CN206158157U CN201620929956.4U CN201620929956U CN206158157U CN 206158157 U CN206158157 U CN 206158157U CN 201620929956 U CN201620929956 U CN 201620929956U CN 206158157 U CN206158157 U CN 206158157U
Authority
CN
China
Prior art keywords
connecting plate
fixing device
steel springboard
pressing plate
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620929956.4U
Other languages
Chinese (zh)
Inventor
马少欣
王暖暖
冯保贵
李慧亭
石家旗
别刚刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Huaxing Construction Co Ltd
Original Assignee
China Nuclear Industry Huaxing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Huaxing Construction Co Ltd filed Critical China Nuclear Industry Huaxing Construction Co Ltd
Priority to CN201620929956.4U priority Critical patent/CN206158157U/en
Application granted granted Critical
Publication of CN206158157U publication Critical patent/CN206158157U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a scaffold frame steel springboard fixing device, including the clamp plate that the level set up, the below of clamp plate is fixed with the connecting plate, and one side below of connecting plate is equipped with the fastener, the connecting plate is orthogonal in same horizontal plane with the clamp plate, the fastener is parallel mutually in same horizontal plane with the clamp plate. The utility model discloses rational in infrastructure, the convenient to use of scaffold frame steel springboard fixing device marchs forward through screwing up the screw rod, drives the cone and moves along, gives the thrust and the ascending lift of steel pipe horizontal direction, realizes the fixed of steel springboard and steel pipe, and the device can effectively push up tight scaffold steel pipe, realizes that the steel springboard is fixed, makes the steel springboard can not remove, rock when the use, guarantees construction safety, and the steel springboard that is applicable to various construction environments is set up.

Description

A kind of scaffold steel springboard fixing device
Technical field
The utility model is related to a kind of fixing device, and especially a kind of fixing device for scaffold steel springboard, belongs to Building structure technology field.
Background technology
At present, scaffold can be widely used in construction, steel springboard is set up on scaffold cross bar, may act as construction Passage and operating platform.When steel springboard is set up, generally steel springboard is fixed on into scaffold cross bar by the way of iron wire colligation On.This kind of fixed form operation is relatively complicated, and during Long-Time Service, iron wire abrasion is released, and needs colligation again, expends material and people Power;Additionally, iron wire ledge may cause personnel to scratch, trip, there is potential safety hazard.
Utility model content
The technical problems to be solved in the utility model is to propose a kind of scaffold steel springboard rational in infrastructure, easy to use Fixing device, can effectively hold out against scaffolding steel pipe, realize the fixation of steel springboard.
The utility model is that the technical scheme for solving above-mentioned technical problem proposition is:A kind of scaffold steel springboard fixes dress Put, including horizontally disposed pressing plate, along the side of the pressing plate, long side downward bending forms connecting plate, the side of the connecting plate Lower section is provided with securing member;The connecting plate is orthogonal in same level with pressing plate, and the securing member is with pressing plate same It is parallel to each other in horizontal plane.
Further, aforesaid scaffold steel springboard fixing device, securing member include handle, tighten screw rod, conical head and Pipe;The pipe level is fixed on connecting plate, and inside is installed with tightens bolt, and the front end for tightening bolt is connected with taper Head, end is provided with through hole, and the handle is connected to through through hole to be tightened on screw rod.The front end of conical head is pyramidal structure, The hemispherical structure in end, the front end for tightening bolt is fixed on by the hemispherical dome structure of end.In being machined with the inside of pipe Screw thread, the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with Pipe is fixedly connected.This kind of structure is advanced forward by tightening screw rod, drives conical head to move forward, and gives steel pipe level side To thrust and lift upwards, realize the fixation of steel springboard and steel pipe.
Further, aforesaid scaffold steel springboard fixing device, the long side downward bending in side of pressing plate forms connecting plate, The pressing plate is provided with the short stripe board of at least two downward bendings with connecting plate opposite side, and the short stripe board is mutual with connecting plate It is parallel.Or, connecting plate is fixed on the middle part lower section of pressing plate along the long side direction of pressing plate, the long side in both sides of the pressing plate sets respectively There is the short stripe board of at least two downward bendings, the short stripe board is parallel to each other with connecting plate.The center of two short stripe boards Away from consistent with the centre-to-centre spacing of steel springboard upper bolt hole.The short stripe board can play a part of " anchor fluke ", and when using, " anchor fluke " is hooked Firmly the bolt hole on steel steel springboard, plays reinforcement fixation.
Further, aforesaid scaffold steel springboard fixing device, the bottom of connecting plate is provided with arched door formula groove, the arched door The circular arc direction of formula groove is opposite with the conical head, and the arched door formula groove arc radius are more than the steel pipe half of scaffold used Footpath.It is easy to frame to enter scaffolding steel pipe, and arched door formula groove is acted on scaffolding steel pipe limited location.
Further, aforesaid scaffold steel springboard fixing device, pressing plate is connected with connecting plate by welding manner;It is described Pipe is connected with connecting plate by welding manner.
Further, aforesaid scaffold steel springboard fixing device, conical head is connected with screw rod is tightened by welding manner, Or conical head is made by tightening screw rod and be integrally machined.
The beneficial effects of the utility model are:Compared with prior art, the utility model scaffold steel springboard fixing device It is rational in infrastructure, easy to use, advanced forward by tightening screw rod, drive conical head to move forward, give steel pipe horizontal direction Thrust and lift upwards, realize the fixation of steel springboard and steel pipe, and the device can effectively hold out against scaffolding steel pipe, realize steel springboard It is fixed, steel springboard do not moved when in use, rocked, it is ensured that construction safety, it is adaptable to which the steel springboard of various construction environments is taken If.
The utility model is easy to operate, and security is good, it is adaptable to which the scaffold steel springboard of various construction environments is set up, and is suitable to Batch production, disclosure satisfy that the market demand for needing to carry out this work.
Description of the drawings
Below in conjunction with the accompanying drawings the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of the utility model embodiment three.
Fig. 3 is the use state schematic diagram of the utility model steel springboard fixing device.
Specific embodiment
Embodiment one
The scaffold steel springboard fixing device of the present embodiment, as shown in Figure 1 and Figure 2, is added using ordinary carbon steel or low-alloy steel Work is formed, including pressing plate 1, connecting plate 2, short stripe board 4, handle 3.1, tightens screw rod 3.2, conical head 3.3 and pipe 3.4.
Wherein, pressing plate is horizontally disposed platy structure, is welded with connecting plate along the long side in the side of the pressing plate, the connecting plate It is orthogonal in same level with pressing plate.And the short stripe board of a group, i.e., two is then fixed with the long side of pressing plate opposite side, should The length direction of short stripe board is orthogonal in same level with pressing plate, and along root 90-degree bent, is formed " anchor fluke ", and The centre-to-centre spacing of two short stripe boards is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.
And connecting plate is then irregular platy structure, it is shaped as:Arched door formula groove, arched door formula are provided with the bottom of connecting plate Side of the groove below connecting plate opens, and arched door formula groove arc radius are easy to frame to enter more than the steel pipe radius of scaffold used Scaffolding steel pipe.
Arched door formula trench bottom is connected with securing member below connecting plate.The securing member includes handle, tightens screw rod, conical head And pipe.Wherein, pipe is fixed on the arched door formula trench bottom of connecting plate by welding manner level, is machined with the inside of pipe Internal thread, and the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with Pipe is fixedly connected.
The front end for tightening bolt is welded with conical head, and end is provided with through hole, and handle then passes through through hole and tightens screw rod It is connected.The front end of conical head is pyramidal structure, and the hemispherical structure in end is fixed on by the hemispherical dome structure of end and is tightened The front end of bolt.Tighten after screw front end is connected with conical head, from its end pipe is begun to pass, after through hole exposure thereon, Handle is made through through hole, and handle two ends are processed, make handle both ends with diameter greater than through bore dia, it is to avoid handle Come off.
Embodiment two
The scaffold steel springboard fixing device of the present embodiment, as shown in Figure 1 and Figure 2, is added using ordinary carbon steel or low-alloy steel Work is formed, including pressing plate 1, connecting plate 2, short stripe board 4, handle 3.1, tightens screw rod 3.2, conical head 3.3 and pipe 3.4.
Wherein, pressing plate be horizontally disposed platy structure, there is connecting plate along the long side in the side of the pressing plate, the connecting plate with Pressing plate is orthogonal in same level.And the short stripe board of a group, i.e., two is then fixed with the long side of pressing plate opposite side, this is short The length direction of stripe board is orthogonal in same level with pressing plate, and along root 90-degree bent, is formed " anchor fluke ", and two The centre-to-centre spacing of individual short stripe board is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.In the present embodiment, pressing plate and short stripe board are constituted " anchor fluke ", connecting plate and its arched door formula groove process on same plate, and carry out 90 ° of bendings from assigned position.
And connecting plate is then irregular platy structure, it is shaped as:Arched door formula groove, arched door formula are provided with the bottom of connecting plate Side of the groove below connecting plate opens, and arched door formula groove arc radius are easy to frame to enter more than the steel pipe radius of scaffold used Scaffolding steel pipe.
Arched door formula trench bottom is connected with securing member below connecting plate.The securing member includes handle, tightens screw rod, conical head And pipe.Wherein, pipe is fixed on the arched door formula trench bottom of connecting plate by welding manner level, is machined with the inside of pipe Internal thread, and the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with Pipe is fixedly connected.
The front end for tightening bolt is welded with conical head, and end is provided with through hole, and handle then passes through through hole and tightens screw rod It is connected.The front end of conical head is pyramidal structure, and the hemispherical structure in end is fixed on by the hemispherical dome structure of end and is tightened The front end of bolt.Tighten after screw front end is connected with conical head, from its end pipe is begun to pass, after through hole exposure thereon, Handle is made through through hole, and handle two ends are processed, make handle both ends with diameter greater than through bore dia, it is to avoid handle Come off.
Embodiment three
The scaffold steel springboard fixing device of the present embodiment, as shown in Figure 1 and Figure 2, is added using ordinary carbon steel or low-alloy steel Work is formed, including pressing plate 1, connecting plate 2, short stripe board 4, handle 3.1, tightens screw rod 3.2, conical head 3.3 and pipe 3.4.
Wherein, pressing plate is horizontally disposed platy structure, and connecting plate vertical welding is in pressing plate middle part, the connecting plate and pressing plate It is orthogonal in same level.And it is respectively fixed with one group of short stripe board, and the length of short stripe board on the long side in pressing plate both sides Degree direction is orthogonal in same level with pressing plate, and along root 90-degree bent, is formed " anchor fluke ", and two short stripe boards Centre-to-centre spacing it is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.
And connecting plate is then irregular platy structure, it is shaped as:Arched door formula groove, arched door formula are provided with the bottom of connecting plate Side of the groove below connecting plate opens, and arched door formula groove arc radius are easy to frame to enter more than the steel pipe radius of scaffold used Scaffolding steel pipe.
Arched door formula trench bottom is connected with securing member below connecting plate.The securing member includes handle, tightens screw rod, conical head And pipe.Wherein, pipe is fixed on the arched door formula trench bottom of connecting plate by welding manner level, is machined with the inside of pipe Internal thread, and the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with Pipe is fixedly connected.
The front end for tightening bolt is welded with conical head, and end is provided with through hole, and handle then passes through through hole and tightens screw rod It is connected.The front end of conical head is pyramidal structure, and the hemispherical structure in end is fixed on by the hemispherical dome structure of end and is tightened The front end of bolt.Tighten after screw front end is connected with conical head, from its end pipe is begun to pass, after through hole exposure thereon, Handle is made through through hole, and handle two ends are processed, make handle both ends with diameter greater than through bore dia, it is to avoid handle Come off.
Example IV
The scaffold steel springboard fixing device of the present embodiment, as shown in Figure 1 and Figure 2, is added using ordinary carbon steel or low-alloy steel Work is formed, including pressing plate 1, connecting plate 2, short stripe board 4, handle 3.1, tightens screw rod 3.2, conical head 3.3 and pipe 3.4.
Wherein, pressing plate is horizontally disposed platy structure, is welded with connecting plate along the long side in the side of the pressing plate, the connecting plate It is orthogonal in same level with pressing plate.And the short stripe board of a group, i.e., two is then fixed with the long side of pressing plate opposite side, should The length direction of short stripe board is orthogonal in same level with pressing plate, and along root 90-degree bent, is formed " anchor fluke ", and The centre-to-centre spacing of two short stripe boards is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.
And connecting plate is then irregular platy structure, it is shaped as:Arched door formula groove, arched door formula are provided with the bottom of connecting plate Side of the groove below connecting plate opens, and arched door formula groove arc radius are easy to frame to enter more than the steel pipe radius of scaffold used Scaffolding steel pipe.
Arched door formula trench bottom is connected with securing member below connecting plate.The securing member includes handle, tightens screw rod, conical head And pipe.Wherein, pipe is fixed on the arched door formula trench bottom of connecting plate by welding manner level, is machined with the inside of pipe Internal thread, and the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with Pipe is fixedly connected.
The front end for tightening bolt is connected with conical head, and this is tightened screw rod and be integrated with conical head and is processed into.End is provided with Through hole, handle is then connected through through hole with screw rod is tightened.The front end of conical head be pyramidal structure, the hemispherical knot in end Structure.Tighten after screw front end is connected with conical head, from its end pipe is begun to pass, after through hole exposure thereon, wear handle Through hole is crossed, and handle two ends are processed, make handle both ends with diameter greater than through bore dia, it is to avoid handle comes off.
When using, as shown in Figure 2, after steel springboard is set up on scaffold, " anchor fluke " for making fixing device pressing plate is penetrated The bolt hole of steel springboard simultaneously makes pressing plate fit with steel springboard, steel pipe is penetrated in groove by connecting plate arched door formula groove open sides, to Screw rod is tightened in front precession, makes conical head hold out against steel pipe, and by conical head steel pipe active force forward and upwards is given, make steel pipe with Connecting plate realizes closely connection, makes steel springboard be fixed on the purpose on scaffold so as to reach.
Preferred embodiment of the present utility model is the foregoing is only, as long as using the technical solution of the utility model, or Modification or equivalent variations that those skilled in the art are made above based on conventional meanses, all fall within the utility model requirement In protection domain.

Claims (10)

1. a kind of scaffold steel springboard fixing device, it is characterised in that:Including horizontally disposed pressing plate, the lower section of the pressing plate is consolidated Surely the side-lower for having connecting plate, the connecting plate is provided with securing member;The connecting plate is mutual in same level with pressing plate Vertically, the securing member is parallel to each other in same level with pressing plate.
2. scaffold steel springboard fixing device according to claim 1, it is characterised in that:The securing member include handle, Tighten screw rod, conical head and pipe;The pipe level is fixed on connecting plate, and inside is installed with tightens bolt, described to tighten spiral shell The front end of bolt is connected with conical head, and end is provided with through hole, and the handle is connected to through through hole to be tightened on screw rod.
3. scaffold steel springboard fixing device according to claim 2, it is characterised in that:The front end of the conical head is cone Shape structure, the hemispherical structure in end, the front end for tightening bolt is fixed on by the hemispherical dome structure of end.
4. scaffold steel springboard fixing device according to claim 2, it is characterised in that:It is machined with the inside of the pipe Internal thread, the external process for tightening bolt has external screw thread, and by the realization that cooperates of external screw thread and internal thread screw rod is tightened With being fixedly connected for pipe.
5. scaffold steel springboard fixing device according to claim 1, it is characterised in that:The long side in side of the pressing plate to Lower bending forms connecting plate, and the pressing plate is provided with the short stripe board of at least two downward bendings with connecting plate opposite side, described Short stripe board is parallel to each other with connecting plate.
6. scaffold steel springboard fixing device according to claim 1, it is characterised in that:Length of the connecting plate along pressing plate Edge direction is fixed on the middle part lower section of pressing plate, and the long side in both sides of the pressing plate is respectively equipped with the billet shape of at least two downward bendings Plate, the short stripe board is parallel to each other with connecting plate.
7. the scaffold steel springboard fixing device according to claim 5 or 6, it is characterised in that:Described two short stripe boards Centre-to-centre spacing it is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.
8. scaffold steel springboard fixing device according to claim 2, it is characterised in that:The bottom of the connecting plate is provided with Arched door formula groove, the circular arc direction of the arched door formula groove is opposite with the conical head, and the arched door formula groove arc radius are more than institute With the steel pipe radius of scaffold.
9. scaffold steel springboard fixing device according to claim 2, it is characterised in that:The pressing plate passes through with connecting plate Welding manner is connected;The pipe is connected with connecting plate by welding manner.
10. scaffold steel springboard fixing device according to claim 2, it is characterised in that:The conical head with tighten spiral shell Bar is connected by welding manner, or conical head is made by tightening screw rod and be integrally machined.
CN201620929956.4U 2016-08-23 2016-08-23 Scaffold frame steel springboard fixing device Active CN206158157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620929956.4U CN206158157U (en) 2016-08-23 2016-08-23 Scaffold frame steel springboard fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620929956.4U CN206158157U (en) 2016-08-23 2016-08-23 Scaffold frame steel springboard fixing device

Publications (1)

Publication Number Publication Date
CN206158157U true CN206158157U (en) 2017-05-10

Family

ID=58649274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620929956.4U Active CN206158157U (en) 2016-08-23 2016-08-23 Scaffold frame steel springboard fixing device

Country Status (1)

Country Link
CN (1) CN206158157U (en)

Similar Documents

Publication Publication Date Title
CN201826519U (en) Building template
CN206467574U (en) For finish rolling deformed bar anchorage sleeve fastener
CN206158157U (en) Scaffold frame steel springboard fixing device
CN204199182U (en) A kind of head tower construction inhaul cable anchorage structure
CN206048160U (en) A kind of height-adjustable split heads
CN202831623U (en) Concrete arch-shaped template supporting structure
CN203113761U (en) Wall connection structure of scaffold
CN2835437Y (en) Falsework fastening fastener
CN206769350U (en) Outer on large-sized station boiler Steel Structure chooses net scaffold
CN205976580U (en) Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction
CN205875657U (en) Plug -in type steel pipe scaffold frame
CN205954972U (en) Steel structure floor slab
CN211173042U (en) Scaffold wall connecting piece
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN202073302U (en) Direct plugging type scaffold
CN207063676U (en) Swing suspension column
CN206858018U (en) A kind of tool-type tower crane passageway
CN205743455U (en) A kind of Novel civil air defense anchoring hook
CN205134556U (en) Improved connecting piece for steel -structure beam columns
CN204590568U (en) A kind of triatic stay matched with dish button support
CN102444283A (en) Lateral bracing structure of building formwork
CN206815803U (en) A kind of outer outrigger scaffold girder steel bearing diagonal
CN207194428U (en) A kind of building scaffold wall attaching parts
CN206888497U (en) A kind of large steel structure installation attachment means
CN207776414U (en) A kind of outer tripod wall-connecting piece of architectural engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant