CN206190002U - Air film building bottom sealing device and air film building - Google Patents

Air film building bottom sealing device and air film building Download PDF

Info

Publication number
CN206190002U
CN206190002U CN201621078733.8U CN201621078733U CN206190002U CN 206190002 U CN206190002 U CN 206190002U CN 201621078733 U CN201621078733 U CN 201621078733U CN 206190002 U CN206190002 U CN 206190002U
Authority
CN
China
Prior art keywords
air film
connecting portion
fixed part
pneumatic membrane
membrane building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621078733.8U
Other languages
Chinese (zh)
Inventor
薛飞龙
张辉
王秦
肖龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Braodwell Environment Protection Technology Co Ltd
Original Assignee
Shenzhen Braodwell Environment Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Braodwell Environment Protection Technology Co Ltd filed Critical Shenzhen Braodwell Environment Protection Technology Co Ltd
Priority to CN201621078733.8U priority Critical patent/CN206190002U/en
Application granted granted Critical
Publication of CN206190002U publication Critical patent/CN206190002U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to an air film building bottom sealing device installs on the base member for the membrane material of preprocessing in the sealing gas membrane building and the gap between the base member, it includes: and simultaneously, seal the curtain, including first connecting portion and second connecting portion, first connecting portion are connected with the air film fixed part, and the second connecting portion are extended to air film building interior along the top of base member earlier by first connecting portion, and the lateral part downwardly extending along the base member laminates on the lateral part again, a fixing device wears to establish angle steel, air film fixed part and top in proper order and locks and fix on the base member. Adopt that this structure sealing curtain is tight to shelter from the gap between air film fixed part and the base member top, avoid air film building interior's gas gap flow play from then on to avoid taking away a large amount of heats (cold volume) and influence the inside heat preservation of air film, reduce the energy consumption. The utility model provides an air film building including above -mentioned air film building bottom sealing device.

