- Prior art keywords
- arm
- cross
- shaft
- sending end
- communication
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses a can produce a communication and sending end integral type shaft tower who influences each other and provide to current defeated power distribution facility with communication facility, including hypomere pole body, middle section pole body, upper segment pole body, sending end facility, communication facility. The sending end facility includes ground wire cross arm, wire cross arm and supplementary cross arm, installs ground wire cross arm, wire cross arm and supplementary cross arm from top to bottom in proper order. Communication facility include lightning rod, platform antenna, upper segment pole body top is located to the lightning rod, is used for the lightning protection, upper segment pole body lower part is located to the platform antenna for receive / send a signal. The utility model discloses accomplish transmission line shaft tower and communication tower's integrated design, avoided the corridor conflict, realized the common corridor of transmission line shaft tower with communication tower. Adopt assembled conceptual design, according to power supply unit and communication unit communication result, accessible time adjust conceptual design, avoid extravagant.
Description
Technical field
The utility model belongs to communication energization technical field, more particularly to a kind of shaft tower communicated with transmission of electricity.
Background technology
As national economy is fast-developing, transmission line construction paces are accelerated, and power transmission line corridor is more and more rare, engineering
The external environmental factor that construction is related to is increasingly complicated, and power transmission and distribution facility influences each other with communications facility in the circuit of city hair repeatly
It is raw.
For power transmission and distribution facility and communication iron tower location overlap, if transmission line of electricity is newly-built, communication iron tower position is selected else, increase
The difficulty and expense of communication arrangement;If communication iron tower is first built, built communication iron tower is removed, be the reserved corridor of power transmission and distribution facility, because
This, it is necessary to power transmission and distribution facility is studied with the integral type steel tower that communicates.
Utility model content
The purpose of this utility model is directed to existing power transmission and distribution facility and communications facility can be produced and influence each other and provide
One kind communication and sending end integral type shaft tower.
To achieve these goals, technical solution adopted in the utility model is:
One kind communication and sending end integral type shaft tower, including hypomere shaft, stage casing shaft, epimere shaft, sending end
Facility, communications facility.
The sending end facility includes ground wire cross-arm, wire cross-arm and auxiliary cross-arm, and ground wire is from top to bottom installed successively
Cross-arm, wire cross-arm and auxiliary cross-arm.Totally one layer of the ground wire cross-arm, sets both sides cross-arm, for hanging perpendicular to line direction
Hanging ground-wire.Totally one layer of the wire cross-arm, it is T-shaped, perpendicular to line direction, both sides cross-arm is set, its cross-arm taper fixes strain insulator
String Pendent edge phase conductor, parallel circuit direction sets one side cross-arm towards adjacent overhead line support towers, and its cross-arm taper is fixed resistance to
Phase conductor in string suspension is opened, wire cross-arm taper fixes cable termination.Totally one layer of the cross-arm of auxiliary, it is T-shaped, perpendicular to circuit
Direction sets both sides cross-arm, and parallel circuit direction sets one side cross-arm towards adjacent overhead line support towers, and auxiliary cross-arm taper is consolidated
Determine cable termination.The wire is using wire jumper around causing connection cable end.The cable termination is by end, pendency insulation
Substring and arrester are constituted, and between wire cross-arm and auxiliary cross-arm, are fixed on cross-arm taper.
The stage casing shaft is located at hypomere shaft top, for increasing spacing of the communications facility with sending end facility, increasing
Plus communications facility height etc..
The epimere shaft is located at stage casing shaft top, for setting communications facility.
Described communications facility includes lightning rod, platform antenna;Lightning rod is located at epimere shaft top, for lightning protection;It is flat
Platform antenna is located at epimere shaft bottom, for receiving/sending signal.
The communications facility, sending end facility, stage casing shaft, epimere shaft are designed using assembling, as needed
Appropriate facility is assembled, stage casing shaft upper end is fixedly connected with epimere shaft lower end, stage casing shaft lower end is consolidated with hypomere shaft upper end
Fixed connection.
The beneficial effects of the utility model:The utility model completes electric power line pole tower and is set with communication the integrated of shaft tower
Meter, it is to avoid corridor conflict, realizes the common corridor of electric power line pole tower and the shaft tower that communicates.Using assembled conceptual design, according to
Power supply unit links up result with communication unit, Adjusted Option can design in time, it is to avoid waste.Cable draws lower terminal only 1 layer conductor
Cross-arm, reduces steel tower overall height, reduces floor space.Applicability is improved, the requirement to target line is reduced.Iron tower structure letter
It is single, draw under type facility, it is easy to implement.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the left view of Fig. 1.
Specific embodiment
The utility model is described further with reference to embodiment.
A kind of communication as depicted in figs. 1 and 2 and sending end integral type shaft tower, including hypomere shaft 1, stage casing shaft 5,
Epimere shaft 2, sending end facility, communications facility.
The sending end facility includes ground wire cross-arm, wire cross-arm and auxiliary cross-arm, and ground wire is from top to bottom installed successively
Cross-arm 6, wire cross-arm 7 and auxiliary cross-arm 8.Totally one layer of the ground wire cross-arm, both sides cross-arm is set perpendicular to line direction, is used for
Suspension ground wire.Totally one layer of the wire cross-arm, it is T-shaped, perpendicular to line direction, both sides cross-arm is set, its cross-arm taper is fixed resistance to
String Pendent edge phase conductor is opened, parallel circuit direction sets one side cross-arm towards adjacent overhead line support towers, and its cross-arm taper is fixed
Phase conductor in strain insulator-string suspension, wire cross-arm taper fixes cable termination.Totally one layer of the cross-arm of auxiliary, it is T-shaped, perpendicular to line
Road direction sets both sides cross-arm, and parallel circuit direction sets one side cross-arm towards adjacent overhead line support towers, aids in cross-arm taper
Fixed cable termination.The wire is using wire jumper around causing connection cable end.The cable termination is exhausted by end, pendency
Edge substring and arrester are constituted, and between wire cross-arm and auxiliary cross-arm, are fixed on cross-arm taper.
The stage casing shaft is located at hypomere shaft top, for increasing spacing of the communications facility with sending end facility, increasing
Plus communications facility height etc..
The epimere shaft is located at stage casing shaft top, for setting communications facility.
Described communications facility includes lightning rod 3, platform antenna 4;Lightning rod is located at epimere shaft top, for lightning protection;
Platform antenna is located at epimere shaft bottom, for receiving/sending signal.
The communications facility, sending end facility, stage casing shaft, epimere shaft are designed using assembling, as needed
Appropriate facility is assembled, stage casing shaft upper end is fixedly connected with epimere shaft lower end, stage casing shaft lower end is consolidated with hypomere shaft upper end
Fixed connection.
If transmission line of electricity is first built, built after communication, linked up with communication unit through power supply unit and determine the shaft tower proposed locations that communicate,
Hypomere shaft is pressed, the order of sending end facility installs shaft tower, while being stage casing shaft, epimere shaft, the reserved peace of communications facility
Holding position.When communication unit determines communication pole tower position, stage casing shaft, epimere shaft, communications facility need to be installed;Work as communication unit
During the adjustment communication pole tower position of position, without extra installation.
If communication is first built, built after transmission line of electricity, linked up with power supply unit through communication unit and determine the shaft tower proposed locations that communicate,
Press hypomere shaft, stage casing shaft, epimere shaft, the order of communications facility and shaft tower is installed, be the reserved installation position of sending end facility
Put.When power supply unit determines grid locational, sending end facility need to be installed, and by hanging lead wire and earth wire and cable termination
Realize circuit insertion;When power supply unit adjusts grid locational, without extra installation.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession
The technical staff of industry it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification
Simply illustrate principle of the present utility model, it is in the art common on the premise of the utility model spirit and scope are not departed from
Technical staff simple change and replacement be all within protection domain of the present utility model.
Claims (4)
- It is 1. a kind of to communicate and sending end integral type shaft tower, it is characterised in that:Including hypomere shaft, stage casing shaft, epimere shaft, Sending end facility, communications facility, the sending end facility include ground wire cross-arm, wire cross-arm and auxiliary cross-arm, by up to Under install successively ground wire cross-arm, wire cross-arm and auxiliary cross-arm, totally one layer of the ground wire cross-arm, perpendicular to line direction set use In the both sides cross-arm of suspension ground wire, totally one layer of the wire cross-arm is T-shaped, and both sides cross-arm is set perpendicular to line direction, and it is horizontal Load taper fixes strain insulator-string Pendent edge phase conductor, and parallel circuit direction sets one side cross-arm towards adjacent overhead line support towers, its Cross-arm taper fixes phase conductor in strain insulator-string suspension, and wire cross-arm taper fixes cable termination, and totally one layer of the auxiliary cross-arm is in It is T-shaped, perpendicular to line direction, both sides cross-arm is set, parallel circuit direction sets one side cross-arm towards adjacent overhead line support towers, Auxiliary cross-arm taper fixes cable termination;The wire using wire jumper around causing connection cable end, the cable termination by End, suspension insulator and arrester composition, between wire cross-arm and auxiliary cross-arm, are fixed on cross-arm taper.
- 2. one kind according to claim 1 communicates and sending end integral type shaft tower, it is characterised in that:The stage casing shaft Located at hypomere shaft top, the epimere shaft is located at stage casing shaft top.
- 3. one kind according to claim 1 communicates and sending end integral type shaft tower, it is characterised in that:Described communication sets Apply including the lightning rod for lightning protection, for receiving/the platform antenna of sending signal;Lightning rod is put down located at epimere shaft top Platform antenna is located at epimere shaft bottom.
- 4. one kind according to claim 1 communicates and sending end integral type shaft tower, it is characterised in that:The communication sets Apply, sending end facility, stage casing shaft, epimere shaft are designed using assembling, stage casing shaft upper end and epimere shaft lower end It is fixedly connected, stage casing shaft lower end is fixedly connected with hypomere shaft upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621080413.6U CN206189980U (en) | 2016-09-26 | 2016-09-26 | Communication and sending end integral type shaft tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621080413.6U CN206189980U (en) | 2016-09-26 | 2016-09-26 | Communication and sending end integral type shaft tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206189980U true CN206189980U (en) | 2017-05-24 |
Family
ID=58729628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621080413.6U Active CN206189980U (en) | 2016-09-26 | 2016-09-26 | Communication and sending end integral type shaft tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206189980U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590313A (en) * | 2018-06-29 | 2018-09-28 | 江苏国华管塔制造有限公司 | A kind of novel Joint construction and sharing power communication poles |
CN110043104A (en) * | 2019-04-17 | 2019-07-23 | 国网安徽省电力有限公司经济技术研究院 | A kind of multistage shaft tower |
CN110206374A (en) * | 2019-06-12 | 2019-09-06 | 国家电网有限公司 | Communication antenna mounting bracket and power communication with the bracket share steel tower |
-
2016
- 2016-09-26 CN CN201621080413.6U patent/CN206189980U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590313A (en) * | 2018-06-29 | 2018-09-28 | 江苏国华管塔制造有限公司 | A kind of novel Joint construction and sharing power communication poles |
CN110043104A (en) * | 2019-04-17 | 2019-07-23 | 国网安徽省电力有限公司经济技术研究院 | A kind of multistage shaft tower |
CN110206374A (en) * | 2019-06-12 | 2019-09-06 | 国家电网有限公司 | Communication antenna mounting bracket and power communication with the bracket share steel tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206189980U (en) | Communication and sending end integral type shaft tower | |
CN103046791A (en) | Transmission line tangent tower using double-loop cable T guide | |
CN206273967U (en) | Novel communication and transmission of electricity integral type shaft tower | |
CN109347042A (en) | The mounting structure and installation method of ground wire are protected on a kind of straight line pole | |
CN206128808U (en) | Novel single loop cable dead end tower | |
CN203260976U (en) | Cable termination tower | |
CN106374342A (en) | Energy-saving type lightning rod | |
CN208479112U (en) | A kind of cable for built single time anchor support draws lower special pole | |
CN210127695U (en) | Cable terminal tower with novel cable supporting structure | |
CN208299394U (en) | A kind of shrunk type pendency strain insulator tangent tower used for transmission line | |
CN206533034U (en) | A kind of energy-saving type lightning rod | |
CN107386771B (en) | A kind of 110kV overhead transmission line front and back cable type double back steel pipe rod-type terminal tower | |
CN204928052U (en) | Rod -type vertical arrangement compact transmission line | |
CN202227763U (en) | Tower in compact structure | |
CN203026886U (en) | Four-cracking jumper wire support arm | |
CN106555499A (en) | Existing single loop strain insulator steel tower cable draws lower beam | |
CN102983535A (en) | Shielding circuit for improving ground field intensity of direct current transmission line | |
CN202949190U (en) | Shielding circuit for inhibiting ground synthetic field intensity of high-voltage direct-current circuit | |
CN204349398U (en) | Cable termination tower | |
CN203397826U (en) | Transformer installation structure | |
CN210622425U (en) | Single-loop staggered-layer power transmission line tower | |
CN208473420U (en) | A kind of cable termination and cross over gantry integral type tower | |
CN206673547U (en) | A kind of new 6 10 kilovolts of overhead lines double-rod structure for installing lightning arrester | |
CN102383639A (en) | Compactly structured pole tower | |
CN206220621U (en) | A kind of double back overhead transmission line cable cut-offs and draws lower angle tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |