CN206146235U - Composite cooling tower - Google Patents

Composite cooling tower Download PDF

Info

Publication number
CN206146235U
CN206146235U CN201621212015.5U CN201621212015U CN206146235U CN 206146235 U CN206146235 U CN 206146235U CN 201621212015 U CN201621212015 U CN 201621212015U CN 206146235 U CN206146235 U CN 206146235U
Authority
CN
China
Prior art keywords
cooling tower
air
air cooler
water distribution
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621212015.5U
Other languages
Chinese (zh)
Inventor
陈善齐
汪迪文
傅立新
戴聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Yuan Heng Polytron Technologies Inc
Original Assignee
HUNAN YUANHENG TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN YUANHENG TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HUNAN YUANHENG TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201621212015.5U priority Critical patent/CN206146235U/en
Application granted granted Critical
Publication of CN206146235U publication Critical patent/CN206146235U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a composite cooling tower, it includes, and air flue baffle in the cooling tower casing, dryer, fan, water distribution connecting pipe, water distribution system, receipts hydrophone, fin, water catch bowl, the adjustable tripe of cooling tower air inlet, air cooler, the adjustable tripe of air cooler air inlet, the adjustable tripe of air cooler air -out, air cooler baffle, air damper, tower, valve are a set of, two groups on the valve, fluid entry, air cooler outlet pipe, airflow channel, air cooler inlet tube. The utility model aims at providing a composite cooling tower can be according to different environment's demand, and the pertinence operation can improve cooling efficiency and cooling effect in hot season, can eliminate fog, deicing in chilly season.

Description

A kind of Complex-cooling tower
Technical field
The utility model is related to a kind of cooling tower, specially a kind of Complex-cooling tower.
Background technology
Cooling tower is widely used in various industries as a kind of cooling system, and this is at a variety of weather conditions Middle operation.In summer, when temperature is higher than circulating water temperature, cooling effectiveness is low, and cooling tower cooling-down effect is poor, in cold season, Generally existing ice formation issues, and because the damp-heat air that cooling tower is discharged causes a fog, shroud the environment near cooling tower Among smog, the smog described in another aspect also results in the environment near cooling tower and freezes.For various situations, do It is many to make great efforts to tackle various operating modes, such as the energy-saving cooling tower that summer does is specifically designed for, it is specifically designed for winter operation and does anti-caking Ice cooling tower, is specifically designed for the cooling tower economized on water that disperses fog.But still without a kind of cooling tower that can be suitably used for various working.
Utility model content
The purpose of this utility model is for problem above, there is provided a kind of Complex-cooling tower, can be according to varying environment Demand, specific aim operation, can improve cooling effectiveness and cooling-down effect in hot season;Mist can be eliminated in cold season Gas, prevent freeze.
To realize object above, the technical solution adopted in the utility model is:It includes cooling tower shell 1, and its top sets It is equipped with air duct 2, air duct 2 is internally provided with blower fan 3, and the bottom of cooling tower shell 1 is provided with reception basin 8;The cooling tower casing Water collection device 6 is provided with body 1 and in the underface positioned at blower fan 3;The lower end of the water collection device 6 is provided with water distribution system 5;The cloth The underface of water system 5 is provided with fin 7;The fin 7 is provided with airway clapboard in tower with the left and right sides of water collection device 6 15;Gas channel 20 is formed in the tower between the inwall of airway clapboard 15 and cooling tower shell 1;The bottom of the gas channel 20 Portion is provided with air cooler 10;The connecting fluid entrance 18 of air cooler water inlet pipe 21, air cooler outlet pipe 19 connects with water distribution connecting tube 4 Connect;One end connecting fluid entrance 18 of water distribution connecting tube 4, the other end is connected on water distribution system 5;The water distribution connecting tube 4 with The connection end of fluid intake 18 is provided with valve one group 16;Valve is provided with the air cooler water inlet pipe 21 two group 17;It is described The outside of air cooler 10 is respectively arranged with the adjustable blinds 11 of air cooler air intake and the adjustable blinds 12 of air cooler air-out with inner side;It is described Damper 14 is provided with gas channel 20;The left and right sides of the cooling tower shell 1 and positioned at air cooler 10 underface It is provided with the adjustable blinds 9 of cooling tower air intake.
Further, the bottom of the air cooler 10 is provided with air cooler dividing plate 13.
Further, the damper 14 includes the fixed plate 1402 and the structure of flap 1401 of two relative dislocations settings Into;One end of the flap 1401 is arranged on the bottom of fixed plate 1402, and the other end is arranged on the upper end of fixed plate 1402.
Further, the middle setting of the flap 1401 has rotating shaft, turns the tip of the axis connection stepper motor.
Further, the fixed plate 1402 is L-shaped, and it includes linkage section 14021 and seal section 14022;The connection Section 14021 is fixed in gas channel 20;The upper and lower surface of the seal section 14022 is provided with sealing gasket 14023.
The beneficial effects of the utility model:A kind of Complex-cooling tower of offer that the utility model is provided, can be according to not With the demand of environment, specific aim operation, cooling effectiveness and cooling-down effect can be improved in hot season;Can be with cold season Eliminate fog, prevent from freezing.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is structural representation of the utility model when standard condition runs;
Fig. 3 is structural representation of the utility model when hot operating mode is run;
Fig. 4 is structural representation of the utility model when severe cold operating mode is run.
Fig. 5 is the partial enlarged view in Fig. 1 at A.
Fig. 6 is the structural representation of damper in the utility model.
Label character is expressed as described in figure:1st, cooling tower shell;2nd, air duct;3rd, blower fan;4th, water distribution connecting tube;5th, water distribution System;6th, water collection device;7th, fin;8th, reception basin;9th, the adjustable blinds of cooling tower air intake;10th, air cooler;11st, air cooler air intake Adjustable blinds;12nd, the adjustable blinds of air cooler air-out;13rd, air cooler dividing plate;14th, damper;15th, airway clapboard in tower;16、 One group of valve;17th, two groups of valve;18th, fluid intake;19th, air cooler outlet pipe;20th, gas channel;21st, air cooler water inlet pipe; 1401st, flap;1402nd, fixed plate;14021st, linkage section;14022nd, seal section;14023rd, sealing gasket.
Specific embodiment
In order that those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings to this reality Be described in detail with new, the description of this part be only it is exemplary and explanatory, should not be to protection domain of the present utility model There is any restriction effect.
As shown in figs 1 to 6, concrete structure of the present utility model is:It includes cooling tower shell 1, and its top is provided with wind Cylinder 2, air duct 2 is internally provided with blower fan 3, and the bottom of cooling tower shell 1 is provided with reception basin 8;In the cooling tower shell 1 and Underface positioned at blower fan 3 is provided with water collection device 6;The lower end of the water collection device 6 is provided with water distribution system 5;The water distribution system 5 Underface be provided with fin 7;The fin 7 is provided with airway clapboard 15 in tower with the left and right sides of water collection device 6;It is described Gas channel 20 is formed in tower between the inwall of airway clapboard 15 and cooling tower shell 1;The bottom of the gas channel 20 is arranged There is air cooler 10;The connecting fluid entrance 18 of air cooler water inlet pipe 21, air cooler outlet pipe 19 is connected with water distribution connecting tube 4;Water distribution One end connecting fluid entrance 18 of connecting tube 4, the other end is connected on water distribution system 5;The water distribution connecting tube 4 and fluid intake 18 connection end is provided with valve one group 16;Valve is provided with the air cooler water inlet pipe 21 two group 17;The air cooler 10 Outside and inner side be respectively arranged with the adjustable blinds 11 of air cooler air intake and the adjustable blinds 12 of air cooler air-out;The gas channel Damper 14 is provided with 20;The left and right sides of the cooling tower shell 1 and positioned at air cooler 10 underface be provided with it is cold But the adjustable blinds 9 of tower air intake.
Preferably, the bottom of the air cooler 10 is provided with air cooler dividing plate 13.
Preferably, the damper 14 includes that the fixed plate 1402 and flap 1401 of two relative dislocations settings are constituted; One end of the flap 1401 is arranged on the bottom of fixed plate 1402, and the other end is arranged on the upper end of fixed plate 1402.
Preferably, the middle setting of the flap 1401 has rotating shaft, turns the tip of the axis connection stepper motor.
Preferably, the fixed plate 1402 is L-shaped, and it includes linkage section 14021 and seal section 14022;The linkage section 14021 are fixed in gas channel 20;The upper and lower surface of the seal section 14022 is provided with sealing gasket 14023.
Spring and autumn standard condition, torridity summer and cold are being run into below for a kind of Complex-cooling tower of the utility model Operation during winter various operating modes is briefly described:
Fig. 2 is a kind of Complex-cooling tower of the utility model when standard condition runs, and valve is opened for one group 16, valve two Group 17 is closed, and recirculated water is not passed through air cooler 10, is directly entered the water distribution of water distribution system 5, cooling tower air intake is adjustable blinds 9, air cooling Device air intake is adjustable blinds 11, air cooler air-out is adjustable, and blinds 12 is opened, and air cooler top damper 14 is closed.This operating mode Lower air cooler 10 is not involved in heat exchange, and air cooler air intake is adjustable blinds 11, air cooler air-out is adjustable, and blinds 12 is opened only to reduce wind Resistance.When this operating mode is run, the energy is saved.
Fig. 3 is a kind of Complex-cooling tower of the utility model in hot operating mode, when ambient air temperature is higher than circulating water temperature When spending, valve is closed for one group 16, and two groups of openings of valve, recirculated water flows through air cooler 10 and enters back into the water distribution of water distribution system 5, cooling tower Air intake is adjustable blinds 9 is closed, air cooler air intake is adjustable blinds 11, air cooler air-out is adjustable, and blinds 12 is opened, air cooler top Damper 14 is closed.First there is heat exchange in the air under this operating mode into tower body, air first is cooled to enter again with air cooler 10 Enter and evaporate the water in tower so as to take away heat.In this process air such as first passes through at the wet cooling, and wet-bulb temperature is accordingly reduced, from And cooling capacity is improved.Under such conditions a kind of Complex-cooling tower of the utility model compare existing cooling tower it is more efficient, section Energy.
When severe cold operating mode is run, mode operation as shown in Figure 3, the air elder generation into tower body and air cooler under this operating mode 10 there is heat exchange, and air themperature is increased to more than zero degrees celsius before the recirculated water directly contact with cooling tower, then air And circulating water temperature is above zero degrees celsius, when a kind of Complex-cooling tower of the utility model can guarantee that operation under this operating mode not Freeze.
Shown in refer to the attached drawing 4, when severe cold operating mode is run, in addition to ensureing that cooling tower operation does not freeze, surrounding environment When it is required that the humid air that cooling tower operation is discharged does not produce the operating mode of smog.Valve is closed for one group 16, two groups of openings of valve, circulation Water flows through air cooler 10 and enters back into the water distribution of water distribution system 5, cooling tower air intake is adjustable blinds 9 is closed, air cooler air intake is adjustable blinds 11st, the adjustable blinds 12 of air cooler air-out is opened, and air cooler top damper 14 is opened.Into the air of tower body under this operating mode First there is heat exchange with air cooler 10, the air after being heated point two-way contacts all the way evaporation cooling with the recirculated water in tower body Recirculated water, another road is via the passage above air cooler 10, the region above water collection device 6 and the humid air for having taken away heat Mixing.Make the air humidity content of discharge air duct 2 relatively low, a kind of Complex-cooling tower of the utility model can reach and disappear under this operating mode The effect of mist.
It should be noted that herein, term " including ", "comprising" or its any other variant are intended to non-row His property is included, so that a series of process, method, article or equipment including key elements not only include those key elements, and And also include other key elements being not expressly set out, or also include for this process, method, article or equipment institute inherently Key element.
Specific case used herein is set forth to principle of the present utility model and embodiment, above example Illustrate that being only intended to help understands method of the present utility model and its core concept.The above is only of the present utility model preferred Embodiment, it is noted that due to the finiteness of literal expression, and objectively there is unlimited concrete structure, for this technology For the those of ordinary skill in field, on the premise of without departing from the utility model principle, some improvement, retouching can also be made Or change, it is also possible to above-mentioned technical characteristic is combined by rights;These improve retouching, change or combine, or not It is improved that the design of utility model and technical scheme are directly applied to into other occasions, it is regarded as protection of the present utility model Scope.

Claims (5)

1. a kind of Complex-cooling tower, it includes cooling tower shell (1), and its top is provided with air duct (2), the inside of air duct (2) Blower fan (3) is provided with, the bottom of cooling tower shell (1) is provided with reception basin (8);Characterized in that, the cooling tower shell (1) It is interior and be provided with water collection device (6) immediately below the blower fan (3);Water collection device (6) lower end is provided with water distribution system (5); Fin (7) is provided with immediately below the water distribution system (5);The fin (7) is arranged with the left and right sides of water collection device (6) There is airway clapboard in tower (15);Gas channel is formed in the tower between the inwall of airway clapboard (15) and cooling tower shell (1) (20);The bottom of the gas channel (20) is provided with air cooler (10);Air cooler water inlet pipe (21) connecting fluid entrance (18), Air cooler outlet pipe (19) is connected with water distribution connecting tube (4);One end connecting fluid entrance (18) of water distribution connecting tube (4), it is another End is connected on water distribution system (5);The water distribution connecting tube (4) is provided with one group of valve with the connection end of fluid intake (18) (16);Two groups of valve (17) is provided with the air cooler water inlet pipe (21);Distinguish with inner side in the outside of the air cooler (10) It is provided with the adjustable blinds of air cooler air intake (11) and the adjustable blinds of air cooler air-out (12);Tune is provided with the gas channel (20) Section air door (14);The left and right sides of the cooling tower shell (1) and cooling tower is being provided with immediately below the air cooler (10) Air intake is adjustable blinds (9).
2. a kind of Complex-cooling tower according to claim 1, it is characterised in that the bottom of the air cooler (10) is arranged There is air cooler dividing plate (13).
3. a kind of Complex-cooling tower according to claim 1, it is characterised in that the damper (14) is including two The fixed plate (1402) and flap (1401) that relative dislocation is arranged is constituted;One end of the flap (1401) is arranged on fixed plate (1402) bottom, the other end is arranged on the upper end of fixed plate (1402).
4. a kind of Complex-cooling tower according to claim 3, it is characterised in that flap (1401) middle setting has Rotating shaft, turns the tip of the axis connection stepper motor.
5. a kind of Complex-cooling tower according to claim 3, it is characterised in that the fixed plate (1402) is L-shaped, it Including linkage section (14021) and seal section (14022);The linkage section (14021) is fixed in gas channel (20);It is described close The upper and lower surface of envelope section (14022) is provided with sealing gasket (14023).
CN201621212015.5U 2016-11-10 2016-11-10 Composite cooling tower Active CN206146235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621212015.5U CN206146235U (en) 2016-11-10 2016-11-10 Composite cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621212015.5U CN206146235U (en) 2016-11-10 2016-11-10 Composite cooling tower

Publications (1)

Publication Number Publication Date
CN206146235U true CN206146235U (en) 2017-05-03

Family

ID=58626303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621212015.5U Active CN206146235U (en) 2016-11-10 2016-11-10 Composite cooling tower

Country Status (1)

Country Link
CN (1) CN206146235U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106382830A (en) * 2016-11-10 2017-02-08 湖南元亨科技发展有限公司 Composite cooling tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106382830A (en) * 2016-11-10 2017-02-08 湖南元亨科技发展有限公司 Composite cooling tower

Similar Documents

Publication Publication Date Title
WO2021036031A1 (en) Livestock central air conditioner and livestock house
CN105276736B (en) A kind of heat pump type total heat recovering fresh air air-conditioner set of band condensation reheating
CN206420332U (en) Water-saving and environmental protection fog dispersal type cooling tower
CN201285120Y (en) Cold air cooling type air conditioner and air conditioner with air cooler
CN207377593U (en) Mine return air Cryo Heat Tube heat-exchange system
CN102353112B (en) Packing-type recirculation compact-type evaporation cooling air-conditioning unit
CN205048602U (en) Dehumidification runner and indirect evaporation cooling heat recovery fresh air conditioning of heat pump manifold type
CN206669982U (en) A kind of device for recycling condensed water for Fresh air handling units
CN108791341A (en) The Dual-energy source subway ventilation air-conditioning system and its control method of dry cold district
CN104848452B (en) Efficient data room cooling temperature and humidity regulating device
CN101021387A (en) Closed type wet screen cooling tower
CN104613574A (en) Independent temperature and humidity control type air conditioning system based on energy gradient utilization
CN106382830B (en) A kind of Complex-cooling tower
CN206146235U (en) Composite cooling tower
CN206281378U (en) One kind fog dispersal water saving cooling tower
CN105115069A (en) Dehumidification turning wheel and heat pump coupling type indirect evaporative cooling heat recovery fresh air conditioner
CN205014522U (en) Solar energy and indirect evaporation cooling heat recovery fresh air processing machine of dehumidification runner combined type
CN204894763U (en) Refrigerating system of printing stoving heat pump
CN110260567A (en) A kind of spraying condenser, the cold refrigeration machine of evaporation, the cold air conditioner of evaporation and its application method
CN208253831U (en) In conjunction with the recovery type heat split-type air conditioner of mechanical refrigeration and evaporation cooling technique
CN207865579U (en) A kind of air-conditioning system of waste heat recovery humidifying air
CN207600270U (en) Unpowered heat pipe radiating system and indoor temperature adjusting system
CN110207304A (en) Total-heat exchanger based on condensed water recuperation of heat
CN207163106U (en) A kind of drying unit of the board-like heat regenerator of band
CN110440485A (en) A kind of heat pump system with defrosting function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 414600 Yuan Heng energy saving Science Park, Hunan Light Industry Zone, Xiangyin County, Yueyang, Hunan, China

Patentee after: Hunan Yuan Heng Polytron Technologies Inc

Address before: 414600 Yuan Heng energy saving Science Park, Hunan Light Industry Zone, Xiangyin County, Yueyang, Hunan, China

Patentee before: Hunan Yuanheng Technology Development Co., Ltd.