Description

Pneumatic membrane building bottom sealing device and pneumatic membrane building
Technical field
The utility model is related to pneumatic membrane building fixed network, and more particularly to pneumatic membrane building bottom sealing device and air film is built Build.
Background technology
Due to pneumatic membrane building possess low cost, it is quick, be easy to dismounting, it is light the features such as, thus more and more used In all trades and professions.Pneumatic membrane building places oneself in the midst of outdoor in many cases, and pneumatic membrane building bottom is the connecting portion of membrane material and basis, The current link position air-tightness is bad, and heat (cold) scatters and disappears seriously, has influence on air film internal insulation, increases energy consumption.Especially It is in freezer or ice stadium environment, to increase energy consumption more severe.
Utility model content
Based on this, it is necessary to for the bad problem of pneumatic membrane building bottom air-tightness, there is provided a kind of sealing, insulation/guarantor Cold effect good pneumatic membrane building bottom sealing device and pneumatic membrane building.
A kind of pneumatic membrane building bottom sealing device, on matrix, the membrane material for sealing preprocessing in pneumatic membrane building Gap between matrix, described matrix includes top and the sidepiece being connected with the top, and the membrane material is fixed including air film The gentle membrane body in portion, the pneumatic membrane building bottom sealing device includes:
Angle steel, is placed on described matrix, and the air film fixed part is folded between the angle steel and the top;
Sealing curtain, including first connecting portion and second connecting portion, the first connecting portion are connected with the air film fixed part, The second connecting portion is first extended along the top of described matrix from the first connecting portion to inside pneumatic membrane building, further along institute The sidepiece for stating matrix is extended downwardly and is fitted on the sidepiece of described matrix;
First fixing device, wears the angle steel, the air film fixed part and the top and is locked in institute successively State on matrix.
Above-mentioned pneumatic membrane building bottom sealing device is connected to air film by increasing a sealing curtain, the first connecting portion of sealing curtain On fixed part, the second connecting portion of sealing curtain is first extended along the top of matrix by first connecting portion towards pneumatic membrane building inside, Then extend downwardly and be fitted on the sidepiece of matrix further along the sidepiece of matrix;First fixing device wears angle steel, gas successively The top of film fixed part and matrix is simultaneously locked on matrix so that sealing curtain it is tight shelter from air film fixed part and base Gap between body top, it is to avoid hot gas or cold air inside pneumatic membrane building flow out from this gap, so as to avoid taking away big calorimetric Amount (cold) has influence on air film internal insulation, reduces energy consumption.
Wherein in one embodiment, including the side rope on the outside of the angle steel, the air film fixed part bypasses described Side rope doubling simultaneously extends to inside pneumatic membrane building, forms elongated end, and the first connecting portion of the sealing curtain connects with the elongated end Connect, the first fixing device wears the angle steel, the air film fixed part, the elongated end or first connecting portion, Yi Jisuo successively State top and be locked on the matrix.
Wherein in one embodiment, the first connecting portion of the sealing curtain welds to form one with the elongated end.
Wherein in one embodiment, one layer is coated between the second connecting portion of the sealing curtain and the sidepiece of described matrix Glue, to bond the second connecting portion with the sidepiece.
Wherein in one embodiment, also including a heat-insulation layer, the heat-insulation layer is arranged on the second connecting portion and institute State between the sidepiece of matrix, between the second connecting portion and the heat-insulation layer, and between the heat-insulation layer and the sidepiece Bonded by being coated with one layer of glue.
Wherein in one embodiment, also including gasket seal, the gasket seal is located at the air film fixed part and institute State between the top of matrix.
Wherein in one embodiment, the angle steel includes base plate and the side plate set in angle with the base plate, described First fixing device wears the base plate, the air film fixed part and described matrix.
Wherein in one embodiment, also including wearing the second fixing device of the side plate, it is provided with pneumatic membrane building Wirerope, the wirerope is covered on outside the membrane material, and the wirerope is looped around second fixing device in pneumatic membrane building bottom position Lower section, and be locked by second fixing device.
Wherein in one embodiment, first fixing device is embedded in described matrix, and partial denudation is described It is used to wear the air film fixed part and the angle steel outside top.
A kind of pneumatic membrane building, including membrane material and matrix, the membrane material include the gentle membrane body of air film fixed part, also including such as Pneumatic membrane building bottom sealing device described in the embodiment of any of the above one, the air film fixed part is close by the pneumatic membrane building bottom Seal apparatus are fixed on the matrix.
Brief description of the drawings
The pneumatic membrane building bottom sealing device structural representation that Fig. 1 is provided for the embodiment of the utility model one;
The pneumatic membrane building bottom sealing device structural representation that Fig. 2 is provided for another embodiment of the utility model;
Fig. 3 is that wirerope is connected to structural representation on angle steel in another embodiment of the utility model.
Specific embodiment
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings to this The specific embodiment of utility model is described in detail.Elaborate many details in order to abundant in the following description Understand the utility model.But the utility model can be implemented with being much different from other manner described here, this area Technical staff can do similar improvement in the case of without prejudice to the utility model intension, therefore the utility model does not receive following public affairs The limitation of the specific implementation opened.
It should be noted that when element is referred to as " being fixed on " another element, it can directly on another element Or can also there is element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or may be simultaneously present centering elements.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with technology of the present utility model is belonged to The implication that the technical staff in domain is generally understood that is identical.It is herein to be in term used in the description of the present utility model The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include The arbitrary and all of combination of one or more related Listed Items.
Referring to Fig. 1, the pneumatic membrane building bottom sealing device that the utility model is provided is used to seal the He of membrane material 100 of preprocessing Gap between matrix 200, membrane material 100 includes the gentle membrane body 120 of air film fixed part 110, and air film fixed part 110 is fixed on base On body 200, then constantly air film body 120 is set to maintain form to the inner inflatable of membrane material 100 by blowing device, to form air film Building.The pneumatic membrane building bottom sealing device includes the angle steel 300 being arranged on matrix 200, blocks air film fixed part 110 and base The sealing curtain 400 in gap between body 200, and for fixing angle steel 300 and air film fixed part 110 on matrix 200 One fixing device 500.
In one embodiment, matrix 200 includes top 210 and the sidepiece 220 being connected with top 210, and angle steel 300 is placed in matrix On 200 top 210, air film fixed part 110 is folded between angle steel 300 and the top 210 of matrix 200.Sealing curtain 400 includes First connecting portion 410 and second connecting portion 420, first connecting portion 410 are connected with air film fixed part 110;Second connecting portion 420 by First connecting portion 410 first extends along the top 210 of matrix 200 to inside pneumatic membrane building, further along the sidepiece 220 of matrix 200 Extend downwardly and be fitted on the sidepiece 220 of matrix 200.First fixing device 500 wears angle steel 300, air film fixed part successively 110 and matrix 200 top 210 and be locked on matrix 200.Using above structure, the first connecting portion of sealing curtain 400 410 are connected on air film fixed part 110, and the second connecting portion 420 of sealing curtain 400 is tightly fitted in the sidepiece 220 of matrix 200 On, so that the tight gap sheltered between air film fixed part 110 and the top 210 of matrix 200 of sealing curtain 400, it is to avoid Hot gas and cold air inside pneumatic membrane building flow out from this gap, are had influence on inside air film so as to avoid taking away amount of heat (cold) Insulation, reduces energy consumption.Preferably, the first connecting portion 410 of sealing curtain 400 is welded on air film fixed part 110.Specifically, base The top 210 of body 200 can be set or chamfered setting with sidepiece 220 in angle.Specifically, in the present embodiment, sealing curtain 400 First connecting portion 410 be connected to air film fixed part 110 near the position of air film body 120, it is solid positioned at as shown in Figure 1 first Determine the left side of device 500.
Referring also to Fig. 2, in another embodiment, the pneumatic membrane building bottom sealing device also includes being located at the outside of angle steel 300 Side rope 900, air film fixed part 110 bypasses side rope 900 pairs and turns back, and extends to inside pneumatic membrane building, forms elongated end 122, the first connecting portion 410 of sealing curtain 400 is connected with elongated end 122.First fixing device 500 wears angle steel 300, gas successively Film fixed part 110, elongated end 122 or first connecting portion 410, and top 210 and be locked on matrix 200.Specifically, In the present embodiment, the long enough of elongated end 122, during to Fig. 2 left sides more than the position that the first fixing device 500 wears, first fixes Device 500 wears angle steel 300, air film fixed part 110, elongated end 122, and top 210 successively.Preferably, sealing curtain 400 First connecting portion 410 forms one with the welding of elongated end 122.
In another embodiment, elongated end 122 does not extend to Fig. 1 left direction also and is fixed more than first very close to side rope 900 The position (figure does not show the situation) that device 500 wears, the first fixing device 500 wears angle steel 300, air film fixed part successively 110th, first connecting portion 410, and top 210.
Referring to Fig. 1, it is preferred that in an embodiment, the second connecting portion 420 of sealing curtain 400 and the sidepiece 220 of matrix 200 Between be coated with one layer of glue 800, to bond second connecting portion 420 and sidepiece 220, make the side of second connecting portion 420 and matrix 200 It is fully sealed between portion 220, in the absence of gap, so as to avoid hot gas or cold air inside pneumatic membrane building from there successively along base The sidepiece 220 of body 200, top 210, the first fixing device 500 wear the gap to be formed outflow, reduce loss.Another embodiment In, also including a heat-insulation layer (not shown), heat-insulation layer is arranged between second connecting portion 420 and the sidepiece 220 of matrix 200, the Bonded by being coated with one layer of glue between two connecting portions 420 and heat-insulation layer, and between heat-insulation layer and sidepiece 220.Plus one Layer heat-preservation cotton so that insulation or cold insulation effect herein is more preferable.Specifically, heat-insulation layer can be EPE pearl wool or glass fiber Continuous or rubber and plastic boards.
Referring also to Fig. 2, in another embodiment, the pneumatic membrane building bottom sealing device also includes gasket seal 810, sealing Pad 810 is located between air film fixed part 110 and the top 210 of matrix 200, to avoid the hot gas or cold air inside pneumatic membrane building The gap outflow formed during being worn from the first fixing device 500, reduces loss.Preferably, the gasket seal 810 uses rubber Modeling cotton material is made.
Referring also to Fig. 3, in an embodiment, angle steel 300 includes base plate 310 and the side plate set in angle with base plate 310 320, the first fixing device 500 wears the top 210 of base plate 310, air film fixed part 110 and matrix 200.Further, the air film Construction bottom sealing device also includes wearing the second fixing device 600 of side plate 320, and wirerope 700, steel are provided with pneumatic membrane building Cable 700 is covered on outside membrane material 100, and wirerope 700 is looped around below the second fixing device 600 in pneumatic membrane building bottom position, and second consolidates Determine device 600 to be locked, and then make that wirerope is firm to be hung on angle steel 300.Preferably, also turn in the second fixing device 600 Dynamic to be arranged a pulley 710, wirerope 700 is looped around the lower section of pulley 710.
In one embodiment, the first fixing device 500 is embedded in matrix 200, and partial denudation the top 210 of matrix it Outward, for wearing air film fixed part 110 and angle steel 300, to fix air film fixed part 110 and angle steel 300.
Specifically, in an embodiment, matrix 200 is enclosed in pneumatic membrane building bottom around pneumatic membrane building one.It is fixed as multiple The basis of air film fixed part, for whole pneumatic membrane building, pre-buried one first every a segment distance on the top 210 of matrix 200 Fixing device 500, for fixing air film fixed part 110.
The utility model also provides a kind of pneumatic membrane building, including preprocessing membrane material 100 and matrix 200, membrane material 100 includes The gentle membrane body 120 of air film fixed part 110, and the pneumatic membrane building bottom sealing device described in the embodiment of any of the above one, gas Film fixed part 110 is fixed on the top 210 of matrix 200 by pneumatic membrane building bottom sealing device.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed, But therefore can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of pneumatic membrane building bottom sealing device, on matrix, for seal the membrane material of preprocessing in pneumatic membrane building with Gap between matrix, described matrix includes top and the sidepiece being connected with the top, and the membrane material includes air film fixed part Gentle membrane body, it is characterised in that the pneumatic membrane building bottom sealing device includes:
Angle steel, is placed on described matrix, and the air film fixed part is folded between the angle steel and the top;
Sealing curtain, including first connecting portion and second connecting portion, the first connecting portion are connected with the air film fixed part, described Second connecting portion is first extended along the top of described matrix from the first connecting portion to inside pneumatic membrane building, further along the base The sidepiece of body is extended downwardly and is fitted on the sidepiece of described matrix;
First fixing device, wears the angle steel, the air film fixed part and the top and is locked in the base successively On body.
2. pneumatic membrane building bottom sealing device according to claim 1, it is characterised in that including positioned at angle steel outside Side rope, the air film fixed part bypass the side rope doubling and to inside pneumatic membrane building extend, formed elongated end, the sealing The first connecting portion of curtain is connected with the elongated end, and the first fixing device wears the angle steel, the air film fixed part, institute successively State elongated end or first connecting portion, and the top and be locked on the matrix.
3. pneumatic membrane building bottom sealing device according to claim 2, it is characterised in that the first connection of the sealing curtain Weld to form one with the elongated end in portion.
4. pneumatic membrane building bottom sealing device according to claim 1 and 2, it is characterised in that the second of the sealing curtain One layer of glue is coated between connecting portion and the sidepiece of described matrix, to bond the second connecting portion with the sidepiece.
5. pneumatic membrane building bottom sealing device according to claim 3, it is characterised in that described also including a heat-insulation layer Heat-insulation layer is arranged between the second connecting portion and the sidepiece of described matrix, the second connecting portion and the heat-insulation layer it Between, and by being coated with one layer of glue bonding between the heat-insulation layer and the sidepiece.
6. pneumatic membrane building bottom sealing device according to claim 1, it is characterised in that described also including gasket seal Gasket seal is located between the air film fixed part and the top of described matrix.
7. pneumatic membrane building bottom sealing device according to claim 1, it is characterised in that the angle steel include base plate and with The side plate that the base plate is set in angle, first fixing device wears the base plate, the air film fixed part and the base Body.
8. pneumatic membrane building bottom sealing device according to claim 7, it is characterised in that also including wearing the side plate Second fixing device, is provided with wirerope on pneumatic membrane building, the wirerope is covered on outside the membrane material, and the wirerope is at pneumatic membrane building bottom Portion position is looped around the second fixing device lower section, and is locked by second fixing device.
9. pneumatic membrane building bottom sealing device according to claim 1, it is characterised in that first fixing device is pre-buried In described matrix, and partial denudation is used to wear the air film fixed part and the angle steel outside the top.
10. a kind of pneumatic membrane building, including membrane material and matrix, the membrane material include the gentle membrane body of air film fixed part, and its feature exists In also including the pneumatic membrane building bottom sealing device as described in claim 1-9 any one, the air film fixed part is by described Pneumatic membrane building bottom sealing device is fixed on the matrix.
CN201621078733.8U 2016-09-23 2016-09-23 Air film building bottom sealing device and air film building Withdrawn - After Issue CN206190002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621078733.8U CN206190002U (en) 2016-09-23 2016-09-23 Air film building bottom sealing device and air film building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621078733.8U CN206190002U (en) 2016-09-23 2016-09-23 Air film building bottom sealing device and air film building

Publications (1)

Publication Number Publication Date
CN206190002U true CN206190002U (en) 2017-05-24

Family

ID=58731210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621078733.8U Withdrawn - After Issue CN206190002U (en) 2016-09-23 2016-09-23 Air film building bottom sealing device and air film building

Country Status (1)

Country Link
CN (1) CN206190002U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437285A (en) * 2016-09-23 2017-02-22 深圳市博德维环境技术股份有限公司 Gas-film building bottom sealing device and gas-film building
CN109138584A (en) * 2018-07-23 2019-01-04 朱程航 A kind of outdoor mountain-climbing activity-specific windbreak tentage

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437285A (en) * 2016-09-23 2017-02-22 深圳市博德维环境技术股份有限公司 Gas-film building bottom sealing device and gas-film building
WO2018054324A1 (en) * 2016-09-23 2018-03-29 深圳市博德维环境技术股份有限公司 Bottom sealing device of air film structure and air film structure
CN106437285B (en) * 2016-09-23 2018-10-26 深圳市博德维环境技术股份有限公司 Pneumatic membrane building bottom sealing device and pneumatic membrane building
CN109138584A (en) * 2018-07-23 2019-01-04 朱程航 A kind of outdoor mountain-climbing activity-specific windbreak tentage

Similar Documents

Publication Publication Date Title
CN106437285B (en) Pneumatic membrane building bottom sealing device and pneumatic membrane building
CN206190002U (en) Air film building bottom sealing device and air film building
CN102733723B (en) Efficient and energy-saving hollow film glass
WO2018064944A1 (en) Inflatable building and door structure therefor
CN106368577B (en) Refrigeration storage system, pneumatic membrane building and its emergent door
US9170044B2 (en) Frost inhibiting joints for insulated panels and curtains
CN205203335U (en) A fixed connector and aerostatics for aerostatics
CN208792876U (en) Pneumatic membrane building special-purpose thermal insulation thermal insulation air bag formula internal membranous structure
CN206190153U (en) Freezer system, air film building and escape door structure thereof
WO2019219047A1 (en) Frp composite board
CN107254914B (en) Inflatable membrane and method of making same
CN202899949U (en) Efficient and energy-saving hollow film-layer glass
CN207510700U (en) Protective cover in aircraft canopy coated glass umbrella rib type
CN109305182A (en) A kind of glass fibre reinforced plastic air channel for rail vehicle
CN208855637U (en) A kind of glass fibre reinforced plastic air channel for rail vehicle
CN205871340U (en) High air -permeability CPP film
CN107575672A (en) Smoke exhaust pipe erection joint component, smoke evacuation tube assembly and range hood
CN207569443U (en) Thermal insulation casing
CN207244844U (en) Aerated film
CN206368607U (en) Pneumatic membrane building base fixture and pneumatic membrane building
CN207569295U (en) Thermal insulation valve door pocket
CN207392591U (en) A kind of tongue-and-groove type rockwool sandwich board
CN2907320Y (en) Cloth coated with rubber layer with water/gas sealing function for zipper
TW202031565A (en) Extended-type air column cushioning structure
CN206091414U (en) Freezer storehouse and anti cold bridge bolt assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170524

Effective date of abandoning: 20181026

AV01 Patent right actively abandoned