CN206134108U - Dark excavation supporting teaching mode - Google Patents

Dark excavation supporting teaching mode Download PDF

Info

Publication number
CN206134108U
CN206134108U CN201620802471.9U CN201620802471U CN206134108U CN 206134108 U CN206134108 U CN 206134108U CN 201620802471 U CN201620802471 U CN 201620802471U CN 206134108 U CN206134108 U CN 206134108U
Authority
CN
China
Prior art keywords
layer
guan liang
support
wall
dark
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620802471.9U
Other languages
Chinese (zh)
Inventor
董克齐
李建华
马希博
司振民
刚宪水
王志远
于秀娟
张唯煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dezhou Vocational and Technical College
Original Assignee
Dezhou Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dezhou Vocational and Technical College filed Critical Dezhou Vocational and Technical College
Priority to CN201620802471.9U priority Critical patent/CN206134108U/en
Application granted granted Critical
Publication of CN206134108U publication Critical patent/CN206134108U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Dark excavation supporting teaching mode, by guan liang, a plurality of concrete pouring stakes, corner brace and to propping the constitution, guan liang sets up in concrete pouring pile bolck portion, be dark soil layer between the concrete pouring stake, characterized by guan liang, the concrete pouring stake, corner brace, make by the lightweight wall material with dark soil layer propping, corner brace passes through the steel support column by two -layer corner brace layer and sets up in the guan liang corner, set up between hat roof beam opposite side through the steel support column propping the layer by two -layer propping, the lightweight wall material is by light wall body, the cladding is formed at this internal diagonal drawing steel bar of light wall with wearing at this external acid and alkali -resistance non -woven fabrics of light wall. The utility model discloses a guan liang among the dark excavation supporting teaching mode, concrete pouring stake, corner brace, to prop and dark soil layer is all made by the lightweight wall material, the dark excavation supporting model quality that has significantly reduced, the installation transportation is convenient, has simple structure, the installation effectiveness is high, structural strength is high and safety ring protects advantage.

Description

Deep foundation pit support teaching mode
Technical field
The utility model is related to a kind of architectural teaching modelling technique field, and in particular to a kind of deep pit support apologetics mould Type.
Background technology
The effect of deep foundation pit support is to keep off soil, intercepting water, ensure that foundation ditch is stablized, while necessary construction can be undertaken Load, controls soil deformation, it is ensured that the construction safety of construction of underground structure.With China's urban construction scale also increasingly Greatly, the basic engineering of executive information systems is also increasingly deeper, and deep pit digging supporting project is more and more more, to deep basal pit work The supporting of journey requires more and more higher, and therewith produced problem is also more and more.Therefore deep foundation pit support is in architectural engineering teaching One of wherein important problem, generally needs to make corresponding deep foundation pit support model, current deep pit support for the ease of teaching Shield model is all made of that, using cement or bar material, manufacturing process wastes time and energy, and material weight is big, installs and carries trouble, by In material weight for student's work-place study there is also certain security threat.
Utility model content
The utility model provides a kind of deep foundation pit support teaching mode, to solve the deep foundation pit support of prior art presence Modelling process wastes time and energy, and material weight is big, installs and carries trouble and unsafe problem.
The utility model by Guan Liang, some concrete filling piles, angle brace and to support constitute, Guan Liang be arranged on concrete filling pile top, It is deep soil layer between concrete filling pile, solving the technical scheme that its technical problem adopted is:Guan Liang, concrete filling pile, angle brace, to support Be made up of Light Wall with deep soil layer, angle brace is arranged on Guan Liang corner by two-layer angle brace layer by steel-made support post, to support by Two-layer to support layer be arranged between Guan Liang opposite side by steel-made support post, Light Wall by light weight wall body, be coated on light weight wall This external acid and alkali-resistance non-woven fabrics is constituted with the intrinsic oblique pull reinforcing bar of light weight wall is through.
Above-mentioned Light Wall is polyurethane Light Wall or polyphenyl Light Wall.
Guan Liang, concrete filling pile, angle brace in deep foundation pit support teaching mode of the present utility model, to support and deep soil layer all by Light wall material is made, and greatly reduces deep foundation pit support model quality, and installation and transportation are convenient, with simple structure, installs High and safety and environmental protection the advantage of efficiency high, structural strength.
Description of the drawings
Below in conjunction with the accompanying drawings the utility model is further illustrated with specific embodiment.
Fig. 1 is schematic top plan view of the present utility model;
Fig. 2 is schematic elevation view of the present utility model;
Fig. 3 is the structural representation of the utility model Light Wall.
It is 1 Guan Liang in figure, 2 concrete filling piles, 3 angle braces, the 4 pairs of supports, 5 steel-made support posts, 6 deep soil layers, 41 light weight wall bodies, 42 resistance to Soda acid non-woven fabrics, 43 oblique pull reinforcing bars.
Specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, a kind of deep foundation pit support teaching mode, by Guan Liang 1, some concrete filling piles 2, angle brace 3 With support 4 is constituted, Guan Liang 1 is arranged on the top of concrete filling pile 2, is deep soil layer 6 between concrete filling pile 2, Guan Liang 1, concrete filling pile 2, Angle brace 3, support 4 and deep soil layer 6 are made up of Light Wall, angle brace 3 is arranged on Guan Liang by two-layer angle brace layer by steel-made support post 5 1 corner, is arranged between the opposite side of Guan Liang 1 to supportting layer by two-layer to support 4 by steel-made support post 5, and Light Wall is by light weight wall Body 41, the acid and alkali-resistance non-woven fabrics 42 for being coated on light weight wall body 41 and 43 groups of oblique pull reinforcing bar being through in light weight wall body 41 Into.Deep soil layer 6 is polyphenyl Light Wall, and Guan Liang 1 and concrete filling pile 2 are polyurethane Light Wall, angle brace 3 and be polyphenyl to support 4 Light Wall.
Guan Liang, concrete filling pile, angle brace in deep foundation pit support teaching mode of the present utility model, to support and deep soil layer all by Light wall material is made, and greatly reduces deep foundation pit support model quality, and installation and transportation are convenient, with simple structure, installs High and safety and environmental protection the advantage of efficiency high, structural strength.

Claims (2)

1. a kind of deep foundation pit support teaching mode, constitutes by Guan Liang, some concrete filling piles, angle brace and to support, and Guan Liang is arranged on concrete Bored concrete pile top, is deep soil layer between concrete filling pile, it is characterized in that Guan Liang, concrete filling pile, angle brace, to support and deep soil layer by lightweight Body of wall is made, and angle brace is arranged on Guan Liang corner by two-layer angle brace layer by steel-made support post, and support is passed through by two-layer to supportting layer Steel-made support post is arranged between Guan Liang opposite side, Light Wall by light weight wall body, be coated on the external acid and alkali-resistance of light weight wall sheet Non-woven fabrics is constituted with the intrinsic oblique pull reinforcing bar of light weight wall is through.
2. deep foundation pit support teaching mode according to claim 1, is characterized in that Light Wall is polyurethane Light Wall Or polyphenyl Light Wall.
CN201620802471.9U 2016-07-28 2016-07-28 Dark excavation supporting teaching mode Expired - Fee Related CN206134108U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620802471.9U CN206134108U (en) 2016-07-28 2016-07-28 Dark excavation supporting teaching mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620802471.9U CN206134108U (en) 2016-07-28 2016-07-28 Dark excavation supporting teaching mode

Publications (1)

Publication Number Publication Date
CN206134108U true CN206134108U (en) 2017-04-26

Family

ID=58563237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620802471.9U Expired - Fee Related CN206134108U (en) 2016-07-28 2016-07-28 Dark excavation supporting teaching mode

Country Status (1)

Country Link
CN (1) CN206134108U (en)

Similar Documents

Publication Publication Date Title
CN203145038U (en) Latticed column type tower crane foundation
CN204418187U (en) Subway protection region soil nail wall is in conjunction with double-row pile deep foundation ditch composite supporting construction
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN204825921U (en) Excavation supporting system
CN103590408A (en) Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN105089670A (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN104631469B (en) For deep big foundation pit without post reinforced concrete support framework and building method thereof
CN203716046U (en) Steel trestle for earthwork transportation of foundation pit
CN101736756A (en) Method for constructing soft soil foundation reverse interlayer
CN203096745U (en) Multi-row pile foundation pit supporting structure
CN203834487U (en) Section steel inner brace and Lassen pile support for excavation of dumbbell-shaped deep and large foundation pit
CN211340800U (en) Super dark foundation ditch earthwork excavation platform structure
CN202969387U (en) Pile hole lattice column locating device
CN206134108U (en) Dark excavation supporting teaching mode
CN110847188A (en) Ultra-deep foundation pit earth excavation platform structure and construction method thereof
CN210887229U (en) Irregular foundation pit assembled steel strutting arrangement
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN205296173U (en) Utilize structure of foundation ditch support system bearing tower crane
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN103485348A (en) Lateral-force-resisting pier body combined-type fender structure in large-area pit excavation
CN201826326U (en) Foundation of deep-excavation tower crane
CN103388336B (en) Main purline part for inner support
CN203393721U (en) Inner support main purlin component
CN208396338U (en) Load bearing wall underground construction underpins support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20180728