CN206143718U - System of blocking up fast of dykes and dams crevasse - Google Patents

System of blocking up fast of dykes and dams crevasse Download PDF

Info

Publication number
CN206143718U
CN206143718U CN201621210914.1U CN201621210914U CN206143718U CN 206143718 U CN206143718 U CN 206143718U CN 201621210914 U CN201621210914 U CN 201621210914U CN 206143718 U CN206143718 U CN 206143718U
Authority
CN
China
Prior art keywords
dykes
dams
arcual component
crevasse
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621210914.1U
Other languages
Chinese (zh)
Inventor
孙喜壮
余以翩
王玉太
武冬梅
孙平
范晓洁
孙文悦
徐运海
林荣军
苏波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Water Resources Research Institute of Shandong Province
Original Assignee
Water Resources Research Institute of Shandong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Water Resources Research Institute of Shandong Province filed Critical Water Resources Research Institute of Shandong Province
Priority to CN201621210914.1U priority Critical patent/CN206143718U/en
Application granted granted Critical
Publication of CN206143718U publication Critical patent/CN206143718U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a system of blocking up fast of dykes and dams crevasse, this system includes the arch member that stretches over final closure, and the arch member is assembled by a plurality of prefabricated component and is formed, and the both ends of arch member are respectively through fastener and dykes and dams fastening connection, wherein, final closure is through standing the stifled crevasse of handling rapidly. When big vast flood calamity takes place, can rapidly stand the crevasse stifledly to 30~50 meters, when preparing the closure, fill the jackstone at final closure earlier and wrap up in the head, then can use the prefabricated component to assemble the arch component that becomes to span final closure rapidly, construction convenience is swift, for the flood -fighting work of flood prevention of racing against time strive the first chance. The utility model discloses an arch component is compared with the horizontal structure of conventionality, and it requires relatively lowly to what the head was wrapped up in to the jackstone, and prefabricated component adopts light gauge steel, and light in weight has reduced the construction degree of difficulty greatly.

Description

A kind of system of quickly blocking up of dykes and dams crevasse
Technical field
This utility model is related to a kind of system of blocking up of dykes and dams crevasse, and in particular to a kind of quickly blocking up for dykes and dams crevasse be System.Belong to construction of hydro project and flood control technical field.
Background technology
At present, due to there is potential safety hazard or super standard flood occurring in common river course, it may occur however that dike breach phenomenon, gives Country, society and the people cause serious economic loss, or even entail dangers to people's life safety.After bursting to occur, due to Each side condition is different, and employing blocks up method also not to the utmost.Conventional closure method includes:It is vertical to block up method, flat stifled method and stand Block up flat bridging legal.Founding stifled peace and blocking up respectively has pluses and minuses, and vertical blocking up need not set up pontoon bridge or trestle, but Longkou closure stage flow velocity Greatly, strong to channel scour, the scope of operation is narrower, supplied materials is required higher;The flat stifled scope of operation is wider, and velocity flow profile is uniform, to river Bed washes away little, however it is necessary that setting up floating (stack) bridge or Large Construction ship.
Therefore, closure speed how is improved, is reduced and is let out and downstream property loss under flood, be inevitable requirement.
For some small and medium river channels, the depth of water is not too big, does not possess the execution conditions of workboat.So, pontoon bridge is set up Or trestle becomes inevitable choice, typically material of jettisoninging can only be shipped by dump truck or other means of transports, then along dragon Jettisoninged in mouth forward position.The general pontoon bridge for setting up or trestle are horizontal structure, component using material is more, deadweight is larger, as letter Structure, it is higher that the jackstone to filling at breach wraps up in head requirement, increased difficulty of construction and progress..
The content of the invention
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of dykes and dams crevasse is quickly blocked up System.
For achieving the above object, this utility model adopts following technical proposals:
A kind of system of quickly blocking up of dykes and dams crevasse, including across closure mouth arcual component, if the arcual component by A dry splicing prefabricated components are formed, and the two ends of arcual component are fastenedly connected respectively by securing member with dykes and dams;Wherein, closure mouth is The Jing vertical stifled crevasses for processing rapidly.
Preferably, connected by connector between described prefabricated components.
Preferably, described prefabricated components are two.
Preferably, the material of the prefabricated components is light section.
Preferably, the closure mouth wraps up in head filled with one layer of jackstone.
Preferably, the arcual component is provided with electrical hoist, and it passes through serving and is connected with the material of jettisoninging on dykes and dams, from And the material that will jettisoning is transported on arcual component.
Preferably, the arcual component is vertically arranged.
It is further preferred that the arcual component is provided with horizontal shore, bracing frame leans out arcual component, convenient to throw Jettisoning material.
Preferably, the arcual component upstream direction is inclined.
It is further preferred that the arcual component is provided with horizontal shore, bracing frame leans out arcual component, convenient to throw Jettisoning material.
It is further preferred that fixing high-strength braided thing in arcual component downstream bottom side.
Still more preferably, the high-strength braided thing is any one in high-strength geotextile, reinforcement cloth or wire gauze.
It is further preferred that the arcual component is provided with horizontal shore, bracing frame downstream or updrift side Arcual component is leant out, facilitates throwing to jettisoning material.
The beneficial effects of the utility model:
When big vast flood disaster occurs, crevasse can rapidly be stood and be blocked up to 30~50 meters, when closure is prepared, first in closure Mouthful filling jackstone wraps up in head, and prefabricated components then can be used to be assembled into the arcual component across the mouth that joins the two sections of a bridge, etc rapidly, and easy construction is fast Victory, the flood fighting work of flood prevention to race against time wins advantage, and reduces the property loss of the downstream people.This utility model is using arch Shape component, compared with conventional horizontal structure, the requirement that it wraps up in head to jackstone is relatively low, and prefabricated components adopt light section, weight Amount is light, substantially reduces difficulty of construction.
Arcual component both can be vertically arranged, again can upstream direction incline, by the horizontal support leant out on arcual component Frame, can very easily throw material of jettisoninging.Material of jettisoninging directly can be transported by electrical hoist from dykes and dams, convenient fast Victory, saves manpower.
When arcual component upstream direction is inclined, also high-strength braided thing can be fixed in arcual component downstream bottom side, its Float with current, function similarly to fixed effect of driving piles, but, effectively prevent current to jettisoninging more than piling construction easily The sliding that the percussion of material causes, greatly accelerates closure speed.
Description of the drawings
Fig. 1 is profilograph of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is the inclined structural representation of arcual component upstream direction;
Fig. 4 is the inclination of arcual component upstream direction, and fixes high-strength braided thing near the side of water in arcual component When profile;
Fig. 5 is the process schematic of blocking up of Fig. 4 structures;
Wherein, 1 is closure mouth, and 2 are fixed body of blocking up, and 3 is securing member, and 4 is prefabricated components, and 5 is bracing frame, and 6 are connection Part, 7 is electrical hoist, and 8 is serving, and 9 wrap up in head for jackstone, and 10 is dykes and dams, and 11 is arcual component, and 12 is high-strength braided thing.
Specific embodiment
This utility model is further elaborated with reference to the accompanying drawings and examples, it should explanation, under state It is bright merely to explain this utility model, its content is not defined.
Embodiment 1:
A kind of system of quickly blocking up of dykes and dams crevasse when figures 1 and 2 show that arcual component 11 is vertically arranged, including horizontal stroke Across the arcual component 11 of closure mouth 1, arcual component 11 is assembled by several prefabricated components 4 (light section), arcual component 11 Two ends be fastenedly connected with dykes and dams 10 by securing member 3 respectively;Wherein, the mouth 1 that joins the two sections of a bridge, etc is the Jing vertical stifled crevasses for processing rapidly.
Prefabricated components 4 are two, are connected by connector 6 between the two.
Closure mouth 1 wraps up in 9 filled with one layer of jackstone.
Arcual component 11 is provided with electrical hoist 7, and it passes through serving 8 and is connected with the jettisoninging material on dykes and dams 10, so as to incite somebody to action Material of jettisoninging is transported on arcual component 11.
Arcual component 11 is vertically arranged.Arcual component 11 is provided with horizontal shore 5, and bracing frame 5 leans out arcual component 11, Throwing is facilitated to jettisoning material.
A kind of method of quickly blocking up of dykes and dams crevasse, comprises the following steps:
(1) crevasse is stood rapidly and is blocked up to 30 meters, prepare closure, first wrap up in 9 in the closure filling jackstone of mouth 1;
(2) arcual component 11 is assembled into using prefabricated components 4, is allowed to across closure mouth 1, and by securing member 3 by arch The two ends of component 11 are fastened on dykes and dams 10;
(3) using material of jettisoninging is thrown in plant equipment or the artificial mouth 1 to closure on arcual component 11, formation is blocked up solid Body 2 is determined, until closure.
Material of jettisoninging in step (3) is transported from dykes and dams 10 by the electrical hoist 7 on arcual component 11.
In step (3), operator station throws material of jettisoninging on bracing frame 5 or by plant equipment.
Embodiment 2:
A kind of system of quickly blocking up of dykes and dams crevasse when Fig. 3 shows that the upstream direction of arcual component 11 is inclined, its knot Structure is similar with Fig. 1 and Fig. 2, and including the arcual component 11 across closure mouth 1, arcual component 11 is (light-duty by several prefabricated components 4 Steel) it is assembled, the two ends of arcual component 11 are fastenedly connected respectively by securing member 3 with dykes and dams 10;Wherein, the mouth 1 that joins the two sections of a bridge, etc is Jing The rapid vertical stifled crevasse for processing.
Prefabricated components 4 are two, are connected by connector 6 between the two.
Closure mouth 1 wraps up in 9 filled with one layer of jackstone.
Arcual component 11 is provided with electrical hoist 7, and it passes through serving 8 and is connected with the jettisoninging material on dykes and dams 10, so as to incite somebody to action Material of jettisoninging is transported on arcual component 11.
The upstream direction of arcual component 11 is inclined.Arcual component 11 is provided with horizontal shore 5, the downward roam all around the would of bracing frame 5 To or updrift side lean out arcual component 11, facilitate throwing to jettisoning material.
A kind of method of quickly blocking up of dykes and dams crevasse, comprises the following steps:
(1) crevasse is stood rapidly and is blocked up to 50 meters or so, prepare closure, first wrap up in 9 in the closure filling jackstone of mouth 1;
(2) arcual component 11 is assembled into using prefabricated components 4, is allowed to across closure mouth 1, and by securing member 3 by arch The two ends of component 11 are fastened on dykes and dams 10;
(3) using material of jettisoninging is thrown in plant equipment or the artificial mouth 1 to closure on arcual component 11, formation is blocked up solid Body 2 is determined, until closure.
Material of jettisoninging in step (3) is transported from dykes and dams 10 by the electrical hoist 7 on arcual component 11.
In step (3), operator station throws material of jettisoninging on bracing frame 5 or by plant equipment.
Embodiment 3:
Fig. 4 is that the upstream direction of arcual component 11 is inclined, and when high-strength braided thing 12 is fixed in the bottom side of arcual component 11 A kind of dykes and dams crevasse system of quickly blocking up, its basic structure is similar with Fig. 1 and Fig. 2, including the arch structure across closure mouth 1 Part 11, arcual component 11 is assembled by several prefabricated components 4 (light section), and the two ends of arcual component 11 are respectively by fastening Part 3 is fastenedly connected with dykes and dams 10;Wherein, the mouth 1 that joins the two sections of a bridge, etc is the Jing vertical stifled crevasses for processing rapidly.
Prefabricated components 4 are two, are connected by connector 6 between the two.
Closure mouth 1 wraps up in 9 filled with one layer of jackstone.
Arcual component 11 is provided with electrical hoist 7, and it passes through serving 8 and is connected with the jettisoninging material on dykes and dams 10, so as to incite somebody to action Material of jettisoninging is transported on arcual component 11.
The upstream direction of arcual component 11 is inclined, the bottom side of arcual component 11 fix high-strength braided thing 12 (high-strength geotextile, Any one in reinforcement cloth or wire gauze).Arcual component 11 is provided with horizontal shore 5, the downstream of bracing frame 5 or upstream Direction leans out arcual component 11, facilitates throwing to jettisoning material.
Fig. 5 shows its process of blocking up, and comprises the following steps:
(1) crevasse is stood rapidly and is blocked up to 40 meters, prepare closure, first wrap up in 9 in the closure filling jackstone of mouth 1;
(2) arcual component 11 is assembled into using prefabricated components 4, is allowed to across closure mouth 1, and by securing member 3 by arch The two ends of component 11 are fastened on dykes and dams 10;
(3) using material of jettisoninging is thrown in plant equipment or the artificial mouth 1 to closure on arcual component 11, formation is blocked up solid Body 2 is determined, until closure.
Material of jettisoninging in step (3) is transported from dykes and dams 10 by the electrical hoist 7 on arcual component 11.
In step (3), the upstream direction of arcual component 11 is inclined, and in the downstream bottom side of arcual component 11 high-strength braided is fixed Thing 12, it is floated with current, and the horizontal shore 5 that downstream leans out is arranged on arcual component 11, and operator station exists Material of jettisoninging downstream is thrown on bracing frame 5 or by plant equipment, bottom is fallen on high-strength braided thing 12 and sunk to material of jettisoninging, High-strength braided thing is greatly increased with bottom and with material frictional force between the two of jettisoninging, and has been reduced or avoided and has been jettisoninged material downstream Sliding;Then the horizontal shore 5 that upstream direction leans out is set on arcual component 11, and operator station is on bracing frame 5 Or material of jettisoninging upstream is thrown by plant equipment, the downstream formerly thrown material of jettisoninging effectively blocks upstream and jettisonings the cunning of material Move;Continue in the manner described above to throw throwing and be dosed to and lean out the water surface, then in the upper directly construction of material of jettisoninging piled up, until closing Dragon.
It is not new to this practicality although the above-mentioned accompanying drawing that combines is described to specific embodiment of the present utility model The restriction of type protection domain, on the basis of the technical solution of the utility model, those skilled in the art need not pay creation Property work can the various modifications that make or deformation still within protection domain of the present utility model.

Claims (6)

1. a kind of system of quickly blocking up of dykes and dams crevasse, it is characterised in that include the arcual component across closure mouth, the arch Component is formed by several splicing prefabricated components, and the two ends of arcual component are fastenedly connected respectively by securing member with dykes and dams;Wherein, Closure mouth is the Jing vertical stifled crevasses for processing rapidly.
2. the system of quickly blocking up of a kind of dykes and dams crevasse according to claim 1, it is characterised in that on the arcual component Electrical hoist is provided with, it passes through serving and is connected with the material of jettisoninging on dykes and dams.
3. the system of quickly blocking up of a kind of dykes and dams crevasse according to claim 1, it is characterised in that the arcual component is erected It is straight to arrange.
4. the system of quickly blocking up of a kind of dykes and dams crevasse according to claim 1, it is characterised in that the arcual component to Updrift side is inclined.
5. the system of quickly blocking up of a kind of dykes and dams crevasse according to claim 4, it is characterised in that in arcual component downstream High-strength braided thing is fixed in end bottom side.
6. a kind of system of quickly blocking up of dykes and dams crevasse according to claim 5, it is characterised in that the high-strength braided thing For any one in high-strength geotextile, reinforcement cloth or wire gauze.
CN201621210914.1U 2016-11-10 2016-11-10 System of blocking up fast of dykes and dams crevasse Expired - Fee Related CN206143718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621210914.1U CN206143718U (en) 2016-11-10 2016-11-10 System of blocking up fast of dykes and dams crevasse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621210914.1U CN206143718U (en) 2016-11-10 2016-11-10 System of blocking up fast of dykes and dams crevasse

Publications (1)

Publication Number Publication Date
CN206143718U true CN206143718U (en) 2017-05-03

Family

ID=58624410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621210914.1U Expired - Fee Related CN206143718U (en) 2016-11-10 2016-11-10 System of blocking up fast of dykes and dams crevasse

Country Status (1)

Country Link
CN (1) CN206143718U (en)

Similar Documents

Publication Publication Date Title
US4661014A (en) Prefabricated civil engineering module, method for the construction of a structure including said module and resulting structure
EP3882399A1 (en) Incremental launching process for a submerged cable-stayed floating tunnel
CN114481959B (en) Anchoring type self-adaptive water level lifting ship collision prevention method
CN106948349A (en) Quick block up fabricated construction system, erecting device and method
CN200982053Y (en) Reinforcing steel bar frame for plugging dam burst and dealing with emergency
CN105421292B (en) The provisional dash dykes and dams that bag and steelframe support system are built are charged using geotechnique
CN107059786B (en) A kind of floating wall of movable embankment protection
CN108104058A (en) A kind of dykes and dams flood crevasse plugging device and its method for blocking
CN109881634A (en) A kind of flood season dike breach rapid rescue method shut off using geosynthetics
CN206143718U (en) System of blocking up fast of dykes and dams crevasse
CN1069718C (en) Construction method while river cut-off dam closured
CN107054572B (en) A kind of flood disaster prevention and reduction ship
CN106337397B (en) A kind of method of quickly blocking up of dykes and dams crevasse
CN2900621Y (en) Bamboo raft for clearing tide
CN105089016B (en) Hawser draws herringbone check dam
CN110409373A (en) A kind of flood-fighting net device and its application and application method
CN205203296U (en) Prevent inrushing, dam break shutoff ship
CN104264625B (en) A kind of based on the regulation method that links than the mountain stream pebble beach group falling principle
CN206784389U (en) Quick block up fabricated construction system and erecting device
CN206359877U (en) A kind of current structure waterborne
CN109338983A (en) A kind of adaptation SEA LEVEL VARIATION blocks boat equipment from tensioning
CN110331696A (en) A kind of door curtain made of cloth water proof filling type breach plugging device and its application method
CN206554087U (en) One kind efficiently rushes stake protection sleeve pipe
CN105714740A (en) Rapid dike leaking stoppage equipment
CN106088145B (en) Soft foundation water blocking wall construction and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503