CN206126650U - Whole drive assembly balance hanger of high drive bull -dozer - Google Patents
Whole drive assembly balance hanger of high drive bull -dozer Download PDFInfo
- Publication number
- CN206126650U CN206126650U CN201621172326.3U CN201621172326U CN206126650U CN 206126650 U CN206126650 U CN 206126650U CN 201621172326 U CN201621172326 U CN 201621172326U CN 206126650 U CN206126650 U CN 206126650U
- Authority
- CN
- China
- Prior art keywords
- hook
- suspension hook
- neck
- lifting hook
- dozer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides a whole drive assembly balance hanger of high drive bull -dozer, belongs to workshop instrument technical field, and its technical scheme is, including main lifting hook, supplementary lifting hook and the skew bow frame of focus in the constitution, the bill of main lifting hook and supplementary lifting hook divides the hook on the boss of driven sprocket both sides eventually, and the neck of hook of main lifting hook and supplementary lifting hook is through two spacer pin hub connections, in the rings on the neck of hook of main lifting hook are inserted to the skew bow frame's of focus one end, the hook connect of the other end and hoist. The utility model discloses regard the sprocket as the hoisting point, the cooperation through two lifting hooks realizes whole drive assembly's quick, reliable hook to skew bow frame makes subassembly keep balance through the focus, has simple structure, low cost, and convenient operation, ann congruent characteristics have not only improved the assembly efficiency and the assembly quality of bull -dozer, can alleviate workman's intensity of labour moreover.
Description
Technical field
This utility model is related to a kind of device for lifting high driving bulldozer final drive component, belongs to workshop tools skill
Art field.
Background technology
Height drives its end that is mainly characterized by of bull-dozer to be driven(Also it is drive sprocket)Departing from walker, with braking in a turn
Clutch and central transmission arrange that on the same axis as viewed from bull-dozer side, crawler belt is shaped as triangle, this structure
Drive sprocket can be prevented effectively from and directly bear temporary impact load from ground, the life-span that can make whole drive system improves about
30%.It is typically all first then again will to constitute the two together with eventually transmission is attached together with braking in a turn clutch during practical set
Whole transmission component integral hoisting enter whole machine, because whole transmission component installation site is high, weight is big(About 800kg), in geometry
The heart and deviation of gravity center are more and without suspension centre, in addition many workpieces and hydraulic packing of the transmission with braking in a turn clutch eventually
Part is all afraid of to collide with, and to the lifting of component very big difficulty is caused, and greatly reduces the efficiency of assembling of product, increased the work of workman
Intensity.Therefore how while product safety is ensured, the efficient lifting of whole transmission component is realized, always perplexs relevant technology
The difficult problem of personnel.
Utility model content
The purpose of this utility model is the drawback for prior art, there is provided a kind of high driving bulldozer final drive component
Balance sling, to improve the efficiency of assembling and assembling quality of bull-dozer, mitigates the labor intensity of workman.
Problem described in the utility model is with following technical proposals realization:
A kind of high driving bulldozer final drive component balance sling, composition includes that main suspension hook, auxiliary suspension hook and center of gravity are inclined
From segmental support, the bill of the main suspension hook and auxiliary suspension hook is hooked in respectively on the eventually boss of the sprocket both sides of transmission, main suspension hook and
The neck of hook of auxiliary suspension hook by two spacing bearing pin connections, insert on the neck of hook of main suspension hook by one end of the deviation of gravity center segmental support
Suspension ring in, the other end is connected with the suspension hook of crane.
Above-mentioned high driving bulldozer final drive component balance sling, the neck of hook of the auxiliary suspension hook arranges two, their phases
Neck of hook both sides that are mutually parallel and being located at main suspension hook respectively.
Above-mentioned high driving bulldozer final drive component balance sling, the spacing pin shaft hole on the neck of hook of the auxiliary suspension hook is equal
For circular hole, a spacing pin shaft hole on the neck of hook of the main suspension hook is circular hole, and another spacing pin shaft hole is slotted hole.
Sprocket as suspension centre, by the cooperation of two suspension hooks the quick, reliable of whole transmission component is realized by this utility model
Hook, and make component keep balance by deviation of gravity center segmental support, it is with low cost with simple structure, it is easy to operate, safe etc.
Feature, not only increases the efficiency of assembling and assembling quality of bull-dozer, and can mitigate the labor intensity of workman.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram that is installed of balance sling;
The structural representation of suspension hook based on Fig. 3;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is the structural representation for aiding in suspension hook;
Fig. 6 is the left view of Fig. 5.
Respectively it is numbered in figure:1st, rear axle box welding body;2nd, braking in a turn clutch;3rd, transmission eventually;4th, main suspension hook;5th, it is auxiliary
Help suspension hook;6th, spacing bearing pin;7th, deviation of gravity center segmental support;8th, spacing pin shaft hole;9th, sprocket;10th, suspension ring.
Specific embodiment
Below in conjunction with the accompanying drawings the utility model is described in further detail.
Referring to Fig. 1~Fig. 6, this utility model includes main suspension hook 4, auxiliary suspension hook 5, spacing bearing pin 6 and deviation of gravity center arch
Frame 7.
First 3 being driven during practical set by braking in a turn clutch 2 and eventually, whole transmission component is connected into by alignment pin,
Whole transmission component is steadily positioned in Special station tool to carry out spacing, and prevents whole transmission component from being collided with or having different
Thing is fallen in whole transmission component.
The whole transmission component balance sling of assembling, is first placed on the neck of hook of main suspension hook 4 between two necks of hook of auxiliary suspension hook 5,
The bill of two suspension hooks is relative, and with a spacing bearing pin 6 through the slotted hole on the neck of hook of main suspension hook 4(Spacing pin shaft hole)With it is auxiliary
The circular hole helped on the neck of hook of suspension hook 5(Spacing pin shaft hole)So that can rotate against between main suspension hook 4 and 25, so
Hook the boss of the sprocket both sides of whole transmission component respectively with the bill of main suspension hook 4 and auxiliary suspension hook 5 afterwards, then it is spacing with another
It is spacing that bearing pin 6 passes through another spacing pin shaft hole of main suspension hook 4 and auxiliary suspension hook 5 to carry out, and an elliptical closed suspension ring 10 are mounted in
The upper end of main suspension hook 4, through oval suspension ring 10, the other end hangs on crane hook the one end of deviation of gravity center segmental support 7.Start
After crane, by the effect of deviation of gravity center segmental support, whole transmission component can be made generally in horizontality, deviation of gravity center arch
The size of frame is drawn by calculating according to the barycentre offset of whole transmission component.This structure can be prevented effectively from whole transmission
Component collides with assembling process with frame rear axle box welding body 1, makes the connection of whole transmission component and rear axle box welding body
It is safe and reliable, convenient, fast.
Claims (3)
1. a kind of high driving bulldozer final drive component balance sling, is characterized in that, composition includes main suspension hook(4), auxiliary hanging
Hook(5)With deviation of gravity center segmental support(7), the main suspension hook(4)With auxiliary suspension hook(5)Bill be hooked in the sprocket of eventually transmission respectively
(9)On the boss of both sides, main suspension hook(4)With auxiliary suspension hook(5)The neck of hook pass through two spacing bearing pins(6)Connection, the center of gravity
Deviate segmental support(7)One end insert main suspension hook(4)The neck of hook on suspension ring(10)Interior, the other end connects with the suspension hook of crane
Connect.
2. a kind of high driving bulldozer final drive component balance sling according to claim 1, is characterized in that, the auxiliary
Suspension hook(5)The neck of hook arrange two, they be parallel to each other and respectively be located at main suspension hook(4)Neck of hook both sides.
3. a kind of high driving bulldozer final drive component balance sling according to claim 1 and 2, is characterized in that, described
Auxiliary suspension hook(5)The neck of hook on spacing pin shaft hole be circular hole, the main suspension hook(4)The neck of hook on a spacing pin shaft hole
For circular hole, another spacing pin shaft hole is slotted hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621172326.3U CN206126650U (en) | 2016-10-26 | 2016-10-26 | Whole drive assembly balance hanger of high drive bull -dozer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621172326.3U CN206126650U (en) | 2016-10-26 | 2016-10-26 | Whole drive assembly balance hanger of high drive bull -dozer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206126650U true CN206126650U (en) | 2017-04-26 |
Family
ID=58575969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621172326.3U Active CN206126650U (en) | 2016-10-26 | 2016-10-26 | Whole drive assembly balance hanger of high drive bull -dozer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206126650U (en) |
-
2016
- 2016-10-26 CN CN201621172326.3U patent/CN206126650U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204506961U (en) | Ladle car is embraced in a kind of high security upset | |
CN102659029B (en) | Combined type movable hanger | |
CN202358849U (en) | Small-size suspension crane | |
CN103979438B (en) | A kind of auxiliary device for removing tower crane attachment frame | |
CN202449788U (en) | Special crane device for wall bricks | |
CN106006365B (en) | A kind of suspender for being used to assemble heavy forklift tire | |
CN205709618U (en) | Hooks coupling universal coupling dismounting special hanger on a kind of vertical mill | |
CN201889616U (en) | Box girder tilter | |
CN206126650U (en) | Whole drive assembly balance hanger of high drive bull -dozer | |
CN106744263A (en) | The conversion method and tower crane of hook mechanism and its working condition | |
CN204737595U (en) | Roof beam hoist gyration hoist is hung to four hoisting point electromagnetism | |
CN105006924B (en) | Motor core threading device and its punching method | |
CN103882852A (en) | Rammer release device of dynamic compactor | |
CN204778355U (en) | Automobile wheel hub special lifting device | |
CN206956559U (en) | Quick peace for guardrail template in Bridge guardrail concrete pouring construction tears equipment open | |
CN206607837U (en) | A kind of single-stranded cucurbit mounting structure of combined type lifted for climbing frame | |
CN206051351U (en) | Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form | |
CN201325823Y (en) | Novel hanger for large loop wheel machine | |
CN203834458U (en) | Hammer dropping device of dynamic compaction machine | |
CN206645739U (en) | A kind of crane with fixing function | |
CN206870932U (en) | A kind of mountain region pole trailer equipment | |
CN207618885U (en) | Diesel engine lubricant filtering device hoisting tool | |
CN210393418U (en) | Automatic hoisting device for tubular pile steel cage | |
CN220182608U (en) | Electric lifting hoisting device for inspection well water pump | |
CN205820686U (en) | A kind of bracket type auto sling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200604 Address after: 075105 No. 21 Dongsheng Road, Xuanhua District, Hebei, Zhangjiakou Patentee after: Hebei Xuangong Machinery Development Co.,Ltd. Address before: 075105 No. 21 Dongsheng Road, Xuanhua District, Hebei, Zhangjiakou Patentee before: XUANHUA CONSTRUCTION MACHINERY Co.,Ltd. |