CN206128663U - Adjusting device of steel construction steel column construction installation - Google Patents
Adjusting device of steel construction steel column construction installation Download PDFInfo
- Publication number
- CN206128663U CN206128663U CN201621018339.5U CN201621018339U CN206128663U CN 206128663 U CN206128663 U CN 206128663U CN 201621018339 U CN201621018339 U CN 201621018339U CN 206128663 U CN206128663 U CN 206128663U
- Authority
- CN
- China
- Prior art keywords
- steel
- frame
- face
- steel column
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 70
- 239000010959 steel Substances 0.000 title claims abstract description 70
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 238000009434 installation Methods 0.000 title claims abstract description 14
- 230000001105 regulatory effect Effects 0.000 claims description 7
- 238000006073 displacement reaction Methods 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims 1
- 210000001503 joint Anatomy 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000003466 welding Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to steel construction building construction field, concretely relates to adjusting device of steel construction steel column construction installation, include the frame of constituteing by upper segment portion, middle section portion and hypomere portion, be provided with a cavity in this frame, wherein, be provided with upper channel in the upper segment portion, the side end face of upper segment portion is provided with side direction adjusting bolt, and the top face of upper segment portion is provided with the spacing bolt in upper portion, be provided with lower channel in the hypomere portion, the side end face of hypomere portion is provided with the spacing bolt of side direction, and the bottom face of hypomere portion is provided with the spacing bolt in lower part, be provided with a guiding mechanism in the cavity of frame, this guiding mechanism can adjust the vertical height of steel column. The utility model discloses not only improve the efficiency of construction greatly, can realize conveniently moreover that the fast speed adjusting of steel column butt joint deviation is whole, can obtain higher hoist and mount precision, guaranteed high -quality welding.
Description
Technical field
This utility model belongs to steel building construction field, and in particular to a kind of adjustment of steel columns of steel structures construction and installation
Device.
Background technology
Steel building generally applies to modernize large stadium and skyscraper as a kind of new building system, its
There is higher intensity and shock resistance for conventional concrete building.Steel construction column piece is usually batch production making, existing
Install field.Traditional construction method of installation needs to assemble steel column overturning-preventing rope in advance, then carry out steel column independent lifting and
The fixation of overturning-preventing rope, then girder steel is installed and is fixed with bolt, then measure steel column coordinate and carried out by steel cable
Drift correction, then carry out repetition measurement, bolt fix and steel column welding.Conventional construction method process is complicated, and efficiency is low, and precision is not
Height, easily produces deviation and replys, and also affects steel column butt joint weldquality.Based on the shortcoming of above conventional construction method, the application
People provides a kind of adjusting apparatus of steel columns of steel structures construction and installation, and thus this case produces.
Utility model content
The purpose of this utility model is to provide a kind of adjusting apparatus of steel columns of steel structures construction and installation, to overcome tradition to apply
Work procedure is complicated, and efficiency is low, and precision is not high, easily produces deviation and replys, and also affects steel column butt joint weldquality etc.
Technical problem.
To realize above-mentioned technical problem, the technical scheme that this utility model is specifically provided is:A kind of steel columns of steel structures construction
The adjusting apparatus of installation, including the frame being made up of epimere portion, center section part and hypomere portion, are provided with a cavity in the frame;Its
In, upper guide groove is provided with the epimere portion, the side end face in epimere portion is provided with lateral adjustment bolt, and the top end face in epimere portion sets
It is equipped with top caging bolt;Lower guide channel is provided with the hypomere portion, the side end face in hypomere portion is provided with lateral Displacement bolt, under
The bottom face in section portion is provided with lower limit bolt;An adjustment mechanism is provided with the cavity of the frame, the adjustment mechanism energy
Adjust the vertical height of steel column.
Further, the adjustment mechanism is located in the cavity of the center section part of frame, and by the housing cap with regulating tank
Adjustment mechanism is limited and is installed in the cavity of the center section part of frame by plate;Guiding is additionally provided with the side end face of the center section part
Groove.
Further, the adjustment mechanism includes four connecting rods being mutually flexibly connected, and the intermediate connections of four connecting rods lead to
The flexible connection of two nut sliders is crossed, double threaded screw is movably set between symmetrically arranged two nut slider, the one of double threaded screw
End is located at regulating tank and exposes.
Further, the upper end junction of the connecting rod is flexibly connected by top braces slide block, on top braces slide block
Guider screw is additionally provided with, the guider screw is located in the gathering sill;The lower end junction of the connecting rod is by bottom
Fagging is flexibly connected, and the bottom support plate is fixed in frame.
The beneficial effects of the utility model:This utility model is efficiently solved in traditional steel columns of steel structures work progress, work
Sequence is complicated, efficiency is low, and precision is not high, easily produces deviation and replys, the low problem of steel column butt joint weldquality.This adjustment is filled
Put and method of adjustment practicality, economy and safety are good applied widely, with certain promotional value.
Description of the drawings
Fig. 1 is this utility model structural representation;Fig. 2 is this utility model steel column and connection otic placode structural representation;Fig. 3
For this utility model adjustment mechanism structural representation;Fig. 4 specifically adjusts application schematic diagram for this utility model.
Label declaration:
Frame 10;Cavity 20
Epimere portion 1;Upper guide groove 11;Lateral adjustment bolt 12;Top caging bolt 13;
Center section part 2;Regulating tank 21;Frame cover plate 22;Gathering sill 23;
Hypomere portion 3;Lower guide channel 31;Lateral Displacement bolt 32;Lower limit bolt 33;
Adjustment mechanism 4;Connecting rod 41;Nut slider 42;Double threaded screw 43;Top braces slide block 44;Guider screw 45;Bottom
Portion's gripper shoe 46;
Steel column 5;Upper steel column 51;Lower steel column 52;Connection otic placode 6;Hole for hoist 7;Mousing-hook 8;Hanging device 9.
Specific embodiment
Next combine accompanying drawing to be further described utility model.
As shown in Figure 1,3, what this utility model was disclosed is a kind of adjusting apparatus 100 of steel columns of steel structures construction and installation, bag
The frame 10 being made up of epimere portion 1, center section part 2 and hypomere portion 3 is included, in the frame 10 cavity 20 is provided with;Wherein, on described
Upper guide groove 11 is provided with section portion 1, the side end face in epimere portion 1 is provided with lateral adjustment bolt 12, and the top end face in epimere portion 1 is arranged
There is top caging bolt 13;Lower guide channel 31 is provided with the hypomere portion 3, the side end face in hypomere portion 3 is provided with lateral Displacement spiral shell
Bolt 32, the bottom face in hypomere portion 3 is provided with lower limit bolt 33;An adjustment mechanism is provided with the cavity 20 of the frame 10
4, the adjustment mechanism 4 can adjust the vertical height of steel column.
The adjustment mechanism 4 is located in the cavity 20 of the center section part 2 of frame, and by the frame cover plate with regulating tank 21
22 are installed on the restriction of adjustment mechanism 4 in the cavity 20 of the center section part 2 of frame 10;Also set up on the side end face of the center section part 2
There is gathering sill 23.
The adjustment mechanism 4 includes four connecting rods 41 being mutually flexibly connected, and the intermediate connections of four connecting rods 41 pass through
Two nut sliders 42 are flexibly connected, and between symmetrically arranged two nut slider 42 double threaded screw 43, double threaded screw are movably set with
43 one end is located at regulating tank and exposes.
The upper end junction of the connecting rod 41 is flexibly connected by top braces slide block 44, on top braces slide block 44 also
Guider screw 45 is provided with, the guider screw 45 is located in the gathering sill 23;The lower end junction of the connecting rod 41 passes through
Bottom support plate 46 is flexibly connected, and the bottom support plate 46 is fixed in frame 10.
With reference to shown in Fig. 2, upper and lower steel column(51,52)Hole for hoist 7 is offered in connection otic placode 6, while being provided with end face
Mousing-hook 8, to ensure reliability and the safety of the docking of steel column 5.
With reference to shown in 4, when carrying out steel column construction and installation, first in upper and lower steel column(51,52)Four side correct position welderings
Connect upper and lower steel column(51,52)Connection otic placode 6, is then slowly hung upper steel column 51 to lower steel column 52 by hanging device 9
Side.
Adjusting apparatus upper guide groove 11 is inserted into the connection otic placode 6 of upper steel column 51, with the decline of upper steel column 51, by adjusting apparatus
Lower guide channel 31 is inserted into the connection otic placode 6 of lower steel column 52, then lower limit bolt 33 is locked.The weight for now going up steel column 51 is complete
Born by the top support surface of lower steel column 52.
When upper steel column 52 is toppled power, can be transferred to adjust by top caging bolt 13, lower limit bolt 33
The frame 10 of engagement positions 100, and the mousing-hook 8 in top caging bolt 13, lower limit bolt 33 and connection otic placode 6 can enter one
Step prevents toppling for steel column 51.
When upper and lower steel column(51,52)After by four adjusting apparatus 100 firmly connection, hanging device can be discharged, further according to
The measured three-dimensional coordinate of steel column 5 is accordingly corrected.
When there is horizontal departure, by the lateral adjustment spiral shell of two adjusting apparatus of the adjustment in deviation vertical direction
Bolt 12, makes the post of steel 51 by deviation compensation directional trim, finally tightens lateral adjustment bolt 12.
When there is horizontal elevation deviation, upper limit bolt is unscrewed into 13, be adjusted in synchronism the double end spiral shell of four adjusting apparatus
Bar 43, is made top braces slide block 44 slowly rise and upper steel column 51 is lifted up to required by the connection otic placode 6 of upper steel column 51
After height(The weight for now going up steel column 51 is transferred to frame 10 by the adjustment mechanism 4 of double threaded screw 43, then by leading under frame 10
The cooperation indirect transfer of the top surface of groove 31 and lower connection otic placode 6 is to lower steel column 52), tighten upper limit bolt 13.
Because using less lead angle, bolt and nut has self-locking performance, therefore steel column can be fixed on final adjustment
Position, when there is perpendicularity deviation, the upper limit bolt pine 13 of yawing moment side is opened, by screw rod clockwise or the inverse time
Pin is rotated and is required with the perpendicularity needed for reaching.
Above content is combine that preferred implementation of the present utility model made to provided technical scheme further detailed
Describe in detail bright, it is impossible to assert that this utility model is embodied as being confined to above-mentioned these explanations, for the affiliated technology of this utility model
For the those of ordinary skill in field, without departing from the concept of the premise utility, some simple deductions can also be made
Or replace, should all be considered as belonging to protection domain of the present utility model.
Claims (4)
1. a kind of adjusting apparatus of steel columns of steel structures construction and installation, it is characterised in that:Including by epimere portion, center section part and hypomere portion
The frame of composition, is provided with a cavity in the frame;Wherein, upper guide groove, the side end face in epimere portion are provided with the epimere portion
Lateral adjustment bolt is provided with, the top end face in epimere portion is provided with top caging bolt;Lower guide channel is provided with the hypomere portion,
The side end face in hypomere portion is provided with lateral Displacement bolt, and the bottom face in hypomere portion is provided with lower limit bolt;The frame
An adjustment mechanism is provided with cavity, the adjustment mechanism can adjust the vertical height of steel column.
2. adjusting apparatus of a kind of steel columns of steel structures construction and installation according to claim 1, it is characterised in that:The adjustment
Mechanism is located in the cavity of the center section part of frame, and adjustment mechanism restriction is installed on into machine by the frame cover plate with regulating tank
In the cavity of the center section part of frame;Gathering sill is additionally provided with the side end face of the center section part.
3. adjusting apparatus of a kind of steel columns of steel structures construction and installation according to claim 2, it is characterised in that:The adjustment
Mechanism includes four connecting rods being mutually flexibly connected, and the intermediate connections of four connecting rods are flexibly connected by two nut sliders, right
Claim to be movably set with double threaded screw between two nut sliders for arranging, one end of double threaded screw is located at regulating tank and exposes.
4. adjusting apparatus of a kind of steel columns of steel structures construction and installation according to claim 3, it is characterised in that:The connection
The upper end junction of bar is flexibly connected by top braces slide block, and on top braces slide block guider screw is additionally provided with, the guiding
Screw is located in the gathering sill;The lower end junction of the connecting rod is flexibly connected by bottom support plate, the bottom
Fagging is fixed on frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621018339.5U CN206128663U (en) | 2016-08-31 | 2016-08-31 | Adjusting device of steel construction steel column construction installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621018339.5U CN206128663U (en) | 2016-08-31 | 2016-08-31 | Adjusting device of steel construction steel column construction installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206128663U true CN206128663U (en) | 2017-04-26 |
Family
ID=58567916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621018339.5U Expired - Fee Related CN206128663U (en) | 2016-08-31 | 2016-08-31 | Adjusting device of steel construction steel column construction installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206128663U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403643A (en) * | 2018-12-19 | 2019-03-01 | 浙江中南建设集团钢结构有限公司 | A kind of steel structure column mounting device and construction method |
CN112792491A (en) * | 2021-02-03 | 2021-05-14 | 中铁十七局集团城市建设有限公司 | Welding method of H-shaped steel structure and horizontal positioning and connecting device |
-
2016
- 2016-08-31 CN CN201621018339.5U patent/CN206128663U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403643A (en) * | 2018-12-19 | 2019-03-01 | 浙江中南建设集团钢结构有限公司 | A kind of steel structure column mounting device and construction method |
CN109403643B (en) * | 2018-12-19 | 2024-05-03 | 浙江中南绿建科技集团有限公司 | Steel structure column installation device and construction method |
CN112792491A (en) * | 2021-02-03 | 2021-05-14 | 中铁十七局集团城市建设有限公司 | Welding method of H-shaped steel structure and horizontal positioning and connecting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103572708B (en) | Large-span concrete continuous girder bridge side span folding device and method | |
CN103643637B (en) | Original position construction method for lifting whole after the first vertical transfer of Long-Span Concrete Filled Steel Tubular Arch Bridges | |
CN206128663U (en) | Adjusting device of steel construction steel column construction installation | |
CN102774784B (en) | Pole transformer rack tilt regulator | |
CN104465065A (en) | Sheet inserting device for producing transformer | |
CN206319213U (en) | Adjusting apparatus before track laying fixation | |
CN204270863U (en) | Produce transformer film threading equipment | |
CN205531255U (en) | Construction scaffold | |
CN212535081U (en) | Opposite-pulling plate fixing device for building beam side template | |
CN207846228U (en) | Prestressed concrete simply supported box girder face pre-buried sleeve positioning die | |
CN206279855U (en) | Rod-adjurstable formula steel column correcting structure | |
CN203403681U (en) | Temporary supporting frame of string beam | |
CN207903700U (en) | A kind of lift car telescope support | |
CN105649081B (en) | A kind of oblique inserting piling multistage guiding trestle of super long-large diameter pile | |
CN209368825U (en) | A kind of solid mechanical device of stake for building | |
CN205369921U (en) | Template roof beam strutting arrangement with adjustable | |
CN208995919U (en) | It is a kind of for setting up the support device and construction system of eminence steel girder segment | |
CN206667784U (en) | The erecting device of glass curtain wall outer visor | |
CN202689578U (en) | Door and window installation device | |
CN212802270U (en) | Steel structure upright post | |
CN219732524U (en) | Rust-proof ejector rod type shear wall protection layer control adjusting rib | |
CN206090328U (en) | Ball formula steel bearing installation device | |
CN217201744U (en) | Groove steel formwork lifting appliance convenient to mount and dismount | |
CN205735442U (en) | Windowsill bears down on one mould | |
CN217579724U (en) | Tie beam template with adjustable section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170426 |