constituteed, and the upper end platform is located this frame, and upper end platform both ends do not link to each other with first stay tube and second stay tube through embracing the deduction of points, and the one end of upper end platform is equipped with the tunnel pulley, and this pulley and tunnel wall activity contact still are equipped with the work light on the second stay tube, B. The second support includes the frame that first stay tube, fourth stay tube and the 5th stay tube are constituteed, and balance weight platform and lower extreme platform are located this frame, and balance weight platform is on the lower extreme platform, C. Be equipped with vertical pulley and horizontal pulley in the draw -in groove, the draw -in groove is pegged graft along the activity with the outer of cable duct, and the one end of draw -in groove links to each other with first support. The utility model discloses the operation is removed in the leaky cable installation in the mainly used railway tunnel.

Description

Tunnel leakage cable installs mobile job platform
Technical field
The utility model is related to a kind of job platform, more particularly to a kind of tunnel leakage cable to install mobile job platform.
Background technology
In upper tiny fragments of stone, coal, etc. constructing tunnel, tunnel is carried out using lift more and leaks the installation of cable fixture, tunnel leakage cable erection.Due to card Spacing between tool is 1 meter, workmen's frequently upper and lower ladder, consumes very much workman's muscle power, inefficiency, while constructing Random big in journey, punch position error is big, ultimately results in construction quality and is difficult to control to, and influence follow-up equipment is installed.
With the continuous improvement and the continuous quickening of pace of construction of electric railway desin speed, matter is installed to tunnel leakage cable Amount and efficiency of construction propose requirement higher, and traditional form of construction work cannot meet site operation demand.
Leak cable mobile job platform is installed by making tunnel and can be very good to solve that field worker labour intensity is big, work The low problem of efficiency, while improve fixture installs drilling precision and construction quality.
The content of the invention
The purpose of this utility model is to provide a kind of tunnel leakage cable to install mobile job platform, above-mentioned to solve Problem.
To achieve the above object, technical solution of the present utility model is:A kind of tunnel leakage cable installs mobile operation horizontal Platform, including first support, second support, upper end platform, counterweight platform, lower end platform, draw-in groove and cable trough, it is characterised in that:
A. the first support includes the framework of the first support tube 1, the second support tube 2 and the 3rd support tube 3 composition, upper end Platform 4 is located in the framework, and upper end platform two ends are not connected by embracing deduction of points with the first support tube 1 and the second support tube 2, upper end One end of platform 4 is provided with tunnel pulley 5, the pulley and the movable contact of tunnel wall 6, and portable lamp 15 is additionally provided with the second support tube;
B. the second support includes the framework of the first support tube 1, the 4th support tube 7 and the 5th support tube 8 composition, counterweight Platform 9 and lower end platform 13 are located in the framework, and counterweight platform is above the platform of lower end;
C. vertical pulley 11 and horizontal pulley 12 are provided with the draw-in groove 14, draw-in groove 14 is inserted with the outer activity of cable trough 10 Connect, one end of draw-in groove is connected with first support.
The support tube is steel pipe.
Platen is equipped with the upper end platform 4, counterweight platform 9 and lower end platform 13.
The length of the upper end platform 4, counterweight platform 9 and lower end platform 13 is respectively 1.7 meters, 0.5 meter and 0.8 meter.
The beneficial effects of the utility model are:
1st, operating platform makes simple, easy to operate, low cost, is easy to promote.
2nd, tunnel leakage cable fixture hole position spacing, perpendicularity equally accurate are high.
3rd, lift changes movable operation platform, significantly reduces labor strength, improves efficiency of construction.
4th, by horizontal and vertical positioning, fixture pitch-row, perpendicularity correlation required precision is made to meet equipment mounting condition.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:The support tubes of 1- first, the support tubes of 2- second, the support tubes of 3- the 3rd, 4- upper ends platform, 5- tunnels pulley, 6- Tunnel wall, 7- the 4th is supported, the support tubes of 8- the 5th, 9- counterweight platforms, 10- cable troughs, the vertical pulleys of 11-, 12- transverse direction pulleys, 13- lower ends platform, 14- draw-in grooves, 15- portable lamps.
Specific embodiment
Below in conjunction with the accompanying drawings to the utility model and its specific embodiment as further description.
Referring to Fig. 1, the utility model includes first support, second support, upper end platform, counterweight platform, lower end platform, card Groove and cable trough, it is characterised in that:
A. the first support includes the framework of the first support tube 1, the second support tube 2 and the 3rd support tube 3 composition, upper end Platform 4 is located in the framework, and upper end platform two ends are not connected by embracing deduction of points with the first support tube 1 and the second support tube 2, upper end One end of platform 4 is provided with tunnel pulley 5, the pulley and the movable contact of tunnel wall 6, and portable lamp 15 is additionally provided with the second support tube;
B. the second support includes the framework of the first support tube 1, the 4th support tube 7 and the 5th support tube 8 composition, counterweight Platform 9 and lower end platform 13 are located in the framework, and counterweight platform is above the platform of lower end;
C. vertical pulley 11 and horizontal pulley 12 are provided with the draw-in groove 14, draw-in groove 14 is inserted with the outer activity of cable trough 10 Connect, one end of draw-in groove is connected with first support.
The support tube is steel pipe.
Platen is equipped with the upper end platform 4, counterweight platform 9 and lower end platform 13.
The length of the upper end platform 4, counterweight platform 9 and lower end platform 13 is respectively 1.7 meters, 0.5 meter and 0.8 meter.
First, processing step:
1st, Assembling movement job platform 3, is fixed on cable trough outer wall, and the spacing between job platform is maintained at 10 meters;
2nd, first 2 mobile job platforms apart from rail level 4.7 meters of tunnel inner walls high carry out setting-out positioning keep with rail level put down OK;
3rd, the 3rd mobile job platform carries out drilling with fixture installation;
4th, 3 platform continuous productive processes.
2nd, principle explanation:
1st, leakage cable in tunnel installs the making of mobile job platform
The platform uses steel pipe support, fixed using fastener (embracing button), convenient to install;
Pulley laterally is installed by tunnel wall, it is ensured that smooth movement.Bottom is vertical and is transversely mounted pulley, is placed in cable trough Upper end and inner side, vertically slidable to smooth movement, horizontal pulley plays a part of safety and firmness.
2nd, instrument application
During onsite application, Assembling job platform, lower end is fixed on the wall of cable trough outer, and vertical wheel and lateral wheel are tight Tight to block cable trough outer, upper lateral wheel is close to tunnel wall, and tunnel is leaned in workmen station in the construction of upper end platform operations under platform Road side sets counterweight platform, increases overall steadiness, and lower end platform puts generator and associated materials, and generator is powered to portable lamp, The people of lower section 2 promotes job platform slowly to be moved ahead along cable trough.
3rd, structure explanation:
Tunnel leakage cable is installed mobile job platform and is mainly made up of four part-structures, and Each part is as follows:
1st, platform fixing device (first support):Supported at three point pattern is taken, 3 points at three pulleys of longitudinal positioning device Separate stress;
2nd, carriage:Pulley is installed in upper end by tunnel wall, and the longitudinally mounted perpendicular wheel of lower end cable trough outer wall, inner side is laterally pacified Dress side wheel (horizontal pulley);
3rd, brake gear:Each pulley is respectively mounted brake;
4th, operating platform:Upper end platform is construction operation platform, and fence outside sets portable lamp;Job platform lower section is counterweight Platform, increases counterweight and plays firm effect;Lower end platform is placement Work tool platform.

Claims (4)

1. a kind of leakage cable in tunnel installs mobile job platform, including first support, second support, upper end platform, counterweight platform, under End platform, draw-in groove and cable trough, it is characterised in that:
A. the first support includes the framework of the first support tube (1), the second support tube (2) and the 3rd support tube (3) composition, on End platform (4) in the framework, upper end platform two ends by embrace deduction of points not with the first support tube (1) and the second support tube (2) It is connected, one end of upper end platform (4) is provided with tunnel pulley (5), the pulley and tunnel wall (6) movable contact, on the second support tube It is additionally provided with portable lamp (15);
B. the second support includes the framework of the first support tube (1), the 4th support tube (7) and the 5th support tube (8) composition, matches somebody with somebody In the framework, counterweight platform is above the platform of lower end for galassing platform (9) and lower end platform (13);
C. the outer of vertical pulley (11) and horizontal pulley (12), draw-in groove (14) and cable trough (10) is provided with the draw-in groove (14) Activity grafting, one end of draw-in groove is connected with first support.
2. the job platform as described in claim 1, it is characterised in that the support tube is steel pipe.
3. the job platform as described in claim 1, it is characterised in that the upper end platform (4), counterweight platform (9) and lower end platform (13) platen is equipped with.
4. the job platform as described in claim 1, it is characterised in that the upper end platform (4), counterweight platform (9) and lower end platform (13) length is respectively 1.7 meters, 0.5 meter and 0.8 meter.
CN201621157528.0U 2016-10-31 2016-10-31 Work platform is removed in leaky cable installation in tunnel Active CN206190319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621157528.0U CN206190319U (en) 2016-10-31 2016-10-31 Work platform is removed in leaky cable installation in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621157528.0U CN206190319U (en) 2016-10-31 2016-10-31 Work platform is removed in leaky cable installation in tunnel

Publications (1)

Publication Number Publication Date
CN206190319U true CN206190319U (en) 2017-05-24

Family

ID=58731937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621157528.0U Active CN206190319U (en) 2016-10-31 2016-10-31 Work platform is removed in leaky cable installation in tunnel

Country Status (1)

Country Link
CN (1) CN206190319U (en)

Similar Documents

Publication Publication Date Title
CN106050272B (en) Multifunctional rack for installing lining steel bars and laying waterproof boards special for tunnels
CN105735140B (en) A kind of bridge side platform device for high-altitude operation
CN201610631U (en) Traction and movable type lifting platform for construction
CN105113984A (en) Automatic drill jumbo for tunnel and working method thereof
CN105442932A (en) Power grid pole burying device and construction method
CN102654021A (en) Tunnel drilling machine
CN205668010U (en) A kind of fully automatic hydraulic perforating press
CN206190319U (en) Work platform is removed in leaky cable installation in tunnel
CN209812813U (en) Automatic joint cutter for cement protective wall
CN208934715U (en) A kind of anchor bar of waterproof plate in tunnels construction platform vehicle
CN102071780B (en) Method for manufacturing and mounting 120-meter long roof tile at high altitude
CN211647371U (en) Surface flattening device for concrete
CN211116120U (en) Device for laying ventilation pipe of coal mine
CN205477636U (en) Underground railway track moving platform
CN202755886U (en) Tunnel perforating machine
CN104624747B (en) A kind of curved rail device of grooved track sharp radius curve and installation and application
CN103982881B (en) A kind of omnipotent lamp bracket, the illuminator of curtain wall and construction method thereof
CN107884025A (en) Drill underground water level measurement meter
CN104088442B (en) Airduct erecting device and method
CN212250138U (en) Construction operation vehicle in railway tunnel
CN205036293U (en) Automatic drill jumbo in tunnel
CN207033491U (en) A kind of mine roof separation indicator anchor erecting device
CN202214965U (en) Complete electric mechanical whitewashing equipment
CN207377503U (en) A kind of portable drilled grout hole platform of angle adjustable
CN107034333B (en) The installation of converter oxygen gun trapped orbit, aligning method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant