CN207244844U - Aerated film - Google Patents

Aerated film Download PDF

Info

Publication number
CN207244844U
CN207244844U CN201720964894.5U CN201720964894U CN207244844U CN 207244844 U CN207244844 U CN 207244844U CN 201720964894 U CN201720964894 U CN 201720964894U CN 207244844 U CN207244844 U CN 207244844U
Authority
CN
China
Prior art keywords
hole
jam
adhesive band
aerated film
membrane body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720964894.5U
Other languages
Chinese (zh)
Inventor
肖龙
薛飞龙
张辉
王秦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Braodwell Environment Protection Technology Co Ltd
Original Assignee
Shenzhen Braodwell Environment Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Braodwell Environment Protection Technology Co Ltd filed Critical Shenzhen Braodwell Environment Protection Technology Co Ltd
Priority to CN201720964894.5U priority Critical patent/CN207244844U/en
Application granted granted Critical
Publication of CN207244844U publication Critical patent/CN207244844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Bags (AREA)

Abstract

It the utility model is related to a kind of aerated film.Above-mentioned aerated film includes membrane body, adhesive band, the first jam and ventilation duct;Membrane body offers through hole;Adhesive band is arranged on membrane body, and adhesive band is around through hole;The mounting hole connected with through hole is offered on first jam, the first jam is connected on adhesive band;Ventilation duct is arranged in through hole and mounting hole.Ventilation duct, during assembling, is first inserted into through hole by above-mentioned aerated film;Then ventilation duct is arranged in the mounting hole of the first jam;Then the first jam is connected on adhesive band, in order to avoid aerated film gas leakage;Finally by the ventilation equipment of ventilation duct access membrane body periphery, the assembling of aerated film is finally completed, therefore, the more simple and reliable property of assembling process of aerated film is preferable, so that the ease of use of aeration structure is preferable;In addition, the aeration structure of above-mentioned aerated film is simple and cost is relatively low.

Description

Aerated film
Technical field
The technical field of pneumatic membrane building is the utility model is related to, more particularly to a kind of aerated film.
Background technology
Pneumatic membrane building is widely used in all trades and professions because having the characteristics that cost relatively low and light.Traditional pneumatic membrane building On need to set aeration structure and the air port of defeated wind apparatus of outside to connect, such as air-conditioning, with the temperature to the air in pneumatic membrane building Degree, humidity, degree of purity and air velocity are adjusted.
The part of the aeration structure of traditional pneumatic membrane building is more, makes that aeration structure is more complicated and cost is higher;In addition, gas The ease of use of the aeration structure of membrane building is poor and easy gas leakage.
Utility model content
Based on this, it is necessary to the higher problem of and cost more complicated for the aeration structure of pneumatic membrane building;In addition, aeration structure A kind of the problem of poor also there are ease of use and easy gas leakage, there is provided aerated film.
A kind of aerated film, including:
Membrane body, the membrane body offer through hole;
Adhesive band, the adhesive band are arranged on the membrane body, and the adhesive band is around the through hole;
First jam, the mounting hole connected with the through hole, the first jam connection are offered on first jam In on the adhesive band;And
Ventilation duct, the ventilation duct are arranged in the through hole and the mounting hole.
In one of the embodiments, first jam is socketed on the ventilation duct, and first jam is pasted In on the adhesive band.
In one of the embodiments, it is described ventilation tubular elastic be connected on the inner wall of the mounting hole, make ventilation duct with It is in close contact and combines between first jam, ensures the leakproofness connected between ventilation duct and the first jam, can preferably solve The problem of aeration structure easy gas leakage.
In one of the embodiments, the membrane body includes film main body and reinforced sheet, and the reinforced sheet is connected to the film In main body;The through hole includes the first through hole being connected and the second through hole, the first through hole are opened in the film main body, Second through hole is opened on the reinforced sheet;The adhesive band is arranged on the reinforced sheet side for deviating from the film main body Face, the adhesive band is around the first through hole;Since film main body is membrane material material, reinforced sheet is set in film main body, can be with Film main body and the bonding strength of ventilation duct junction are improved, makes film main body not easy to crack, is ensured reliable between membrane body and ventilation duct Connection.
In one of the embodiments, aerated film further includes the second jam, and second jam is pasted on the adhesive band On, second jam is used to block the through hole;When that need to pass through through hole aerated film is aerated, the second jam is unloaded, The ventilation duct of ventilation equipment is arranged in through hole and mounting hole, and the first jam is pasted on adhesive band, with to membrane body into Row ventilation.When without when being aerated by through hole to aerated film, unloading the first jam and ventilation duct, the second jam being pasted on On adhesive band, to block through hole, aerated film gas leakage is avoided.Therefore, the second jam and the first jam can switch use.Work as membrane body When need not divulge information, ventilation duct can be extracted, and the first jam is replaced with into the second jam, mounting hole is blocked.
In one of the embodiments, aerated film further includes counter balance pocket, and the counter balance pocket is connected with the membrane body, by membrane body It is connected in counter balance pocket, in case membrane body arbitrarily moves.
In one of the embodiments, the counter balance pocket includes bag body and filler, and receipts are offered on the bag body Cavity volume, the filler are located in the host cavity.
In one of the embodiments, the filler is sandbag or water bag or metal derby.
In one of the embodiments, aerated film further includes connecting plate and fastener, and it is solid that first is offered on the membrane body Positioning is put, and the second fixed position and opening are further opened with the bag body, and the host cavity and second fixed position are equal With the open communication;The filler is located in the host cavity;Mounting hole is offered on the connecting plate;The connecting plate It is connected on one of the membrane body and the bag body;Fastener order wears the mounting hole, described first solid Positioning put with second fixed position, for making the membrane body, the bag body and the connecting plate be connected together.
In one of the embodiments, the fastener includes screw bolt and nut;The number of the connecting plate is two;Institute State bolt order wear the mounting hole of one of them connecting plate, first fixed position, second fixed position and The mounting hole of another connecting plate, the bolt are connected with the nut thread, and the bolt is away from the nut In on one of them described connecting plate, the nut is connected on another described connecting plate end abutment.
Above-mentioned aerated film, offers through hole on membrane body, due to offering mounting hole on the first jam, and ventilation duct is worn Connected in through hole and mounting hole, making membrane body inner cavity with membrane body periphery;Ventilation duct can be with membrane body peripheral ventilation equipment connect Connect, such as air-conditioning, ventilation equipment is aerated membrane body;Again since membrane body is equipped with adhesive band, adhesive band is around through hole, i.e., logical The periphery in hole is equipped with adhesive band, and the first jam is connected on adhesive band, is blocked with the junction to ventilation duct and membrane body, Avoid the problem that easy gas leakage between ventilation duct and membrane body;During assembling, first ventilation duct is inserted into through hole;Then ventilation duct is worn In the mounting hole of the first jam;Then the first jam is connected on adhesive band, in order to avoid aerated film gas leakage;Finally will ventilation On the ventilation equipment of pipe access membrane body periphery, be finally completed the assembling of aerated film, therefore, the assembling process of aerated film relatively simply and Reliability is preferable, so that the ease of use of aeration structure is preferable;In addition, the aeration structure of above-mentioned pneumatic membrane building it is simple and Cost is relatively low.
Brief description of the drawings
Fig. 1 is the aerated film schematic diagram of an embodiment;
Fig. 2 is the explosive view of aerated film shown in Fig. 1;
Fig. 3 is another schematic diagram of aerated film shown in Fig. 1;
Fig. 4 is the explosive view of aerated film shown in Fig. 3;
Fig. 5 is the partial enlarged view of aerated film shown in Fig. 4;
Fig. 6 is the partial enlarged view of aerated film shown in Fig. 3.
Embodiment
For the ease of understanding the utility model, aerated film is described more fully below with reference to relevant drawings.It is attached The preferred embodiment of aerated film is given in figure.But aerated film can be realized in many different forms, however it is not limited to this Literary described embodiment.On the contrary, the purpose for providing these embodiments is to make the disclosure to aerated film more thorough complete Face.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", For illustrative purposes only, it is unique embodiment to be not offered as " right side " and similar statement.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to the technology of the utility model The normally understood implication of technical staff in domain is identical.It is intended merely to retouch in the term used in the description of aerated film herein State the purpose of specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include one Or the arbitrary and all combination of multiple relevant Listed Items.
For example, a kind of aerated film includes:Membrane body, adhesive band, the first jam and ventilation duct;For example, the membrane body opens up There is through hole;For example, the adhesive band is arranged on the membrane body;For example, the adhesive band is around the through hole;For example, described The mounting hole connected with the through hole is offered on one jam;For example, first jam is connected on the adhesive band;Example Such as, the ventilation duct is arranged in the through hole and the mounting hole.For example, a kind of aerated film includes:Membrane body, adhesive band, One jam and ventilation duct;The membrane body offers through hole;The adhesive band is arranged on the membrane body, and the adhesive band is around institute State through hole;The mounting hole connected with the through hole is offered on first jam, first jam is connected to the stickup Take;The ventilation duct is arranged in the through hole and the mounting hole.
As shown in Figure 1, the aerated film 10 of an embodiment includes membrane body 100, adhesive band 200, the first jam 300 and leads to Air hose 400.Referring also to Fig. 2, the membrane body 100 offer through hole 110.The adhesive band 200 is arranged on the membrane body 100. For the adhesive band 200 around the through hole 110, i.e. the periphery of through hole 110 is equipped with adhesive band 200.Opened on first jam 300 Equipped with the mounting hole 310 connected with the through hole 110.First jam 300 is connected on the adhesive band 200.For example, First jam 300 is pasted on the adhesive band 200.The ventilation duct 400 is arranged in the through hole 110 and the installation In hole 310, the inner cavity of membrane body 100 is set connect with the periphery of membrane body 100, ventilation duct 400 can be with membrane body 100 peripheral leads to Wind devices connect, such as air-conditioning, in this way, ventilation equipment are divulged information by ventilation duct 400 and membrane body 100.Again since membrane body 100 is equipped with Adhesive band 200, adhesive band 200 is around through hole 110, i.e., the periphery of through hole 110 is equipped with adhesive band 200, and the first jam 300 connects It is connected on adhesive band 200, is blocked with the junction to ventilation duct 400 and membrane body 100, avoids ventilation duct 400 and membrane body Between 100 the problem of easy gas leakage.
During assembling, first ventilation duct 400 is inserted into through hole 110;Then ventilation duct 400 is arranged in the first jam 300 In mounting hole 310;Then the first jam 300 is connected on adhesive band 200, in order to avoid 10 gas leakage of aerated film;Finally by ventilation duct On the ventilation equipment of 400 access membrane body, 100 periphery, the assembling of aerated film 10 is finally completed, therefore, the assembling process of aerated film 10 More simple and reliable property is preferable, so that the ease of use of aeration structure is preferable.For example, the first jam 300 is pasted on stickup On band 200, the first jam is set to be connected on adhesive band, it is possible to achieve the quick assembling of aerated film 10, while realize the first jam It is detachably connected between 300 and membrane body 100, shortens the built-up time of aerated film 10;When the first jam 300 exist it is damaged and When paste performance is poor, the first jam 300 that can more renew at any time, reduces the use cost of aerated film 10.For example, the The shape and the shape of adhesive band 200 of one jam 300 are adapted.Certainly, the first jam 300 can also be buckled in adhesive band 200 On, for example, the first jam 300 is the plugging sheet of hard.And for example, the material of the first jam 300 is timber or ebonite or other materials Matter.
In one of the embodiments, first jam 300 is socketed on the ventilation duct 400, wears ventilation duct 400 In the mounting hole 310 of the first jam 300.First jam is pasted on the adhesive band, it is possible to achieve aerated film 10 Quick assembling, while realize and be detachably connected between the first jam 300 and membrane body 100, when shortening the assembling of aerated film 10 Between;When the first jam 300 exist damaged and paste performance it is poor when, the first jam 300 that can more renew at any time is reduced and filled The use cost of air film 10.For example, the circular in cross-section shape of ventilation duct 400.Through hole 110 and mounting hole 310 are circular hole. In other embodiment, the cross section of ventilation duct 400 can also square-shaped or elliptical shape, the shape of through hole 110 and mounting hole 310 Shape and the shape of the cross section of ventilation duct 400 are adapted.And for example, ventilation duct 400 is elastic pipeline, ventilation duct 400 is had bullet Property.For example, the extension track of adhesive band 200 is square-shaped.It is appreciated that in other embodiments, the extension track of splicing tape Can also in rounded shape or elliptical shape.
It is in one of the embodiments, described in order to make to be in close contact combination between 400 and first jam 300 of ventilation duct 400 elasticity of ventilation duct is connected on the inner wall of the mounting hole 310, makes to be in close contact between 400 and first jam 300 of ventilation duct With reference to the leakproofness connected between guarantee 400 and first jam 300 of ventilation duct, can preferably solve aeration structure and easily leak The problem of gas.
In one of the embodiments, the membrane body 100 includes film main body 100a and reinforced sheet 100b, the reinforced sheet 100b is connected on the film main body 100a.The through hole 110 includes the first through hole that is connected and the second through hole, and described first Through hole is opened on the film main body 100a, and second through hole is opened on the reinforced sheet 100b.The adhesive band 200 is set In the side for deviating from the film main body 100a on the reinforced sheet 100b, the adhesive band 200 is around the first through hole.By It is membrane material material in film main body 100a, reinforced sheet 100b is set on film main body 100a, film main body 100a and ventilation can be improved The bonding strength of 400 junction of pipe, makes film main body 100a not easy to crack, ensures reliably to connect between membrane body 100 and ventilation duct 400 Connect.For example, the adhesive band 200 is also stitch-bonded on the reinforced sheet 100b, adhesive band 200 is set more to be firmly attached to reinforced sheet On 100b.
In the present embodiment, reinforced sheet 100b is identical with the shape of adhesive band 200.In other embodiments, reinforced sheet The shape of 100b and adhesive band 200 can not also be same.For example, reinforced sheet 100b is in toroidal, adhesive band 200 is square-shaped, And the overall diameter of reinforced sheet 100b is more than the length of side of adhesive band 200, the interior diameter of reinforced sheet 100b is less than the side of adhesive band 200 It is long.And for example, reinforced sheet 100b is identical with the shape of adhesive band 200 and area is identical.For example, reinforced sheet 100b is by being welded and fixed In on film main body 100a, reinforced sheet 100b is set to be connected on film main body 100a.In other embodiments, reinforced sheet 100b can also It is fixed on by being glued on film main body 100a.
In one of the embodiments, aerated film 10 further includes the second jam 500, and second jam 500 is pasted on institute State on adhesive band 200, second jam 500 is used to block the through hole 110.When need to pass through through hole 110 to aerated film 10 into During row ventilation, the second jam 500 is unloaded, the ventilation duct 400 of ventilation equipment is arranged in through hole 110 and mounting hole 310, and First jam 300 is pasted on adhesive band 200, to be aerated to membrane body 100.When without by through hole 110 to aerated film 10 when being aerated, and unloads the first jam 300 and ventilation duct 400, the second jam 500 is pasted on adhesive band 200, with closure Through hole 110, avoids 10 gas leakage of aerated film.Therefore, the second jam 500 and the first jam 300 can switch use.When membrane body 100 When need not divulge information, ventilation duct 400 can be extracted, and the first jam 300 is replaced with into the second jam 500, by mounting hole 310 Blocked.For example, the second jam 500 is square-shaped, the second jam 500 closure through hole 110.And for example, second jam 500 The length of side is equal to the length of side of splicing tape, the second jam 500 is attached at completely on splicing tape.For example, the material of the second jam 500 With the material identical of the material of the first jam 300 with membrane body 100, make 10 easy to manufacture of aerated film and cost is relatively low.
In one of the embodiments, aerated film 10 further includes counter balance pocket 600, the counter balance pocket 600 and the membrane body 100 Connection, membrane body 100 is connected in counter balance pocket 600, in case membrane body 100 arbitrarily moves.In one of the embodiments, it is described to match somebody with somebody Weight bag 600 includes bag body 610 and filler 620, and host cavity 612, the filler 620 are offered on the bag body 610 In the host cavity 612.In one of the embodiments, the filler 620 is sandbag or water bag or metal derby.At this In embodiment, the filler 620 is sandbag.In one of the embodiments, the adhesive band 200 is velcro.
As shown in figure 3, for example, aerated film 10 further includes connecting plate 700 and fastener 800, is offered on the membrane body One fixed position 110.As shown in figure 4, the second fixed position 614 and opening 616 are further opened with the bag body 610, it is described Host cavity 612 and second fixed position 614 are connected with the opening 616.The filler 620 is located at the collecting In chamber 612.Mounting hole 710 is offered on the connecting plate 700.The connecting plate 700 is connected to the membrane body and the bag sheet On one of body 610.800 order of fastener wears the mounting hole 710, first fixed position 110 and described Second fixed position 614, for making the membrane body, the bag body 610 and the connecting plate 700 be connected together, so that 610 upper shed 616 of bag body is clamped, and avoids being separated from each other between filler 620 and bag body 610.
When assembling is fixed, filler 620 is positioned in host cavity by the opening 616 of bag body 610 first, makes filling Bag body 610 is positioned at target location by thing 620;Then fastener 800 is arranged in mounting hole 710, the first fixed position 110th, in the second fixed position 614 and opening 616, film main body 100a is made to be connected with bag body 610.When dismounting is mobile, unload first Lower fastener 800 and connecting plate 700, weight belt and film main body 100a are separated;Then respectively to film main body 100a and bag body 610 packing movements, and bag body 610 and filler 620 can pack movement together.When reaching new destination, user Aerated film 10 can be re-assemblied, and film main body 100a and bag body 610 are subjected to assembly and connection again.Due to aerated film 10 In assembling, without being connected with concrete foundation, move the dismounting of aerated film 10 and be easier to, solve tearing open for portable air film The problem of dress is mobile difficult, while reduce the dismounting cost of aerated film 10.
In order to make the connection between film main body 100a and bag body 610 more firm, the number of connecting plate 700 is two, its In a connecting plate 700 be connected on the film main body 100a deviate from the bag body 610 side, another institute State connecting plate 700 and be connected to the side for deviating from the film main body 100a on the bag body 610.The bolt order wears it In a connecting plate mounting hole, first fixed position, second fixed position and another described connection The mounting hole of plate, the bolt are connected with the nut thread, and end abutment of the bolt away from the nut is in wherein one On a connecting plate, the nut is connected on another described connecting plate, is pressed from both sides film main body 100a and bag body 610 Tightly between two connecting plates 700.It is appreciated that in other embodiments, the number of connecting plate 700 can also be multiple, film Main body 100a and bag body 610 are clamped between two of which connecting plate 700.
In one of the embodiments, the first fixed position 110 and the second fixed position 614 are through hole.Such as Fig. 5 institutes Show, the second fixed position 614 includes Part I 614a and Part II 614b, Part I 614a and Part II 614b Connected with opening 230.The number of mounting hole is two, and 500 order of fastener wears first mounting hole 710, described First fixed position 110, the Part I 614a, the Part II 614b and second mounting hole 710.
It is further, neighbouring on film main body 100a in order to make preferably to be abutted between film main body 100a and bag body 610 The side of bag body 610 is raised equipped with multiple first, and there are the first gap between two neighboring first protrusion.Bag body 610 is adjacent The side of nearly film main body 100a is raised equipped with multiple second, and there are the second gap between two neighboring second protrusion.First is raised In the second gap, second is raised in the first gap, makes preferably to abut between film main body 100a and bag body 610. Further, multiple first protrusions are uniformly distributed on film main body 100a, and multiple second protrusions are uniformly distributed in bag body 610 On.In order to improve the wearability of bag body 610, further, the bottom of bag body 610 is equipped with wearing layer.
It should be noted that the structure of counter balance pocket need to consider convenience when aerated film 10 is assembled and transported.For example, counterweight The opening of bag is in contraction-like, can easily be separated to avoid filler 620 from the opening of counter balance pocket, make the position all the time of filler 620 In in the host cavity of counter balance pocket.In order to improve the stress intensity of counter balance pocket, for example, the opening of counter balance pocket is equipped with strengthening rib strip, In order to avoid counter balance pocket be repeatedly opened cause it is cracked.And for example, filler 620 is connected in counter balance pocket by sewing up or being glued, and is made Filler 620 is stronger to be connected in counter balance pocket.And for example, the inner wall of the opening of counter balance pocket is equipped with hasp or Sealing strap or drawing Chain, with sealed opening.For example, counter balance pocket includes fixing bag body, first connecting portion and second connecting portion, the fixing bag body It is connected respectively with the first connecting portion and second connecting portion, the host cavity is opened on the fixing bag body, and described The opening is formed between one connecting portion and second connecting portion.Second fixed position 614 is opened in first connecting portion and respectively On two connecting portions.And for example, first connecting portion and second connecting portion are movably connected on fixing bag body.Specifically, the first connection Portion and second connecting portion are rotationally connected with fixing bag body.For example, the connection between first connecting portion and fixing bag body Place is equipped with the first hinge, first connecting portion is rotatablely connected with fixing bag body.And for example, second connecting portion and fixing bag body it Between junction be equipped with the second hinge, be rotatablely connected second connecting portion and fixing bag body.
In order to play anti-loosing effect, in one of the embodiments, the fastener 800 includes bolt 810 and nut 820.The number of the connecting plate is two, and bolt order wears the mounting hole of one of them connecting plate, described the The mounting hole of one fixed position, second fixed position and another connecting plate, the bolt and the nut spiral shell Line connects, and on one of them described connecting plate, the nut is connected to separately end abutment of the bolt away from the nut On an outer connecting plate, it is fastenedly connected two connecting plates, film main body 100a and counter balance pocket.Bolts and nuts screw thread connects Connect, play anti-loosing effect, make the connection of two connecting plates, film main body 100a and counter balance pocket relatively reliable.
For example, bolt includes bolt body and bolt head, bolt head is connected to the end of bolt body.Bolt body End away from bolt head is equipped with screw thread, to be connected with nut thread.The diameter of bolt head is more than the diameter of bolt body. Bolt body order wears the mounting hole of one of them connecting plate, first fixed position, second fixed position With the mounting hole of connecting plate another described.Bolt head is supported with one of connecting plate away from the side of film main body 100a Connect, nut is abutted with another connecting plate away from the side of counter balance pocket.
Further, in order to make fastener 800 and the connection of connecting plate 700 more firm, aerated film 10 further includes packing ring, Packing ring is sheathed on bolt, and the both sides of packing ring are abutted with fastener 800 and connecting plate 700 respectively, can preferably prevent spiral shell Bolt is loosened from connecting plate 700, so that fastener 800 and the connection of connecting plate 700 are more firm.For example, connecting plate 700 On offer the groove connected with mounting hole 710, packing ring is located in groove to abut with connecting plate 700, can make packing ring preferably It is connected on connecting plate 700.In addition, packing ring is contained in groove, packing ring the space occupied can be saved, makes the knot of aerated film 10 Structure is compacter.
It is appreciated that in other embodiments, fastener 800 is not limited only to bolt, mounting hole 710 is also not limited to screw thread Hole.For example, fastener 800 can also be connecting pole.Protrusion is offered on the side wall of fastener 800.710 company of being opened in of mounting hole The edge of fishplate bar 700.During installation, fastener 800 first can be inserted into the first fixed position 110, the second fixed position 614 In threaded hole;Then fastener 800 is rotated to predetermined angular, protrusion is connected on one of connecting plate 700, fastener 800 head is connected on another connecting plate 700.
In one of the embodiments, aerated film 10 further includes the first reinforcement rope 900, and described first, which strengthens rope 900, is arranged on The edge of the neighbouring bag body 610 on the film main body 100a.When film main body 100a is inflated, film main body 100a and bag sheet Relative motion between body 610, the first reinforcement rope is added in the edge of the neighbouring bag body 610 on the film main body 100a 900, to avoid because the frictional force between connecting plate 700, bag body 610 and film main body 100a three is smaller first can be caused to consolidate Positioning is put 110 and is easily pulled, and makes to be reliably connected between bag body 610 and film main body 100a.For example, first strengthens the bag of rope 900 The edge of neighbouring bag body 610 is wrapped on film main body 100a, strengthen rope 900 to prevent first separates with film main body 100a, makes the One reinforcement rope 900 is stronger with the connection of film main body 100a.It is appreciated that the first reinforcement rope 900 is not limited only to by parcel Mode is arranged on film main body 100a.In other embodiments, the first reinforcement rope 900 can also be connected to film by sewing up or being glued On main body 100a.In the present embodiment, the first reinforcement rope 900 is connected on film main body 100a by being glued.
And for example, film main body 100a includes 100 and first covering portion of membrane body, and the first covering portion is connected to the end of membrane body 100 Portion.First covering portion parcel first strengthens rope, the first reinforcement rope is wrapped in the edge of neighbouring bag body 610 on film main body 100a Place.Further, membrane body 100 is integrally formed with the first covering portion.For example, the thickness of the first covering portion is equal to the thickness of membrane body 100 Degree.And for example, the first covering portion fold handling forms two the first covering portion units.Mutually pasted between two the first covering portion units Attached formed is used to wrap up the first the first accommodating chamber for strengthening rope, the first reinforcement rope is wrapped in the first covering portion.First fixed bit 110 are put to be opened in respectively on two the first covering portion units.Fastener is arranged in the first fixed position, makes two the first covering portion Closely attached between unit.Further, it is attached at the attaching between two the first covering portion units by welding, makes two It is closer between a first covering portion unit to attach.
As shown in figure 5, in one of the embodiments, aerated film 10 further includes the second reinforcement rope 1100, described second adds Strong rope 1100 is arranged on the edge of the bag body 610.When film main body 100a is inflated, film main body 100a and bag body 610 it Between relative motion, add the second reinforcement rope 1100 in the edge of the bag body 610, can be to avoid because of connecting plate 700, bag sheet Frictional force between body 610 and film main body 100a three is smaller and causes the second fixed position 614 easily to be pulled, and makes a bag body More reliable connection between 610 and film main body 100a.For example, second strengthens the edge that rope 1100 is wrapped in bag body 610, to prevent Second strengthens rope 1100 separates with bag body 610, makes the connection of the second reinforcement rope 1100 and film main body 100a stronger.It can manage Solution, second, which strengthens rope 1100, is not limited only to be arranged on bag body 610 by way of parcel.In other embodiments, second adds Strong rope 1100 is connected on bag body 610 by sewing up or being glued.In the present embodiment, second strengthens rope 1100 by being glued company It is connected on bag body 610.
And for example, bag body 610 includes bag body and the second covering portion, and the second covering portion is connected to the end of bag body.Second bag Cover portion's parcel second and strengthen rope, the second reinforcement rope is wrapped in the edge of counter balance pocket.Further, bag body and the second covering portion It is integrally formed.For example, the thickness of the second covering portion is equal to the thickness of bag body.And for example, the second covering portion fold handling forms two Second covering portion unit.Formation is mutually attached between two the second covering portion units to be used to wrap up the second the second receiving for strengthening rope Chamber, makes the second reinforcement rope be wrapped in the second covering portion.Second fixed position is opened on two the second covering portion units respectively.Tightly Firmware is arranged in the second fixed position, makes closely to attach between two the second covering portion units.Further, two second claddings It is attached at attaching between portion's unit by welding, makes closer attaching between two the second covering portion units.
As shown in fig. 6, in one of the embodiments, aerated film 10 further includes earth anchor reservation member 1200, the earth anchor is pre- Part 1200 is stayed to be arranged on the bag body 610.When assembling is fixed, user can pass through earth anchor on earth anchor reservation member 1200, And ground is inserted into, and bag body 610 is fixed on ground, in case counter balance pocket is relative to ground moving.In the present embodiment, earth anchor Reservation member 1200 is becket, and in other embodiments, earth anchor reservation member 1200 can also be cable loop.For example, counter balance pocket bag Include bag body and connect band.Connect band is arranged in earth anchor reservation member, and the both ends of connect band are welded on bag body.And for example, connect The material of band and bag body is membrane material.And for example, connect band doubling and it is welded at the same position of bag body, i.e. the both ends of connect band Body three is welded in together with bag.Certainly, in other embodiments, connect band both ends can also be respectively welded in the difference of bag body At position.And for example, earth anchor reservation member 1200 is fixed on bag body 610 by sewing up.In order to improve earth anchor reservation member 1200 with Bonding strength between bag body 610, further, on bag body 610 is equipped with the junction of earth anchor reservation member 1200 and strengthens Layer, improves the bonding strength between earth anchor reservation member 1200 and bag body 610.For example, earth anchor reservation member 1200 is D-ring Or one week bag rope triangular plate.
For example, aerated film 10 includes membrane body 100, adhesive band 200, the first jam 300,400 and second jam of ventilation duct 500.The membrane body 100 offers through hole 110.The membrane body 100 includes film main body 100a and reinforced sheet 100b, the reinforcement Piece 100b is connected on the film main body 100a.The through hole 110 includes the first through hole that is connected and the second through hole, and described the One through hole is opened on the film main body 100a, and second through hole is opened on the reinforced sheet 100b.The adhesive band 200 Deviate from the side of the film main body 100a on the reinforced sheet 100b, the adhesive band 200 is around the first through hole. Since film main body 100a is membrane material material, reinforced sheet 100b is set on film main body 100a, film main body 100a can be improved with leading to The bonding strength of 400 junction of air hose, makes film main body 100a not easy to crack, ensures reliably to connect between membrane body 100 and ventilation duct 400 Connect.
The mounting hole 310 connected with second through hole is offered on first jam 300.First jam 300 It is pasted on the adhesive band 200.The ventilation duct 400 is arranged in the first through hole, the second through hole and the mounting hole 310 It is interior, the inner cavity of membrane body 100 is connected with the periphery of membrane body 100, the peripheral ventilation equipment that ventilation duct 400 can be with membrane body connect Connect, such as air-conditioning, divulge information in this way, ventilation equipment pass through ventilation duct 400 with membrane body.Again since reinforced sheet 100b is equipped with adhesive band 200, for adhesive band 200 around the second through hole, i.e. the periphery of the second through hole is equipped with adhesive band 200, and the first jam 300 be pasted on it is viscous In adhesive tape 200, blocked with the junction to ventilation duct 400 and membrane body, avoid easy gas leakage between ventilation duct 400 and membrane body The problem of.
Second jam 500 is pasted on the adhesive band 200, and second jam 500 is used to block the through hole 110.When that need to pass through through hole 110 aerated film 10 is aerated, the second jam 500 is unloaded, by the ventilation duct 400 of ventilation equipment It is arranged in through hole 110 and mounting hole 310, and the first jam 300 is pasted on adhesive band 200, leads to membrane body Wind.When without when being aerated by through hole 110 to aerated film 10, unloading the first jam 300 and ventilation duct 400, second being blocked up Piece 500 is pasted on adhesive band 200, to block through hole 110, avoids 10 gas leakage of aerated film.Therefore, the second jam 500 and first Jam 300 can switch use.
Above-mentioned aerated film 10, offers through hole 110 on membrane body, due to offering mounting hole 310 on the first jam 300, And ventilation duct 400 is arranged in through hole 110 and mounting hole 310, membrane body inner cavity is set to be connected with membrane body periphery;Ventilation duct 400 can be with It is connected with the peripheral ventilation equipment of membrane body, such as air-conditioning, makes ventilation equipment be aerated membrane body;Glued again since membrane body is equipped with Adhesive tape 200, adhesive band 200 is around through hole 110, i.e., the periphery of through hole 110 is equipped with adhesive band 200, and the first jam 300 is connected to On adhesive band 200, blocked with the junction to ventilation duct 400 and membrane body, avoid easily leaking between ventilation duct 400 and membrane body The problem of gas;For example, during assembling, first ventilation duct 400 is inserted into through hole 110;Then ventilation duct 400 is arranged in the first jam In 300 mounting hole 310;Then the first jam 300 is connected on adhesive band 200, in order to avoid 10 gas leakage of aerated film;Finally will be logical Air hose 400 is accessed on the ventilation equipment of membrane body periphery, is finally completed the assembling of aerated film 10, therefore, the assembling of aerated film 10 The more simple and reliable property of journey is preferable, so that the ease of use of aeration structure is preferable;In addition, the ventilation of above-mentioned aerated film 10 Simple in structure and cost is relatively low.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the utility model, its description is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

  1. A kind of 1. aerated film, it is characterised in that including:
    Membrane body, the membrane body offer through hole;
    Adhesive band, the adhesive band are arranged on the membrane body, and the adhesive band is around the through hole;
    First jam, offers the mounting hole connected with the through hole on first jam, first jam is connected to institute State on adhesive band;And
    Ventilation duct, the ventilation duct are arranged in the through hole and the mounting hole.
  2. 2. aerated film according to claim 1, it is characterised in that first jam is socketed on the ventilation duct, and First jam is pasted on the adhesive band.
  3. 3. aerated film according to claim 1, it is characterised in that the ventilation tubular elastic is connected to the interior of the mounting hole On wall.
  4. 4. aerated film according to claim 1, it is characterised in that the membrane body includes film main body and reinforced sheet, described to add Strong piece is connected in the film main body;The through hole includes the first through hole being connected and the second through hole, the first through hole are opened In the film main body, second through hole is opened on the reinforced sheet;The adhesive band is arranged on the reinforced sheet and carries on the back From the side of the film main body, the adhesive band is around the first through hole.
  5. 5. aerated film according to claim 1, it is characterised in that further include the second jam, second jam is pasted on On the adhesive band, second jam is used to block the through hole.
  6. 6. aerated film according to claim 1, it is characterised in that further include counter balance pocket, the counter balance pocket and the membrane body Connection.
  7. 7. aerated film according to claim 6, it is characterised in that the counter balance pocket includes bag body and filler, described Host cavity is offered on bag body, the filler is located in the host cavity.
  8. 8. aerated film according to claim 7, it is characterised in that the filler is sandbag or water bag or metal derby.
  9. 9. aerated film according to claim 7, it is characterised in that further include connecting plate and fastener, opened on the membrane body Equipped with the first fixed position, the second fixed position and opening, the host cavity and described second are further opened with the bag body Fixed position with the open communication;The filler is located in the host cavity;Mounting hole is offered on the connecting plate; The connecting plate is connected on one of the membrane body and the bag body;Fastener order wear the mounting hole, First fixed position and second fixed position, for making the membrane body, the bag body be connected with the connecting plate In together.
  10. 10. aerated film according to claim 9, it is characterised in that the fastener includes screw bolt and nut;The connection The number of plate is two;Bolt order wears the mounting hole of one of them connecting plate, first fixed position, institute The mounting hole of the second fixed position and another connecting plate is stated, the bolt is connected with the nut thread, the spiral shell For end abutment of the bolt away from the nut on one of them described connecting plate, the nut is connected to another described connection On plate.
CN201720964894.5U 2017-08-01 2017-08-01 Aerated film Active CN207244844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720964894.5U CN207244844U (en) 2017-08-01 2017-08-01 Aerated film

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720964894.5U CN207244844U (en) 2017-08-01 2017-08-01 Aerated film

Publications (1)

Publication Number Publication Date
CN207244844U true CN207244844U (en) 2018-04-17

Family

ID=61879005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720964894.5U Active CN207244844U (en) 2017-08-01 2017-08-01 Aerated film

Country Status (1)

Country Link
CN (1) CN207244844U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254914A (en) * 2017-08-01 2017-10-17 深圳市博德维环境技术股份有限公司 Aerated film and its manufacture method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254914A (en) * 2017-08-01 2017-10-17 深圳市博德维环境技术股份有限公司 Aerated film and its manufacture method
CN107254914B (en) * 2017-08-01 2023-01-24 深圳市博德维环境技术股份有限公司 Inflatable membrane and method of making same

Similar Documents

Publication Publication Date Title
CN207073193U (en) Aerated film
CN207244844U (en) Aerated film
CN107254914A (en) Aerated film and its manufacture method
CN107254915A (en) Aerated film
CN105464939B (en) A kind of compressor blimp
CA2277523A1 (en) Pipeline weight
CN105256765B (en) A kind of waterwall unit and waterwall and dash method
US3991583A (en) Method of providing an underwater enclosure
CN206798199U (en) A kind of transport case for being used to transport LED display
CN206190002U (en) Air film building bottom sealing device and air film building
CN109573373A (en) A kind of harmful influence transport leak-proof device
CN206180553U (en) Pipeline plugging device
CN103574201B (en) A kind of encapsulated retainer ring component
CN109765098A (en) A kind of flexible high pressure utricule system application of uniform stress
CN107558371B (en) Sealing structure of inhaul cable embedded pipe orifice and method for realizing reliable sealing of inhaul cable embedded pipe orifice
WO2019023942A1 (en) Air-supported membrane
CN201140886Y (en) Dry bulk container and its door end sealing and reinforcing structure
JP3215095B2 (en) Shatterproof cover for solid-liquid mixture transfer tube
JP2002250496A (en) No-blow bag
CN206142084U (en) Novel valve bag
CN210339003U (en) Double-layer combined leakage-proof flexible container bag
CN206528610U (en) Structure for the technique mouthful of aerostatics
CN206112350U (en) Ha fushi pipe strap casing
WO2019023949A1 (en) Air-supported membrane and manufacturing method therefor
CN207079725U (en) Aerated film

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 518000 b1-603, building B, Kexing Science Park, 15 Keyuan Road, Science Park community, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.

Address before: 518000 Guangdong science and Technology Park, Shenzhen, Nanshan District, science and Technology Park, 15 Kexing Science Park, 2 B unit 12, 3

Patentee before: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.