CN206174061U - Formula of sinking bathroom waterproof construction - Google Patents
Formula of sinking bathroom waterproof construction Download PDFInfo
- Publication number
- CN206174061U CN206174061U CN201621154935.6U CN201621154935U CN206174061U CN 206174061 U CN206174061 U CN 206174061U CN 201621154935 U CN201621154935 U CN 201621154935U CN 206174061 U CN206174061 U CN 206174061U
- Authority
- CN
- China
- Prior art keywords
- collector pipe
- waterproof layer
- waterproof
- pipe
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a formula of sinking bathroom waterproof construction, including the collector pipe that the slope set up, a plurality of inlet openings are offered to the lateral wall on the collector pipe, and collector pipe slope lower extreme switches on row infiltration pipe. The collector pipe divide into: first collector pipe and second collector pipe, every first collector pipe slope tip down switch on the second collector pipe, and the infiltration pipe is arranged in second collector pipe slope end connection down. First waterproof layer is laid to the collector pipe downside, the first waterproof layer upper surface of the sunken income of second collector pipe downside, and first waterproof layer upper surface extends, runs through second collector pipe pipe wall and forms a plurality of waterproof layer inlet openings. The inlet opening of a plurality of collections infiltration is seted up to the collector pipe upside, pass through to collect to the infiltration of bathroom inside get rid of the mode, realize waterproof effect. Avoided taking care of the pence in waterproof layer surface's infiltration, long -term moist environment damages the waterproof layer to the drainage appears. Defect that construction cost is high in having solved prior art, through the waterproof layer is waterproof simply, expects much to the waterproof layer.
Description
Technical field
The utility model is related to the design of building discharge structure, especially subsided rest room waterproof construction.
Background technology
At present, existing subsided rest room waterproofing work, has that construction technology is simple, waterproof effect is poor, and user makes
Easily occurs waterproof layer damage with during, so as to affect the problem for using.In the prior art at present, generally use many
The mode of layer waterproof layer stops toilet infiltration into the mode waterproof of body of wall.But, during toilet Long-Time Service, by
In toilet use water consumption than larger, and a small amount of percolating water cannot be excluded in time, and percolating water product is few on the upside of waterproof layer
Cheng Duo, easily causes the drainage in house.
It follows that in the waterproof type of the blocking type of prior art, having high demands to the waterproof effect of every layer of waterproof layer, prevent
Water construction requirement is high, causes construction cost to increase.During Long-Time Service, because infiltration is difficult to exclude, infiltration length is easily caused
Phase accumulates, and waterproof layer is damaged, so as to cause house drainage.
Utility model content
For the defect in the presence of above-mentioned background technology, the technical solution of the utility model is as follows:
Subsided rest room waterproof construction of the present utility model, including the collector pipe being obliquely installed, the collector pipe upside
Wall opens up multiple inlet openings, and the collector pipe inclines lower end conducting row's soakaway trench.
In a kind of embodiment of the utility model, the collector pipe is divided into:First collector pipe and the second collector pipe, each institute
State the first collector pipe and incline the second collector pipe of bottom conducting, second collector pipe inclines bottom connection row's soakaway trench.The
One collector pipe parallel laid, it is ensured that the water of seepage can be collected more comprehensively in body of wall.By with the first collector pipe lower end
Second collector pipe of portion's conducting, the first infiltration collected is flowed in the second collector pipe, the infiltration collected in the second collector pipe
Enter inside soakaway trench again, finally discharge, it is to avoid the ponding inside the waterproof layer or body of wall, so as to damage lacking for waterproof layer
Fall into.
In a kind of embodiment of the utility model, the first waterproof layer of the collector pipe downside laying, second collector pipe
Downside dents into the first waterproof layer upper surface, and the first waterproof layer upper surface extends, and forms many through second tube wall that catchments
Individual waterproof layer inlet opening.In use, the first waterproof layer surface is collected to the water of seepage, and waterproof layer is parallel to first
Collector pipe is obliquely installed, and minimum point extends in the second collector pipe position in the first waterproof layer upper surface, catchments through second
Tube wall forms multiple waterproof layer inlet openings.First waterproof layer stops to percolating water, because the second collector pipe dents into
One waterproof layer upper surface so that the second collector pipe flowing water area is less than the first waterproof layer upper surface.So as to the first waterproof layer surface receipts
The water of collection is flowed into the second collector pipe by waterproof layer inlet opening, and further infiltration is collected.
In a kind of embodiment of the utility model, the first screed-coat is laid in the first waterproof layer bottom, and described first prevents
The second screed-coat is laid between water layer and the first collector pipe.The convenient inclined plane for forming the first waterproof layer of first screed-coat laying,
The usage amount of waterproof layer material is reduced, so as to reduce building cost.Second screed-coat filling first is catchmented ligament, so as to support
First collector pipe, improves the support strength of the first collector pipe.And the second screed-coat supports to the first collector pipe higher than waterproof
The height of layer surface, so as to reduce the depth that the second collector pipe dents into the first waterproof layer surface, reduces to the first waterproof layer
Destruction, improve waterproof effect.
In a kind of embodiment of the utility model, first collector pipe leaves each other gap, fills between gap
There are backfill layer material or levelling layer material.Gap is left between first collector pipe, between gap filled with backfill layer material or
The levelling layer material of person, the material in gap, so as to reduce the pressure of the first collector pipe carrying, is kept away the first collector pipe supporting role
Exempt to damage the first collector pipe, so as to improve waterproof effect.
In a kind of embodiment of the utility model, the collector pipe upside filling backfill layer, backfill layer upside laying
The 3rd screed-coat and floor layer are laid successively in second waterproof layer, the second waterproof layer upside.The be arranged on the upside of backfill layer
Infiltration of two waterproof layers to toilet carries out the stop of the first step.3rd screed-coat has been also convenient for the installation of floor layer.
In a kind of embodiment of the utility model, the downward-sloping setting in row's soakaway trench lower end, and it is conducting to blow-off pipe
It is internal.Row's soakaway trench collects infiltration, is finally drained into blow-off pipe inside and discharges, and row's soakaway trench is obliquely installed, and further facilitates
The infiltration of collection is quickly excluded.
Subsided rest room waterproof construction of the present utility model compared with prior art, its advantage:
In the toilet structure of sunk type, multiple collector pipes are obliquely installed, collector pipe upside opens up multiple collection and seeps water
Inlet opening.To the infiltration inside toilet by collection-wipe-out mode, the effect of waterproof is realized.Avoid in waterproof layer table
The infiltration in face takes care of the pence, long-term moist environmental damage waterproof layer, so as to there is drainage.In solving prior art,
By simply waterproof layer waterproof, waterproof layer is had high demands, the high defect of construction cost.
Description of the drawings
Fig. 1 is the utility model subsided rest room waterproof construction general illustration;
Fig. 2 is partial enlarged drawing at the A of Fig. 1;
Fig. 3 is the first collector pipe cross section view of the utility model subsided rest room waterproof construction;
Fig. 4 is the second collector pipe cross section view of the utility model subsided rest room waterproof construction;
Wherein, 1, concrete, 2, floor layer, the 31, the 3rd screed-coat, the 32, second screed-coat, 33, first is levelling
Layer, the 41, second waterproof layer, the 42, first waterproof layer, 5, backfill layer, 6, blow-off pipe, 7, row's soakaway trench, the 8, first collector pipe, 81,
Water seepage hole, the 82, first collector pipe flowing water area, the 9, second collector pipe, 91, gully-hole, 92, waterproof layer inlet opening, 93, second catchments
Pipe flowing water area.
Specific embodiment
As Figure 1-Figure 4, a kind of subsided rest room waterproof construction of the present utility model, on concrete 1
Multiple collector pipes are set in the waterproof construction of side, and collector pipe upper side wall opens up multiple inlet openings, and inlet opening is collected and oozed in backfill layer 5
The infiltration leaked down.First collector pipe 8 is obliquely installed, in the second collection that the inclined bottom conducting of the first collector pipe 8 is obliquely installed
Water pipe 9, and the percolating water of collection is flowed into inside the second collector pipe 9, the second collector pipe 9 is oozed by turning on row in inclination lower end
Water pipe 7, row's conducting blow-off pipe 6 of soakaway trench 7, discharges infiltration.The upper side wall of first collector pipe 8 opens up water seepage hole 81 and collects infiltration, the
The upside of two collector pipe 9 opens up the infiltration of 91 pairs of the first collector pipes 9 of gully-hole and is collected, and enters to backfilling the infiltration inside layer 5
Row is collected.
In work progress, first in first screed-coat of bottom pad 33 of waterproof construction, on the surface of the first screed-coat 33
The first waterproof layer 42 is laid, the surface of the first waterproof layer 42 is obliquely installed.The surface of first waterproof layer 42 arranges the along incline direction
One collector pipe 8, in the inclined minimum side of the first waterproof layer 42 the second collector pipe 9 is arranged.Second collector pipe 9 dents into first
The surface of waterproof layer 42, makes the place face of waterproof layer inlet opening 92 in the flush of the first waterproof layer 42, and the second collector pipe flowing water
Area 93 is less than the upper surface of the first waterproof layer 42.Liner has second levelling between the first collector pipe 9 and the surface of the first waterproof layer 42
Layer 32, and the interstitial site between the first collector pipe 9 fills levelling layer material or the backfill material of layer 5, to the first collector pipe 8
Support.The upside of first collector pipe 8 filling backfill layer 5, the second waterproof layer 41 of upside laying of backfill layer 5, to seeping water, the first step stops
Waterproof action.
It is that percolating water stops through the second waterproof layer 41 to Seepage water process, a small amount of infiltration for penetrating into backfill layer 5 is worn
Backfill layer 5 is crossed, the first collector pipe 8 is flowed in the water seepage hole 81 of the upper side wall of the first collector pipe 8.Multiple first collector pipes 8 are collected
The infiltration of backfill layer 5, is flowed in the gully-hole 91 of the second collector pipe 9 in the first collector pipe flowing water area 82.In the second collector pipe 9
Middle collection, then by discharging in row's soakaway trench 7 for turning on the bottom of the second collector pipe 9.Realize the discharge of percolating water, it is to avoid
Percolating water cannot be discharged in prior art, and the defect of damp damages waterproof layer.
The above, specific embodiment only of the present utility model, but protection domain of the present utility model do not limit to
In this, any those familiar with the art can readily occur in change in the technical scope that the utility model is disclosed
Or replace, all should cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be with the power
The protection domain that profit is required is defined.
Claims (7)
1. subsided rest room waterproof construction, it is characterised in that including the collector pipe being obliquely installed, the collector pipe upper side wall is opened
If multiple inlet openings, the collector pipe inclines lower end conducting row's soakaway trench.
2. subsided rest room waterproof construction according to claim 1, it is characterised in that the collector pipe is divided into:First
Collector pipe and the second collector pipe, each described first collector pipe inclines bottom and turns on the second collector pipe, second collector pipe
Incline bottom connection row's soakaway trench.
3. subsided rest room waterproof construction according to claim 2, it is characterised in that collector pipe downside laying the
One waterproof layer, the second collector pipe downside dents into the first waterproof layer upper surface, and the first waterproof layer upper surface extends, passes through
Wear second tube wall that catchments and form multiple waterproof layer inlet openings.
4. subsided rest room waterproof construction according to claim 3, it is characterised in that the first waterproof layer bottom paving
If the first screed-coat, between first waterproof layer and the first collector pipe the second screed-coat is laid.
5. subsided rest room waterproof construction according to claim 4, it is characterised in that first collector pipe mutually it
Between leave gap, filled with backfill layer material or levelling layer material between gap.
6. the subsided rest room waterproof construction according to claim 1-5 any one, it is characterised in that the collector pipe
Upside filling backfill layer, the second waterproof layer of the backfill layer upside laying, successively laying the 3rd is looked for for the second waterproof layer upside
Flat bed and floor layer.
7. the subsided rest room waterproof construction according to claim 1-5 any one, it is characterised in that row's infiltration
The downward-sloping setting in pipe lower end, and be conducting to inside blow-off pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621154935.6U CN206174061U (en) | 2016-10-31 | 2016-10-31 | Formula of sinking bathroom waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621154935.6U CN206174061U (en) | 2016-10-31 | 2016-10-31 | Formula of sinking bathroom waterproof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206174061U true CN206174061U (en) | 2017-05-17 |
Family
ID=58679319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621154935.6U Expired - Fee Related CN206174061U (en) | 2016-10-31 | 2016-10-31 | Formula of sinking bathroom waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206174061U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816138A (en) * | 2017-10-21 | 2018-03-20 | 浙江世贸装饰股份有限公司 | A kind of construction technology of subsided rest room |
CN108867896A (en) * | 2018-06-08 | 2018-11-23 | 程顺发 | A kind of gap water pipe for keeping floor dry |
CN109930780A (en) * | 2019-03-19 | 2019-06-25 | 浙江君豪建筑装饰设计工程有限公司 | A kind of construction technology of subsided rest room |
CN110029688A (en) * | 2019-02-25 | 2019-07-19 | 深圳市建筑设计研究总院有限公司 | Waterproof, moisture-proof structure applied to sunk type building |
-
2016
- 2016-10-31 CN CN201621154935.6U patent/CN206174061U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816138A (en) * | 2017-10-21 | 2018-03-20 | 浙江世贸装饰股份有限公司 | A kind of construction technology of subsided rest room |
CN108867896A (en) * | 2018-06-08 | 2018-11-23 | 程顺发 | A kind of gap water pipe for keeping floor dry |
CN110029688A (en) * | 2019-02-25 | 2019-07-19 | 深圳市建筑设计研究总院有限公司 | Waterproof, moisture-proof structure applied to sunk type building |
CN109930780A (en) * | 2019-03-19 | 2019-06-25 | 浙江君豪建筑装饰设计工程有限公司 | A kind of construction technology of subsided rest room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206174061U (en) | Formula of sinking bathroom waterproof construction | |
CN103510528B (en) | For the blind drainage structure of underground structure anti-floating | |
CN207538059U (en) | A kind of water drainage of deep foundation pit structure | |
CN202730785U (en) | Anti-floating blind ditch water drainage structure for underground structure | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN203373713U (en) | Drainage system for reconstructed and expanded expressway soil slope shallow layer | |
CN209603202U (en) | Basement anti-floating discharge structure | |
CN108951557B (en) | Irrigation and flood control dam for hydraulic engineering | |
CN207331931U (en) | A kind of water seepage prevention floor drain | |
CN214219730U (en) | Water seepage prevention structure for building outer wall | |
CN109763552A (en) | A kind of basis is dark to apply gravity type draining regeneration application system and its construction method | |
CN212078180U (en) | Integrated water storage, seepage and drainage linear drainage device for water and soil conservation | |
CN205444127U (en) | Novel vertical drainage body structure of homogeneous earth dam | |
CN201495530U (en) | Blockage-prevention dam foundation seepage monitoring catch drain structure | |
CN210712967U (en) | Impervious anti structure that floats of basement | |
CN210482215U (en) | Anti-seepage drainage and exhaust structure suitable for flat reservoir basin | |
CN211312401U (en) | Ecological wall that hydraulic engineering construction used | |
CN210712894U (en) | Underground garage outer wall decompression drainage device | |
CN112878456A (en) | Flood control structure of closed tailings pond and construction method thereof | |
CN203654332U (en) | Novel water prevention and dredge construction structure of basement | |
CN207659819U (en) | A kind of sponge urban ecology square road foundation structure | |
CN202866893U (en) | Tunnel net waterproof and drainage plate | |
CN207211173U (en) | CFRD reverse drainage system | |
CN208009393U (en) | A kind of non-dankly base manure slot backfill structure based on sponge city | |
CN105484286A (en) | Green gravity type soil retaining structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 Termination date: 20191031 |
|
CF01 | Termination of patent right due to non-payment of annual fee |