CN206134107U - 综合实体比例教学模型 - Google Patents
综合实体比例教学模型 Download PDFInfo
- Publication number
- CN206134107U CN206134107U CN201620208128.1U CN201620208128U CN206134107U CN 206134107 U CN206134107 U CN 206134107U CN 201620208128 U CN201620208128 U CN 201620208128U CN 206134107 U CN206134107 U CN 206134107U
- Authority
- CN
- China
- Prior art keywords
- show area
- construction
- partitioned project
- sub
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620208128.1U CN206134107U (zh) | 2016-03-17 | 2016-03-17 | 综合实体比例教学模型 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620208128.1U CN206134107U (zh) | 2016-03-17 | 2016-03-17 | 综合实体比例教学模型 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206134107U true CN206134107U (zh) | 2017-04-26 |
Family
ID=58559578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620208128.1U Active CN206134107U (zh) | 2016-03-17 | 2016-03-17 | 综合实体比例教学模型 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206134107U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524231A (zh) * | 2017-10-09 | 2017-12-29 | 徐州工业职业技术学院 | 一种装配式建筑实训装备系统 |
CN107578691A (zh) * | 2017-10-16 | 2018-01-12 | 哈尔滨建筑云网络科技有限公司 | 一种装配式建筑教学用框架结构施工实训模型 |
CN108335617A (zh) * | 2018-04-17 | 2018-07-27 | 广西城市建设学校 | 剪力墙与筏型基础施工教学设施 |
CN110992811A (zh) * | 2019-11-29 | 2020-04-10 | 湖北工业大学 | 一种土木工程实践教学的多功能工作台 |
CN111009178A (zh) * | 2019-12-20 | 2020-04-14 | 重庆房地产职业学院 | 一种装配式建筑教学模型 |
-
2016
- 2016-03-17 CN CN201620208128.1U patent/CN206134107U/zh active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524231A (zh) * | 2017-10-09 | 2017-12-29 | 徐州工业职业技术学院 | 一种装配式建筑实训装备系统 |
CN107578691A (zh) * | 2017-10-16 | 2018-01-12 | 哈尔滨建筑云网络科技有限公司 | 一种装配式建筑教学用框架结构施工实训模型 |
CN108335617A (zh) * | 2018-04-17 | 2018-07-27 | 广西城市建设学校 | 剪力墙与筏型基础施工教学设施 |
CN110992811A (zh) * | 2019-11-29 | 2020-04-10 | 湖北工业大学 | 一种土木工程实践教学的多功能工作台 |
CN110992811B (zh) * | 2019-11-29 | 2022-01-14 | 湖北工业大学 | 一种土木工程实践教学的多功能工作台 |
CN111009178A (zh) * | 2019-12-20 | 2020-04-14 | 重庆房地产职业学院 | 一种装配式建筑教学模型 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206134107U (zh) | 综合实体比例教学模型 | |
Tam | Cost effectiveness of using low cost housing technologies in construction | |
Guastavino | Essay on the theory and history of cohesive construction: applied especially to the timbrel vault | |
US4586299A (en) | Building system of interconnected block elements | |
Orlenko et al. | Art-clusters as a new type of buildings: The specificity of the spatial solution and the features of restoration during the redevelopment process (the experience of Poland) | |
Cosgun et al. | Seismic performance assessment and retrofitting proposal for a historic masonry school building (Bursa, Türkiye) | |
CN201540683U (zh) | 教学用仿真建筑模型 | |
CN101515416B (zh) | 教学用仿真建筑模型 | |
Kagan | Management, mechanization and automation of work in the construction of high-rise buildings | |
Birkmire | The planning and construction of high office-buildings | |
CN103422671B (zh) | 建筑工程施工用集成工艺样板房的施工方法 | |
CN206819642U (zh) | 一种装配式原比例建筑教学模型 | |
Adam | Building materials, construction techniques and chronologies | |
CN210129353U (zh) | 一种混凝土结构施工吊装实训平台 | |
Parajuli et al. | Vulnerability assessment of the old brick masonry buildings | |
Raaffels et al. | Material Experiments in Architects’ Houses. The Case of Louis Herman De Koninck’s House in Brussels (1923-24/1968) | |
do Corvo et al. | Reuse of Modern Schools: Public space as a linker | |
Badran et al. | Integrated Re-design of the Ayesh Office Building in Ramallah/Al-Bireh | |
GORLEZZA et al. | Transforming the Convitto. A new perspective for via Daverio | |
Kamande | A Discussion of Proper Construction Expertise: A Case Study of Great Denham School | |
Adas et al. | A sustainable repair process for heritage buildings in historic Jeddah | |
GOVALKAR et al. | 04 STRUCTURAL AND NON-STRUCTURAL COMPONENTS | |
CN113323457A (zh) | 巡回装配式路桥建设施工安全体验馆的建造方法 | |
Kjaerbye et al. | Precast Buildings: Design and Implementation of the Precast Method | |
RU123816U1 (ru) | Надстройка для детского сада |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181016 Address after: 322104 Nanxi City, six stone street, Dongyang City, Jinhua, Zhejiang Patentee after: Zhejiang Tai Xue Construction Technology Co., Ltd. Address before: 310013 12 floor, 4 building, 567 Cai Cai street, three pier Town, Xihu District, Hangzhou, Zhejiang. Patentee before: Zhejiang Taixue Technology Co., Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220107 Address after: 11 / F, building 4, CHUANGMEI Huacai center, Sandun Town, Xihu District, Hangzhou City, Zhejiang Province, 310000 Patentee after: Zhejiang Taixue Technology Group Co., Ltd Address before: 322104 Nanxi City, six stone street, Dongyang City, Jinhua, Zhejiang Patentee before: Zhejiang Tai Xue Construction Technology Co.,Ltd. |