CN206128607U - Lifting platform device of chimney derrick - Google Patents

Lifting platform device of chimney derrick Download PDF

Info

Publication number
CN206128607U
CN206128607U CN201620915385.9U CN201620915385U CN206128607U CN 206128607 U CN206128607 U CN 206128607U CN 201620915385 U CN201620915385 U CN 201620915385U CN 206128607 U CN206128607 U CN 206128607U
Authority
CN
China
Prior art keywords
derrick
chimney
suspension bracket
pull bar
hoisting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620915385.9U
Other languages
Chinese (zh)
Inventor
王群伟
崔建涛
韩富强
李群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
13th Construction Co Ltdof China National Chemical Engineering
Original Assignee
13th Construction Co Ltdof China National Chemical Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 13th Construction Co Ltdof China National Chemical Engineering filed Critical 13th Construction Co Ltdof China National Chemical Engineering
Priority to CN201620915385.9U priority Critical patent/CN206128607U/en
Application granted granted Critical
Publication of CN206128607U publication Critical patent/CN206128607U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a lifting platform device of chimney derrick, it includes derrick, derrick pull rod, chimney section of thick bamboo wall and hoisting frame, the derrick is the column steel frame construction of the square that is formed by angle steel welding, and the first derrick pull rod and the second derrick pull rod of two inclination differences are drawn together to a plurality of group derrick pull rods of symmetric distribution on the lateral wall of derrick, every derrick draw -bar box of group, the hoisting frame is including radiation roof beam, annular beam, backup pad and gallows, and the radiation roof beam uses the derrick to be a plurality of channel -section steels of radially distributed as the center, and radiation roof beam lower part sets up the gallows through linking up with the activity. Above -mentioned lifting platform device of chimney derrick, hoisting frame and derrick can promote along with increasing of chimney shaft gradually, have easy operation, safe and reliable's characteristics.

Description

A kind of lifting stage apparatus of chimney derrick
Technical field
This utility model is related to chimney construction technical field, and the derrick during particularly a kind of chimney construction lifts platform Device.
Background technology
Building reinforced concrete chimney the seventies in last century needs to build the scaffold for matching according to the height of chimney, by In substantial amounts of scaffold template is needed, quantities is big, and the construction of small-sized chimney is only applied to now.In recent years the construction of chimney was more Using the technique of slding form operation, without building large-scale scaffold, but need using complicated hydraulic slip-form device, plant equipment Input is more, complex operation and a large amount of support bars of waste.
Utility model content
Technical problem to be solved in the utility model is the defect for overcoming prior art, there is provided a kind of chimney derrick is carried Stage apparatus are risen, hoisting frame and derrick can gradually be lifted with increasing for chimney shaft, with simple to operate, safe and reliable spy Point.
Technical problem of the present utility model is with following technical proposals realization:
A kind of lifting stage apparatus of chimney derrick, it includes derrick, derrick pull bar, chimney wall and hoisting frame, described Derrick is the foursquare column steel frame construction being welded by angle steel, symmetrical some groups of derrick pull bars on the wall of derrick side, Every group of derrick pull bar includes the first different derrick pull bar of two angles of inclination and the second derrick pull bar;The hoisting frame includes spoke Beam, annular girder, gripper shoe and suspension bracket are penetrated, radiation beam is some channel-section steels radially distributed centered on derrick, under radiation beam Portion arranges suspension bracket by hook activity.
The lifting stage apparatus of above-mentioned chimney derrick, the derrick pull bar is the steel wire rope of diameter 15mm, pacifies on steel wire rope Dress bottle gouard moved by hands.
The lifting stage apparatus of above-mentioned chimney derrick, the suspension bracket is divided into inside and outside two groups, and internal hanger and outer suspension bracket are pacified respectively It is mounted in the inside and outside both sides of chimney wall;Every group of suspension bracket is made up of upper and lower two-layer, and between per layer of adjacent suspension bracket scaffold board is laid.
The lifting stage apparatus of above-mentioned chimney derrick, the outside of the outer suspension bracket arranges safety net.
This utility model adopts above-mentioned technical proposal, and by the circular lift frame being suspended on derrick, inside outer lifting, pours Note chimney wall, as stack shell is stepped up, derrick and hoisting frame are also stepped up, it is not necessary to build the cunning of scaffold and complexity Mould, saves the material that artificial operation and steel pipe etc. build scaffold, saves man-hour, reduces building cost.There is operation simultaneously Simply, working security is high, the characteristics of chimney structure quality is good.The vertical lifting equipment of derrick lifts hopper using hoist engine, It is simple to operation.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is A-A views of the present utility model.
Each list of reference numerals is in figure:1st, derrick, 2, derrick pull bar, 3, chimney wall, 4, charging aperture, 5, chimney raft, 6, Hopper, 7, radiation beam, 8, suspension bracket, 9, scaffold board, 10, bottle gouard moved by hands, 11, safety net, 12, toroidal frame, 13, gripper shoe.
Specific embodiment
This utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in figure 1, this utility model includes derrick 1, derrick pull bar 2, chimney wall 3 and hoisting frame.The derrick 1 is The foursquare column steel frame construction being welded by angle steel, wherein the foursquare length of side is 1.25m, the specification of angle steel is 80* 8.The inside of derrick is provided for conveying the hopper 6 of material, and the hoist engine of crown lifts hopper by pull rope.Derrick 1 Some groups of derrick pull bars 2 are uniformly arranged in every one side at side wall four sides, derrick pull bar is symmetrical centered on derrick.The well Frame pull bar is the steel wire rope of Ф 15 (diameter 15mm), and bottle gouard moved by hands 10 is installed on steel wire rope.Every group of derrick pull bar inclines including two The first different derrick pull bar of rake angle and the second derrick pull bar, the first derrick pull bar and the second derrick pull bar upper end are fixed on well Frame same position, lower end is connected respectively with hoisting frame.50 ° -90 ° of the scope of derrick pull bar and horizontal direction angle.Wherein with water Flat angular separation it is big for the first derrick pull bar, angle it is little for the second derrick pull bar.The friendship of the first derrick pull bar and hoisting frame Joint of the meeting point away from derrick center 0.625m, the second derrick pull bar and hoisting frame by derrick pull bar, is carried away from derrick center 4.7m The triangular structure for rising frame and derrick composition ensures that hoisting frame stress is steady, safe and reliable.
As shown in Fig. 2 the hoisting frame includes radiation beam 7, annular girder 12, gripper shoe 13 and suspension bracket 8.The radiation beam 7 It is some channel-section steels radially distributed centered on derrick, 16,20 or 24 radiation beams is typically set, it is uniform due to radiating beam Distribution, makes hoisting frame uniform force.Derrick pull bar 2 is fixed on radiation beam 7.The circle that annular girder 12 is increased successively by three loop diameters Ring is constituted, and annulus is made up of channel-section steel.Annular girder 12 welds integral with radiation beam 7, radiates the surface laying shape of gripper shoe 13 of beam Into hoisting frame.The bottom of each radiation beam arranges suspension bracket 8 by hook activity, and 8 points of suspension bracket is inside and outside two groups, internal hanger with Outer suspension bracket is separately mounted to the inside and outside both sides of chimney wall.Every group of suspension bracket is made up of upper and lower two-layer, the adjacent suspension bracket of upper and lower layer Between lay scaffold board 9 respectively, operator construct on scaffold board.Suspension bracket 8 is made up of the round steel of Ф 20, and round steel upper end is curved Into inverted U-shaped hook formation, suspension bracket is set to be hooked on radiation beam and can move along radiation beam.The outside of outer suspension bracket arranges safety net 11, to the safety for guaranteeing operator.
The course of work of the present utility model is described further below:
Reinforcing bar, concrete perfusion are laid on chimney raft 5, funnel base is built.The center of pedestal sets up derrick 1.The radial upper surface for being welded on annular girder of beam 7 is radiated by 24, between radiation beam gripper shoe 13 is laid, make lifting Frame.Derrick pull bar 2 is installed on derrick, and is connected with hoisting frame.It is responsible for holding and is carried by 16 groups of (per four groups of side) derrick pull bar Rise the balance of frame.Manually calabash 10 manually pulls upwards hoisting frame during construction.In the bottom mounting suspension of hoisting frame.Operation Work attaches inside and outside two-layer template on chimney wall, is fixed by anchor ear between template.Concrete is poured into a mould between template, chimney is formed Barrel 3.With the increase of chimney shaft, diameter is gradually reduced, and the hook of suspension bracket 8 is moved along radiation beam 7 to center, to adapt to cylinder The change of body.
When needing lift headframe pull bar, per group of the first derrick pull bar is moved up along derrick, the second derrick pull bar is used To stablize hoisting frame;After first derrick draw rod positions are fixed, the second derrick pull bar is moved upwards up to the first derrick and draws along derrick again The position of bar.By the alternating movement of two derrick pull bars, the rising of hoisting frame is realized.

Claims (5)

1. a kind of lifting stage apparatus of chimney derrick, it is characterised in that it includes derrick (1), derrick pull bar (2), chimney barrel Wall (3) and hoisting frame, the derrick (1) is the foursquare column steel frame construction being welded by angle steel, the side wall of derrick (1) Upper symmetrical some groups of derrick pull bars (2), each group of derrick pull bar (2) is drawn including two the first different derricks of angle of inclination Bar and the second derrick pull bar;The hoisting frame includes radiation beam (7), annular girder (12), gripper shoe (13) and suspension bracket (8), radiation Beam (7) is some channel-section steels radially distributed centered on derrick, and radiation beam bottom arranges suspension bracket (8) by hook activity.
2. lifting stage apparatus of chimney derrick according to claim 1, it is characterised in that the derrick pull bar (2) is The steel wire rope of diameter 15mm, installs bottle gouard moved by hands (10) on steel wire rope.
3. lifting stage apparatus of chimney derrick according to claim 2, it is characterised in that the suspension bracket (8) be divided into it is interior, Outer two groups, inside and outside suspension bracket is separately mounted to the inside and outside both sides of chimney wall;Every group of suspension bracket is made up of upper and lower two-layer, per layer of laying Scaffold board (9).
4. lifting stage apparatus of chimney derrick according to claim 3, it is characterised in that the hook bends for round steel Form.
5. lifting stage apparatus of chimney derrick according to claim 4, it is characterised in that set on the outside of the outer suspension bracket Put safety net (11).
CN201620915385.9U 2016-08-22 2016-08-22 Lifting platform device of chimney derrick Active CN206128607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620915385.9U CN206128607U (en) 2016-08-22 2016-08-22 Lifting platform device of chimney derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620915385.9U CN206128607U (en) 2016-08-22 2016-08-22 Lifting platform device of chimney derrick

Publications (1)

Publication Number Publication Date
CN206128607U true CN206128607U (en) 2017-04-26

Family

ID=58563829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620915385.9U Active CN206128607U (en) 2016-08-22 2016-08-22 Lifting platform device of chimney derrick

Country Status (1)

Country Link
CN (1) CN206128607U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590169A (en) * 2018-03-21 2018-09-28 中国化学工程第十三建设有限公司 A kind of urea prilling tower is without derrick hydraulic sliding mould construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590169A (en) * 2018-03-21 2018-09-28 中国化学工程第十三建设有限公司 A kind of urea prilling tower is without derrick hydraulic sliding mould construction method

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN102535843B (en) Construction method of circular reinforced concrete chimney cylinder wall and hydraulic sliding mould device
CN202467191U (en) Hydraulic slip form device used for construction of circular reinforced concrete chimney wall
CN102328881B (en) Device and method for hoisting entire oversized steel reinforcement cage in one step
CN106429791B (en) A kind of the Special-purpose hanger rigging and hanging method of nuclear power station CR10 and reinforcing bar composite module
CN102146729B (en) Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof
CN205973618U (en) Shell ring hoisting device in chimney
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN206128607U (en) Lifting platform device of chimney derrick
CN201362953Y (en) Construction platform for pouring concrete silo roof
CN110984642A (en) Construction method for large-diameter hyperbolic cooling tower cylinder wall
CN203160664U (en) Mould hanging device of lifting platform during concrete cylinder wall construction
CN108331429B (en) Method for installing tubular high-rise steel structure
CN207312977U (en) A kind of special construction apparatus suitable for prestressed concrete wind tower Wall Construction
CN203795311U (en) Multi-leg high pier and slip form construction device
CN204954202U (en) Blast furnace stove outer covering inner wall welded platform
CN103924653A (en) Framework type drainage well and construction method thereof
CN105951683A (en) Construction method for corbel steel reinforcements of gate pier
CN207160721U (en) A kind of super-huge iron tower of power transmission line supervisor
CN213267906U (en) Circular foundation ditch is pour and is used pin-connected panel steel form
CN206220460U (en) For the operating platform of tower
CN202347846U (en) Simple lifting setting stair steel moulding plate
CN205296829U (en) Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system
CN210549018U (en) Eccentric arc-shaped ring corridor section high-altitude lifting tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant