CN206132045U - Hidden bridge settlement observation sign - Google Patents

Hidden bridge settlement observation sign Download PDF

Info

Publication number
CN206132045U
CN206132045U CN201621041428.1U CN201621041428U CN206132045U CN 206132045 U CN206132045 U CN 206132045U CN 201621041428 U CN201621041428 U CN 201621041428U CN 206132045 U CN206132045 U CN 206132045U
Authority
CN
China
Prior art keywords
sleeve
settlement observation
bridge settlement
hidden bridge
observation monument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621041428.1U
Other languages
Chinese (zh)
Inventor
张士英
孙永
赵芳
师慧
王树信
刘铁
胡连华
张冲冲
尹学博
柴亚
杨芳
刘婷婷
李默
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Highway Qingyin Management Office
Original Assignee
Hebei Highway Qingyin Management Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Highway Qingyin Management Office filed Critical Hebei Highway Qingyin Management Office
Priority to CN201621041428.1U priority Critical patent/CN206132045U/en
Application granted granted Critical
Publication of CN206132045U publication Critical patent/CN206132045U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a hidden bridge settlement observation sign belongs to building settlement observation thing technical field. Including pre -buried outer fringe in the concrete hole for regular polygon's hollow sleeve, screw in sleeve internal screw thread measuring stick, put into sleeve internal screw thread end cap, the sleeve outer fringe is equipped with annular stopping groove more than 2, measuring head that the measuring stick includes the polished rod portion of closing complex screw thread portion soon with the sleeve internal thread, being connected with screw thread portion, is connected with polished rod portion, the end cap is including the portion of putting into in the sleeve of putting into, be connected just the portion of exposing, a plurality of preformed holes of setting on exposing a lateral surface that the external diameter is greater than the sleeve external diameter with the portion of putting into. The utility model has the characteristics of easy and simple to handle, avoid exposing, disguised good, be difficult for corrosion damage.

Description

Hidden bridge settlement observation monument
Technical field
This utility model is related to a kind of hidden bridge settlement observation monument, belongs to building subsidence observation thing technology neck Domain.
Background technology
Building subsidence observation, relative to the elevation changing value of basic point, is ground by observing each sedimentation index point on building Study carefully the sedimentation change of building, to design and constructing e measurement technology foundation is provided.
At present, the settlement observation point for building bolt type mark pattern specified in deformation measurement specification JGJ8-2007 is being built Build and be widely used during thing settlement observation, under normal circumstances embedded bolt type mark piece more or less always has certain angle Inclination, if there is the debris such as mortar or concrete chip to enter nut, matching screw rod can be made surely to screw in the depth of nut It is different from each time, and then causes difference in height.
Various complicated and large-scale engineering works is increasing with industry and the development of civil buildings industry, engineering is built The construction of thing is built, the original state in ground is changed, and for the ground of building is applied with certain pressure, this is just inevitable The deformation of ground and surrounding bottom can be caused, in order to ensure to build(Structure)Build normally using and building for thing(Structure)The safety of thing is built, And reliable data and corresponding settlement parameter are provided for later prospective design construction, build(Structure)Build necessity of thing settlement observation Property and importance are further obvious.Show shape specification also to specify, Gaocheng building, towering structure, important heritage buildings and continuous life Produce facility basis, Power-equipment Foundation, landslide monitoring etc. to be intended to carry out settlement observation, especially in high-story architecture construction process In, monitor using settlement observation enhance process, instruct rational working procedure, prevention to occur in work progress uneven heavy Drop, timely feedback information, for prospective design construction, department provides detailed first-hand data, it is to avoid because settlement reason causes building The destruction of agent structure produces the crack for affecting structure using function, causes huge economic loss.
Observation station and fixation that settlement observation should be arranged according to building(Pbm)Measuring point be observed, survey Its sedimentation degree data representation, all more than three layers buildings, structures design requirement arrange observation station, artificial, soil base(Sand base Plinth)Deng, settlement observation all should be set, should be observed on schedule or by layer progress in construction and record until construction.
In building, such as high building, bridge, its safety is particularly significant, is related to project of vital and lasting importance, so needing regular Detection case, according to the requirement of national project specifications of surveys, to engineerings such as skyscraper, bridge, dams, is both needed to wall around it Several are buried on body is used to measure the permanent marker of sedimentation, and traditional observation monument is fairly simple, and with reinforcing bar wall is embedded in On body, its one end exposes outside, uses for detection, and the shortcoming of this method is that expose portion easily produces displacement or raw Rust, corrosion and damage, while affecting attractive in appearance.
On the premise of safety and construction function is guaranteed, how to realize easy to operateization of settlement observation embedded part, tool, Recyclableization, realizes that fast and efficiently construction is the new problem that each building people needs to go to think deeply.
Utility model content
This utility model technical issues that need to address are to provide a kind of hidden bridge settlement observation monument, with operation It is easy, the characteristics of avoid exposure, good concealment, be difficult corrosion and damage.
To solve above-mentioned technical problem, the technical scheme that this utility model is adopted is:
A kind of hidden bridge settlement observation monument, including the sky that the outer rim being embedded in concrete hole is regular polygon Heart sleeve, the measurement bar for screwing in internal thread of sleeve, the plug for inserting internal thread of sleeve, sleeve outer rim is provided with more than 2 annulars and stops Move back groove, measurement bar includes the light bar portion and the connection of light bar portion that the threaded portion and threaded portion that screw cooperation with internal thread of sleeve be connected Measurement head;What plug included inserting in sleeve insert portion and the portion of inserting connect and external diameter more than sleeve outer diameter expose portion, It is arranged on some preformed holes exposed on portion's lateral surface.
Technical solutions of the utility model further improvement is that:Sleeve is regular hexagon or octagon.
Technical solutions of the utility model further improvement is that:Length sleeve is 60~120mm, and the opposite side distance of sleeve is 20~30mm.
Technical solutions of the utility model further improvement is that:Back stop slot is 2~4, and the width of each back stop slot is The 1/7~1/10 of length sleeve.
Technical solutions of the utility model further improvement is that:Measurement head is spherical, and spherical measurement head is led to light bar portion Cross thin footpath connection.
Technical solutions of the utility model further improvement is that:Measurement head is cydariform, elliposoidal or dish type.
Technical solutions of the utility model further improvement is that:Insert portion and expose portion's medial surface to be uniformly distributed to be fixed on On 2~5 Elastic buckles.
Technical solutions of the utility model further improvement is that:Elastic buckle is the tortuous machine with a zigzag part Structure, tortuous mechanism one end is fixedly connected with the portion of exposing, the other end is free end, the inward at both ends of the tortuous mechanism receive and centre to Outer protrusion.
Technical solutions of the utility model further improvement is that:The portion of inserting is to be fixed on the spiral shell exposed on portion's medial surface Bar.
Technical solutions of the utility model further improvement is that:Sleeve and measurement bar are stainless steel.
As a result of above-mentioned technical proposal, the technological progress that this utility model is obtained is:
Reasonable in design science, using separation design, the female thread spun with the threaded portion in measurement bar on sleeve The method being connected, it is easy to use, install accurate, it is easy to pre-buried installation, accurate positioning;Sleeve outer rim be regular polygon, anti-rotation Performance is good;The back stop slot being provided with, can prevent the rotation and displacement of sleeve, make that sleeve has anti-rotation and anti-displacement performance is good, volume The advantages of little, lightweight, few stainless steel consumption, low price and site operation facilitate, actual weight is about former cylinder Half, cost can also decline more than 1/3rd, and market prospect is wide.
The measurement head of measurement bar is spherical, cydariform, elliposoidal or dish type, can be connected with light bar portion by thin footpath, also may be used To be directly connected with light bar portion, various shapes are easy to actual selection.
The plug being provided with can effective protection sleeve, can prevent when pre-buried concrete enter sleeve in, prevent blocking, Artificial destruction sleeve is reduced simultaneously, further ensures that observation data are accurate;Plug is implemented by screw thread or Elastic buckle to sleeve Closure, simple structure, installation and removal facilitate, easy to operate, time saving and energy saving.
Sleeve and measurement bar are stainless steel, it is ensured that observation monument will not be collided by external force and deformed, and be not easy to Get rusty;It is easy to operate during settlement measurement;And building contour structures are not affected, with aesthetic.
Description of the drawings
Fig. 1 is the sleeve and measurement bar assembling structure schematic diagram of this utility model embodiment 1;
Fig. 2 is the sleeve and plug assembling structure schematic diagram of this utility model embodiment 1;
Fig. 3 is the measurement bar structural representation of this utility model embodiment 2;
Fig. 4 is the stopper structure schematic diagram of this utility model embodiment 2;
Fig. 5 is the top view of Fig. 4;
Wherein, 1, sleeve, 11, back stop slot, 21, threaded portion, 22, light bar portion, 23, measurement head, 31, insert portion, 32, expose Portion, 33, preformed hole, 34, Elastic buckle, 4, concrete.
Specific embodiment
This utility model is described in further details with reference to embodiment:
As depicted in figs. 1 and 2, a kind of hidden bridge settlement observation monument, it is outer in the hole of concrete 4 including being embedded in Edge is the cannulated sleeve 1 of the stainless steel of regular polygon, the measurement bar of the stainless steel of the screw-in female thread of sleeve 1, inserts The plug of the female thread of sleeve 1, the outer rim of sleeve 1 is provided with more than 2 annular back stop slots 11;Measurement bar includes and the internal thread rotation of sleeve 1 Close the light bar portion 22 of the threaded portion 21 and connection of threaded portion 21 for coordinating and the measurement head 23 of the connection of light bar portion 22;Plug includes putting Enter inserting portion 31 and inserting portion 31 in sleeve 1 to connect and external diameter exposing portion 32, being arranged on the portion of exposing more than the external diameter of sleeve 1 Some preformed holes 33 on 32 lateral surface.
Sleeve 1 is regular hexagon, and the length of sleeve 1 is 60~120mm, and the opposite side distance of sleeve 1 is 20~30mm.Back stop slot 11 For 2~4, the width of each back stop slot 11 is the 1/7~1/10 of the length of sleeve 1, and the width of suitable back stop slot 11 had both met only Move back the rigidity and intensity requirement for requiring and not affecting sleeve 1.
Measurement head 23 is cydariform, elliposoidal or dish type, and the present embodiment is cydariform.Portion 31 is inserted to be fixed in the portion of exposing 32 Screw rod on side.
During concrete application, observation position perforating is being needed, the sleeve 1 of stainless steel is being fixed into pre-buried, plug is being used at ordinary times Block, plug is opened the measurement bar of stainless steel of screwing on during measurement, it is easy to use.This utility model is used for all kinds of building Build, the settlement observation of bridge, road, subway etc..
The settlement values of building are observed in construction, building subsidence observation should determine the sedimentation of structure foundation Amount, differential settlement and sedimentation velocity simultaneously calculate the inclination of basic slope, local dip, local inclination and component, architecture construction stage Observation, should in time carry out with construction metal, common buildings, observation can be started after the completion of basis or after basement is finished building, greatly Type, skyscraper, can start observation after the completion of blinding layer or sole plate, should regard observation frequency and interval time ground with Depending on loading situation, civil buildings can often increase by 1~5 layer of observation once, and industrial building can be settled accounts by different constructions(Such as backfill base Hole, installation pillar and roof truss, masonry panel, equipment installation etc.)It is observed respectively.As building uniformly increases, should at least exist It is each when increasing 25%, 50%, 75% and the 100% of load to survey once.Such as temporary shut-down in work progress, go into operation again on shut-down opportunity When should respectively observe once, the downtime, can no interval observation in 2~3 months be once.Sedimentation speed is formed according to settlement observation result Du-when m- settling amount curve chart, to draw settlement observation analysis report.
Embodiment 2
The present embodiment is with the difference of embodiment 1:Referring to Fig. 3~Fig. 5, sleeve 1 is octagon, and measurement head 23 is ball Shape, spherical measurement head 23 is connected with light bar portion 22 by thin footpath.Insert portion 31 and be fixed on the medial surface of the portion of exposing 32 to be uniformly distributed On 2~5 Elastic buckles 34, the present embodiment is 4 Elastic buckles 34, and Elastic buckle 34 is evenly distributed on circular exposed portion 32 On same circumference.Elastic buckle 34 is the tortuous mechanism with a zigzag part, and tortuous mechanism one end is fixed with portion of exposing and connected Connect, the other end is free end, the inward at both ends of the tortuous mechanism receive and centre outwardly.Elastic buckle 34 can for rubber or Plastic material, Elastic buckle 34 is fastened in sleeve 1 by its elastic force, is easily installed and is dismantled.
During settlement observation, in sleeve 1 that Elastic buckle 34 is fastened at settlement observation point by be observed.

Claims (10)

1. a kind of hidden bridge settlement observation monument, it is characterised in that:Including being embedded in concrete(4)Outer rim in hole is The cannulated sleeve of regular polygon(1), screw in sleeve(1)The measurement bar of female thread, insert sleeve(1)The plug of female thread, sleeve (1)Outer rim is provided with more than 2 annular back stop slots(11);Measurement bar includes and sleeve(1)Female thread screws the threaded portion of cooperation (21)With threaded portion(21)The light bar portion of connection(22)With light bar portion(22)The measurement head of connection(23);Plug includes inserting set Cylinder(1)Interior inserts portion(31)With insert portion(31)Connect and external diameter is more than sleeve(1)External diameter exposes portion(32), be arranged on Expose portion(32)Some preformed holes on lateral surface(33).
2. hidden bridge settlement observation monument according to claim 1, it is characterised in that:Sleeve(1)For regular hexagon Or octagon.
3. hidden bridge settlement observation monument according to claim 2, it is characterised in that:Sleeve(1)Length be 60~ 120mm, sleeve(1)Opposite side distance be 20~30mm.
4. hidden bridge settlement observation monument according to claim 1, it is characterised in that:Back stop slot(11)For 2~4 It is individual, each back stop slot(11)Width be sleeve(1)The 1/7~1/10 of length.
5. hidden bridge settlement observation monument according to claim 1, it is characterised in that:Measurement head(23)For spherical, Spherical measurement head(23)With light bar portion(22)Connected by thin footpath.
6. hidden bridge settlement observation monument according to claim 1, it is characterised in that:Measurement head(23)For cydariform, Elliposoidal or dish type.
7. hidden bridge settlement observation monument according to claim 1, it is characterised in that:Insert portion(31)For uniform point Cloth is fixed on the portion of exposing(32)2~5 Elastic buckles on medial surface(34).
8. hidden bridge settlement observation monument according to claim 7, it is characterised in that:Elastic buckle(34)Be with The tortuous mechanism of one zigzag part, tortuous mechanism one end and the portion of exposing(32)Be fixedly connected, the other end be free end, the tortuous machine The inward at both ends of structure receive and centre outwardly.
9. hidden bridge settlement observation monument according to claim 1, it is characterised in that:Insert portion(31)To be fixed on Expose portion(32)Screw rod on medial surface.
10. the hidden bridge settlement observation monument according to any one of claim 1~9, it is characterised in that:Sleeve(1) Stainless steel is with measurement bar.
CN201621041428.1U 2016-09-07 2016-09-07 Hidden bridge settlement observation sign Active CN206132045U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621041428.1U CN206132045U (en) 2016-09-07 2016-09-07 Hidden bridge settlement observation sign

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621041428.1U CN206132045U (en) 2016-09-07 2016-09-07 Hidden bridge settlement observation sign

Publications (1)

Publication Number Publication Date
CN206132045U true CN206132045U (en) 2017-04-26

Family

ID=58568056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621041428.1U Active CN206132045U (en) 2016-09-07 2016-09-07 Hidden bridge settlement observation sign

Country Status (1)

Country Link
CN (1) CN206132045U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204799A (en) * 2018-03-08 2018-06-26 湖南科技大学 Mining influence lower room basic slope settles stretcher strain measuring device and method
CN108458697A (en) * 2018-03-12 2018-08-28 哈尔滨工业大学 A kind of auxiliary device and detection method of detection bridge linear change

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204799A (en) * 2018-03-08 2018-06-26 湖南科技大学 Mining influence lower room basic slope settles stretcher strain measuring device and method
CN108458697A (en) * 2018-03-12 2018-08-28 哈尔滨工业大学 A kind of auxiliary device and detection method of detection bridge linear change

Similar Documents

Publication Publication Date Title
CN206132045U (en) Hidden bridge settlement observation sign
CN201241335Y (en) Pile and post in one foundation structure of underground engineering
CN106703437A (en) Shock-insulation underpinning structure and construction method thereof
CN101545271B (en) Telescopic type settlement observer
Wang et al. Analysis of deep foundation pit construction monitoring in a metro station in Jinan city
CN113529707A (en) Umbrella-shaped light anchor rod, slope supporting structure and construction method thereof
CN205653787U (en) Soil nail is used in foundation ditch construction
CN209310788U (en) A kind of laminated settlement meter that can simply fix sedimentation ring
CN202757609U (en) Stainless steel pedestal settlement sign
CN203116742U (en) Settlement observation marker
CN107938724A (en) A kind of friction-type bored concrete pile and its Model Calculating Method for karst region
CN104776840B (en) A kind of Elastic Deformation of Foundation Pit observation monument being easy to observation and observation procedure
CN201397139Y (en) Expansion type settlement observation device
CN103274329B (en) A kind of top draws jack for the construction method of pile-anchor retaining
CN209387182U (en) A kind of mine pressure detection device
CN204405055U (en) Stratum settlement monitoring metal header erector
CN108086086B (en) A method of drilling repairs structure and repairs exploration coring bituminous pavement using it
CN206667929U (en) A kind of detachable precast concrete bounding wall system
CN206496755U (en) Foundation pile static loading test Displacement & Settlement device
CN206681008U (en) Exempt from the constructing device for the pile cover concrete that inter-pile soil is excavated
CN217974519U (en) Intelligent safety monitoring system for deep foundation pit in urban complex environment
CN203337134U (en) Building settlement measuring point protective device
CN109487823A (en) The accurate installation method of groove type embedded part in city integrated piping lane punching block system
CN109991158A (en) The push pipe of push pipe experimental box
CN204535696U (en) A kind of settlement observation point embedded part structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant