CN206174014U - Static pressure stake device suitable for transmission tower rectifies on basis - Google Patents

Static pressure stake device suitable for transmission tower rectifies on basis Download PDF

Info

Publication number
CN206174014U
CN206174014U CN201621095499.XU CN201621095499U CN206174014U CN 206174014 U CN206174014 U CN 206174014U CN 201621095499 U CN201621095499 U CN 201621095499U CN 206174014 U CN206174014 U CN 206174014U
Authority
CN
China
Prior art keywords
transmission tower
double
basis
piling device
static press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621095499.XU
Other languages
Chinese (zh)
Inventor
武江传
宗钟凌
蒋德稳
刘宇同
张魁
伏祥运
林祥军
张胜林
程广军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lianyungang Power Supply Co Of State Grid Jingsu Electric Power Company
State Grid Corp of China SGCC
Huaihai Institute of Techology
Original Assignee
Lianyungang Power Supply Co Of State Grid Jingsu Electric Power Company
State Grid Corp of China SGCC
Huaihai Institute of Techology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lianyungang Power Supply Co Of State Grid Jingsu Electric Power Company, State Grid Corp of China SGCC, Huaihai Institute of Techology filed Critical Lianyungang Power Supply Co Of State Grid Jingsu Electric Power Company
Priority to CN201621095499.XU priority Critical patent/CN206174014U/en
Application granted granted Critical
Publication of CN206174014U publication Critical patent/CN206174014U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a static pressure stake device suitable for transmission tower rectifies on basis, including the short groove steel corbel of steel anchor slab by the way, taking two angle steel reaction frames of roof, double acting jack with the manual staple bolt that double acting jack links to each other, connects the connection batten plate between two pairs of angle steel reaction frames, the utility model discloses little and the total light in weight of static pressure stake device suitable for transmission tower rectifies on basis overall height, transportation and work progress do not need large -scale machinery to assist, satisfy the electrified operation in transmission facility and transmission tower basis and rectify a deviation to the restriction requirement of operating space height, utilizing original basis dead weight to provide and pressing a stake counter -force, it provides the counter -force not need to set up in addition stock etc for it is convenient quick to be under construction, and pile forming process is quick and do not have noise pollution to all ring edge borders, just the utility model discloses manual staple bolt is easy and simple to handle among the static pressure stake device suitable for transmission tower rectifies on basis, can stably provide to press the required frictional force of stake, can dismantle fast again, improves the stake speed of pressing.

Description

A kind of static press piling device suitable for transmission tower foundation correction
Technical field
This utility model belongs to architectural engineering pile foundation technology and construction field, particularly a kind of to be applied to power transmission rod column foot The static press piling device of plinth correction.
Background technology
Deposits in Eastern Coastal China area there are the higher soft soil foundation of widely distributed compressibility, a large amount of power transmission and transforming equipments and Transmission tower is built on the soft soil foundation, and due to a variety of causes, part power transmission and transforming equipment and transmission tower are in running Larger foundation uneven settlement is there occurs, because these equipment need to carry out correcting offset of base operation, operation in the energized state Spatial altitude is limited, and existing pile mode and pile-forming equipment are difficult to be suitable for.
The content of the invention
The purpose of this utility model is to provide a kind of static press piling device suitable for transmission tower foundation correction so that Basis is carried out in the case of power transmission and transforming equipment and transmission tower foundation are under charging operation state, working space is height-limited to entangle Partially.
The technical solution for realizing this utility model purpose is:
A kind of static press piling device suitable for transmission tower foundation correction, it is characterised in that the static press piling device bag The short channel-section steel bracket of subsidiary steel anchor slab is included, the double angle reaction frame with top board, double-action jack is connected with double-action jack Manual anchor ear, connect two double angle reaction frames between connection batten plate;The steel anchor slab corresponds to be fixed on short channel-section steel cattle respectively The end of lower limb, the side of short channel-section steel bracket corresponds to be fixed with double angle reaction frame respectively, and the top of double angle reaction frame is right respectively Top board should be fixed with, be corresponded to respectively on top board and is fixed with double-action jack;It is described connection batten plate two ends respectively with two pairs of angles Steel reaction frame is fixedly connected;The both sides of the manual anchor ear help plate to be connected with the piston rod of two double-action jacks respectively.
Preferably, the side of the short channel-section steel bracket is corresponded to respectively by high-strength bolt and is fixed with double angle reaction frame.
Preferably, corresponded to respectively by high-strength bolt on the top board and be fixed with double-action jack.
Preferably, the two ends of the connection batten plate are fixedly connected respectively by high-strength bolt with two double angle reaction frames.
Preferably, the short channel-section steel bracket of the subsidiary steel anchor slab is made using integrally casting.
Preferably, the double angle reaction frame with top board is made using integrally casting.
This utility model compared with prior art, its remarkable advantage:
(1)This utility model is little suitable for the static press piling device total height of transmission tower foundation correction and gross weight is light, Transport and work progress do not need big machinery to assist, and meet transmission facility and the correction of transmission tower foundation charging operation to operation The restriction of spatial altitude is required.
(2)This utility model is applied to the static press piling device of transmission tower foundation correction and is provided using original base deadweight Pressure pile reaction, it is not necessary to anchor pole etc. is set in addition counter-force is provided so that construction convenient quickly, formation of pile is quickly and to peripheral ring Border noise-less pollution.
(3)Manual anchor ear is easy to operate the static press piling device that this utility model is rectified a deviation suitable for transmission tower foundation, Piling necessary friction force, and the fast quick-detach of energy can be stably provided, piling speed is improved.
Description of the drawings
Fig. 1 is the front view of the static press piling device that this utility model is applied to transmission tower foundation correction.
Fig. 2 is the side view of the static press piling device that this utility model is applied to transmission tower foundation correction.
Fig. 3 is the top view of the static press piling device that this utility model is applied to transmission tower foundation correction.
Specific embodiment
This utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, Figure 2 and Figure 3, a kind of static press piling device suitable for transmission tower foundation correction, its feature exists In the static press piling device includes the short channel-section steel bracket 31,32 of subsidiary steel anchor slab 21,22, the double angle counter-force of band top board 61,62 The connected manual anchor ear 5 of frame 41,42, double-action jack 81,82 and double-action jack 81,82, two double angle counter-forces of connection Frame 41, the connection batten plate 71,72 between 42;The steel anchor slab 21,22 corresponds to respectively the end for being fixed on short channel-section steel bracket 31,32 Portion, the side of short channel-section steel bracket 31,32 corresponds to be fixed with double angle reaction frame 41,42, the top of double angle reaction frame 41,42 respectively Portion corresponds to be fixed with top board 61,62 respectively, top board 61, corresponds to respectively on 62 and is fixed with double-action jack 81,82;The connection The two ends of batten plate 71,72 are fixedly connected respectively with two double angle reaction frames 41,42;The both sides of the manual anchor ear 5 help plate to distinguish It is connected with the piston rod of two double-action jacks 81,82.
The side of the short channel-section steel bracket 31,32 is corresponded to respectively by high-strength bolt and is fixed with double angle reaction frame 41, 42。
The top board 61, is corresponded to respectively by high-strength bolt on 62 and is fixed with double-action jack 81,82.
The two ends of the connection batten plate 71,72 are fixed respectively with two double angle reaction frame 41,42 by high-strength bolt and are connected Connect.
The short channel-section steel bracket 31,32 of the subsidiary steel anchor slab 21,22 is made using integrally casting.
The double angle reaction frame 41,42 of the band top board 61,62 is made using integrally casting.
A kind of described static press piling device operational approach suitable for transmission tower foundation correction, it is characterised in that should Method comprises the steps:
Step 1:Work surface is cleared up, and basal perimeter is banketed into cutting depth to the bottom of foundation, and about 1 meter of bottom width, is anti- Rear perimeter edge soil body landslide is only excavated, the periphery soil body should on demand carry out slope in digging process;
Step 2:Short channel-section steel bracket 31,32 is installed, and will need to install the base side of steel anchor slab 21,22 first by design requirement Face is cleaned out, and is drilled in side of the base plate with impact drill, the rubbish and grieshoch in cleaning drilling, and in drilling high strength structure is poured into Glue, fills in shank of bolt, treats that high strength structure gelling knot reaches some strength, and in the mounting surface of steel anchor slab 21,22 structure glue is filled, will The short channel-section steel bracket 31,32 of subsidiary steel anchor slab 21,22 is installed on side of the base plate;
Step 3:Double angle reaction frame 41,42 is installed, and double angle reaction frame 41,42 is installed on into short groove with high-strength bolt The side of steel corbel 31,32, and will connection batten plate 71,72 use the double angle reaction frame 41 of high strength exploitation two, 42, with strengthen The overall performance of the static press piling device, in connection double angle reaction frame 41, it should be noted that high-strength bolt is tightened during 42 To strengthen its overall performance;
Step 4:Double-action jack 81,82 is installed, and double-action jack 81,82 is installed on into double angles with high-strength bolt The top board 61 of steel reaction frame 41,42, above 62;
Step 5:Manual anchor ear 5 is installed, by the both sides floor of manual anchor ear 5 and the piston of two double-action jacks 81,82 Bar is connected;
Step 6:Piling, ground is stood on steel-pipe pile 1 through the hollow circular arc of manual anchor ear 5, locks manual anchor ear 5 Eccentric cam, makes to produce enough frictional force between manual anchor ear 5 and steel-pipe pile 1, starts hydraulic oil pumping oil, makes double acting thousand 81, the 82 piston rods elongation of jin top, drives the manual anchor ear 5 for holding steel-pipe pile 1 tightly that steel-pipe pile 1 is pressed into into underground, reaches double acting thousand During the elongation limit of 81,82 piston rods of jin top, suspend hydraulic oil pumping oil, loosen the eccentric cam of manual anchor ear 5, remove steel pipe Frictional force between stake 1 and manual anchor ear 5, high-pressure oil pump oil return drives manual anchor ear 5 to return to initial position, and so on works, By the overall press-in underground of steel-pipe pile 5.
In sum, this utility model be applied to transmission tower foundation correction static press piling device total height is little and gross weight Amount is light, and transport and work progress do not need big machinery to assist, and meets transmission facility and the correction of transmission tower foundation charging operation Restriction to working place height is required;This utility model is applied to the static press piling device of transmission tower foundation correction using former There is basis deadweight to provide pressure pile reaction, it is not necessary to anchor pole etc. to be set in addition and provides counter-force so that construction convenient quickly, formation of pile Quickly and to surrounding enviroment noise-less pollution;Handss the static press piling device that this utility model is rectified a deviation suitable for transmission tower foundation Dynamic anchor ear is easy to operate, can stably provide piling necessary friction force, and the fast quick-detach of energy, improves piling speed.

Claims (6)

1. it is a kind of suitable for transmission tower foundation correction static press piling device, it is characterised in that the static press piling device includes Subsidiary steel anchor slab(21,22)Short channel-section steel bracket(31,32), band top board(61,62)Double angle reaction frame(41,42), double cropping Use jack(81,82)With double-action jack(81,82)Connected manual anchor ear(5), connection two double angle reaction frames(41, 42)Between connection batten plate(71,72);The steel anchor slab(21,22)Correspond to respectively and be fixed on short channel-section steel bracket(31,32)End Portion, short channel-section steel bracket(31,32)Side respectively correspond to be fixed with double angle reaction frame(41,42), double angle reaction frame(41, 42)Top respectively correspond to be fixed with top board(61,62), top board(61,62)Upper corresponding to respectively is fixed with double-action jack (81,82);The connection batten plate(71,72)Two ends respectively with two double angle reaction frames(41,42)It is fixedly connected;It is described manual Anchor ear(5)Both sides help plate respectively with two double-action jacks(81,82)Piston rod be connected.
2. it is according to claim 1 suitable for transmission tower foundation correction static press piling device, it is characterised in that it is described Short channel-section steel bracket(31,32)Side by high-strength bolt respectively correspond to be fixed with double angle reaction frame(41,42).
3. it is according to claim 1 suitable for transmission tower foundation correction static press piling device, it is characterised in that it is described Top board(61,62)Upper being corresponded to respectively by high-strength bolt is fixed with double-action jack(81,82).
4. it is according to claim 1 suitable for transmission tower foundation correction static press piling device, it is characterised in that it is described Connection batten plate(71,72)Two ends by high-strength bolt respectively with two double angle reaction frames(41,42)It is fixedly connected.
5. it is according to claim 1 suitable for transmission tower foundation correction static press piling device, it is characterised in that it is described Subsidiary steel anchor slab(21,22)Short channel-section steel bracket(31,32)Made using integrally casting.
6. it is according to claim 1 suitable for transmission tower foundation correction static press piling device, it is characterised in that it is described Band top board(61,62)Double angle reaction frame(41,42)Made using integrally casting.
CN201621095499.XU 2016-09-30 2016-09-30 Static pressure stake device suitable for transmission tower rectifies on basis Active CN206174014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621095499.XU CN206174014U (en) 2016-09-30 2016-09-30 Static pressure stake device suitable for transmission tower rectifies on basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621095499.XU CN206174014U (en) 2016-09-30 2016-09-30 Static pressure stake device suitable for transmission tower rectifies on basis

Publications (1)

Publication Number Publication Date
CN206174014U true CN206174014U (en) 2017-05-17

Family

ID=58678034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621095499.XU Active CN206174014U (en) 2016-09-30 2016-09-30 Static pressure stake device suitable for transmission tower rectifies on basis

Country Status (1)

Country Link
CN (1) CN206174014U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351269A (en) * 2016-09-30 2017-01-25 国网江苏省电力公司连云港供电公司 Static pile pressing device suitable for error correction of transmission tower foundation and operation method
CN107489152A (en) * 2017-09-07 2017-12-19 淮海工学院 A kind of screw anchor encircles static press piling constructing device and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351269A (en) * 2016-09-30 2017-01-25 国网江苏省电力公司连云港供电公司 Static pile pressing device suitable for error correction of transmission tower foundation and operation method
CN106351269B (en) * 2016-09-30 2018-09-04 国网江苏省电力公司连云港供电公司 A kind of static press piling device and operating method suitable for transmission tower foundation correction
CN107489152A (en) * 2017-09-07 2017-12-19 淮海工学院 A kind of screw anchor encircles static press piling constructing device and its construction method

Similar Documents

Publication Publication Date Title
CN104314078A (en) Concrete pile construction equipment and construction method thereof
CN206174014U (en) Static pressure stake device suitable for transmission tower rectifies on basis
CN204898672U (en) Discard device of pulling out of pile foundation
CN102605783A (en) Construction method for applying prestress to anchor jacked piles
CN105714834B (en) A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake
CN106351269B (en) A kind of static press piling device and operating method suitable for transmission tower foundation correction
CN101701459B (en) Method for processing soft soil foundation of intertidal belt to form construction working face
CN205062795U (en) Slope tamping unit
CN204252120U (en) The construction equipment of concrete pile
CN204225100U (en) The construction equipment of concrete pile
CN204827213U (en) Double dynamical head digs rig soon
CN106400814A (en) Foundation pit supporting method
CN104153355B (en) The constructing device of concrete-pile and construction method thereof
CN204225101U (en) The construction equipment of concrete pile
CN206887957U (en) A kind of construction of prefabricated piles auxiliary stand
CN201588222U (en) Superposed digging/embedding foundation
CN201148617Y (en) Wrapping opening-shaped pile tip
CN101476444A (en) Horizontal radiation pipe construction equipment for vibration-impact type radiation well
CN104895058B (en) The all-hydraulic two-tube compound club-footed pile machine of static pressure and its construction method
CN201062393Y (en) Hollow concrete block for round or arc buildings
CN204456182U (en) Vertical anchorage pile retaining wall
CN110004908B (en) Deep ramming pipe and construction method thereof
CN204676536U (en) A kind of pile driver of adjustable hammering height
CN106759267A (en) A kind of auxiliary for being easy to hard formation steel sheet pile to squeeze into draws hole method
CN102226343A (en) Combined anchor-rod static pressure pile

Legal Events