CN206157584U - Track template is used in bridge construction - Google Patents
Track template is used in bridge construction Download PDFInfo
- Publication number
- CN206157584U CN206157584U CN201621162131.0U CN201621162131U CN206157584U CN 206157584 U CN206157584 U CN 206157584U CN 201621162131 U CN201621162131 U CN 201621162131U CN 206157584 U CN206157584 U CN 206157584U
- Authority
- CN
- China
- Prior art keywords
- bridge construction
- funnel
- template
- track template
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a track template is used in bridge construction, including adjusting nut, side form board, support panel and connection steel pipe, adjusting nut is connected with split bolt, the side form board is connected with the support base, the spout is connected with the pulley, be connected through the belt from between driving wheel and the action wheel, support panel's upper end is provided with the motor, and its lower extreme is provided with the controller, connecting the steel pipe and being connected with the side support frame, just the side support frame is connected with the funnel, side support frame left end is provided with the switch board. This track template is used in bridge construction, the track template is used in bridge construction who combines to use now carry out the innovative design, and whole track template is used in bridge construction is provided with the motor and cooperates purpose -made support and will propose the pulp grinder removal with the funnel can be very light for the efficiency of construction improves greatly, still is provided with the vibrting spear jack in the inside of funnel, makes the tamping that the concrete of pouring can be timely, increases the quality of pouring.
Description
Technical field
The utility model is related to bridge construction correlation technical field of auxiliary facilities, specially a kind of bridge construction track mould
Plate.
Background technology
Bridge construction track template is a kind of for aiding in transportable concrete warehouse machine during bridge casting concrete
Track plate device, its mainly by motor, split bolt, funnel, side template, lateral bolster support and warehouse machine deck this six
Individual part composition, it is more and more with track template however as the development bridge construction of science and technology, for bridge construction rail
Road template demand more and more higher, the bridge construction for using on the market is various with track formwork style, and the bridge for nowadays using is applied
Also there is deficiency more or less in work track template, coagulation is moved by traditional approach than the manpower that is mostly as now used
Native warehouse machine, larger yet with the quality of warehouse machine, staff needs to spend very big strength in mobile warehouse machine
Mobile warehouse machine, so as to cause high labor intensive, wastes time and energy, low construction efficiency, and what is had is not provided with vibration bar fixing device,
Prevent the concrete for pouring is from timely consolidating, easily cause to pour effect on driving birds is not good, it is impossible to the needs that satisfaction is used, so pin
Presence to such case, it is now desired to carry out the innovative design of relevant device.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction track template, to solve above-mentioned background technology in carry
Go out currently use be mostly manpower by traditional approach transportable concrete warehouse machine, yet with warehouse machine quality compared with
Greatly, staff needs to spend very big strength to move warehouse machine in mobile warehouse machine, so as to cause high labor intensive,
Waste time and energy, low construction efficiency, what is had is not provided with vibration bar fixing device so that the concrete for pouring can not timely be smash
Problem that is real, easily causing to pour effect on driving birds is not good.
For achieving the above object, the utility model provides following technical scheme:A kind of bridge construction track template, including
Adjusting nut, side template, support panel and joint steel pipe, the adjusting nut is connected with split bolt, and split bolt
Lower end is provided with bottom template, and the side template is connected with support base, and fixing screws and cunning are provided with support base
Groove, the chute is connected with pulley, and pulley is connected with driven pulley, and belt phase is passed through between the driven pulley and driving wheel
Connection, the upper end of the support panel is provided with motor, and its lower end is provided with controller, the joint steel pipe and lateral bolster
Support is connected, and lateral bolster support is connected with funnel, and the lateral bolster support left end is provided with power distribution cabinet.
Preferably, the split bolt is connected through side template with adjusting nut, and it is provided with two.
Preferably, warehouse machine deck is provided with the funnel, and the lower end of warehouse machine deck is provided with vibrating head jack.
Preferably, the adjusting nut left and right adjusting scope is 0-5cm.
Preferably, the funnel is connected with support panel, and vibrating head jack is internally provided with two at it.
Compared with prior art, the beneficial effects of the utility model are:Bridge construction track template, with reference to making now
With bridge construction innovative design is carried out with track template, whole bridge construction track template-setup has motor and coordinates spy
The support and funnel of system can very easily by the movement of warehouse machine so that efficiency of construction is greatly improved, and is also set in the inside of funnel
It is equipped with vibrating head jack so that the concrete for pouring can be consolidated timely, increases the quality for pouring.
Description of the drawings
Fig. 1 is the utility model structural representation.
In figure:1st, adjusting nut, 2, split bolt, 3, bottom template, 4, side template, 5, support base, 6, fixing screws,
7th, chute, 8, pulley, 9, driven pulley, 10, belt, 11, controller, 12, support panel, 13, driving wheel, 14, motor, 15,
Joint steel pipe, 16, warehouse machine deck, 17, funnel, 19, vibrating head jack, 19, lateral bolster support, 20, power distribution cabinet.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1 is referred to, the utility model provides a kind of technical scheme:A kind of bridge construction track template, including regulation
Nut 1, split bolt 2, bottom template 3, side template 4, support base 5, fixing screws 6, chute 7, pulley 8, driven pulley 9, skin
Band 10, controller 11, support panel 12, driving wheel 13, motor 14, joint steel pipe 15, warehouse machine deck 16, funnel 17, shake
Dynamic rod jack 18, lateral bolster support 19 and power distribution cabinet 20, adjusting nut 1 is connected with split bolt 2, and under split bolt 2
End is provided with bottom template 3, and the left and right adjusting scope of adjusting nut 1 is 0-5cm, and split bolt 2 is through side template 4 and adjusting nut
1 is connected, and it is provided with two, can well ensure the stability and intensity of side template 4, side template 4 and support base 5
It is connected, and fixing screws 6 and chute 7 is provided with support base 5, chute 7 is connected with pulley 8, and pulley 8 and driven pulley
9 are connected, and are connected by belt 10 between driven pulley 9 and driving wheel 13, and the upper end of support panel 12 is provided with motor 14,
And its lower end is provided with controller 11, joint steel pipe 15 is connected with lateral bolster support 19, and lateral bolster support 19 and funnel 17
It is connected, warehouse machine deck 16 is provided with funnel 17, and the lower end of warehouse machine deck 16 is provided with vibrating head jack 18, funnel
17 are connected with support panel 12, and vibrating head jack 18 is internally provided with two at it, and the left end of lateral bolster support 19 is provided with
Power distribution cabinet 20.
Operation principle:Before using the bridge construction with track template, need to whole bridge construction track template
Simple structure understanding is carried out, first we are by bottom template 3 and side template 4 is by adjusting nut 1, split bolt 2 and supports
Base 5 splices, and then assembles in device, then power distribution cabinet 20 is connected with cable, is then set by controller 11
Translational speed, and vibrating head is inserted on the vibrating head jack 18 in funnel 17, can thus start construction, by warehouse machine
It is placed on warehouse machine deck 16, as motor 14 drives driving wheel 13 to rotate, never drives driven pulley 9 and pulley 8 to rotate,
And then the purpose that mobile warehouse machine is constructed is reached, here it is use process of the whole bridge construction with track template.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out various changes in the case of without departing from principle of the present utility model and spirit, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of bridge construction track template, including adjusting nut (1), side template (4), support panel (12) and joint steel pipe
(15), it is characterised in that:The adjusting nut (1) is connected with split bolt (2), and the lower end of split bolt (2) is provided with
Bottom template (3), the side template (4) is connected with support base (5), and fixing screws (6) are provided with support base (5)
With chute (7), the chute (7) is connected with pulley (8), and pulley (8) is connected with driven pulley (9), the driven pulley (9)
It is connected by belt (10) between driving wheel (13), the upper end of the support panel (12) is provided with motor (14), and
Its lower end is provided with controller (11), and the joint steel pipe (15) is connected with lateral bolster support (19), and lateral bolster support
(19) it is connected with funnel (17), lateral bolster support (19) left end is provided with power distribution cabinet (20).
2. a kind of bridge construction track template according to claim 1, it is characterised in that:The split bolt (2) is passed through
Wear side template (4) to be connected with adjusting nut (1), and it is provided with two.
3. a kind of bridge construction track template according to claim 1, it is characterised in that:Arrange on the funnel (17)
There is warehouse machine deck (16), and the lower end of warehouse machine deck (16) is provided with vibrating head jack (18).
4. a kind of bridge construction track template according to claim 1, it is characterised in that:The adjusting nut (1) is left
Right adjustable range is 0-5cm.
5. a kind of bridge construction track template according to claim 1, it is characterised in that:The funnel (17) and support
Panel (12) is connected, and vibrating head jack (18) is internally provided with two at it.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621162131.0U CN206157584U (en) | 2016-11-01 | 2016-11-01 | Track template is used in bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621162131.0U CN206157584U (en) | 2016-11-01 | 2016-11-01 | Track template is used in bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206157584U true CN206157584U (en) | 2017-05-10 |
Family
ID=58654663
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621162131.0U Expired - Fee Related CN206157584U (en) | 2016-11-01 | 2016-11-01 | Track template is used in bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206157584U (en) |
-
2016
- 2016-11-01 CN CN201621162131.0U patent/CN206157584U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207749835U (en) | Concrete vibrating device | |
CN206335686U (en) | A kind of environmentally friendly cutter device of laying bricks | |
CN210414902U (en) | Movable vibrating device | |
CN213709073U (en) | Rail-mounted paver for highway construction | |
CN102747733B (en) | Pouring machine and pouring method for concrete of road shoulder on high-speed railroad bed section | |
CN205501782U (en) | Concrete vibrating device | |
CN204844405U (en) | Fixed mould platform is used in synchronous vibration device and production of PC component | |
CN113715133B (en) | Vibrating table for producing prefabricated parts and prefabricated part production line | |
CN206157584U (en) | Track template is used in bridge construction | |
CN106245509B (en) | A kind of highway oscillatory type repairing compaction apparatus | |
CN204780909U (en) | Construct pre -buried foundation pile tamping unit | |
CN203188070U (en) | Plate-type ballast-less track plate replacing device | |
CN207495722U (en) | A kind of concrete slip-form system | |
CN206801038U (en) | A kind of concreting crossbeam based on building | |
CN202744907U (en) | Concrete leveling, paste lifting and elevation control integrated device for bed plates | |
CN207109589U (en) | Formula concrete vibrating beam is spelled certainly in being constructed applied to Deck concrete pavement layer | |
CN202672156U (en) | High-speed-railway roadbed-section road-shoulder concrete pouring machine | |
CN206052505U (en) | A kind of cement concrete pavement vibrates leveling equipment | |
CN106812051A (en) | A kind of asphalt road construction formation works machinery | |
CN211897883U (en) | Concrete distributing device for tower column of cable-stayed bridge | |
CN211775830U (en) | Building templates lead screw cleaning device | |
CN209144676U (en) | A kind of bridge construction flowing water top of the slope face trowelling machine | |
CN207295388U (en) | A kind of concrete slip-form device | |
CN209145293U (en) | A kind of construction concrete casting device | |
CN201841583U (en) | High-frequency vibrator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170510 Termination date: 20171101 |
|
CF01 | Termination of patent right due to non-payment of annual fee |