Utility model content
For above-mentioned deficiency, the purpose of this utility model is, there is provided a kind of intelligent storage tunnel robot mechanical arm, its
Construction is scientific and reasonable, and response speed is fast, positional precision is high, is designed by multilamellar linkage, realizes that mechanical hand efficiently accesses goods, or even
Realize the left and right bi-directional expansion access goods of mechanical hand.
The technical solution adopted in the utility model is:A kind of intelligent storage tunnel robot mechanical arm, including driving means,
Panel seat, rebound, transition panel guide, rebound synchronizing wheel group, rebound Timing Belt, fork plate, fork plate guide rail, it is characterised in that
The rebound is arranged on panel seat by the movement of transition panel guide, coordinates that rebound is same before and after the rebound synchronizing wheel group
Step band is arranged on rebound, and makes the layout direction of rebound Timing Belt corresponding with the moving direction of rebound(In addition, one
As for, the epimere of the rebound Timing Belt is located at rebound top, hypomere and is located at rebound lower section, and it is also not excluded for certainly
He construct, special rebound Timing Belt storage tank is such as set on rebound, as long as meet hypomere be it is corresponding with panel seat, on
Section is corresponding with fork plate), the middle part of the panel seat is fixedly connected with the hypomere of rebound Timing Belt, and the fork plate is by fork
Panel guide movement is arranged on rebound, and its moving direction is corresponding with the moving direction of rebound, in addition, the fork plate
Middle part is fixedly connected with the epimere of rebound Timing Belt;The driving means are arranged on panel seat, and with the rebound mutually company of transmission
Connect.When robot work links, the driving means drive rebound to move, at the same time, the middle part of panel seat and transition
The hypomere of plate Timing Belt is engaged, and drives rebound Timing Belt to rotate, and the epimere of rebound Timing Belt matches with the middle part of fork plate
Close, drive fork plate to move, finally realize the linkage extension or retraction of rebound and fork plate.
Preferably, when mechanical hand is in middle recovery state, middle part and the rebound Timing Belt of the panel seat
Hypomere middle part be fixedly connected, the middle part of the fork plate is fixedly connected with the middle part of the epimere of rebound Timing Belt;At mechanical hand
When left-hand protracts state, the middle part of the panel seat is fixedly connected with the hypomere right part of rebound Timing Belt, in the fork plate
Portion is fixedly connected with the epimere left part of rebound Timing Belt;When mechanical hand protracts state in dextrad, the middle part of the panel seat
It is fixedly connected with the hypomere left part of rebound Timing Belt, the middle part of the fork plate is fixed with the epimere right part of rebound Timing Belt and connected
Connect.Such set-up mode, enabling to mechanical hand can realize the extension of left and right directions, and the distance phase of left and right directions extension
When.If there is deflection situation when arranging, the distance of mechanical hand left and right directions extension has deviation(It is left long right short or left short
Right length);The limit is tended to, then mechanical hand just can only protract to a direction linkage.
Preferably, the rebound includes two groups, respectively First Transition plate, the second rebound, in contrast
Should, the transition panel guide includes two groups, respectively First Transition panel guide, the second transition panel guide, the rebound transition
Plate synchronizing wheel group includes two groups, respectively First Transition plate synchronizing wheel group, the second rebound synchronizing wheel group, the rebound synchronization
Band includes two groups, respectively First Transition plate Timing Belt, the second rebound Timing Belt;Wherein, the First Transition plate is by the
The movement of one transition panel guide is arranged on panel seat, is coordinated First Transition plate Timing Belt before and after the First Transition plate synchronizing wheel group
It is arranged on First Transition plate, and makes the layout direction of First Transition plate Timing Belt relative with the moving direction of First Transition plate
Should, the middle part of the panel seat is fixedly connected with the hypomere of First Transition plate Timing Belt, and second rebound passes through the second transition
Panel guide movement is arranged on First Transition plate, and its moving direction is corresponding with the moving direction of First Transition plate, in addition, institute
The middle part for stating the second rebound is fixedly connected with the epimere of First Transition plate Timing Belt, before and after the second rebound synchronizing wheel group
Cooperation is arranged on the second rebound Timing Belt on the second rebound, and makes the layout direction and second of the second rebound Timing Belt
The moving direction of rebound is corresponding, and the middle part of the First Transition plate is fixedly connected with the hypomere of the second rebound Timing Belt,
The fork plate is arranged on the second rebound by the movement of fork plate guide rail, and the moving direction of its moving direction and the second rebound
It is corresponding, in addition, the middle part of the fork plate is fixedly connected with the epimere of the second rebound Timing Belt;The driving means are arranged on
On panel seat, and mutually it is connected with First Transition plate.Here is it should be noted that in principle, the rebound can include two
More than group, correspond, the transition panel guide include it is more than two, the rebound rebound synchronizing wheel group include two groups
More than, the rebound Timing Belt includes more than two.In other words, rebound, transition panel guide, rebound rebound synchronization
The quantity of wheel group, rebound Timing Belt, can be increased and decreased as needed.
Preferably, when mechanical hand is in middle recovery state, the middle part of the panel seat is same with First Transition plate
The hypomere middle part of step band is fixedly connected, and the middle part of second rebound is fixed with the epimere middle part of First Transition plate Timing Belt to be connected
Connect, the hypomere middle part of the middle part of the First Transition plate and the second rebound Timing Belt is fixedly connected, the middle part of the fork plate with
The epimere middle part of the second rebound Timing Belt is fixedly connected;When mechanical hand protracts state in left-hand, the middle part of the panel seat
It is fixedly connected with the hypomere right part of First Transition plate Timing Belt;The middle part of second rebound and First Transition plate Timing Belt
Epimere left part is fixedly connected;The middle part of the First Transition plate is fixedly connected with the hypomere right part of the second rebound Timing Belt;Institute
The middle part for stating fork plate is fixedly connected with the epimere left part of the second rebound Timing Belt;When mechanical hand protracts state in dextrad,
The middle part of the panel seat is fixedly connected with the hypomere left part of First Transition plate Timing Belt;The middle part and first of second rebound
The epimere right part of rebound Timing Belt is fixedly connected;The middle part of the First Transition plate is left with the hypomere of the second rebound Timing Belt
Portion is fixedly connected;The middle part of the fork plate is fixedly connected with the epimere right part of the second rebound Timing Belt.
Preferably, the First Transition plate synchronizing wheel group, First Transition plate Timing Belt are located at First Transition plate
Sidepiece;The second rebound synchronizing wheel group, the second rebound Timing Belt are located at the middle part of the second rebound.
Preferably, the epimere of the First Transition plate Timing Belt is located at First Transition plate top, hypomere and is located at the
One rebound lower section;The epimere of the second rebound Timing Belt is located at the second rebound top, hypomere and is located at the second rebound
Lower section.
Preferably, the middle part of the panel seat is fixedly clamped the hypomere of block and First Transition plate Timing Belt by first
It is fixedly connected;Company is fixed in the middle part of the First Transition plate by the second hypomere for being fixedly clamped block and the second rebound Timing Belt
Connect;The middle part of second rebound is fixedly connected by the first connection fixing block with the epimere of First Transition plate Timing Belt;Institute
The middle part for stating fork plate is fixedly connected by the second connection fixing block with the epimere of the second rebound Timing Belt(The middle part of the fork plate
Directly can also be fixedly connected with the epimere of the second rebound Timing Belt by hole, pin structure).
Preferably, the driving means include fixed seat, servomotor, travelling gear and driving rack, wherein,
Located at panel seat lower section, in fixed seat, the driving rack is located at rebound lower section to the servomotor to the fixed seat, and
Make the layout direction of driving rack corresponding with the moving direction of rebound, the servomotor is by travelling gear and driving cog
Bar is engaged, and drives rebound to move relative to panel seat.In addition, it is necessary to explanation, its can also including decelerator etc. assisted parts
Part, so that the operation of driving means is with control more preferably.In addition, the driving means are except can be with gear-rack drive, it is also possible to
Belt wheel belt drives, as long as meet driving rebound to move relative to panel seat.
Preferably, the transition panel guide, fork plate guide rail are all cross slideway.
This utility model has advantages below:By driving means, panel seat, rebound, transition panel guide, rebound synchronization
Wheel group, rebound Timing Belt, fork plate, fork plate guide rail cooperate, and realize linkage extension or retraction.Only need to single driving to fill
Put and be just capable of achieving high speed, high-precision access goods, but also left and right bi-directional expansion operation can be realized, more efficiently.
Illustrate below in conjunction with the accompanying drawings and specific embodiment, the utility model is described in further detail.
Specific embodiment
Referring to Fig. 1 to 2, the intelligent storage tunnel robot mechanical arm that the present embodiment is provided, it passes through support mounting plate
It is arranged in the robot of intelligent storage tunnel(Specifically it is mounted in the vertical lifting mechanism of intelligent storage tunnel robot
On).Wherein, the intelligent storage tunnel robot includes horizontal mobile mechanism a, vertical lifting mechanism b, mechanical hand c and industry
Computerized control system power distribution cabinet d.
Referring to Fig. 3 to 7, intelligent storage tunnel robot mechanical arm, including driving means, panel seat 1, First Transition plate 2,
Two rebounds 3, First Transition panel guide 4, the second transition panel guide 5, First Transition plate synchronizing wheel group 6, the second rebound synchronization
Wheel group 7, First Transition plate Timing Belt 8, the second rebound Timing Belt 9, fork plate 10, fork plate guide rail 11(The transition panel guide, fork
Panel guide is all cross slideway).
Specifically, the driving means include fixed seat 12, servomotor and decelerator 13, travelling gear 14 and driving cog
Bar 15, wherein, the fixed seat 12 is located at the lower section of panel seat 1, and the servomotor is located in fixed seat 12 with decelerator 13, described
Driving rack 15 makes the layout direction of driving rack 15 and the moving direction of First Transition plate 2 located at the lower section of First Transition plate 2
Corresponding, the servomotor is engaged by travelling gear 14 with decelerator 13 with driving rack 15, drives First Transition plate 2
Move relative to panel seat 1.
Specifically, the First Transition plate 2 is arranged on panel seat 1 by the movement of First Transition panel guide 4, first mistake
Coordinate before and after cab apron synchronizing wheel group 6 and First Transition plate Timing Belt 8 is arranged on First Transition plate 2, and make First Transition plate same
Step is corresponding with the moving direction of First Transition plate 2 with 8 layout direction, and the middle part of the panel seat 1 is fixedly clamped by first
Block 16 is fixedly connected with the hypomere of First Transition plate Timing Belt 8(Wherein, the middle part of the panel seat 1 is reserved with first and is fixedly clamped
Block installing hole 17.The block that is fixedly clamped clamps Timing Belt, and is fixedly installed on installing hole.), second rebound 3 is by the
The movement of two transition panel guide 5 is arranged on First Transition plate 2, and its moving direction is relative with the moving direction of First Transition plate 2
Should, in addition, the middle part of second rebound 3 is consolidated by the first connection fixing block 18 with the epimere of First Transition plate Timing Belt 8
Fixed connection(Wherein, the middle part side coil of second rebound 3 is put and is reserved with the first connection fixing block installing hole, in accompanying drawing not
First connection fixing block installing hole is shown), coordinate the second rebound Timing Belt 9 before and after the second rebound synchronizing wheel group 7
It is arranged on the second rebound 3, and makes the layout direction of the second rebound Timing Belt 9 and the moving direction phase of the second rebound 3
Correspondence, the middle part of the First Transition plate 2 is fixed by the second hypomere for being fixedly clamped the rebound Timing Belt 9 of block 19 and second and is connected
Connect(Wherein, the middle part of the First Transition plate 2 is reserved with second and is fixedly clamped block installing hole 20.Block be fixedly clamped by Timing Belt
Clamp, and be fixedly installed on installing hole.), the fork plate 10 by fork plate guide rail 11 movement be arranged on the second rebound 3, and
Its moving direction is corresponding with the moving direction of the second rebound 3, in addition, the middle part of the fork plate 10 is connected by second
Block 21 is fixedly connected with the epimere of the second rebound Timing Belt 9(Wherein, the middle part of the fork plate 10 is reserved with and the second rebound
The second connection fixing block installing hole 22 that Timing Belt 9 is fixedly connected);The driving means are arranged on panel seat, and with the first mistake
Cab apron is mutually connected., wherein it is desired to explanation, the above-mentioned block structure substantially similar with connection fixing block that be fixedly clamped
Part, its objective is that what is set up between panel seat, rebound or fork plate and Timing Belt is fixedly connected relation;Therefore, go the concrete structure can
With ever-changing, flat, it is three-dimensional block, etc. all applicable.
Specifically, the First Transition plate synchronizing wheel group 6, First Transition plate Timing Belt 8 are located at the side of First Transition plate 2
Portion;The second rebound synchronizing wheel group 7, the second rebound Timing Belt 9 are located at the middle part of the second rebound 3.First mistake
The epimere of cab apron Timing Belt 6 is located at the top of First Transition plate 2, hypomere and is located at the lower section of First Transition plate 2;Second rebound is same
Step is located at the top of the second rebound 3, hypomere and is located at the lower section of the second rebound 3 with 9 epimere.
Specifically, when mechanical hand is in middle recovery state, middle part and the First Transition plate Timing Belt 8 of the panel seat 1
Hypomere middle part be fixedly connected, the middle part of second rebound 3 is fixed with the epimere middle part of First Transition plate Timing Belt 8 to be connected
Connect, the middle part of the First Transition plate 2 is fixedly connected with the hypomere middle part of the second rebound Timing Belt 9, in the fork plate 10
Portion is fixedly connected with the epimere middle part of the second rebound Timing Belt 9;When mechanical hand protracts state in left-hand, the panel seat 1
Middle part be fixedly connected with the hypomere right part of First Transition plate Timing Belt 8;The middle part of second rebound 3 and First Transition plate
The epimere left part of Timing Belt 8 is fixedly connected;The middle part of the First Transition plate 2 and the hypomere right part of the second rebound Timing Belt 9
It is fixedly connected;The middle part of the fork plate 10 is fixedly connected with the epimere left part of the second rebound Timing Belt 9;When mechanical hand is in the right side
During to extension state, the middle part of the panel seat 1 is fixedly connected with the hypomere left part of First Transition plate Timing Belt 8;Second mistake
The middle part of cab apron 3 is fixedly connected with the epimere right part of First Transition plate Timing Belt 8;The middle part and second of the First Transition plate 2
The hypomere left part of rebound Timing Belt 9 is fixedly connected;The middle part of the fork plate 10 and the epimere right part of the second rebound Timing Belt 9
It is fixedly connected.
This utility model is not limited to above-mentioned embodiment, using identical with this utility model above-described embodiment or approximate
Technical characteristic, and other intelligent storage tunnel robot mechanical arms for obtaining, within protection domain of the present utility model.