CN206174997U - 一种采动覆岩走向分区隔离注浆充填结构 - Google Patents

一种采动覆岩走向分区隔离注浆充填结构 Download PDF

Info

Publication number
CN206174997U
CN206174997U CN201621164026.0U CN201621164026U CN206174997U CN 206174997 U CN206174997 U CN 206174997U CN 201621164026 U CN201621164026 U CN 201621164026U CN 206174997 U CN206174997 U CN 206174997U
Authority
CN
China
Prior art keywords
horizon
subregion
coal
area
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621164026.0U
Other languages
English (en)
Inventor
龚梦秋
姚军峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Industrial Building Design Institute Co Ltd
Original Assignee
Huaibei Industrial Building Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Industrial Building Design Institute Co Ltd filed Critical Huaibei Industrial Building Design Institute Co Ltd
Priority to CN201621164026.0U priority Critical patent/CN206174997U/zh
Application granted granted Critical
Publication of CN206174997U publication Critical patent/CN206174997U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本实用新型公开了一种采动覆岩走向分区隔离注浆充填结构,包括水平的煤层、第一基岩层和底板层,所述第一基岩层位于所述煤层的上方,所述底板层位于所述煤层的下方,所述煤层和所述第一基岩层中水平分布有若干垮落区,相邻所述垮落区之间设置有分区隔离煤柱,所述分区隔离煤柱竖直设置,每个所述垮落区内均填充有高压粉煤灰浆液。本实用新型所提供的一种采动覆岩走向分区隔离注浆充填结构,组合注浆充填与条带开采技术,在相邻注浆充填工作面之间留设一定宽度的分区隔离煤柱,通过注浆充填与分区隔离煤柱支撑的联合作用控制地表沉陷,以实现不迁村采煤。

Description

一种采动覆岩走向分区隔离注浆充填结构
技术领域
本实用新型涉及一种注浆充填不迁村煤矿开采技术领域,特别是一种采动覆岩走向分区隔离注浆充填结构。
背景技术
分区隔离注浆充填不迁村开采技术是近年来发展起来的一项新的不迁村开采技术,它是在回采工作面不充分采动的前提下,通过地面钻孔向采动覆岩离层区注入高压粉煤灰浆液,保持采动后煤层上覆关键层的稳定,阻止采动沉陷向地表发展,以达到控制和减少地表沉降,实现不迁村开采的目的。根据各矿区离层注浆充填开采实践来看:覆岩离层注浆充填技术仅在非充分开采时减沉效果较好;若开采区域达到充分采动状态,即使在充填效果较好情况下减沉率也只能达到30%~50%,仍无法满足建下采煤的减沉要求。
发明内容
为了克服现有技术的不足,本实用新型提供了一种采动覆岩走向分区隔离注浆充填结构,在开采区域达到充分采动的状态下,能够具有较好的减沉效果。
本实用新型解决其技术问题所采用的技术方案是:
一种采动覆岩走向分区隔离注浆充填结构,包括水平的煤层、第一基岩层和底板层,所述第一基岩层位于所述煤层的上方,所述底板层位于所述煤层的下方,所述煤层和所述第一基岩层中水平分布有若干垮落区,相邻所述垮落区之间设置有分区隔离煤柱,所述分区隔离煤柱竖直设置,每个所述垮落区内均填充有高压粉煤灰浆液。
作为上述技术方案的进一步改进,还包括水平的主关键层、亚关键层和第二基岩层,所述亚关键层位于所述第一基岩层的上方,所述第二基岩层位于所述亚关键层的上方,所述主关键层位于所述第二基岩层的上方,每个所述垮落区的正上方有一个覆岩离层区,且每个所述覆岩离层区均位于所述主关键层和所述第二基岩层之间,每个所述覆岩离层区内均填充有高压粉煤灰浆液。
作为上述技术方案的进一步改进,还包括水平的表土层、第三基岩层,还包括竖直的注浆钻孔,所述第三基岩层位于所述主关键层的上方,所述表土层位于所述第三基岩层的上方,所述注浆钻孔的上端连通地面,所述注浆钻孔的下端穿过所述表土层、所述第三基岩层和所述主关键层连通所述覆岩离层区。
与现有技术相比较,本实用新型的有益效果是:
本实用新型所提供的一种采动覆岩走向分区隔离注浆充填结构,组合注浆充填与条带开采技术,在相邻注浆充填工作面之间留设一定宽度的分区隔离煤柱,通过注浆充填与分区隔离煤柱支撑的联合作用控制地表沉陷,以实现不迁村采煤。
与常规条带开采留设煤柱不同之处在于,本实用新型对分区隔离煤柱的宽度设计要求较低,只要能起到隔离覆岩离层区的作用并保持稳定就行;覆岩离层区及垮落区充填后的充填体能够起到支撑作用,此时覆岩离层区及垮落区的充填体承载了上覆岩层的部分载荷,覆岩离层区及垮落区充填体、关键层以及分区隔离煤柱构成共同承载体,事实上形成了覆岩离层区及垮落区充填与条带开采相结合的综合减沉方案。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是本实用新型所述的一种采动覆岩走向分区隔离注浆充填结构的示意图。
具体实施方式
参照图1,图1是本实用新型一个具体实施例的结构示意图。
如图1所示,一种采动覆岩走向分区隔离注浆充填结构,包括水平的煤层1、第一基岩层2和底板层3,所述第一基岩层2位于所述煤层1的上方,所述底板层3位于所述煤层1的下方,所述煤层1和所述第一基岩层2中水平分布有若干垮落区4,相邻所述垮落区4之间设置有分区隔离煤柱5,所述分区隔离煤柱5竖直设置,每个所述垮落区4内均填充有高压粉煤灰浆液。进一步地,还包括水平的主关键层6、亚关键层7和第二基岩层8,所述亚关键层7位于所述第一基岩层2的上方,所述第二基岩层8位于所述亚关键层7的上方,所述主关键层6位于所述第二基岩层8的上方,每个所述垮落区4的正上方有一个覆岩离层区9,且每个所述覆岩离层区9均位于所述主关键层6和所述第二基岩层8之间,每个所述覆岩离层区9内均填充有高压粉煤灰浆液。更进一步具体地,还包括水平的表土层10、第三基岩层11,还包括竖直的注浆钻孔12,所述第三基岩层11位于所述主关键层6的上方,所述表土层10位于所述第三基岩层11的上方,所述注浆钻孔12的上端连通地面,所述注浆钻孔12的下端穿过所述表土层10、所述第三基岩层11和所述主关键层6连通所述覆岩离层区9。
覆岩离层区9及垮落区4充填体、关键层以及分区隔离煤柱5形成共同承载体,覆岩内的充填体分担上覆岩层的部分载荷,减少了分区隔离煤柱5上的载荷。由于分区隔离煤柱5上所受的载荷小于正规条带开采留设煤柱承受载荷,因而分区隔离煤柱5的宽度可小于正规条带开采留设的煤柱宽度。理论上讲,如果覆岩离层区9及垮落区4内干灰充填量越多,该部分充填体承担的载荷也就越多,则分区隔离煤柱5的宽度可以更小。
以上对本实用新型的较佳实施进行了具体说明,当然,本实用新型还可以采用与上述实施方式不同的形式,熟悉本领域的技术人员在不违背本实用新型精神的前提下所作的等同的变换或相应的改动,都应该属于本实用新型的保护范围内。

Claims (3)

1.一种采动覆岩走向分区隔离注浆充填结构,其特征在于:包括水平的煤层、第一基岩层和底板层,所述第一基岩层位于所述煤层的上方,所述底板层位于所述煤层的下方,所述煤层和所述第一基岩层中水平分布有若干垮落区,相邻所述垮落区之间设置有分区隔离煤柱,所述分区隔离煤柱竖直设置,每个所述垮落区内均填充有高压粉煤灰浆液。
2.根据权利要求1所述的一种采动覆岩走向分区隔离注浆充填结构,其特征在于:还包括水平的主关键层、亚关键层和第二基岩层,所述亚关键层位于所述第一基岩层的上方,所述第二基岩层位于所述亚关键层的上方,所述主关键层位于所述第二基岩层的上方,每个所述垮落区的正上方有一个覆岩离层区,且每个所述覆岩离层区均位于所述主关键层和所述第二基岩层之间,每个所述覆岩离层区内均填充有高压粉煤灰浆液。
3.根据权利要求2所述的一种采动覆岩走向分区隔离注浆充填结构,其特征在于:还包括水平的表土层、第三基岩层,还包括竖直的注浆钻孔,所述第三基岩层位于所述主关键层的上方,所述表土层位于所述第三基岩层的上方,所述注浆钻孔的上端连通地面,所述注浆钻孔的下端穿过所述表土层、所述第三基岩层和所述主关键层连通所述覆岩离层区。
CN201621164026.0U 2016-10-25 2016-10-25 一种采动覆岩走向分区隔离注浆充填结构 Expired - Fee Related CN206174997U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621164026.0U CN206174997U (zh) 2016-10-25 2016-10-25 一种采动覆岩走向分区隔离注浆充填结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621164026.0U CN206174997U (zh) 2016-10-25 2016-10-25 一种采动覆岩走向分区隔离注浆充填结构

Publications (1)

Publication Number Publication Date
CN206174997U true CN206174997U (zh) 2017-05-17

Family

ID=58679768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621164026.0U Expired - Fee Related CN206174997U (zh) 2016-10-25 2016-10-25 一种采动覆岩走向分区隔离注浆充填结构

Country Status (1)

Country Link
CN (1) CN206174997U (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989613A (zh) * 2017-11-14 2018-05-04 太原理工大学 一种覆岩离层分区隔离注浆充填开采煤层全部回采方法
CN108661705A (zh) * 2018-06-25 2018-10-16 山东科技大学 条采采空区四位一体综合治理施工方法
CN108756944A (zh) * 2018-05-29 2018-11-06 中国煤炭地质总局勘查研究总院 采煤过程中控制地表塌陷的方法
CN108798769A (zh) * 2018-06-25 2018-11-13 山东科技大学 条采采空区一体化综合治理施工方法
CN108999634A (zh) * 2018-07-26 2018-12-14 中国矿业大学 地面钻孔实现水害防治和地表沉降控制的一孔多用方法
CN109162758A (zh) * 2018-10-31 2019-01-08 煤炭工业济南设计研究院有限公司 一种条带开采采空区注浆治理方法
CN109507393A (zh) * 2018-12-28 2019-03-22 山东科技大学 一种室内覆岩离层量测量及注浆控制模拟系统及其方法
CN109681206A (zh) * 2018-08-20 2019-04-26 华北科技学院 一种采煤填充控制地表沉降的方法
CN110043312A (zh) * 2019-04-04 2019-07-23 中勘资源勘探科技股份有限公司 一种注浆充填地表沉降范围的控制方法
CN112360550A (zh) * 2020-10-28 2021-02-12 安徽理工大学 一种沿空留巷中低位顶板离层区煤基固废膏体注充方法
CN114233380A (zh) * 2021-12-27 2022-03-25 徐州格润矿山技术开发有限公司 一种煤基固废用于覆岩隔离注浆充填的方法
CN114320296A (zh) * 2021-12-28 2022-04-12 山东省煤田地质局第三勘探队 一种复杂地质条件下煤层探测及采空区处理综合方法
CN114575918A (zh) * 2022-01-18 2022-06-03 安徽理工大学 覆岩离层注浆后的探测与补强一体方法
CN114607378A (zh) * 2022-03-28 2022-06-10 中国矿业大学 煤基固废覆岩隔离注浆充填保水采煤方法

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989613A (zh) * 2017-11-14 2018-05-04 太原理工大学 一种覆岩离层分区隔离注浆充填开采煤层全部回采方法
CN108756944A (zh) * 2018-05-29 2018-11-06 中国煤炭地质总局勘查研究总院 采煤过程中控制地表塌陷的方法
CN108661705A (zh) * 2018-06-25 2018-10-16 山东科技大学 条采采空区四位一体综合治理施工方法
CN108798769A (zh) * 2018-06-25 2018-11-13 山东科技大学 条采采空区一体化综合治理施工方法
CN108798769B (zh) * 2018-06-25 2020-06-02 山东科技大学 条采采空区一体化综合治理施工方法
CN108999634B (zh) * 2018-07-26 2019-07-05 中国矿业大学 地面钻孔实现水害防治和地表沉降控制的一孔多用方法
CN108999634A (zh) * 2018-07-26 2018-12-14 中国矿业大学 地面钻孔实现水害防治和地表沉降控制的一孔多用方法
CN109681206A (zh) * 2018-08-20 2019-04-26 华北科技学院 一种采煤填充控制地表沉降的方法
CN109162758A (zh) * 2018-10-31 2019-01-08 煤炭工业济南设计研究院有限公司 一种条带开采采空区注浆治理方法
CN109162758B (zh) * 2018-10-31 2020-10-16 通用技术集团工程设计有限公司 一种条带开采采空区注浆治理方法
CN109507393A (zh) * 2018-12-28 2019-03-22 山东科技大学 一种室内覆岩离层量测量及注浆控制模拟系统及其方法
CN109507393B (zh) * 2018-12-28 2024-04-16 山东科技大学 一种室内覆岩离层量测量及注浆控制模拟系统及其方法
CN110043312A (zh) * 2019-04-04 2019-07-23 中勘资源勘探科技股份有限公司 一种注浆充填地表沉降范围的控制方法
CN112360550A (zh) * 2020-10-28 2021-02-12 安徽理工大学 一种沿空留巷中低位顶板离层区煤基固废膏体注充方法
CN114233380A (zh) * 2021-12-27 2022-03-25 徐州格润矿山技术开发有限公司 一种煤基固废用于覆岩隔离注浆充填的方法
CN114233380B (zh) * 2021-12-27 2023-12-05 徐州格润矿山技术开发有限公司 一种煤基固废用于覆岩隔离注浆充填的方法
CN114320296A (zh) * 2021-12-28 2022-04-12 山东省煤田地质局第三勘探队 一种复杂地质条件下煤层探测及采空区处理综合方法
CN114320296B (zh) * 2021-12-28 2022-07-19 山东省煤田地质局第三勘探队 一种复杂地质条件下煤层探测及采空区处理综合方法
CN114575918A (zh) * 2022-01-18 2022-06-03 安徽理工大学 覆岩离层注浆后的探测与补强一体方法
CN114607378A (zh) * 2022-03-28 2022-06-10 中国矿业大学 煤基固废覆岩隔离注浆充填保水采煤方法

Similar Documents

Publication Publication Date Title
CN206174997U (zh) 一种采动覆岩走向分区隔离注浆充填结构
US11085296B2 (en) Method for controlling subsidence area caused by underground mining in adjoining open-pit mine
CN108661705B (zh) 条采采空区四位一体综合治理施工方法
CN102704933B (zh) 采动覆岩分区隔离注浆充填采煤方法
CN104481536B (zh) 控制覆岩裂隙与地表沉陷的掘采充平行作业的采煤方法
CN207177964U (zh) 一种废弃矿井采空区注浆充填结构
US20150125209A1 (en) Method for Distributed Storage and Use of Underground Water in Mine
CN106593445A (zh) 一种老采空区下伏近距离煤层覆岩隔离注浆充填开采方法
CN104775816B (zh) 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法
CN108625894B (zh) 短壁巷采水平工作面的矸石充填立体注浆施工方法
CN108194132B (zh) 一种墩式连拱式采空区处理方法
CN107044280A (zh) 一种采动覆岩离层分布特征的钻孔注浆探测方法
CN103758559A (zh) 沿空留巷y型通风高位回风巷钻孔抽采瓦斯方法
CN108087021A (zh) 一种充填采煤回收遗留煤柱并控制隔水关键层稳定的方法
CN109667562A (zh) 采动体瓦斯井上下联合全域抽采方法
CN110173264A (zh) 断顶与常规卸压防治坚硬顶板留巷冲击地压方法
CN107151956A (zh) 一种有压返浆加固覆盖型岩溶路堤的注浆方法
CN106958446A (zh) 一种急倾斜煤层开采的岩层移动及地表沉陷的控制方法
CN103993882A (zh) 一种冒落区注浆充填置换条带煤柱的方法
CN104675399B (zh) 煤矿采掘充填一体化采煤方法
CN106555607A (zh) 一种老采空区注浆充填控制地表残余沉降方法
CN206092058U (zh) 一种采动覆岩倾向分区隔离注浆充填结构
CN108266189A (zh) 一种巷顶完全沿空掘巷采空区隔绝方法
CN107100625A (zh) 覆岩注水充填降低导高的保水开采方法
CN104863591A (zh) 采空区控制冒落与地表充填治理方法

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

Termination date: 20191025

CF01 Termination of patent right due to non-payment of annual fee