CN206157582U - Pier stud jacking structure is cuted to rigid frame bridge non - - Google Patents
Pier stud jacking structure is cuted to rigid frame bridge non - Download PDFInfo
- Publication number
- CN206157582U CN206157582U CN201621138544.5U CN201621138544U CN206157582U CN 206157582 U CN206157582 U CN 206157582U CN 201621138544 U CN201621138544 U CN 201621138544U CN 206157582 U CN206157582 U CN 206157582U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pier
- rigid frame
- frame bridge
- pier stud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to an architectural engineering technology field especially relates to a pier stud jacking structure is cuted to rigid frame bridge non -, including jack, steel pipe mound and grooving in advance, the both ends of steel pipe mound all are provided with the ring flange, the ring flange of steel pipe mound bottom is fixed and is provided with grooving in advance in the bottom of billet through mounting and billet, through the fixed jack of mounting, the top of jack is fixed with the billet on the ring flange at steel pipe mound top, the utility model discloses a pier stud jacking structure is cuted to rigid frame bridge non - does not harm former structural -load -carrying capacity, the work progress is simple, the time limit for a project is short, recoverable, used repeatedly.
Description
Technical field
The utility model is related to construction engineering technical field, more particularly to a kind of rigid frame bridge non-truncated pier stud climbing structure.
Background technology
Traditional indeterminate bridge jacking engineering carries out again the spy of jacking with releasing after the conversion stress system that is rigidly connected
Point, had both destroyed former pier stud and had carried system, can not protect again fully ensure that releasing be rigidly connected during construction safety, and subsequently
Accurate Prediction is unable to bridge mass action counter productive, is unfavorable for the protection to former bridge structure.
Utility model content
To solve above-mentioned technical problem, the purpose of this utility model is to provide a kind of not injury of primary structural-load-carrying capacity, applies
Work process is simple, short time limit, recyclable, reusable rigid frame bridge non-truncated pier stud climbing structure.
Rigid frame bridge non-truncated pier stud climbing structure of the present utility model, including jack, steel pipe pier and precutting trough, institute
The two ends for stating steel pipe pier are provided with ring flange;The ring flange of the steel pipe pier bottom fixed by fixture and billet and
The bottom of the billet is provided with precutting trough;Fix described very heavy by fixture on ring flange at the top of the steel pipe pier
Top, at the top of the jack billet is fixed with.
Further, it is additionally provided with for the non-slipping block of spacing jack on the ring flange at the top of the steel pipe pier.
Further, the fixture is bolt.
Further, the steel pipe pier includes at least end to end steel pipe pier of two-stage.
Further, the length of the steel pipe pier is 5-6m.
Further, two end side surfaces of the steel pipe pier are additionally provided with floor.
Further, the billet surrounding of the steel pipe pier bottom is fixed on the ground by cast-in fixing bolt.
Further, the pre-cut slot thickness is 5~10cm.
By such scheme, the utility model at least has advantages below:1) applied range;2) do not damage original structure to hold
Loading capability;3) work progress is simple, short time limit;4) recyclable, reuse;5) quality is easily guaranteed that.
The utility model in the face of original basis surrounding on ground by applying precutting trough so that original basis are separated with surrounding soil,
Realize the target of jacking by arranging interim steel pipe pier again, especially with hydraulic synchronous system jack jacking is controlled, eliminate
Relative settlement between each pier stud, on the basis of the former pier stud bearing capacity that adequately protects, former pier stud jacking bridge is not blocked in realization
Target;Do not block pier stud jack lifting technique and block pier stud process is simple than traditional, it is not necessary to destroy original structure, maximum possible is protected
Shield original structure bearing capacity, and face steel pipe, girder steel, jack etc. can be with Resource recovery.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand skill of the present utility model
Art means, and being practiced according to the content of specification, with preferred embodiment of the present utility model and coordinate accompanying drawing detailed below
Describe in detail bright as after.
Description of the drawings
Fig. 1 is a kind of mounting structure schematic diagram of rigid frame bridge non-truncated pier stud climbing structure of the utility model;
Fig. 2 is a kind of structural representation of rigid frame bridge non-truncated pier stud climbing structure of the utility model.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below
Embodiment is used to illustrate the utility model, but is not limited to scope of the present utility model.
Embodiment one
Referring to Fig. 1 and Fig. 2, a kind of rigid frame bridge non-truncated pier stud climbing structure of the preferred embodiment of the utility model one, bag
Jack 13, steel pipe pier 3 and precutting trough 12 are included, the two ends of steel pipe pier are provided with ring flange 7;The flange of the bottom of steel pipe pier 3
Disk 7 is fixed and the bottom of billet 10 is provided with precutting trough 12 by fixture 8 and billet 10, and precutting trough 12 is arranged on
Former pier stud basis surrounding makes it separate with the soil body;By the fixation jack 13 of fixture 8 on the ring flange 7 at the top of steel pipe pier 3, thousand
Jin 13 liftings of top are no less than safely 1.5, and the top of jack 13 is fixed with billet 10.
A kind of rigid frame bridge non-truncated pier stud climbing structure of the present utility model, also sets up on the ring flange 7 at the top of steel pipe pier
There is the non-slipping block 14 for spacing jack;Fixture 8 is bolt;Steel pipe pier 3 includes at least end to end steel pipe pier of two-stage;
The length of steel pipe pier is 5-6m;Two end side surfaces of steel pipe pier 3 are additionally provided with floor 9;The surrounding of billet 10 of the bottom of steel pipe pier 3 is led to
Cross cast-in fixing bolt 11 to fix on the ground;Pre-cut slot thickness is 5~10cm.
Embodiment two
Referring to Fig. 1, the utility model provides a kind of construction method of rigid frame bridge non-truncated pier stud climbing structure, carries out construction
Prepare, interim steel pipe pier 3 is set around former pier stud 4, jack 13 is installed, and be connected to synchronization hydraulic system, in former pier stud
The second precutting trough 2 is applied around basis 1, original structure is separated with the soil body, the fixed jack 13 in the top of interim steel pipe pier 3 is very heavy
Top 13 is attached by high-strength bolt 8 with the ring flange 7 on steel pipe pier 3, and jack both sides arrange non-slipping block 14, and top passes through
Billet 10 is welded with interim girder steel 5, the top pressure of interim girder steel 5 in the bottom of former bridge panel 6, the interim steel pipe pier 3
Bottom is attached with ground by billet 10, cast-in fixing bolt 11 and high-strength bolt 8.
The above is only preferred embodiment of the present utility model, is not limited to the utility model, it is noted that
For those skilled in the art, on the premise of without departing from the utility model know-why, can also do
Go out some improvement and modification, these are improved and modification also should be regarded as protection domain of the present utility model.
Claims (8)
1. a kind of rigid frame bridge non-truncated pier stud climbing structure, it is characterised in that:Including jack, steel pipe pier and precutting trough, institute
The two ends for stating steel pipe pier are provided with ring flange;The ring flange of the steel pipe pier bottom fixed by fixture and billet and
The bottom of the billet is provided with precutting trough;Fix described very heavy by fixture on ring flange at the top of the steel pipe pier
Top, at the top of the jack billet is fixed with.
2. rigid frame bridge non-truncated pier stud climbing structure according to claim 1, it is characterised in that:At the top of the steel pipe pier
It is additionally provided with ring flange for the non-slipping block of spacing jack.
3. rigid frame bridge non-truncated pier stud climbing structure according to claim 1, it is characterised in that:The fixture is spiral shell
Bolt.
4. rigid frame bridge non-truncated pier stud climbing structure according to claim 1, it is characterised in that:The steel pipe pier include to
The end to end steel pipe pier of few two-stage.
5. rigid frame bridge non-truncated pier stud climbing structure according to claim 4, it is characterised in that:The length of the steel pipe pier
For 5-6m.
6. rigid frame bridge non-truncated pier stud climbing structure according to claim 1, it is characterised in that:The two ends of the steel pipe pier
Side is additionally provided with floor.
7. rigid frame bridge non-truncated pier stud climbing structure according to claim 1, it is characterised in that:The steel pipe pier bottom
Billet surrounding is fixed on the ground by cast-in fixing bolt.
8. rigid frame bridge non-truncated pier stud climbing structure according to claim 1, it is characterised in that:The pre-cut slot thickness is
5~10cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621138544.5U CN206157582U (en) | 2016-10-20 | 2016-10-20 | Pier stud jacking structure is cuted to rigid frame bridge non - |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621138544.5U CN206157582U (en) | 2016-10-20 | 2016-10-20 | Pier stud jacking structure is cuted to rigid frame bridge non - |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206157582U true CN206157582U (en) | 2017-05-10 |
Family
ID=58655300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621138544.5U Active CN206157582U (en) | 2016-10-20 | 2016-10-20 | Pier stud jacking structure is cuted to rigid frame bridge non - |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206157582U (en) |
-
2016
- 2016-10-20 CN CN201621138544.5U patent/CN206157582U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235290A (en) | Bridge peace tears construction method open | |
CN105804400A (en) | Hoisting construction method of curved truss | |
CN106055801B (en) | A kind of determination method of Brace in Deep Footing Groove beam demolition blasting sequence | |
CN106499201A (en) | A kind of dismountable safety rope tool-type holding clamp and its using method | |
CN202785351U (en) | Tower cranes attached operating platform | |
CN206157582U (en) | Pier stud jacking structure is cuted to rigid frame bridge non - | |
CN107503513B (en) | Wall template split bolt constructing device and construction method | |
CN206298994U (en) | A kind of waveform energy-dissipating and shock-absorbing steel plate, rubber concrete compound shear wall | |
CN103321438B (en) | A kind of modular protection marguise of large cantilever being applicable to high-building construction | |
CN107964978A (en) | Wind driven generator base crab-bolt ruggedized construction and foundation anchor bolt fracture reinforcement means | |
CN206220461U (en) | A kind of packaged type I-steel hoistway operation platform | |
CN106049496A (en) | Pulling-out device used for steel pipe fender post recycling and construction method | |
CN202467170U (en) | Aluminum alloy rising template system | |
CN102900023B (en) | A kind of combined type working platform | |
CN204662937U (en) | A kind of fixture being fixed on steel structure girder | |
CN204675629U (en) | The suspender that a kind of mill housing is installed or removed | |
CN104032944A (en) | Suspension frame construction platform device | |
CN104612166B (en) | The combination supporting device of a kind of supporting hole wall and method for protecting support | |
CN204238443U (en) | A kind of detachable suspension column fastening devices | |
CN106089267A (en) | Excavator auxiliary steel arch-shelf mounting process | |
CN203701878U (en) | Split-type bearing connection mechanism for vertical columns of platform screen door | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN104358355A (en) | Detachable column base fixing device and construction method thereof | |
CN207032001U (en) | A kind of bridge structure | |
CN207362706U (en) | Load carrying type hanging basket operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |