CN206143727U - Concrete pile board dam - Google Patents
Concrete pile board dam Download PDFInfo
- Publication number
- CN206143727U CN206143727U CN201621160461.6U CN201621160461U CN206143727U CN 206143727 U CN206143727 U CN 206143727U CN 201621160461 U CN201621160461 U CN 201621160461U CN 206143727 U CN206143727 U CN 206143727U
- Authority
- CN
- China
- Prior art keywords
- concrete
- pile
- reinforced
- armoured
- armored
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a concrete pile board dam. Including bed course concrete (5), bed course concrete (5) go up to distribute there is concrete pile (1), connects through concrete connection beam (10) between concrete pile (1), concrete pile (1) between still be equipped with reinforced concrete (2), be equipped with wash port (3) on reinforced concrete (2), reinforced concrete (2) the bottom be connected through concrete connecting portion (9) and bed course concrete (5), concrete pile (1) including concrete pile foundation stake (8), concrete pile foundation stake (8) are passed inside bed course concrete (5) embedding basement rock. The utility model has the characteristics of the stability height, economic nature is good and the construction is facilitated.
Description
Technical field
This utility model is related to field of engineering technology, particularly a kind of armored concrete peg board dam.
Background technology
Recent years, there is harm when in mud-stone flow disaster engineering construction, cities and towns, farmland, highway periphery side slope, also make
Into no small personnel and economic loss.So, for the improvement of side slope mud-rock flow has also obtained engineering construction and local government
Extensive concern, it is desirable to having the mud-rock flow in state of debris flow disasters and coverage to be prevented and administered.Current engineering
Main or row, the principle of gear that bound pair is adopted in Controlling Debris Flow, it processes concrete measure includes building drainage groove, blocking dam
(concrete or stone masonry barricade, slit dam) etc., effectively alleviates or solves harm of the mud-rock flow to the generation of people.But at this
In a little measures, for the Against Sliding Stability and antidumping stability requirement of blocking dam, the section of barricade adopts big cross section size, to protect
The requirement for bearing capacity kept steady under fixed and poor geological condition, and it is then that economy is relatively poor that big cross section build brings.Together
When, when terrain slope is steeper, its antiskid and antidumping problem are stably more projected the blocking dam of the above, are broken except increasing bottom
Also need to increase a large amount of joint bars outside face, cause its economy worse, but also there is larger potential safety hazard.
The content of the invention
The purpose of this utility model is, there is provided a kind of armored concrete peg board dam.This utility model have stability it is high,
The characteristics of good economy performance and convenient construction.
The technical solution of the utility model:A kind of armored concrete peg board dam, including blinding concrete, on blinding concrete
Reinforced concrete pile is distributed with, Jing concrete connection beam connection between reinforced concrete pile;Also set between described reinforced concrete pile
There is armoured concrete slab, armoured concrete slab is provided with osculum;Described armoured concrete slab bottom is provided with concrete connection
Portion, concrete connecting portion is connected with blinding concrete;Described reinforced concrete pile includes concrete-pile foundation pile, concrete pipe base
Stake is through inside the embedded basement rock of blinding concrete.
In aforesaid armored concrete peg board dam, described armoured concrete slab is provided with concrete connecting rod, concrete
The two ends of connecting rod connect respectively adjacent reinforced concrete pile.
In aforesaid armored concrete peg board dam, described armoured concrete slab is provided with concrete floor, concrete rib
The two ends of plate connect respectively adjacent reinforced concrete pile.
In aforesaid armored concrete peg board dam, the length of described concrete-pile foundation pile is mixed for reinforcing bar more than above-ground route
The 1/3 of the height of solidifying soil stake.
In aforesaid armored concrete peg board dam, the height of described reinforced concrete pile less than/be equal to 25m.
In aforesaid armored concrete peg board dam, the section circle or square of described reinforced concrete pile is straight when circular
Footpath less than/be equal to 25m, when square the monolateral length of side less than/be equal to 8m.
Beneficial effect:Compared with prior art, this utility model is by inside the embedded basement rock of concrete-pile foundation pile;By the knot
Structure, effectively utilizes have been crossed using the good anchoring of concrete-pile and basis connection, keep reliable stability.Simultaneously in reinforcing bar
Concrete-pile arranges armoured concrete slab, effectively maintains effect of reliably blocking, and onboard arranges osculum, it is ensured that draining
Performance.While the structural stability in order to keep reinforced concrete pile, armoured concrete slab, is first according to limit capacity and shearing resistance
Requirement carries out arrangement of reinforcement to structure, and the effectively connection for carrying out between the two using concrete connecting rod between stake, plate, there is drop
The stress of low reinforced concrete pile and armoured concrete slab, it is ensured that reliability of structure.
This utility model is connected armoured concrete slab bottom with blinding concrete by concrete connecting portion;By the knot
Structure, equivalent to armoured concrete slab is embedded on blinding concrete, and then makes armored concrete peg board dam shape of the present utility model
Into an entirety, stability of the present utility model is further enhancing.
Massive structure of this utility model compared to traditional blocking dam, it will be apparent that save quantities, specifically, this reality
Concrete works amount more than 50% is saved with the traditional gravity type blocking dam of new friendship, therefore with good economy.Due to mixed
The stake of solidifying soil, concrete slab and concrete connecting rod are qualitatively member structure, so convenient construction, largely shortens
Construction period, specifically, because drastically reduce the area concrete amount compared with traditional structure, and reduce Concrete temperature controlling when
Between require, so compared with traditional structure save the duration of a project 30% or so;Simultaneously the structure is beneficial to the control of distress in concrete, reason
It is that the concrete of pile slab structure is relatively small in size, there are no the climate control issues of mass concrete, so limit well
The crack of concrete is made.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram that reinforced concrete pile is connected with armoured concrete slab;
Fig. 3 is the schematic diagram that reinforced concrete pile is connected with concrete connecting rod;
Fig. 4 is the schematic diagram that reinforced concrete pile is connected with concrete floor;
Fig. 5 is the embedded basement rock inside of reinforced concrete pile and the schematic diagram being connected with blinding concrete.
Labelling in accompanying drawing for:1- reinforced concrete piles, 2- armoured concrete slabs, 3- osculums, 4- concrete floors, 5-
Blinding concrete, 6- concrete connecting rods, 7- above-ground routes, 8- concrete-pile foundation piles, 9- concrete connecting portions, 10- concrete connection
Binder.
Specific embodiment
This utility model is further described with reference to the accompanying drawings and examples, but is not intended as to this utility model
The foundation of restriction.
Embodiment 1.A kind of armored concrete peg board dam, is constituted as Figure 1-5, including blinding concrete 5, bed course coagulation
Reinforced concrete pile 1 is distributed with soil 5,1 Jing concrete connection beam 10 of reinforced concrete pile connects;Described armored concrete
Armoured concrete slab 2 is additionally provided between stake 1, armoured concrete slab 2 is provided with osculum 3;The described bottom of armoured concrete slab 2 sets
There is concrete connecting portion 9, concrete connecting portion 9 is connected with blinding concrete 5;Described reinforced concrete pile 1 includes concrete
Pile foundation stake 8, concrete-pile foundation pile 8 is embedded in inside basement rock through blinding concrete 5.
The concrete strength of aforesaid reinforced concrete pile 1 more than/be equal to C25.Knot is mainly considered using the intensity
The durability and intensity requirement of structure, improves structure fraction.
Aforesaid osculum 3 is circular or square, and area of section is 0.04~2m2.Should be by when osculum aperture is larger
Stiffener is set in hole periphery according to specification.Array pitch is arranged according to corresponding requirements between osculum.Osculum 3 is set, it is ensured that on
The water of trip interceptor, stone are separated.
Aforesaid concrete connection beam 10 is the attachment structure of the structure safety and connection bent columns for ensureing concrete slab, its
Fine strain of millet width is equal with the thickness of armoured concrete slab 2, highly according to 1.0 ~ 2.0 times of values of thickness.By the structure, each knot is met
Intermal force between structure, while improve the globality of this utility model structure.Concrete strength more than/be equal to C25, structure
Arrangement of reinforcement is configured according to corresponding code requirement.
Aforesaid blinding concrete 5 is arranged to ensure dam body upstream and downstream face not drawn brush by mud-rock flow, is mainly protected
Shield foundation plane, it is desirable to which thickness is more than/is equal to 0.3m, and the development length swum up and down determines by being more than/being equal to 0.5 times of height of dam, logical
The structure is crossed, the basis of structure of the present utility model can be shielded.Strength grade of concrete more than/be equal to C15, should
Arrange, not only meet the durability and intensity requirement of structure, and economy can also be taken into account.
Aforesaid armoured concrete slab 2 is provided with concrete connecting rod 6, and the two ends of concrete connecting rod 6 connect respectively phase
Adjacent reinforced concrete pile 1.
Aforesaid armoured concrete slab 2 is provided with concrete floor 4, and the two ends of concrete floor 4 connect respectively adjacent
Reinforced concrete pile 1.
The length of aforesaid concrete-pile foundation pile 8 is the 1/3 of the height of the reinforced concrete pile 1 of above-ground route more than 7.Pass through
The structure, meets the intermal force between each structure, while improve the globality of this utility model structure.
The height of aforesaid reinforced concrete pile 1 less than/be equal to 25m.The setting, can be in the optimal of concrete-pile
Stressed length.
The section circle of aforesaid reinforced concrete pile 1 is square, and diameter is less than/is equal to 25m when circular, monolateral when square
The length of side less than/be equal to 8m.By the structure, the intermal force between each structure is met, while improve this utility model structure
Globality.
The using method on aforesaid armored concrete peg board dam is:
A, excavation foundation plane;
After b, foundation plane dig, concrete pile foundation is excavated, the good reinforcing bar of colligation is put in concrete pile foundation, then
Casting concrete forms concrete-pile foundation pile 8 and reinforced concrete pile 1.While embedded bar concrete slab 2, concrete floor 4
With the joint bar needed for concrete connecting rod 6, to ensure that the reinforcing bar of corresponding construction is overlapped according to code requirement.
C, successively colligation concrete connection beam 10, armoured concrete slab 2, the knot of concrete connecting rod 6 and concrete floor 4
Structure reinforcing bar, and pour corresponding concrete;Involved osculum is reserved before casting concrete, it is to avoid because the later stage interrupts
Inside configuration reinforcing bar.
D, conserve to pouring the concrete for completing, and search and have zero defect, and carry out corresponding defect elimination process.
E, pour on foundation plane blinding concrete 5.
F, repeat the above steps are until the armored concrete peg board dam construction is completed.
Claims (6)
1. a kind of armored concrete peg board dam, it is characterised in that including blinding concrete(5), blinding concrete(5)On be distributed with
Reinforced concrete pile(1), reinforced concrete pile(1)Between Jing concrete connection beams(10)Connection;Described reinforced concrete pile(1)
Between be additionally provided with armoured concrete slab(2), armoured concrete slab(2)It is provided with osculum(3);Described armoured concrete slab(2)
Bottom is provided with concrete connecting portion(9), concrete connecting portion(9)With blinding concrete(5)Connection;Described reinforced concrete pile
(1)Including concrete-pile foundation pile(8), concrete-pile foundation pile(8)Through blinding concrete(5)Inside embedded basement rock.
2. armored concrete peg board dam according to claim 1, it is characterised in that described armoured concrete slab(2)On
It is provided with concrete connecting rod(6), concrete connecting rod(6)Two ends connect adjacent reinforced concrete pile respectively(1).
3. armored concrete peg board dam according to claim 2, it is characterised in that described armoured concrete slab(2)On
It is provided with concrete floor(4), concrete floor(4)Two ends connect adjacent reinforced concrete pile respectively(1).
4. armored concrete peg board dam according to claim 3, it is characterised in that described concrete-pile foundation pile(8)'s
Length is above-ground route(7)Reinforced concrete pile above(1)Height 1/3.
5. armored concrete peg board dam according to claim 4, it is characterised in that described reinforced concrete pile(1)'s
Highly be less than/it is equal to 25m.
6. armored concrete peg board dam according to claim 5, it is characterised in that described reinforced concrete pile(1)'s
Section circle is square, when circular diameter less than/be equal to 25m, when square the monolateral length of side less than/be equal to 8m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621160461.6U CN206143727U (en) | 2016-11-01 | 2016-11-01 | Concrete pile board dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621160461.6U CN206143727U (en) | 2016-11-01 | 2016-11-01 | Concrete pile board dam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206143727U true CN206143727U (en) | 2017-05-03 |
Family
ID=58622287
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621160461.6U Active CN206143727U (en) | 2016-11-01 | 2016-11-01 | Concrete pile board dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206143727U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106381848A (en) * | 2016-11-01 | 2017-02-08 | 中国电建集团贵阳勘测设计研究院有限公司 | Reinforced concrete pile slab dam and usage method |
-
2016
- 2016-11-01 CN CN201621160461.6U patent/CN206143727U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106381848A (en) * | 2016-11-01 | 2017-02-08 | 中国电建集团贵阳勘测设计研究院有限公司 | Reinforced concrete pile slab dam and usage method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101775987B (en) | Zero spacing construction method for overlapping part of upper main tunnel and lower main tunnel of underground overpass | |
CN106978777B (en) | A kind of make-shift bridge device | |
CN103556602B (en) | Structural body for preventing starting of gully debris flows and design method of structural body | |
CN106223183A (en) | Assembled concrete-filled rectangular steel tube combination truss bridge and construction method | |
CN206090275U (en) | Assembled rectangular concrete -filled steel tube makes up truss bridge | |
CN102146676A (en) | High-steep side slope subgrade structure for mountain area | |
CN103334371A (en) | Roadbed subsidence grouting treatment structure and construction method thereof | |
CN204662494U (en) | A kind of Road Retaining Walls ruggedized construction | |
CN206143727U (en) | Concrete pile board dam | |
CN112012763B (en) | Construction method of double-layer primary support multi-arch tunnel structure | |
CN109469003A (en) | A kind of assembled pile foundation wharfs structure and attaching method thereof | |
CN209669718U (en) | A kind of existing hangar tunnel combination stone cut off wall structure of rockfall protection | |
CN109487793A (en) | Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment | |
CN108374674A (en) | Six pilot tunnels, 12 step Underground Space Excavation method for protecting support | |
CN105986830B (en) | The tunneling method of construction of roadside strip underground garage | |
CN207295418U (en) | The concrete buttress structure for preventing high gradient slope bridge pier from deviating | |
CN208293630U (en) | A kind of structural system of the antiseismic liquefaction uplifting in subway station | |
CN103866788B (en) | A kind of method of pillar abutment scarp slope barricadeization transformation | |
CN203270588U (en) | Mini-pile antiskid structure | |
CN106381848A (en) | Reinforced concrete pile slab dam and usage method | |
CN206144582U (en) | Tunnel is filled formula complex and is strutted | |
CN108505547A (en) | A kind of structural system and method for the antiseismic liquefaction uplifting in subway station | |
CN211973507U (en) | Work pit structure for frame bridge construction | |
CN209323556U (en) | A kind of steel reinforced concrete combination tubular pole system suitable for antiskid earth-retaining | |
CN209324370U (en) | A kind of support system excavated for tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |