CN206113654U - Terminal surface prefabricated section for roasting furnace fire wall - Google Patents

Terminal surface prefabricated section for roasting furnace fire wall Download PDF

Info

Publication number
CN206113654U
CN206113654U CN201620965045.7U CN201620965045U CN206113654U CN 206113654 U CN206113654 U CN 206113654U CN 201620965045 U CN201620965045 U CN 201620965045U CN 206113654 U CN206113654 U CN 206113654U
Authority
CN
China
Prior art keywords
prefabricated
locating piece
boss
vertical
support block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620965045.7U
Other languages
Chinese (zh)
Inventor
靳林文
王广成
卢光群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaozuo Dove New Material Ltd By Share Ltd
Original Assignee
Jiaozuo Dove New Material Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaozuo Dove New Material Ltd By Share Ltd filed Critical Jiaozuo Dove New Material Ltd By Share Ltd
Priority to CN201620965045.7U priority Critical patent/CN206113654U/en
Application granted granted Critical
Publication of CN206113654U publication Critical patent/CN206113654U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a terminal surface prefabricated section for roasting furnace fire wall, the prefabricated section includes two prefabricated plates that set up along fore -and -aft direction symmetry, the prefabricated plate go up side and downside on all be equipped with the interconnection, be equipped with longitudinal channel on the right flank of prefabricated plate, prefabricated chamber is called that in the space between two prefabricated plates, prefabricated chamber right -hand member department is provided with the locating piece, the intermediate position department in prefabricated chamber is provided with the boss, prefabrication chamber left end department is provided with the supporting shoe, locating piece, boss, supporting shoe and two prefabricated plate formula structures as an organic whole. The utility model discloses a wholeness, stable good, the mechanical construction of being convenient for, the speed of building by laying bricks or stones is being shown to be improved.

Description

Baking furnace flame path wall end face prefabricated section
Technical field
This utility model belongs to roaster field, more particularly to a kind of baking furnace flame path wall end face prefabricated section.
Background technology
Ring-form calcining furnace is the large-scale thermal kiln furnace equipment for producing carbon product most critical, to a prebaked anode factory For, the capital expenditure of ring-form calcining furnace accounts for the 50%~60% of whole charcoal ink factory's gross investment, and Anode Baking Furnace Design and technology Advanced quality to carbonaceous product, the production capacity of specific investment cost, energy resource consumption, furnace life, production cost have very big Impact, the design of baking furnace flame path wall end face prefabricated section, the selection of material and construction technology are design roaster most criticals Technology.
The aspects such as China's ring-form calcining furnace technology experience development, its furnace chamber volume, combustion system, bell inner lining material have very Big to improve, the technical-economic index for enabling ring-form calcining furnace substantially changes, but flue wall is still using fritter brick masonry Brick technology, the service life that flue wall is present is short, it is big or middle repair time length etc. and perplex the problem of yield and quality still exist. Different according to flue wall size, per pass wall is about formed by 2000-3000 block brick masonries, and not only the overall structure of furnace wall is strong Degree is poor, and can only be with being accomplished manually construction operation, it is impossible to realize do mechanization operation, the brickwork time is long, low production efficiency, work The high labor intensive of people.And the brick-building art of mud is not beaten due to still adopting flush joint to beat mud, vertical seam, brickwork joint mud so occurs Slurry comes off, and have impact on the overall construction intensity of flue wall.
In addition in process of production, according to technological requirement repeatedly heating, cooling, when filling every time, coming out of the stove, crown block clamp, Carbonaceous product is all inevitably collided on flue wall, can gradually step into then " furnace box deformation → flame do not follow the correct path → Temperature produces the dead angle → different parts temperature difference and becomes big → furnace box and further deforms " etc. vicious cycle, cause energy consumption to increase, the body of heater longevity Life is reduced, light maintenance in occurring frequently.When deformation reaches to a certain degree, must just remove and build again, dismounting is laid equal stress on and builds a quirk Wall takes around the material for carrying nearly 35 tons, and more than 2 days are needed at the soonest.This not only brings difficulty to repairing furnaceman, and gives The normal production in workshop also increases difficulty.Because ring-form calcining furnace is operation in a looping fashion, leaves maintenance, dismounting for, build again The time of flue wall is at full stretch, it is generally the case that be all just must to start to shape when furnace temperature also has 80 DEG C~90 DEG C, Working environment is extremely severe, certainly will influence whether construction quality again in turn.
At present, China's ring-form calcining furnace flue wall depression, deformation, usage cycles it is short be affect stove production capacity it is main because Element;The crack of brick flue wall, leak out, stove upper and lower temperature difference also has large effect to product quality greatly;Overhaul time length, apply Work bad environments are the difficult problems in production management.
Utility model content
This utility model is in order to solve the problems of the prior art, there is provided a kind of baking furnace flame path wall end face prefabricated section, Its globality, good stability, are easy to mechanized construction, build speed by laying bricks or stones and are significantly improved.
To solve above-mentioned technical problem, this utility model is adopted the following technical scheme that:Baking furnace flame path wall is prefabricated with end face Block, the prefabricated section includes two symmetrically arranged precoated plates along the longitudinal direction, is all provided with the upper side of precoated plate and downside There is an interconnection, interconnection is in left-right direction through the groove of the precoated plate and horizontal on upper side and downside Passage is correspondingly arranged up and down;The right flank of precoated plate is provided with vertical passage, and vertical passage is for along the vertical direction through described pre- The groove of making sheet;
Space between two precoated plates is referred to as prefabricated chamber, locating piece to be provided with prefabricated chamber right-hand member, before locating piece Afterwards both ends are vertical with corresponding precoated plate respectively and are fixedly connected, and locating piece is provided with location hole, and location hole is in left-right direction Through the locating piece;The middle position in prefabricated chamber is provided with boss, the rear and front end portion of boss respectively with it is corresponding Precoated plate is vertical and is fixedly connected;Be provided with support block at prefabricated chamber left end, the rear and front end portion of support block respectively with it is corresponding Precoated plate is vertical and is fixedly connected, the upper end of support block, bottom and left part respectively upper side corresponding with precoated plate, Downside is concordant with left surface;
Locating piece, boss, support block are integral type structure with two precoated plates.
The cross sectional shape of the interconnection and vertical passage is circular arc.
The cross sectional shape of the location hole is rectangle.
The cross sectional shape of the boss is Long Circle, rectangle or circle.
The cross sectional shape of the support block is rectangle.
The beneficial effects of the utility model are:
The matching design that prefabricated section of the present utility model passes through locating piece, boss, support block and two precoated plates, its is whole Body, good stability, are also improved by the bulk strength of its flue wall built by laying bricks or stones, greatly reduce flue wall deformation, are carried The high service life of flue wall, enhances the heat transfer property of flue wall, reduces the temperature difference.
This utility model is easy to mechanized construction, reduces labor strength, builds speed by laying bricks or stones and is significantly improved, significantly Shorten the engineering time.
When building by laying bricks or stones, corresponding vertical passage fastens the complete longitudinal direction that Formation cross-section is annular and leads on the adjacent prefabricated section in left and right Road, corresponding interconnection fastens the completed lateral passage that Formation cross-section is annular, complete longitudinal direction on neighbouring prefabricated section Through reinforcing bar or filling adhesive in passage and/or completed lateral passage, the bulk strength of the flue wall built by laying bricks or stones is improved, subtracted significantly Lack flue wall deformation, improve the service life of flue wall.Wear when adopting in complete vertical passage and/or completed lateral passage When crossing the scheme of reinforcing bar, it also has easy-to-mount advantage.
The setting in prefabricated chamber, enhances the heat transfer property of its flue wall built by laying bricks or stones, reduces the temperature difference.
Locating piece is provided with prefabricated chamber right-hand member, the rear and front end portion of locating piece is vertical with corresponding precoated plate respectively and solid Fixed connection, locating piece is provided with location hole, and location hole runs through in left-right direction the setting of the locating piece, locating piece and location hole Be prevented from prefabricated section dislocation, when building by laying bricks or stones, pass through Anti-dislocation brick in location hole, Anti-dislocation brick stretch out location hole and with it is contiguous prefabricated Block is fixed or engaged, that is, realize Anti-dislocation effect, and Anti-dislocation brick is the section of existing bit brick, its cross sectional shape and location hole Form fit.The cross sectional shape of location hole is rectangle, and the Anti-dislocation brick being prevented from it is rotated, and improves locating effect.
The middle position in prefabricated chamber is provided with boss, and the rear and front end portion of boss hangs down respectively with corresponding precoated plate Straight and be fixedly connected, the cross sectional shape of the boss is rectangle, and the setting of boss is improve between two precoated plates Securement strength.
Support block, the rectangular cross-section of the support block, the rear and front end part of support block are provided with prefabricated chamber left end Vertical with corresponding precoated plate and be fixedly connected, the upper end of support block, bottom and left part be not right with precoated plate respectively The upper side answered, downside are concordant with left surface, and the support block of the structure improves the structural strength of prefabricated section end and smooth Degree, its end face body of wall for being adapted to build by laying bricks or stones flue wall bottom is used.
Description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is left view of the present utility model.
Specific embodiment
As shown in Figure 1 to Figure 3, baking furnace flame path wall of the present utility model end face prefabricated section, the prefabricated section includes two Individual symmetrically arranged precoated plate 1 along the longitudinal direction, is equipped with interconnection 6 on the upper side of precoated plate 1 and downside, laterally logical Road 6 is to correspond to about 6 and set through the groove of the precoated plate, and the interconnection on upper side and downside in left-right direction Put;The right flank of precoated plate is provided with vertical passage 7, and vertical passage 7 is for along the vertical direction through the groove of the precoated plate, institute The cross sectional shape for stating interconnection and vertical passage is circular arc.When building by laying bricks or stones, corresponding longitudinal direction on the adjacent prefabricated section in left and right Passage 7 fastens the complete vertical passage that Formation cross-section is annular, and corresponding interconnection 6 fastens shape on neighbouring prefabricated section Into the completed lateral passage that section is annular, reinforcing bar is passed through in complete vertical passage and/or completed lateral passage, what raising was built by laying bricks or stones The bulk strength of flue wall, greatly reduces flue wall deformation, improves the service life of flue wall.When complete vertical passage And/or completed lateral passage in using through reinforcing bar scheme when, its also have easy-to-mount advantage.
Space between two precoated plates 1 is referred to as prefabricated chamber 8, and the setting in prefabricated chamber 8 enhances its flue wall built by laying bricks or stones Heat transfer property, reduce the temperature difference.
Locating piece 4 is provided with the right-hand member of prefabricated chamber 8, the rear and front end portion of locating piece 4 is vertical with corresponding precoated plate 1 respectively And be fixedly connected, locating piece 4 is provided with location hole 5, location hole 5 runs through in left-right direction the locating piece 4, and location hole 5 cuts Face is shaped as rectangle.Locating piece 4 is prevented from prefabricated section dislocation with the setting of location hole 5, when building by laying bricks or stones, passes through in location hole 5 anti- Dislocation brick, Anti-dislocation brick stretch out location hole 5 and with contiguous prefabricated piece of fixation or engage, that is, realize Anti-dislocation effect, Anti-dislocation brick Cross sectional shape for existing bit brick, its cross sectional shape and location hole 5 coordinates.
The middle position in prefabricated chamber 8 is provided with boss 3, and the rear and front end portion of boss 3 is prefabricated with corresponding respectively Plate 1 is vertical and is fixedly connected, and the cross sectional shape of boss is rectangle.The setting of boss 3 is improve between two precoated plates 1 Securement strength.
The cross sectional shape of the boss 3 may be alternatively provided as Long Circle or rectangle.
Support block 2 is provided with the left end of prefabricated chamber 8, the cross sectional shape of support block 2 is rectangle.The rear and front end of support block 2 Portion is vertical with corresponding precoated plate 1 respectively and is fixedly connected, the upper end of support block 2, bottom and left part respectively with it is prefabricated Corresponding upper side, downside are concordant with left surface on plate 1;Locating piece 4, boss 3, support block 2 and two precoated plates 1 are one Body formula structure.Support block 2 improves the structural strength and flatness of prefabricated section end, and it is adapted to build the end face of flue wall bottom by laying bricks or stones Body of wall is used.
The design that prefabricated section of the present utility model passes through locating piece 4, boss 3, support block 2 and two precoated plates 1, its is whole Body, good stability, the bulk strength of its flue wall built by laying bricks or stones is also improved, and greatly reduces flue wall deformation, improves The service life of flue wall, enhances the heat transfer property of flue wall, reduces the temperature difference.This utility model is adapted to build by laying bricks or stones under flue wall The end face body of wall in portion is used, and also all can build whole flue wall by laying bricks or stones by it.
This utility model is easy to mechanized construction, reduces labor strength, builds speed by laying bricks or stones and is significantly improved, significantly Shorten the engineering time.
Above example is only to illustrative and not limiting the technical solution of the utility model, although reference above-described embodiment pair This utility model has been described in detail, it will be understood by those within the art that:Still this utility model can be entered Row modification or equivalent, without deviating from any modification or partial replacement of spirit and scope of the present utility model, it all should Cover in the middle of right of the present utility model.
In description of the present utility model, it is to be understood that term " centre ", " longitudinal direction ", " horizontal ", "front", "rear", "left", "right", " on ", the orientation of the instruction such as D score or position relationship be, based on orientation shown in the drawings or position relationship, to be only Must have specifically for ease of describing this utility model and simplifying description, rather than indicate or infer the device or element of indication Orientation, for specific azimuth configuration and operation, thus it is not intended that protecting the restriction of content to this utility model.

Claims (5)

1. baking furnace flame path wall end face prefabricated section, it is characterised in that:The prefabricated section symmetrically sets along the longitudinal direction including two The precoated plate put, is equipped with interconnection on the upper side of precoated plate and downside, interconnection is in left-right direction through institute The groove of precoated plate is stated, and the interconnection on upper side and downside is correspondingly arranged up and down;The right flank of precoated plate is provided with Vertical passage, vertical passage is along the vertical direction through the groove of the precoated plate;
Space between two precoated plates is referred to as prefabricated chamber, locating piece is provided with prefabricated chamber right-hand member, two before and after locating piece End is vertical with corresponding precoated plate respectively and is fixedly connected, and locating piece is provided with location hole, and location hole runs through in left-right direction The locating piece;The middle position in prefabricated chamber is provided with boss, and the rear and front end portion of boss is prefabricated with corresponding respectively Plate is vertical and is fixedly connected;Support block is provided with prefabricated chamber left end, the rear and front end portion of support block is prefabricated with corresponding respectively Plate is vertical and is fixedly connected, the upper end of support block, bottom and left part upper side corresponding with precoated plate, downside respectively Face is concordant with left surface;
Locating piece, boss, support block are integral type structure with two precoated plates.
2. baking furnace flame path wall according to claim 1 end face prefabricated section, it is characterised in that:The interconnection and vertical Circular arc is to the cross sectional shape of passage.
3. baking furnace flame path wall according to claim 1 and 2 end face prefabricated section, it is characterised in that:The location hole Cross sectional shape is rectangle.
4. baking furnace flame path wall according to claim 3 end face prefabricated section, it is characterised in that:The section of the boss It is shaped as Long Circle, rectangle or circle.
5. baking furnace flame path wall according to claim 3 end face prefabricated section, it is characterised in that:The section of the support block It is shaped as rectangle.
CN201620965045.7U 2016-08-29 2016-08-29 Terminal surface prefabricated section for roasting furnace fire wall Active CN206113654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620965045.7U CN206113654U (en) 2016-08-29 2016-08-29 Terminal surface prefabricated section for roasting furnace fire wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620965045.7U CN206113654U (en) 2016-08-29 2016-08-29 Terminal surface prefabricated section for roasting furnace fire wall

Publications (1)

Publication Number Publication Date
CN206113654U true CN206113654U (en) 2017-04-19

Family

ID=58513362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620965045.7U Active CN206113654U (en) 2016-08-29 2016-08-29 Terminal surface prefabricated section for roasting furnace fire wall

Country Status (1)

Country Link
CN (1) CN206113654U (en)

Similar Documents

Publication Publication Date Title
CN100578127C (en) Fluidized calcining furnace ball arc furnace top and method of forming same
CN201301298Y (en) Duplex exhaust gas reversed jet circulation stamp charging coke oven
CN206177020U (en) Roasting furnace fire wall structure
CN206113654U (en) Terminal surface prefabricated section for roasting furnace fire wall
CN206113653U (en) Anti - misalignment prefabricated section for roasting furnace fire wall
CN206113652U (en) Roasting furnace fire wall is with easily docking prefabricated section
CN206113651U (en) Roasting furnace fire wall is with easily assembling prefabricated section
CN202322715U (en) Novel stamp-charging coke oven
CN206113655U (en) Fire door prefabricated section for roasting furnace fire wall
CN103834416A (en) Large-sized tamping coke oven
CN203923089U (en) A kind of large-scale tamping coke furnace
CN207379289U (en) A kind of baking furnace flame path wall burner castable block
CN207365716U (en) A kind of baking furnace flame path wall castable block
CN204115462U (en) A kind of inner liner of rotary kiln structure
CN207379286U (en) A kind of baking furnace flame path wall top pouring material block
CN107129814A (en) A kind of coke dry quenching furnace refractory lining diclinic road and its process built by laying bricks or stones
CN207351216U (en) A kind of anode carbon baking stove flue wall castable block
CN207299941U (en) A kind of baking furnace flame path wall construction
CN207472053U (en) A kind of flue wall bottom connects quirk castable block
CN206858481U (en) New Type Coke Oven regenerator lattice brick
CN207299940U (en) A kind of baking furnace flame path wall two-chamber road castable block
CN207472051U (en) A kind of baking furnace flame path wall single-chamber road castable block
CN207316903U (en) Improved Ou Ye stoves coal powder injection steam stove
CN207379290U (en) A kind of baking furnace flame path wall bottom pouring material block
CN215049719U (en) Double-chamber lime kiln with ring beam supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Terminal surface prefabricated section for roasting furnace fire wall

Effective date of registration: 20190212

Granted publication date: 20170419

Pledgee: Jiaozuo CTS bank Limited by Share Ltd

Pledgor: Jiaozuo dove new material Limited by Share Ltd

Registration number: 2019410000002

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200106

Granted publication date: 20170419

Pledgee: Jiaozuo CTS bank Limited by Share Ltd

Pledgor: Jiaozuo dove new material Limited by Share Ltd

Registration number: 2019410000002

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Terminal surface prefabricated section for roasting furnace fire wall

Effective date of registration: 20200106

Granted publication date: 20170419

Pledgee: Jiaozuo CTS bank Limited by Share Ltd

Pledgor: Jiaozuo dove new material Limited by Share Ltd

Registration number: Y2020980000027

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210208

Granted publication date: 20170419

Pledgee: Jiaozuo CTS bank Limited by Share Ltd.

Pledgor: JIAOZUO GEDE NEW MATERIALS Co.,Ltd.

Registration number: Y2020980000027

PC01 Cancellation of the registration of the contract for pledge of patent right