CN206158157U - Scaffold frame steel springboard fixing device - Google Patents
Scaffold frame steel springboard fixing device Download PDFInfo
- Publication number
- CN206158157U CN206158157U CN201620929956.4U CN201620929956U CN206158157U CN 206158157 U CN206158157 U CN 206158157U CN 201620929956 U CN201620929956 U CN 201620929956U CN 206158157 U CN206158157 U CN 206158157U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- fixing device
- steel springboard
- pressing plate
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a scaffold frame steel springboard fixing device, including the clamp plate that the level set up, the below of clamp plate is fixed with the connecting plate, and one side below of connecting plate is equipped with the fastener, the connecting plate is orthogonal in same horizontal plane with the clamp plate, the fastener is parallel mutually in same horizontal plane with the clamp plate. The utility model discloses rational in infrastructure, the convenient to use of scaffold frame steel springboard fixing device marchs forward through screwing up the screw rod, drives the cone and moves along, gives the thrust and the ascending lift of steel pipe horizontal direction, realizes the fixed of steel springboard and steel pipe, and the device can effectively push up tight scaffold steel pipe, realizes that the steel springboard is fixed, makes the steel springboard can not remove, rock when the use, guarantees construction safety, and the steel springboard that is applicable to various construction environments is set up.
Description
Technical field
The utility model is related to a kind of fixing device, and especially a kind of fixing device for scaffold steel springboard, belongs to
Building structure technology field.
Background technology
At present, scaffold can be widely used in construction, steel springboard is set up on scaffold cross bar, may act as construction
Passage and operating platform.When steel springboard is set up, generally steel springboard is fixed on into scaffold cross bar by the way of iron wire colligation
On.This kind of fixed form operation is relatively complicated, and during Long-Time Service, iron wire abrasion is released, and needs colligation again, expends material and people
Power;Additionally, iron wire ledge may cause personnel to scratch, trip, there is potential safety hazard.
Utility model content
The technical problems to be solved in the utility model is to propose a kind of scaffold steel springboard rational in infrastructure, easy to use
Fixing device, can effectively hold out against scaffolding steel pipe, realize the fixation of steel springboard.
The utility model is that the technical scheme for solving above-mentioned technical problem proposition is:A kind of scaffold steel springboard fixes dress
Put, including horizontally disposed pressing plate, along the side of the pressing plate, long side downward bending forms connecting plate, the side of the connecting plate
Lower section is provided with securing member;The connecting plate is orthogonal in same level with pressing plate, and the securing member is with pressing plate same
It is parallel to each other in horizontal plane.
Further, aforesaid scaffold steel springboard fixing device, securing member include handle, tighten screw rod, conical head and
Pipe;The pipe level is fixed on connecting plate, and inside is installed with tightens bolt, and the front end for tightening bolt is connected with taper
Head, end is provided with through hole, and the handle is connected to through through hole to be tightened on screw rod.The front end of conical head is pyramidal structure,
The hemispherical structure in end, the front end for tightening bolt is fixed on by the hemispherical dome structure of end.In being machined with the inside of pipe
Screw thread, the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with
Pipe is fixedly connected.This kind of structure is advanced forward by tightening screw rod, drives conical head to move forward, and gives steel pipe level side
To thrust and lift upwards, realize the fixation of steel springboard and steel pipe.
Further, aforesaid scaffold steel springboard fixing device, the long side downward bending in side of pressing plate forms connecting plate,
The pressing plate is provided with the short stripe board of at least two downward bendings with connecting plate opposite side, and the short stripe board is mutual with connecting plate
It is parallel.Or, connecting plate is fixed on the middle part lower section of pressing plate along the long side direction of pressing plate, the long side in both sides of the pressing plate sets respectively
There is the short stripe board of at least two downward bendings, the short stripe board is parallel to each other with connecting plate.The center of two short stripe boards
Away from consistent with the centre-to-centre spacing of steel springboard upper bolt hole.The short stripe board can play a part of " anchor fluke ", and when using, " anchor fluke " is hooked
Firmly the bolt hole on steel steel springboard, plays reinforcement fixation.
Further, aforesaid scaffold steel springboard fixing device, the bottom of connecting plate is provided with arched door formula groove, the arched door
The circular arc direction of formula groove is opposite with the conical head, and the arched door formula groove arc radius are more than the steel pipe half of scaffold used
Footpath.It is easy to frame to enter scaffolding steel pipe, and arched door formula groove is acted on scaffolding steel pipe limited location.
Further, aforesaid scaffold steel springboard fixing device, pressing plate is connected with connecting plate by welding manner;It is described
Pipe is connected with connecting plate by welding manner.
Further, aforesaid scaffold steel springboard fixing device, conical head is connected with screw rod is tightened by welding manner,
Or conical head is made by tightening screw rod and be integrally machined.
The beneficial effects of the utility model are:Compared with prior art, the utility model scaffold steel springboard fixing device
It is rational in infrastructure, easy to use, advanced forward by tightening screw rod, drive conical head to move forward, give steel pipe horizontal direction
Thrust and lift upwards, realize the fixation of steel springboard and steel pipe, and the device can effectively hold out against scaffolding steel pipe, realize steel springboard
It is fixed, steel springboard do not moved when in use, rocked, it is ensured that construction safety, it is adaptable to which the steel springboard of various construction environments is taken
If.
The utility model is easy to operate, and security is good, it is adaptable to which the scaffold steel springboard of various construction environments is set up, and is suitable to
Batch production, disclosure satisfy that the market demand for needing to carry out this work.
Description of the drawings
Below in conjunction with the accompanying drawings the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of the utility model embodiment three.
Fig. 3 is the use state schematic diagram of the utility model steel springboard fixing device.
Specific embodiment
Embodiment one
The scaffold steel springboard fixing device of the present embodiment, as shown in Figure 1 and Figure 2, is added using ordinary carbon steel or low-alloy steel
Work is formed, including pressing plate 1, connecting plate 2, short stripe board 4, handle 3.1, tightens screw rod 3.2, conical head 3.3 and pipe 3.4.
Wherein, pressing plate is horizontally disposed platy structure, is welded with connecting plate along the long side in the side of the pressing plate, the connecting plate
It is orthogonal in same level with pressing plate.And the short stripe board of a group, i.e., two is then fixed with the long side of pressing plate opposite side, should
The length direction of short stripe board is orthogonal in same level with pressing plate, and along root 90-degree bent, is formed " anchor fluke ", and
The centre-to-centre spacing of two short stripe boards is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.
And connecting plate is then irregular platy structure, it is shaped as:Arched door formula groove, arched door formula are provided with the bottom of connecting plate
Side of the groove below connecting plate opens, and arched door formula groove arc radius are easy to frame to enter more than the steel pipe radius of scaffold used
Scaffolding steel pipe.
Arched door formula trench bottom is connected with securing member below connecting plate.The securing member includes handle, tightens screw rod, conical head
And pipe.Wherein, pipe is fixed on the arched door formula trench bottom of connecting plate by welding manner level, is machined with the inside of pipe
Internal thread, and the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with
Pipe is fixedly connected.
The front end for tightening bolt is welded with conical head, and end is provided with through hole, and handle then passes through through hole and tightens screw rod
It is connected.The front end of conical head is pyramidal structure, and the hemispherical structure in end is fixed on by the hemispherical dome structure of end and is tightened
The front end of bolt.Tighten after screw front end is connected with conical head, from its end pipe is begun to pass, after through hole exposure thereon,
Handle is made through through hole, and handle two ends are processed, make handle both ends with diameter greater than through bore dia, it is to avoid handle
Come off.
Embodiment two
The scaffold steel springboard fixing device of the present embodiment, as shown in Figure 1 and Figure 2, is added using ordinary carbon steel or low-alloy steel
Work is formed, including pressing plate 1, connecting plate 2, short stripe board 4, handle 3.1, tightens screw rod 3.2, conical head 3.3 and pipe 3.4.
Wherein, pressing plate be horizontally disposed platy structure, there is connecting plate along the long side in the side of the pressing plate, the connecting plate with
Pressing plate is orthogonal in same level.And the short stripe board of a group, i.e., two is then fixed with the long side of pressing plate opposite side, this is short
The length direction of stripe board is orthogonal in same level with pressing plate, and along root 90-degree bent, is formed " anchor fluke ", and two
The centre-to-centre spacing of individual short stripe board is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.In the present embodiment, pressing plate and short stripe board are constituted
" anchor fluke ", connecting plate and its arched door formula groove process on same plate, and carry out 90 ° of bendings from assigned position.
And connecting plate is then irregular platy structure, it is shaped as:Arched door formula groove, arched door formula are provided with the bottom of connecting plate
Side of the groove below connecting plate opens, and arched door formula groove arc radius are easy to frame to enter more than the steel pipe radius of scaffold used
Scaffolding steel pipe.
Arched door formula trench bottom is connected with securing member below connecting plate.The securing member includes handle, tightens screw rod, conical head
And pipe.Wherein, pipe is fixed on the arched door formula trench bottom of connecting plate by welding manner level, is machined with the inside of pipe
Internal thread, and the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with
Pipe is fixedly connected.
The front end for tightening bolt is welded with conical head, and end is provided with through hole, and handle then passes through through hole and tightens screw rod
It is connected.The front end of conical head is pyramidal structure, and the hemispherical structure in end is fixed on by the hemispherical dome structure of end and is tightened
The front end of bolt.Tighten after screw front end is connected with conical head, from its end pipe is begun to pass, after through hole exposure thereon,
Handle is made through through hole, and handle two ends are processed, make handle both ends with diameter greater than through bore dia, it is to avoid handle
Come off.
Embodiment three
The scaffold steel springboard fixing device of the present embodiment, as shown in Figure 1 and Figure 2, is added using ordinary carbon steel or low-alloy steel
Work is formed, including pressing plate 1, connecting plate 2, short stripe board 4, handle 3.1, tightens screw rod 3.2, conical head 3.3 and pipe 3.4.
Wherein, pressing plate is horizontally disposed platy structure, and connecting plate vertical welding is in pressing plate middle part, the connecting plate and pressing plate
It is orthogonal in same level.And it is respectively fixed with one group of short stripe board, and the length of short stripe board on the long side in pressing plate both sides
Degree direction is orthogonal in same level with pressing plate, and along root 90-degree bent, is formed " anchor fluke ", and two short stripe boards
Centre-to-centre spacing it is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.
And connecting plate is then irregular platy structure, it is shaped as:Arched door formula groove, arched door formula are provided with the bottom of connecting plate
Side of the groove below connecting plate opens, and arched door formula groove arc radius are easy to frame to enter more than the steel pipe radius of scaffold used
Scaffolding steel pipe.
Arched door formula trench bottom is connected with securing member below connecting plate.The securing member includes handle, tightens screw rod, conical head
And pipe.Wherein, pipe is fixed on the arched door formula trench bottom of connecting plate by welding manner level, is machined with the inside of pipe
Internal thread, and the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with
Pipe is fixedly connected.
The front end for tightening bolt is welded with conical head, and end is provided with through hole, and handle then passes through through hole and tightens screw rod
It is connected.The front end of conical head is pyramidal structure, and the hemispherical structure in end is fixed on by the hemispherical dome structure of end and is tightened
The front end of bolt.Tighten after screw front end is connected with conical head, from its end pipe is begun to pass, after through hole exposure thereon,
Handle is made through through hole, and handle two ends are processed, make handle both ends with diameter greater than through bore dia, it is to avoid handle
Come off.
Example IV
The scaffold steel springboard fixing device of the present embodiment, as shown in Figure 1 and Figure 2, is added using ordinary carbon steel or low-alloy steel
Work is formed, including pressing plate 1, connecting plate 2, short stripe board 4, handle 3.1, tightens screw rod 3.2, conical head 3.3 and pipe 3.4.
Wherein, pressing plate is horizontally disposed platy structure, is welded with connecting plate along the long side in the side of the pressing plate, the connecting plate
It is orthogonal in same level with pressing plate.And the short stripe board of a group, i.e., two is then fixed with the long side of pressing plate opposite side, should
The length direction of short stripe board is orthogonal in same level with pressing plate, and along root 90-degree bent, is formed " anchor fluke ", and
The centre-to-centre spacing of two short stripe boards is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.
And connecting plate is then irregular platy structure, it is shaped as:Arched door formula groove, arched door formula are provided with the bottom of connecting plate
Side of the groove below connecting plate opens, and arched door formula groove arc radius are easy to frame to enter more than the steel pipe radius of scaffold used
Scaffolding steel pipe.
Arched door formula trench bottom is connected with securing member below connecting plate.The securing member includes handle, tightens screw rod, conical head
And pipe.Wherein, pipe is fixed on the arched door formula trench bottom of connecting plate by welding manner level, is machined with the inside of pipe
Internal thread, and the external process for tightening bolt has external screw thread, by external screw thread and internal thread cooperate realization tighten screw rod with
Pipe is fixedly connected.
The front end for tightening bolt is connected with conical head, and this is tightened screw rod and be integrated with conical head and is processed into.End is provided with
Through hole, handle is then connected through through hole with screw rod is tightened.The front end of conical head be pyramidal structure, the hemispherical knot in end
Structure.Tighten after screw front end is connected with conical head, from its end pipe is begun to pass, after through hole exposure thereon, wear handle
Through hole is crossed, and handle two ends are processed, make handle both ends with diameter greater than through bore dia, it is to avoid handle comes off.
When using, as shown in Figure 2, after steel springboard is set up on scaffold, " anchor fluke " for making fixing device pressing plate is penetrated
The bolt hole of steel springboard simultaneously makes pressing plate fit with steel springboard, steel pipe is penetrated in groove by connecting plate arched door formula groove open sides, to
Screw rod is tightened in front precession, makes conical head hold out against steel pipe, and by conical head steel pipe active force forward and upwards is given, make steel pipe with
Connecting plate realizes closely connection, makes steel springboard be fixed on the purpose on scaffold so as to reach.
Preferred embodiment of the present utility model is the foregoing is only, as long as using the technical solution of the utility model, or
Modification or equivalent variations that those skilled in the art are made above based on conventional meanses, all fall within the utility model requirement
In protection domain.
Claims (10)
1. a kind of scaffold steel springboard fixing device, it is characterised in that:Including horizontally disposed pressing plate, the lower section of the pressing plate is consolidated
Surely the side-lower for having connecting plate, the connecting plate is provided with securing member;The connecting plate is mutual in same level with pressing plate
Vertically, the securing member is parallel to each other in same level with pressing plate.
2. scaffold steel springboard fixing device according to claim 1, it is characterised in that:The securing member include handle,
Tighten screw rod, conical head and pipe;The pipe level is fixed on connecting plate, and inside is installed with tightens bolt, described to tighten spiral shell
The front end of bolt is connected with conical head, and end is provided with through hole, and the handle is connected to through through hole to be tightened on screw rod.
3. scaffold steel springboard fixing device according to claim 2, it is characterised in that:The front end of the conical head is cone
Shape structure, the hemispherical structure in end, the front end for tightening bolt is fixed on by the hemispherical dome structure of end.
4. scaffold steel springboard fixing device according to claim 2, it is characterised in that:It is machined with the inside of the pipe
Internal thread, the external process for tightening bolt has external screw thread, and by the realization that cooperates of external screw thread and internal thread screw rod is tightened
With being fixedly connected for pipe.
5. scaffold steel springboard fixing device according to claim 1, it is characterised in that:The long side in side of the pressing plate to
Lower bending forms connecting plate, and the pressing plate is provided with the short stripe board of at least two downward bendings with connecting plate opposite side, described
Short stripe board is parallel to each other with connecting plate.
6. scaffold steel springboard fixing device according to claim 1, it is characterised in that:Length of the connecting plate along pressing plate
Edge direction is fixed on the middle part lower section of pressing plate, and the long side in both sides of the pressing plate is respectively equipped with the billet shape of at least two downward bendings
Plate, the short stripe board is parallel to each other with connecting plate.
7. the scaffold steel springboard fixing device according to claim 5 or 6, it is characterised in that:Described two short stripe boards
Centre-to-centre spacing it is consistent with the centre-to-centre spacing of steel springboard upper bolt hole.
8. scaffold steel springboard fixing device according to claim 2, it is characterised in that:The bottom of the connecting plate is provided with
Arched door formula groove, the circular arc direction of the arched door formula groove is opposite with the conical head, and the arched door formula groove arc radius are more than institute
With the steel pipe radius of scaffold.
9. scaffold steel springboard fixing device according to claim 2, it is characterised in that:The pressing plate passes through with connecting plate
Welding manner is connected;The pipe is connected with connecting plate by welding manner.
10. scaffold steel springboard fixing device according to claim 2, it is characterised in that:The conical head with tighten spiral shell
Bar is connected by welding manner, or conical head is made by tightening screw rod and be integrally machined.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620929956.4U CN206158157U (en) | 2016-08-23 | 2016-08-23 | Scaffold frame steel springboard fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620929956.4U CN206158157U (en) | 2016-08-23 | 2016-08-23 | Scaffold frame steel springboard fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206158157U true CN206158157U (en) | 2017-05-10 |
Family
ID=58649274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620929956.4U Active CN206158157U (en) | 2016-08-23 | 2016-08-23 | Scaffold frame steel springboard fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206158157U (en) |
-
2016
- 2016-08-23 CN CN201620929956.4U patent/CN206158157U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826519U (en) | Building template | |
CN206467574U (en) | For finish rolling deformed bar anchorage sleeve fastener | |
CN206158157U (en) | Scaffold frame steel springboard fixing device | |
CN204199182U (en) | A kind of head tower construction inhaul cable anchorage structure | |
CN206048160U (en) | A kind of height-adjustable split heads | |
CN202831623U (en) | Concrete arch-shaped template supporting structure | |
CN203113761U (en) | Wall connection structure of scaffold | |
CN2835437Y (en) | Falsework fastening fastener | |
CN206769350U (en) | Outer on large-sized station boiler Steel Structure chooses net scaffold | |
CN205976580U (en) | Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction | |
CN205875657U (en) | Plug -in type steel pipe scaffold frame | |
CN205954972U (en) | Steel structure floor slab | |
CN211173042U (en) | Scaffold wall connecting piece | |
CN204326498U (en) | Screw outrigger oblique pull wire rope fixing device | |
CN202073302U (en) | Direct plugging type scaffold | |
CN207063676U (en) | Swing suspension column | |
CN206858018U (en) | A kind of tool-type tower crane passageway | |
CN205743455U (en) | A kind of Novel civil air defense anchoring hook | |
CN205134556U (en) | Improved connecting piece for steel -structure beam columns | |
CN204590568U (en) | A kind of triatic stay matched with dish button support | |
CN102444283A (en) | Lateral bracing structure of building formwork | |
CN206815803U (en) | A kind of outer outrigger scaffold girder steel bearing diagonal | |
CN207194428U (en) | A kind of building scaffold wall attaching parts | |
CN206888497U (en) | A kind of large steel structure installation attachment means | |
CN207776414U (en) | A kind of outer tripod wall-connecting piece of architectural engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |