CN206189854U - Roof beam formwork device - Google Patents

Roof beam formwork device Download PDF

Info

Publication number
CN206189854U
CN206189854U CN201621241019.6U CN201621241019U CN206189854U CN 206189854 U CN206189854 U CN 206189854U CN 201621241019 U CN201621241019 U CN 201621241019U CN 206189854 U CN206189854 U CN 206189854U
Authority
CN
China
Prior art keywords
template
side template
side form
erecting device
form board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621241019.6U
Other languages
Chinese (zh)
Inventor
张意
陈怡宏
伍云天
张婕
马中原
杨霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Original Assignee
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University, Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd filed Critical Chongqing University
Priority to CN201621241019.6U priority Critical patent/CN206189854U/en
Application granted granted Critical
Publication of CN206189854U publication Critical patent/CN206189854U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a roof beam formwork device, including die block board, first side form board, second side form board, a pair of rectangular reentrant corner template, die block board both ends are first side form board of hinge and second side form board respectively, the lucky lock joint of one of them reentrant corner template is on first side form board, and the lucky lock joint of another one reentrant corner template is on second side form board. The utility model discloses realize the roof beam formwork at die block board, first side form board and second side form board, formation roof beam formwork through rotatory first side form board and second side form board and when making its perpendicular to die block board during the formwork to simultaneously two reentrant corner templates respectively the lock joint communicate the matrix on first side form board and second side form board, the formwork is conveniently, during the form removal, unpack the support respectively apart, then break into two with one's hands in proper order first side form board and second side form board can, practiced thrift stripping time, simple structure, the installation is convenient with the dismantlement for the construction progress, practice thrift the human cost.

Description

Beam erecting device
Technical field
The utility model is related to building girder erecting device, and in particular to a kind of beam erecting device.
Background technology
In to building construction process, the particularly construction of beam needed to carry out formwork to beam before casting concrete, led to Formwork is all, using polylith plank, each piece of plank to be supported and split respectively then in the case of often, thus more unrestrained It is time-consuming, lost labor.
Utility model content
Problem to be solved in the utility model is directed to the above-mentioned deficiency in the presence of prior art and provides beam formwork dress Putting can save human cost with accelerating construction progress.
To achieve the above object, the utility model employs following technical scheme:Beam erecting device, including end template, First side template, the second side template, a pair internal corner formworks at a right angle;First side form described in the end template two ends difference hinge Plate and the second side template;When first side template is perpendicular to the end template, one of them described internal corner formwork is detained just It is connected on first side template, when second side template is perpendicular to the end template, another described internal corner formwork Just snap onto on second side template.
Further, first side template and the second side template wherein one side to be respectively arranged at two ends with first raised and second Projection, is respectively provided on two sides with a pair of first baffles and second baffle on the end template, the first baffle be provided with a pair with The first groove that first projection is engaged, the second baffle is provided with second for being engaged with second projection for a pair Groove.
Further, the beam erecting device also rises including triangle card, and the triangle card rises and is provided with a pair the 3rd grooves, institute State and the first screwed hole and the second screwed hole are provided with the 3rd groove, first screwed hole and the second screwed hole are respectively perpendicular to institute Two vertical edges that triangle card rises are stated, the internal corner formwork is wherein while be provided with blind with the first of first corresponding threaded holes conjunction Hole, first side template and the second side template are provided with the second blind hole closed with second corresponding threaded holes.
Further, the beam erecting device also includes the first slide plate and the second slide plate, first side template and the second side Formwork sides are respectively equipped with the first rectangular opening and the second rectangular opening, be respectively equipped with the end template in first rectangular opening and Second rectangular opening corresponding the first rectangular channel and the second rectangular channel, first slide plate can fall into through first rectangular opening In first rectangular channel, second slide plate can be fallen into second rectangular channel through second rectangular opening.
Further, hinge is connected to first gear piece and the second catch respectively for the end template both sides, when the internal corner formwork Wherein on one side the vertical end template when, the side surface of first catch and the second catch respectively with two internal corner formworks The side surface of the vertical bed die edges of boards is on the same face.
Further, first side template is respectively equipped with corresponding perforation with second side template.
Further, the first in command and the second in command are respectively equipped with first side template and the second side template.
Compared to prior art, the utility model has the advantages that:The utility model is in the end template, first Side template and the second side template realize beam formwork;By rotating first side template and the second side template and making it during formwork Beam formwork is formed during perpendicular to the end template, and two internal corner formworks are snapped onto first side template respectively simultaneously With template die is connected on the second side template, then casting concrete again, only needed to before pouring the end template, the first side template and Second side template is supported respectively both can be so that formwork is convenient;During form removal, support is taken apart respectively, then break first side into two with one's hands successively Template and the second side template, have saved striking time;The internal corner formwork uses L-square, when first side template and The internal corner formwork snaps onto first side template and the second side respectively just when second side template is perpendicular to the end template In template, so described internal corner formwork wherein while the just vertical end template, the internal corner formwork it is other on one side The parallel end template is easy to through plate template;When first side template and the second side template are perpendicular to the end template The internal corner formwork should be contacted perpendicular to one side end of the end template and described state end template so that it is guaranteed that beam formwork is being poured When concrete will not material leakage, simple structure, installation and removal are convenient, accelerate construction speed, save human cost.
Brief description of the drawings
Structural representation when Fig. 1 is the utility model beam erecting device formwork.
Fig. 2 is structural representation when the utility model beam erecting device is packed up.
Fig. 3 is the utility model bed die plate structure schematic diagram.
Fig. 4 is that the utility model triangle card plays structural representation.
Specific embodiment
In order that technological means, creation characteristic, reached purpose that the utility model is realized more understand and are easy to effect Understand, the utility model is further elaborated with reference to the accompanying drawings and detailed description:
The utility model proposes a kind of beam erecting device, including end template 1, the first side template 2, the second side template 3, To internal corner formwork 4 at a right angle;First side template 2 and the second side template 3 described in the difference hinge of the two ends of the end template 1;Work as institute When stating the first side template 2 perpendicular to the end template 1, one of them described internal corner formwork 4 snaps onto first side form just On plate 2, when second side template 3 is perpendicular to the end template 1, another described internal corner formwork 4 snaps onto institute just State on the second side template 3.
The utility model realizes beam formwork in the end template, the first side template and the second side template;Pass through during formwork Beam formwork is formed when rotating first side template and the second side template and making it perpendicular to the end template, and simultaneously two The internal corner formwork to snap onto connect template die on first side template and the second side template respectively, then casting concrete again, Only needing to the end template, the first side template and the second side template to support respectively before pouring both can be with, and formwork is convenient;Form removal When, take support apart respectively, then break first side template and the second side template into two with one's hands successively, save striking time;Institute State internal corner formwork and use L-square, the inner corner trim mould when first side template and the second side template are perpendicular to the end template Plate is snapped onto on first side template and the second side template respectively just, so described internal corner formwork wherein while just vertical The end template, the other of the internal corner formwork is easy to through plate template with regard to the parallel end template on one side;When described The internal corner formwork is perpendicular to one side end of the end template when one side template and the second side template are perpendicular to the end template End template is stated described in should contacting so that it is guaranteed that beam formwork will not material leakage, simple structure, peace installation and dismantling when casting concrete Unload conveniently, accelerate construction speed, save human cost.
Used as specific embodiment, the side template 3 of first side template 2 and second wherein one side is respectively arranged at two ends with first Raised 21 and second projection 31, it is respectively provided on two sides with a pair of first baffles 11 and second baffle 12 on the end template 1, described the One baffle plate 11 is provided with a pair the first grooves 111 being engaged with first projection 21, and so described first side template 2 can Rotated with around two the described first raised 21 axis for being formed, the second baffle 12 is provided with a pair with second projection 31 The second groove 121 being engaged, so described second side template 3 just can be around the two described second raised 31 axis rotations for being formed Turn,.
Used as specific embodiment, the beam erecting device also includes that triangle card plays 5, and 5 are played described by the triangle card Internal corner formwork 4 is fixed on the side template 3 of first side template 2 and second, and the triangle card plays 5 and should use right angle trigonometry, institute State triangle card 5 and be provided with a pair the 3rd grooves 51, the 3rd groove 51 is interior to be provided with the first screwed hole 52 and the second screwed hole 53, the screwed hole 53 of first screwed hole 52 and second is respectively perpendicular to two vertical edges that the triangle card plays 5, the inner corner trim mould Plate 4 passes through first screw thread wherein while be provided with the first blind hole being engaged with first screwed hole 52 by drive screw Then hole 52 tightens drive screw in first blind hole, the side template 3 of first side template 2 and second be provided with it is described The second blind hole that second screwed hole 53 is engaged, through second screwed hole 53 and then tightens drive screw by drive screw In second blind hole, thus the triangle card rise 5 be fixed on the internal corner formwork 4 and first side template 2 and Second side template 3, now the internal corner formwork 4 be just clamped on the side template 3 of first side template 2 or second.
As specific embodiment, in order to ensure the side template 3 of first side template 2 and second can hang down during formwork The straight end template 1, the beam erecting device also includes the first slide plate and the second slide plate 6, the side of first side template 2 and second The side of template 3 is respectively equipped with the first rectangular opening 22 and the second rectangular opening 32, is respectively equipped with the end template 1 in first square The rectangular opening 32 of shape hole 22 and second corresponding the first rectangular channel 13 and the second rectangular channel 14, when first side template 2 rotates When extremely vertical with the end template 1, first slide plate is operated to fall into first rectangular channel through first rectangular opening 22 First side template 2 is positioned at vertical direction in 13, when second side template 3 rotation is hung down to the end template 1 When straight, second slide plate 6 is operated to be fallen into second rectangular channel 13 i.e. described second through second rectangular opening 32 Side template 3 is positioned at vertical direction, and the channel opening direction of the rectangular channel 14 of first rectangular channel 13 and second should be vertical.
As specific embodiment, in order to ensure the side template 3 of first side template 2 and second is respectively perpendicular to the bed die During plate 1, the side template 3 of first side template 2 and second is seamless with the end template contact position, the both sides of the end template 1 point Other hinge is connected to the catch 8 of first gear piece 7 and second, due to when the vertical end template 1 in wherein one side of the internal corner formwork 4 When, the side surface of the catch 8 of first catch 7 and second vertical with two internal corner formworks 4 side of the end template 1 respectively Side surface on the same face, so ought operate respectively the catch 8 of first catch 7 and second make its vertically with the end template When 1, towards the face of the first catch 7 of second catch 8 and internal corner formwork one of them described 4 towards second side form The face of plate 3 on the same face so that it is guaranteed that first side template 2 is seamless with the contact position of the end template 1, towards described The face of second catch 8 of one catch 7 is with internal corner formwork one of them described 4 towards the face of first side template 2 same So that it is guaranteed that second side template 3 is seamless with the contact position of the end template 1 on face.
As specific embodiment, it is contemplated that after branch beam forms, provided pipe hole is needed in beam, so first side form Plate 2 is respectively equipped with corresponding perforation with second side template 3, when formwork is started, it is necessary to pipe is through first side form Plate 2 is respectively equipped with corresponding perforation with second side template 3.
As specific embodiment, the side template 3 of first side template 2 and second, first side form are taken apart for convenience The first in command and the second in command are respectively equipped with the side template 3 of plate 2 and second, during form removal, pulling open the first in command makes described One side template 2 is separated on the concrete from after pouring, and that pulls open that the second in command makes second side template 3 from after pouring is mixed Separated on solidifying soil.
Finally illustrate, above example is only used to illustrate the technical solution of the utility model and unrestricted, although ginseng The utility model has been described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent, without deviating from the objective and model of technical solutions of the utility model Enclose, it all should cover in the middle of right of the present utility model.

Claims (7)

1. beam erecting device, it is characterised in that:Including end template (1), the first side template (2), the second side template (3), a pair of one-tenth The internal corner formwork (4) at right angle;First side template (2) and the second side template (3) described in end template (1) the two ends difference hinge; When first side template (2) is perpendicular to the end template (1), one of them described internal corner formwork (4) snaps onto institute just State on the first side template (2), when second side template (3) is perpendicular to the end template (1), another described inner corner trim mould Plate (4) is snapped onto on second side template (3) just.
2. beam erecting device according to claim 1, it is characterised in that:First side template (2) and the second side template (3) Wherein one side is respectively arranged at two ends with first raised (21) and the second projection (31), is respectively provided on two sides with the end template (1) A pair of first baffles (11) and second baffle (12), the first baffle (11) are provided with a pair with described first raised (21) phase The first groove (111) for coordinating, the second baffle (12) is provided with second for being engaged with described second raised (31) for a pair Groove (121).
3. beam erecting device according to claim 1, it is characterised in that:The beam erecting device also includes that triangle card plays (5), The triangle card plays (5) and is provided with a pair the 3rd grooves (51), be provided with the 3rd groove (51) the first screwed hole (52) and Second screwed hole (53), first screwed hole (52) and the second screwed hole (53) are respectively perpendicular to the triangle card and rise (5) Two vertical edges, the internal corner formwork (4) is described wherein while be provided with the first blind hole being engaged with first screwed hole (52) First side template (2) and the second side template (3) are provided with the second blind hole being engaged with second screwed hole (53).
4. beam erecting device according to claim 1, it is characterised in that:The beam erecting device also includes the first slide plate and the Two slide plates (6), first side template (2) and the second side template (3) side are respectively equipped with the first rectangular opening (22) and the second square Shape hole (32), is respectively equipped with corresponding in first rectangular opening (22) and the second rectangular opening (32) on the end template (1) First rectangular channel (13) and the second rectangular channel (14), first slide plate can fall into described through first rectangular opening (22) In one rectangular channel (13), second slide plate can be fallen into second rectangular channel (13) through second rectangular opening (32).
5. beam erecting device according to claim 1, it is characterised in that:Hinge is connected to respectively for end template (1) both sides One catch (7) and the second catch (8), when wherein vertical end template (1) on one side of the internal corner formwork (4), described the The side surface of one catch (7) and the second catch (8) vertical with two internal corner formworks (4) end template (1) side respectively Side surface is on the same face.
6. beam erecting device according to claim 1, it is characterised in that:First side template (2) and second side form Plate (3) is respectively equipped with corresponding perforation.
7. beam erecting device according to claim 1, it is characterised in that:First side template (2) and the second side template (3) On be respectively equipped with the first in command and the second in command.
CN201621241019.6U 2016-11-18 2016-11-18 Roof beam formwork device Expired - Fee Related CN206189854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621241019.6U CN206189854U (en) 2016-11-18 2016-11-18 Roof beam formwork device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621241019.6U CN206189854U (en) 2016-11-18 2016-11-18 Roof beam formwork device

Publications (1)

Publication Number Publication Date
CN206189854U true CN206189854U (en) 2017-05-24

Family

ID=58727019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621241019.6U Expired - Fee Related CN206189854U (en) 2016-11-18 2016-11-18 Roof beam formwork device

Country Status (1)

Country Link
CN (1) CN206189854U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518952A (en) * 2018-12-28 2019-03-26 云南建投第二建设有限公司 One kind is for the support of assembled architecture primary and secondary beam nodes, positioning, plate device
CN109779292A (en) * 2019-01-23 2019-05-21 深圳市润飞建筑劳务有限公司 A kind of aluminum alloy pattern plate bracing device
CN110206296A (en) * 2019-02-15 2019-09-06 浙江中益建材科技有限公司 A kind of wooden frame beam forms
CN112761352A (en) * 2020-12-17 2021-05-07 上海建工四建集团有限公司 Integral formwork system and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518952A (en) * 2018-12-28 2019-03-26 云南建投第二建设有限公司 One kind is for the support of assembled architecture primary and secondary beam nodes, positioning, plate device
CN109518952B (en) * 2018-12-28 2023-10-20 云南建投第二建设有限公司 Be used for assembled building primary and secondary beam node to support, location, template device
CN109779292A (en) * 2019-01-23 2019-05-21 深圳市润飞建筑劳务有限公司 A kind of aluminum alloy pattern plate bracing device
CN110206296A (en) * 2019-02-15 2019-09-06 浙江中益建材科技有限公司 A kind of wooden frame beam forms
CN112761352A (en) * 2020-12-17 2021-05-07 上海建工四建集团有限公司 Integral formwork system and construction method thereof

Similar Documents

Publication Publication Date Title
CN206189854U (en) Roof beam formwork device
CN103171036B (en) Self-insulation concrete composite building block mold and using method thereof
CN106426525A (en) Prefabricated pipe rack mold
CN104260185A (en) Multi-function concrete prefabricated part group vertical framework production equipment and production line
CN206495501U (en) A kind of cast-in-place concrete floor reserving hole template
CN204195939U (en) Multifunctional concrete prefabricated components battery mould production equipment and production line
CN108166750A (en) A kind of manpower-free's vibrated concrete wall construction template and implementing process
CN206780609U (en) Cladded cement wallboard casting mold
JPH077909U (en) Inner frame deframer for concrete formwork
GB1094574A (en) Improvements in or relating to prefabricated brick wall panels
CN206438778U (en) The civil engineering even device of vibration
RU2302943C1 (en) Method of manufacture of the construction product made out of the foamed concrete and the formwork for the method realization
CN208529359U (en) A kind of casting device of anti-fire door core board
CN205704621U (en) For pouring into a mould the battery mould of the big wallboard with protruding crossbeam
CN206769383U (en) A kind of building template
CN214575736U (en) Multifunctional pull rod device for building construction template
CN210507150U (en) But segmental beam pier kicking block notch template of whole dismouting
CN214739901U (en) Stair template structure
CN107642238A (en) A kind of floating instrument of construction
CN203669378U (en) Casting device used for necking of constructional column top and large-section beam column
CN207553428U (en) A kind of lightweight pre-cast concrete wallboard
CN208518328U (en) A kind of adjustable constructional column aluminum alloy pattern plate
CN207812999U (en) Digital alloy steel framework plastic formwork
CN205185021U (en) Haydite wallboard mould
CN105216097B (en) A kind of forming method and mould of thin wall cement product

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524