CN206128713U - Multi -functional dismantled and assembled athletic ground of combined type - Google Patents
Multi -functional dismantled and assembled athletic ground of combined type Download PDFInfo
- Publication number
- CN206128713U CN206128713U CN201621074436.6U CN201621074436U CN206128713U CN 206128713 U CN206128713 U CN 206128713U CN 201621074436 U CN201621074436 U CN 201621074436U CN 206128713 U CN206128713 U CN 206128713U
- Authority
- CN
- China
- Prior art keywords
- pond
- dismantled
- swimming pool
- frame
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a multi -functional dismantled and assembled athletic ground of combined type, including horizontal base, set up in horizontal base one side water treatment facilities, set up the dismantled and assembled swimming pool on horizontal base and install the rink in dismantled and assembled swimming pool, dismantled and assembled swimming pool includes square pond frame, the swimming pool bottom plate, install the guardrail on the frame of pond, set up cell body and overflow tank in the frame of pond, the square frame that the pond frame was made including interval parallel arrangement's channel -section steel, the angle steel connecting rod of 4 parallels of the square frame that the fixed adjacent channel -section steel of connection was made, erect in the bearing steel beam of two parallels of the square frame upper end that the channel -section steel was made, lay the plastic wood floor on bearing steel beam, the swimming pool bottom plate includes a plurality of pick -proof boards of handing over misalignment cloth, pick -proof board both ends and pond frame fixed connection, the cell body is formed by a plurality of baffle concatenations, the rink inlays to be located in the cell body, the rink is including rail and middle bed course all around, lay the skateboard on the middle bed course, the height and the overflow tank of middle bed course highly keep unanimous.
Description
Technical field
The utility model is related to large-scale sports events field, more particularly to swimming pool and rink.
Background technology
Although existing Demountable swimming pool simple structure on the market, easy disassembly, due to the limitation of swimming pool itself
Property, when being cold, utilization rate is not high, and floor space is again big, causes the waste of resource more serious, and rink is used as body-building
Motion, floor space is consistent with swimming pool, and is just being adapted to motion when being cold, if swimming pool and rink are combined into
One important problem.
The content of the invention
The utility model is directed to the deficiencies in the prior art, there is provided a kind of simple structure, can organically by swimming pool and roller-skating
Field is combined together, and floor space is little and is used interchangeably, and greatlys save the dismantled and assembled sports ground of combined type of input cost
Ground.
To realize the utility model purpose, there is provided technical scheme below:A kind of dismantled and assembled sports ground of combined multifunctional
Ground, it is characterised in that including horizontal base, be arranged at horizontal base side water treatment facilities, be arranged at it is removable on horizontal base
Dress swimming pool and the rink being installed in dismantled and assembled swimming pool, dismantled and assembled swimming pool includes square pond frame, swimming pool base plate, is installed on pond
Guardrail, the pond body being arranged in the frame of pond and the overflow groove being arranged at around pond body on frame, the pond frame includes spaced and parallel
Quadra made by the channel-section steel of setting, 4 parallel Bolted angle connection bars of the quadra made by adjacent slot steel that is connected,
Two parallel load-bearing girder steels for being set up in quadra upper end made by channel-section steel, the plastic-wood floor being layed on load-bearing girder steel,
Swimming pool base plate includes some staggered anti-skid plates, and anti-skid plate two ends are fixedly connected with pond frame, and the pond body is by some pieces
Baffle plate is spliced, and the rink is embedded in pond body, and rink includes the fence and Backing layer of surrounding, Backing layer
Upper laying skateboard, height and the spilling water groove height of Backing layer are consistent, and fence includes horizontal guard bar and spaced
Vertical strut, the nearly bottom of adjacent upright strut is provided with two parallel reinforcement connecting rods.
Preferably, the bed course of centre includes the scaffold being made up of crossbeam and longitudinal bracing pin, lay on crossbeam
There are some pieces of panels, fix per a cross-tie is provided between two support feets, longitudinal tie is provided between cross-tie and is fixed,
The section of centre panel is to bend font, centre panel surface clamping skateboard, and skateboard bottom surface is provided with and is connected with centre panel
Raised line.
Preferably, side is provided with corridor stairway, changes shoe rack and rest bench in square pond frame.
Preferably, raised line is hollow-core construction, interval offers and arrange in connecting hole, connecting hole attachment screw in raised line,
Attachment screw is fixedly connected with centre panel.
The utility model beneficial effect:The utility model simple structure, organically can combine swimming pool and rink one
Rise, floor space is little and is used interchangeably, and greatlys save input cost.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 middle reaches swimming pool structure schematic diagram.
Fig. 3 is the top view of Fig. 2.
Fig. 4 is the quadra and load-bearing steel girder erection schematic diagram of Fig. 2.
Fig. 5 is swimming pool and rink scheme of installation.
Fig. 6 is Backing layer front view.
Fig. 7 is fence schematic diagram.
Fig. 8 is centre panel and skateboard scheme of installation.
Specific embodiment
Embodiment 1:A kind of dismantled and assembled athletic ground of combined multifunctional, including horizontal base 1, are arranged at horizontal base 1
Side water treatment facilities 2, the dismantled and assembled swimming pool 3 being arranged on horizontal base 1 and the rink being installed in dismantled and assembled swimming pool 3
4, dismantled and assembled swimming pool 3 includes square pond frame 3.1, swimming pool base plate 3.2, the guardrail 3.3 being installed on pond frame 3.1, is arranged at pond frame
Pond body 3.4 in 3.1 and the overflow groove 3.5 being arranged at around pond body 3.4, the pond frame 3.1 includes spaced and parallel setting
Quadra 3.1.1,4 parallel angle steel of the quadra 3.1.1 made by adjacent slot steel that is connected connect made by channel-section steel
Extension bar 3.1.2, two parallel load-bearing girder steel 3.1.3 for being set up in quadra 3.1.1 upper ends made by channel-section steel, it is layed in and holds
Plastic-wood floor 3.1.4 on weight girder steel 3.1.3, swimming pool base plate 3.2 includes some staggered anti-skid plate 3.2.1, pick-proof
Plate 3.2.1 two ends are fixedly connected with pond frame 3.1, and the pond body 3.4 is spliced by some pieces of baffle plates, and the rink 4 is embedded
In pond body 3.4, rink 4 includes the fence 4.1 and Backing layer 4.2 of surrounding, and on Backing layer 4.2 skateboard is laid
4.3, height and the height of overflow groove 3.5 of Backing layer 4.2 are consistent, and fence 4.1 includes that horizontal guard bar 4.1.1 and interval set
The vertical strut 4.1.2 for putting, the nearly bottoms of adjacent upright strut 4.1.2 are provided with two parallel reinforcement connecting rods 4.1.3.It is middle
Bed course 4.2 includes the scaffold being made up of crossbeam 4.2.1 and longitudinal bracing pin 4.2.2, is equipped with some on crossbeam 4.2.1
Block panel 4.2.3, fixes per a cross-tie 4.2.4 is provided between two support feets 4.2.2, arranges between cross-tie 4.2.4
There is longitudinal tie 4.2.5 to fix, the section of centre panel 4.2.3 is bow font, centre panel 4.2.3 surface clamping skateboard
4.3, the bottom surface of skateboard 4.3 is provided with the raised line 4.3.1 connected with centre panel 4.2.3.Side is provided with square pond frame 3.1
Corridor stairway, change shoe rack and rest bench.Raised line 4.3.1 is that interval offers connecting hole in hollow-core construction, raised line 4.3.1
4.3.2, attachment screw 5 is set in connecting hole 4.3.2, and attachment screw 5 is fixedly connected with centre panel 4.2.3.
Claims (4)
1. the dismantled and assembled athletic ground of a kind of combined multifunctional, it is characterised in that including horizontal base, be arranged at horizontal base one
Side water treatment facilities, the dismantled and assembled swimming pool being arranged on horizontal base and the rink being installed in dismantled and assembled swimming pool are removable
Dress swimming pool includes square pond frame, swimming pool base plate, the guardrail being installed on the frame of pond, the pond body being arranged in the frame of pond and is arranged at pond
Overflow groove around body, quadra made by the channel-section steel of the pond frame including spaced and parallel setting, be connected adjacent channel-section steel
Made by quadra 4 parallel Bolted angle connection bars, be set up in two of quadra upper end made by channel-section steel it is parallel
Load-bearing girder steel, the plastic-wood floor being layed on load-bearing girder steel, swimming pool base plate includes some staggered anti-skid plates, anti-skid plate
Two ends are fixedly connected with pond frame, and the pond body is spliced by some pieces of baffle plates, and the rink is embedded in pond body, rink
Including the fence and Backing layer of surrounding, skateboard is laid on Backing layer, height and the spilling water groove height of Backing layer are protected
Hold consistent, fence includes horizontal guard bar and spaced vertical strut, the nearly bottom of adjacent upright strut be provided with two it is parallel
Reinforcement connecting rod.
2. a kind of dismantled and assembled athletic ground of combined multifunctional according to claim 1, it is characterised in that middle bed course
Including the scaffold being made up of crossbeam and longitudinal bracing pin, some pieces of panels are equipped with crossbeam, per between two support feets
It is provided with a cross-tie to fix, longitudinal tie is provided between cross-tie and is fixed, the section of centre panel is bow font, middle
Panel surface clamping skateboard, skateboard bottom surface is provided with the raised line connected with centre panel.
3. the dismantled and assembled athletic ground of a kind of combined multifunctional according to claim 1, it is characterised in that in square pond frame
Side is provided with corridor stairway, changes shoe rack and rest bench.
4. the dismantled and assembled athletic ground of a kind of combined multifunctional according to claim 2, it is characterised in that raised line is hollow
Interval offers and arrange in connecting hole, connecting hole attachment screw in structure, raised line, and attachment screw is fixedly connected with centre panel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621074436.6U CN206128713U (en) | 2016-09-23 | 2016-09-23 | Multi -functional dismantled and assembled athletic ground of combined type |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621074436.6U CN206128713U (en) | 2016-09-23 | 2016-09-23 | Multi -functional dismantled and assembled athletic ground of combined type |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206128713U true CN206128713U (en) | 2017-04-26 |
Family
ID=58569836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621074436.6U Active CN206128713U (en) | 2016-09-23 | 2016-09-23 | Multi -functional dismantled and assembled athletic ground of combined type |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206128713U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106285063A (en) * | 2016-09-23 | 2017-01-04 | 宜兴市申益体育设施有限公司 | A kind of dismantled and assembled athletic ground of combined multifunctional |
CN114623530A (en) * | 2022-02-25 | 2022-06-14 | 青岛海尔空调器有限总公司 | Ice rink refrigerating system, control method and device |
-
2016
- 2016-09-23 CN CN201621074436.6U patent/CN206128713U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106285063A (en) * | 2016-09-23 | 2017-01-04 | 宜兴市申益体育设施有限公司 | A kind of dismantled and assembled athletic ground of combined multifunctional |
CN114623530A (en) * | 2022-02-25 | 2022-06-14 | 青岛海尔空调器有限总公司 | Ice rink refrigerating system, control method and device |
CN114623530B (en) * | 2022-02-25 | 2024-02-20 | 青岛海尔空调器有限总公司 | Ice rink refrigerating system, control method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101935986B (en) | Overwater large-span steel tube pile cast-in-situ trestle and building method thereof | |
CN201933419U (en) | Arch bridge arch rib cast-in-situ bracket | |
CN202755678U (en) | Shape steel secure channel with temporary storage yard function | |
CN102839678A (en) | Structure for improving rigidity and stability of foundation pit steel support | |
CN203021923U (en) | Big cantilever bent cap steel truss construction platform | |
CN206128713U (en) | Multi -functional dismantled and assembled athletic ground of combined type | |
CN106285063A (en) | A kind of dismantled and assembled athletic ground of combined multifunctional | |
CN203238950U (en) | Concrete beam formwork supported by trusses suspended in air | |
CN106351429B (en) | A kind of Process for Heavy Support system and its construction method | |
CN103147573B (en) | Natatorium roof beam slab high formwork construction method | |
CN203742205U (en) | Temporary stand | |
CN201924284U (en) | Screw rod seat pipe double-split Bailey bracket | |
CN204001705U (en) | Outer wall of basement single surface formwork constructing structure based on earth anchor truss | |
CN203307733U (en) | Construction platform system of concrete pier of viaduct | |
CN216042482U (en) | Concatenation formula operation platform | |
CN202577960U (en) | Suspension outer bearing type combination steel formwork applied in roller compacted concrete (RCC) construction | |
CN105019657A (en) | Building construction system | |
CN205077730U (en) | High strength steel muscle support frame | |
CN204876579U (en) | Building construction system | |
CN210596876U (en) | Plank road | |
CN219824871U (en) | Gardens pedestrian trestle | |
CN203886147U (en) | Smc table tennis table | |
CN205676779U (en) | Operation platform for bridge pier column | |
CN216616959U (en) | A building brick timber structure that just has reinforced structure for old city transformation | |
CN219240286U (en) | Construction operation platform system for long-distance cap beam in limited space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |