CN206153230U - Pressure washing probe - Google Patents

Pressure washing probe Download PDF

Info

Publication number
CN206153230U
CN206153230U CN201621126401.2U CN201621126401U CN206153230U CN 206153230 U CN206153230 U CN 206153230U CN 201621126401 U CN201621126401 U CN 201621126401U CN 206153230 U CN206153230 U CN 206153230U
Authority
CN
China
Prior art keywords
main part
pressure washing
apopore
water
delivery port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621126401.2U
Other languages
Chinese (zh)
Inventor
李继东
李钢
尚博
郝印涛
王立
罗辉
孙强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201621126401.2U priority Critical patent/CN206153230U/en
Application granted granted Critical
Publication of CN206153230U publication Critical patent/CN206153230U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning By Liquid Or Steam (AREA)

Abstract

The utility model provides a pressure washing probe, include: main part, main part include water inlet, first delivery port and second apopore, and first delivery port is located the front portion of main part, and the second apopore is located the rear portion of main part, and the main part is still including the first passageway of intercommunication water inlet and first delivery port and the intercommunication water inlet second channel with the second apopore, and wherein, the second channel sets up for the axis slope of main part so that the axis slope for the main part of the play water direction of second apopore, go out the flood peak, set up in first delivery port department, be provided with a plurality of third apopores on the play flood peak. The technical scheme of the utility model it detects and the lower problem of mediation method efficiency to have solved the cable duct bank among the prior art.

Description

Pressure washing is popped one's head in
Technical field
The utility model is related to electrical equipment, in particular to a kind of pressure washing probe.
Background technology
With the Large scale construction in city, cable duct bank has become the indispensable part of urban power distribution network.Traditional Cable duct bank detection and dredging method can not efficiently remove the tamper inside comb, need more workmen logical to drawing Rod carries out drawing logical, carrying, movement.Existing cable duct bank length is longer so that detection and dredging process waste time and energy, and waste Substantial amounts of man power and material, thus it is less efficient.Especially when cable duct bank reaches certain length, or even need to arrange cable Pipe carries out excavation could effectively be dredged.Therefore, in the urgent need to a kind of advanced dredging method replacing traditional drawing to lead to mode.
Utility model content
Main purpose of the present utility model is to provide a kind of pressure washing probe, to solve cable row of the prior art The problem that pipe is detected and dredging method is less efficient.
To achieve these goals, the utility model is popped one's head in there is provided a kind of pressure washing, including:Main part, main part Including water inlet, the first delivery port and the second apopore, the first delivery port is located at the front portion of main part, and the second apopore is located at The rear portion of main part, main part also includes the first passage of connection water inlet and the first delivery port and connects water inlet and second The second channel of apopore, wherein, second channel is obliquely installed relative to the axis of main part so that the water outlet of the second apopore Direction inclines relative to the axis of main part;Water outlet, is arranged on the first water outlet, multiple three is provided with Water outlet and is gone out Water hole.
Further, main part includes the first main part and the second main part being connected with each other, the first delivery port and first Passage is arranged on the first main part, and the second apopore is arranged on the second main part and second channel is arranged on the second main part On, the third channel of connection water inlet and second channel is formed between the first main part and the second main part.
Further, the first main part is provided with water conservancy diversion cambered surface towards the end of the second main part, and water conservancy diversion cambered surface is located at the It is in triple channel and corresponding with the import of second channel.
Further, it is provided with for the connecting portion of connecting water pipe joint on the second main part.
Further, the second apopore is multiple and circumferentially arranges on the rear end of the second main part.
Further, the front portion of the first main part is arcuate structure.
Further, pressure washing probe also includes water plug, and water plug arranges the center through hole of insertion.
Further, the second apopore and the 3rd apopore are screwed hole, and water plug goes out with the first delivery port and second Water hole is connected by screwed hole.
Further, multiple 3rd apopores include multiple periphery holes of centre bore and centrally disposed hole periphery.
Further, the material of pressure washing probe is wolfram steel.
Using the technical solution of the utility model, pressure washing probe includes main part and Water outlet.Wherein, main part bag Water inlet, the first delivery port and the second apopore are included, the first delivery port is located at the front portion of main part, and the second apopore is located at master The rear portion in body portion.Main part also includes the first passage of connection water inlet and the first delivery port and connects water inlet to go out with second The second channel in water hole, wherein, second channel is obliquely installed relative to the axis of main part so that the water side of the second apopore Incline to the axis relative to main part.Water outlet is arranged on the first water outlet, and multiple 3rd water outlets are provided with Water outlet Hole.In this application, when pressure washing probe is rinsed work, water inlet connection water under high pressure simultaneously connects rotating parts, Ensure that pressure washing probe can quickly rotate when being rinsed.Wherein, the second apopore is popped one's head in relative to pressure washing Axis is obliquely installed, and said structure enables the second apopore that thrust forward is produced while water under high pressure is sprayed, so as to Pressure washing probe is driven quickly to move forward.3rd apopore is while water under high pressure is sprayed as pressure washing probe is quick Rotation, realizes rapid cleaning, improves cleaning efficiency.Meanwhile, the said structure of pressure washing probe saves manpower and materials, Improve operating efficiency.
Description of the drawings
The Figure of description for constituting the part of the application is used for providing further understanding to of the present utility model, this practicality New schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model. In the accompanying drawings:
Fig. 1 shows the cross-sectional schematic of the embodiment one according to pressure washing of the present utility model probe;And
Fig. 2 shows the cross-sectional schematic of the embodiment two according to pressure washing of the present utility model probe.
Wherein, above-mentioned accompanying drawing is marked including the following drawings:
10th, main part;11st, water inlet;12nd, the first delivery port;13rd, the second apopore;14th, first passage;15th, second leads to Road;16th, the first main part;17th, the second main part;171st, connecting portion;18th, third channel;19th, water conservancy diversion cambered surface;20th, Water outlet; 30th, water plug.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.It is below illustrative to the description only actually of at least one exemplary embodiment, never as to this practicality New and its application or any restriction for using.Based on the embodiment in the utility model, those of ordinary skill in the art are not having Have and make the every other embodiment obtained under the premise of creative work, belong to the scope of the utility model protection.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
Unless specifically stated otherwise, the part for otherwise illustrating in these embodiments and positioned opposite, the digital table of step Scope of the present utility model is not limited up to formula and numerical value.Simultaneously, it should be appreciated that each shown in accompanying drawing for the ease of description The size of individual part is not to draw according to actual proportionate relationship.For skill known to person of ordinary skill in the relevant Art, method and apparatus may be not discussed in detail, but in the appropriate case, the technology, method and apparatus should be considered to award A part for power specification.In all examples shown here and discussion, any occurrence should be construed as merely example Property, not as restriction.Therefore, the other examples of exemplary embodiment can have different values.It should be noted that:It is similar Label and letter similar terms is represented in following accompanying drawing, therefore, once be defined in a certain Xiang Yi accompanying drawing, then with It need not be further discussed in accompanying drawing afterwards.
In description of the present utility model, it is to be understood that the noun of locality such as " forward and backward, upper and lower, left and right ", " laterally, Vertically, vertically the orientation or position relationship indicated by, level " and " top, bottom " etc. is normally based on orientation shown in the drawings or position Relation is put, description the utility model is for only for ease of and is simplified description, in the case where contrary explanation is not made, these nouns of locality Do not indicate that and imply that the device or element of indication there must be specific orientation or with specific azimuth configuration and operation, because This is it is not intended that the restriction to the utility model protection domain;The noun of locality " inside and outside " is referred to relative to each part wheel of itself Wide is inside and outside.
For the ease of description, space relative terms can be used here, such as " ... on ", " ... top ", " in ... upper surface ", " above " etc., for describing such as a device or feature shown in the figure and other devices or spy The spatial relation levied.It should be appreciated that space relative terms are intended to comprising the orientation except device described in figure Outside different azimuth in use or operation.For example, if the device in accompanying drawing is squeezed, it is described as " in other devices To be positioned as " under other devices or construction after the device of part or construction top " or " on other devices or construction " Side " or " under other devices or construction ".Thus, exemplary term " ... top " can include " ... top " and " in ... lower section " two kinds of orientation.The device can also other different modes positioning (being rotated by 90 ° or in other orientation), and And respective explanations are made to the relative description in space used herein above.
Furthermore, it is necessary to explanation, limits parts, it is only for be easy to using the word such as " first ", " second " Corresponding parts are distinguished, such as without Stated otherwise, above-mentioned word does not have particular meaning, therefore it is not intended that to this The restriction of utility model protection scope.
Embodiment one
Fig. 1 shows the cross-sectional schematic of the embodiment one according to pressure washing of the present utility model probe.Such as Fig. 1 institutes Show, the pressure washing probe of embodiment one includes main part 10 and Water outlet 20.Wherein, main part 10 include water inlet 11, the One delivery port 12 and the second apopore 13, the first delivery port 12 is located at the front portion of main part 10, and the second apopore 13 is located at master The rear portion in body portion 10.Main part 10 also includes the first passage 14 of connection water inlet 11 and the first delivery port 12 and connects water inlet The second channel 15 of the apopore 13 of mouth 11 and second.Wherein, second channel 15 relative to the axis of main part 10 be obliquely installed with The water outlet direction for making the second apopore 13 inclines relative to the axis of main part 10.Water outlet 20 is arranged on the first delivery port 12 Place, is provided with multiple 3rd apopores on Water outlet 20.
The technical scheme of Application Example one, when pressure washing probe is rinsed work, the connection high pressure of water inlet 11 Water simultaneously connects rotating parts, it is ensured that pressure washing probe can quickly rotate when being rinsed.Wherein, the second apopore 13 It is obliquely installed relative to the axis of pressure washing probe, said structure enables the second apopore 13 while water under high pressure is sprayed The enough thrust for producing forward, so as to drive pressure washing probe quickly to move forward.3rd apopore is same injection water under high pressure When with the quick rotation of pressure washing probe, realize rapid cleaning, improve cleaning efficiency.Meanwhile, pressure washing probe Said structure saves manpower and materials, improves operating efficiency.
As shown in figure 1, in embodiment one, main part 10 includes the first main part 16 and the second main part being connected with each other 17, the first delivery port 12 and first passage 14 are arranged on the first main part 16, and the second apopore 13 is arranged on the second main part 17 and second channel 15 be arranged on the second main part 17, between the first main part 16 and the second main part 17 formed connection water inlet The third channel 18 of mouth 11 and second channel 15.Main part 10 is divided into the first main part 16 and the second main part being connected with each other 17 so that be easily worked.
Specifically, in embodiment one, after water inlet 11 of the water under high pressure from the second main part 17 is entered, a part is entered Enter the first passage 14 being arranged on the first main part 16, and discharge from the first delivery port 12.Another part passes through the first main body Formed between the main part 17 of portion 16 and second and the second channel 15 being arranged on the second main part 17 is entered after third channel 18, and Discharge from the second apopore 13.
As shown in figure 1, the first main part 16 is provided with water conservancy diversion cambered surface 19, water conservancy diversion cambered surface towards the end of the second main part 17 19 is in third channel 18 and corresponding with the import of second channel 15.Water under high pressure enters from the water inlet 11 of the second main part 17 Enter, the water under high pressure that setting water conservancy diversion cambered surface 19 can slow down on the first main part 16 is to the impact on the first main part 16, it is ensured that high Pressure washing probe is able to maintain that in the central authorities of cable duct bank.Meanwhile, said structure can extend the use of pressure washing probe In the life-span, improve pressure washing probe flush efficiency.
As shown in figure 1, being provided with the connecting portion 171 for connecting water pipe joint on the second main part 17.Water under high pressure and can Rotating member is attached by connecting portion 171 with the second main part 17.Said structure is convenient to be installed, simple to operate.
As shown in figure 1, the second apopore 13 is multiple and circumferentially arranges on the rear end of the second main part 17.Work as pressure When flushing probe is rinsed work, the second apopore 13 sprays backward water under high pressure, can produce thrust band dynamic pressure forward Rinse probe quickly to move forward.Second apopore 13 is circumferentially arranged in the rear end of the second main part 17, therefore, the second water outlet Hole 13 produces the axis direction for pointing to pressure washing probe with joint efforts of thrust.Said structure causes pressure washing to pop one's head in flushed The central authorities of cable duct bank are maintained in journey, prevents pressure washing probe from colliding with cable duct bank, so as to improve effect is rinsed Rate.
In this application, pressure washing probe also includes water plug 30, and water plug 30 arranges the center through hole of insertion.Water outlet The center through hole that plug 30 is arranged facilitates the injection of water, while arrange water plug 30 also ensuring that from center through hole injection water outlet have Enough pressure, so as to improve the flush efficiency of pressure washing probe.
In embodiment one, the second apopore 13 and the 3rd apopore are screwed hole, the delivery port of water plug 30 and first 12 and second apopore 13 by screwed hole connect.When staff needs to carry out cable duct bank flushing using pressure washing probe When, the delivery port 12 of water plug 30 and first and the second apopore 13 can be carried out Screw assembly.The letter of screw thread compounding practice It is single, and be easily assembled.
In embodiment one, multiple 3rd apopores include multiple periphery holes of centre bore and centrally disposed hole periphery. This kind of setting can improve the cleannes of pressure washing probe so that removing of the pressure washing probe to pipeline inside tamper is imitated Rate is higher.
In embodiment one, the material of pressure washing probe is wolfram steel.High intensity wolfram steel have high rigidity, non-oxidizability and The features such as wearability.Pressure washing probe can be increased the service life using high intensity tungsten steel matter, improve flush efficiency.
Embodiment one proposes a kind of probe with pressure washing and sprays water under high pressure, and the tamper inside pipeline is carried out clearly The method removed.Pressure washing probe effectively can be sprayed backward using water under high pressure, and tamper is entered while moving forward Row is removed.
The main pressure washing probe for cutting cable duct bank flusher of embodiment one is designed, and combines in engineering Particular problem in practice, devises a kind of probe being specially rinsed to cable duct bank inside tamper.In the present embodiment Pressure washing probe be mainly characterized by according to engineering practice, its anterior main curved structure, rear portion is mainly a circle second Apopore 13, to spray backward, the direction of the second apopore 13 and diameter are designed to ensure that water outlet has the angle of water outlet Enough pressure.The material of pressure washing probe is high intensity wolfram steel.Water inlet 11 employs rotating parts, ensure that pressure Power is rinsed probe and is quickly rotated while water under high pressure is sprayed, and reaches the effect being purged to tamper.Water under high pressure to Afterwards rotary-jet, produces thrust forward and drives whole device quickly to move forward, also increases the adaptability of device.
The design of pressure washing probe in the present embodiment one overcomes traditional cable duct bank and draws logical form, using water under high pressure The attachment of the tamper inside comb and tube wall is quickly removed.Therefore, there is no need to tradition to draw needed for logical mode Substantial amounts of manpower and materials, substantially increase operating efficiency, while also very high to the elimination efficiency of the tamper inside pipeline, pressure Power is rinsed the material of probe and also can guarantee that longer service life.
Embodiment two
Fig. 2 shows the cross-sectional schematic of the embodiment two according to pressure washing of the present utility model probe, such as Fig. 2 institutes Show, pressure washing probe and the difference of embodiment one of embodiment two are:
Firstth, the front portion of the first main part 16 of the main part 10 of embodiment two is arcuate structure, and its axial dimension More than the first main part 16 of embodiment one.
When pressure washing probe is rinsed to the inside tamper of cable duct bank, the arc of the front portion of the first main part 16 Structure can reduce the resistance that tamper is popped one's head in pressure washing, so as to accelerate flushing speed, improve flush efficiency.
Secondth, the rear portion of the first main part 16 of embodiment one is arranged in cone mouth, and the first main part 16 and the second main body After portion 17 coordinates, cone mouth is stretched in water inlet 11.And in embodiment two, the rear portion of the first main part 16 is also arranged in cone mouth, The rear portion of the first main part 16 is not extended into water inlet 11.
As can be seen from the above description, the utility model the above embodiments realize following technique effect:
When pressure washing probe is rinsed work, water inlet connection water under high pressure simultaneously connects rotating parts, it is ensured that pressure Power rinses probe can quickly be rotated when being rinsed.Wherein, the second apopore inclines relative to the axis that pressure washing is popped one's head in Tiltedly arrange, said structure enables the second apopore that thrust forward is produced while water under high pressure is sprayed, so as to band dynamic pressure Power is rinsed probe and is quickly moved forward.3rd apopore rotates while water under high pressure is sprayed as pressure washing probe is quick, Rapid cleaning is realized, cleaning efficiency is improve.Meanwhile, the said structure of pressure washing probe saves manpower and materials, improves Operating efficiency.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (10)

1. a kind of pressure washing is popped one's head in, it is characterised in that included:
Main part (10), the main part (10) includes water inlet (11), the first delivery port (12) and the second apopore (13), , positioned at the front portion of the main part (10), second apopore (13) is positioned at the main part for first delivery port (12) (10) rear portion, the main part (10) also includes that the connection water inlet (11) is led to the first of first delivery port (12) Road (14) and the second channel (15) of the connection water inlet (11) and second apopore (13), wherein, described second Passage (15) is obliquely installed the water outlet direction phase so that second apopore (13) relative to the axis of the main part (10) For the axis of the main part (10) is inclined;
Water outlet (20), is arranged on the first delivery port (12) place, and on the Water outlet (20) multiple 3rd water outlets are provided with Hole.
2. pressure washing according to claim 1 is popped one's head in, it is characterised in that the main part (10) is including what is be connected with each other First main part (16) and the second main part (17), first delivery port (12) and the first passage (14) are arranged on described On first main part (16), second apopore (13) is arranged on second main part (17) and the second channel (15) It is arranged on second main part (17), connection is formed between first main part (16) and the second main part (17) described The third channel (18) of water inlet (11) and the second channel (15).
3. pressure washing according to claim 2 probe, it is characterised in that first main part (16) is towards described the The end of two main parts (17) is provided with water conservancy diversion cambered surface (19), and the water conservancy diversion cambered surface (19) is interior simultaneously positioned at the third channel (18) It is corresponding with the import of the second channel (15).
4. pressure washing according to claim 3 is popped one's head in, it is characterised in that be provided with use on second main part (17) In the connecting portion (171) of connecting water pipe joint.
5. pressure washing according to claim 4 probe, it is characterised in that second apopore (13) for it is multiple and Circumferentially arrange on the rear end of second main part (17).
6. pressure washing according to claim 5 is popped one's head in, it is characterised in that the front portion of first main part (16) is arc Shape structure.
7. pressure washing according to claim 1 is popped one's head in, it is characterised in that the pressure washing probe also includes water plug (30), the water plug (30) arranges the center through hole of insertion.
8. pressure washing according to claim 7 is popped one's head in, it is characterised in that second apopore (13) and the described 3rd Apopore is screwed hole, and the water plug (30) is with first delivery port (12) and second apopore (13) by institute State screwed hole connection.
9. pressure washing according to claim 1 is popped one's head in, it is characterised in that multiple 3rd apopores include centre bore And multiple periphery holes of centrally disposed hole periphery.
10. pressure washing according to claim 1 is popped one's head in, it is characterised in that the material of the pressure washing probe is tungsten Steel.
CN201621126401.2U 2016-10-14 2016-10-14 Pressure washing probe Expired - Fee Related CN206153230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621126401.2U CN206153230U (en) 2016-10-14 2016-10-14 Pressure washing probe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621126401.2U CN206153230U (en) 2016-10-14 2016-10-14 Pressure washing probe

Publications (1)

Publication Number Publication Date
CN206153230U true CN206153230U (en) 2017-05-10

Family

ID=58654406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621126401.2U Expired - Fee Related CN206153230U (en) 2016-10-14 2016-10-14 Pressure washing probe

Country Status (1)

Country Link
CN (1) CN206153230U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107008582A (en) * 2017-05-17 2017-08-04 大同煤矿集团有限责任公司 Anti- stifled easy cleaning dust prevention sprinkler
CN108421921A (en) * 2018-05-07 2018-08-21 中山市满金属制品有限公司 Automatic material return device of punch press

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107008582A (en) * 2017-05-17 2017-08-04 大同煤矿集团有限责任公司 Anti- stifled easy cleaning dust prevention sprinkler
CN107008582B (en) * 2017-05-17 2023-09-05 晋能控股煤业集团有限公司 Anti-blocking easy-cleaning dustproof spray head
CN108421921A (en) * 2018-05-07 2018-08-21 中山市满金属制品有限公司 Automatic material return device of punch press

Similar Documents

Publication Publication Date Title
CN206153230U (en) Pressure washing probe
CN109610629A (en) Sewage network dredger and dredging method
CN105672468B (en) Drainage pipeline rinses and system of removing contamination
CN113153156B (en) Hydraulic combined mechanical hole repairing device and method
CN104120767B (en) Electronic logical canal machine
CN207332794U (en) A kind of well-flushing instrument
CN108526148B (en) Self-feeding type self-rotating shield machine grouting channel high-pressure dredging device and system
CN206070622U (en) A kind of culvert dredging robot based on high pressure water-driven
CN202164680U (en) Dredging clearer for sewer dirt
CN201024484Y (en) Water pressure type dredger
CN210421029U (en) Energy dissipation structure for hydraulic engineering
CN107671087A (en) A kind of power construction cable laying pipeline dredging device
CN110541461A (en) Drop energy-dividing energy-dissipating plastic inspection well
CN211037225U (en) Drop energy-dividing energy-dissipating plastic inspection well
CN104989431A (en) Push chain type concrete spraying machine with distributor
CN107725968B (en) Rotary obstacle removing drill bit
CN213775283U (en) Grinding and milling spiral sand washing device
CN106475376B (en) Dredger and dredging method
CN210530748U (en) Reaming sleeve type concentric reaming pipe following drilling tool
CN212041859U (en) Pigging spray head
CN206153232U (en) Dredging device
CN219424653U (en) Automatic cleaning concrete pipe spray head
CN207079083U (en) A kind of pressure type self-cleaning aeration group
CN106988411B (en) Shield type underground dredging device
CN221001368U (en) Sewage pipe dredging device capable of being opened quickly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

CF01 Termination of patent right due to non-payment of annual fee