CN206110659U - Hydraulic pressure subregion creeping formwork system device for skyscraper construction - Google Patents
Hydraulic pressure subregion creeping formwork system device for skyscraper construction Download PDFInfo
- Publication number
- CN206110659U CN206110659U CN201620948865.5U CN201620948865U CN206110659U CN 206110659 U CN206110659 U CN 206110659U CN 201620948865 U CN201620948865 U CN 201620948865U CN 206110659 U CN206110659 U CN 206110659U
- Authority
- CN
- China
- Prior art keywords
- creeping formwork
- platform
- body panel
- guide rail
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Hydraulic pressure subregion creeping formwork system device for skyscraper construction, including truss platform and support post, lower extreme at the truss platform is equipped with the support post, the other creeping formwork platform that is equipped with of support post, rear side at the creeping formwork platform is equipped with the creeping formwork guide rail, the creeping formwork guide rail is fixed on the wall body, be equipped with little stroke cylinder between creeping formwork platform and creeping formwork guide rail, be equipped with behind the creeping formwork platform and connect the chamber, be equipped with body panel and lower body panel in the creeping formwork system, can be conveniently with operating personnel position promotion, can make things convenient for operating personnel to carry out the installation and the processing of creeping formwork to high -rise position, be equipped with the creeping formwork guide rail in the creeping formwork system, can let body panel and lower body panel transmit, can let more the convenience of climbing of creeping formwork, more swift of installation that also can let the creeping formwork.
Description
Technical field
This utility model is related to a kind of climbing form system, and in particular to construction of super highrise building is filled with hydraulic zone climbing form system
Put.
Background technology
In current country's similar item using most, construction technique is, vertically with horizontally separated construction(Core Walls Structure
Backform, integrated climbform)To meet Core Walls Structure index bed speed of application, while can just there be enough constructions housing steel construction part
The scope of operation, then it is such under the premise of, be in itself unfavorable to building, especially as regional difference, concrete design strength is steady
Surely have too many in deciding factor, and Core Walls Structure concrete walls vertical section, centre is right without the mutual drawknot of horizontal beam plate
Vertical wall body structure, the vertical bearing failure of concrete has the hidden danger that can not ignore, and to this, we must break the normal procedure, and be assorted
Horizontal contignation is got rid of into the delayed secondary construction of needs when creeping formwork, backform are constructed, it is necessary to have a kind of speed of application fast and
Can be by the formwork system device of horizontal contignation climbing formwork for construction on year-on-year basis.
The content of the invention
The purpose of this utility model is to provide one kind and climbs conveniently, installs quick construction of super highrise building hydraulic zone
Climbing form system device.
The technical solution of the utility model is:Construction of super highrise building hydraulic zone climbing form system device, including truss
Platform and support post, in the lower end of truss platform support post is provided with, and climb formwork platform is provided with by support post, in climb formwork platform
Rear side be provided with creeping formwork guide rail, creeping formwork guide rail is fixed on body of wall, and little stroke oil is provided between climb formwork platform and creeping formwork guide rail
Cylinder, is provided with connecting cavity after climb formwork platform, be provided with support bar in described connection intracavity and described support bar is distributed in for ramp-like
Connection intracavity.
Described connecting cavity is rectangular-shaped conducting cavity structure, is mutually abutted between connecting cavity.
Described climb formwork platform is divided into body panel and lower body panel, and upper body panel is interconnected and fixed with lower body panel.
Cross bar is provided with described upper body panel, cross bar is distributed in body panel.
The utility model has the advantages that:Body panel and lower body panel are provided with climbing form system, conveniently will can be operated
Personnel positions are lifted, and can facilitate operator that the installation and processing of creeping formwork are carried out to high-rise position, are provided with climbing form system
Creeping formwork guide rail, can allow body panel and lower body panel to be transmitted, and can allow the enhanced convenience of climbing of creeping formwork, it is also possible to allow
The installation of creeping formwork is more quick.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the partial enlarged drawing of this utility model A.
Fig. 3 is the partial enlarged drawing of utility model B.
In figure:1 is truss platform, and 2 is support post, and 3 is creeping formwork guide rail, and 4 is little stroke oil cylinder, and 5 is connecting cavity, and 6 are
Support bar, 7 is upper body panel, and 8 is lower body panel, and 9 is cross bar, and 10 is downward end.
Specific embodiment
This utility model is further illustrated below in conjunction with the accompanying drawings.
Construction of super highrise building hydraulic zone climbing form system device, including truss platform 1 and support post 2, in truss
The lower end of platform 1 is provided with support post 2, and by support post 2 climb formwork platform is provided with, and creeping formwork guide rail is provided with rear side of climb formwork platform
3, creeping formwork guide rail 3 is fixed on body of wall, and little stroke oil cylinder 4 is provided between climb formwork platform and creeping formwork guide rail 3, is set after climb formwork platform
There is connecting cavity 5, support bar 6 is provided with described connecting cavity 5 and described support bar 6 is distributed in connecting cavity 5 for ramp-like, even
It is rectangular-shaped conducting cavity structure to connect chamber 5, is mutually abutted between connecting cavity 5, and climb formwork platform is divided into body panel 7 and lower body panel
8, upper body panel 7 is interconnected and fixed with lower body panel 8, and cross bar 9 is provided with upper body panel 7, and cross bar 9 is distributed in restocking and puts down
In platform, downward end 10 is provided with creeping formwork guide rail, creeping formwork groove is provided with downward end 10, in creeping formwork groove column is provided with.
Claims (4)
1. construction of super highrise building hydraulic zone climbing form system device, it is characterised in that:Including truss platform and support post,
Support post is provided with the lower end of truss platform, climb formwork platform is provided with by support post, creeping formwork is provided with rear side of climb formwork platform
Guide rail, creeping formwork guide rail is fixed on body of wall, and little stroke oil cylinder is provided between climb formwork platform and creeping formwork guide rail, is set after climb formwork platform
There is connecting cavity, be provided with support bar in described connection intracavity and described support bar is distributed in connection intracavity for ramp-like.
2. construction of super highrise building according to claim 1 hydraulic zone climbing form system device, it is characterised in that:It is described
Connecting cavity be rectangular-shaped conducting cavity structure, mutually abut between connecting cavity.
3. construction of super highrise building according to claim 1 hydraulic zone climbing form system device, it is characterised in that:It is described
Climb formwork platform be divided into body panel and lower body panel, upper body panel is interconnected and fixed with lower body panel.
4. construction of super highrise building according to claim 3 hydraulic zone climbing form system device, it is characterised in that:It is described
Upper body panel in be provided with cross bar, cross bar is distributed in body panel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620948865.5U CN206110659U (en) | 2016-08-26 | 2016-08-26 | Hydraulic pressure subregion creeping formwork system device for skyscraper construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620948865.5U CN206110659U (en) | 2016-08-26 | 2016-08-26 | Hydraulic pressure subregion creeping formwork system device for skyscraper construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206110659U true CN206110659U (en) | 2017-04-19 |
Family
ID=58513718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620948865.5U Active CN206110659U (en) | 2016-08-26 | 2016-08-26 | Hydraulic pressure subregion creeping formwork system device for skyscraper construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206110659U (en) |
-
2016
- 2016-08-26 CN CN201620948865.5U patent/CN206110659U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967881B (en) | Hydraulic synchronous jacking device of die carrier system | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN202530754U (en) | Floor post-cast strip template structure | |
CN205296803U (en) | Elevator automatic lifting operation panel | |
CN202866262U (en) | Bearing hanging rack for civil construction | |
CN101691169A (en) | Lifting device used on rubbish compression machine (station) | |
CN208280592U (en) | Automatic climbing formula hoistway cylinder mould panel assembly | |
CN204163298U (en) | A kind of antidetonation stair | |
CN202658867U (en) | Overhanging construction platform | |
CN206110659U (en) | Hydraulic pressure subregion creeping formwork system device for skyscraper construction | |
CN206667458U (en) | The constructing device of vestibule system steel structure girder | |
CN103654610A (en) | Rail type hanging basket | |
CN202936807U (en) | Assembled tower footing | |
CN204456816U (en) | One can promote supporting leg type elevator hoistway construction platform | |
CN106351441A (en) | Chimney creeping formwork construction device and construction method | |
CN102900096B (en) | Fabricated tower footing | |
CN204059901U (en) | A kind of high-altitude construction operation platform | |
CN203867198U (en) | Slip equipment for high-rise steel structure transfer layer truss | |
CN201794305U (en) | Supporting device for elevator shaft mold | |
CN205590111U (en) | Construction elevator attaches wall structure | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN204960273U (en) | Protection handling frame instrument formula steel platform in elevartor shaft | |
CN103723638B (en) | The climbing support of tower crane and tower crane | |
CN207974502U (en) | Operation platform in a kind of combined electrical stair shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |