CN206110492U - Grout material sleeve, prefab connection structure of presetting for building - Google Patents

Grout material sleeve, prefab connection structure of presetting for building Download PDF

Info

Publication number
CN206110492U
CN206110492U CN201621100103.6U CN201621100103U CN206110492U CN 206110492 U CN206110492 U CN 206110492U CN 201621100103 U CN201621100103 U CN 201621100103U CN 206110492 U CN206110492 U CN 206110492U
Authority
CN
China
Prior art keywords
slurry
sleeve
building
reinforcing bar
grouting material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621100103.6U
Other languages
Chinese (zh)
Inventor
杨晓彤
彭凯玲
杨万和
彭昱
蔡灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621100103.6U priority Critical patent/CN206110492U/en
Application granted granted Critical
Publication of CN206110492U publication Critical patent/CN206110492U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a grout material sleeve, prefab connection structure of presetting for building. The grout material sleeve that presets for building is including overlapping the barrel, and the one end of this set barrel is equipped with the threaded connection hole, the sleeve body and function is in connecing continuously through the threaded connection hole with first reinforcing wire, the other end of cover barrel is equipped with to internal thick liquids chamber of extending in the sleeve, and this the thick liquids intracavity that wholly is the blind hole form is used for inserting the second reinforcing bar. The utility model provides the cost has been practiced thrift to high efficiency of construction, can produce huge economic benefits.

Description

Preset grouting material sleeve for building, prefabricated component attachment structure
Technical field
This utility model is related to a kind of preset grouting material sleeve for building, prefabricated component attachment structure, is particularly suited for assembling Formula building field.
Background technology
, by sleeve connection, sleeve is arranged on prefabricated structure for architectural industrialization prefabricated components upper reinforcement and lower rebar at present In part, using upper reinforcement it is prefabricated when be connected with telescopic screw.Lower rebar insertion sleeve, is then made by preformed hole grouting Upper reinforcement and lower rebar pass through sleeve connection.
Except installation procedure is more, slip casting is wayward, sleeve is difficult to dock with reinforcing bar, inserts difficult, peace conventional grout sleeve Fill it is extremely inefficient beyond.Although conventional grout sleeve principle is feasible, due to grouting quality easily by grouting workman level, The impact of the external conditions such as quality, the impact of responsibility, the impact of grouting material quality and weather, grouting quality cannot ensure, Most fearful is that grouting effect or quality cannot effective detections.Or caused consequence is designer dare not be connected with grout sleeve Connection technology, or increasing safety stock uses grout sleeve interconnection technique with caution, and assembled architecture is difficult to get around or root Originally sleeve connection technology is can't steer clear of, therefore constrains the development of assembled architecture.Due also to conventional sleeve link cost is too high, greatly Family is few with the component, the part that need grout sleeve connection intentionally, has a strong impact on the raising of assembled architecture assembly rate.
Utility model content
This utility model aims to provide a kind of preset grouting material sleeve for building, prefabricated component attachment structure, and the sleeve does not set Grout hole and slurry outlet are put, exempts from grouting, such that it is able to improve the quality of product, while improving efficiency.
To achieve these goals, the technical scheme adopted by this utility model is:
A kind of preset grouting material sleeve for building, including sleeve body, one end of the sleeve body is provided with threaded connection hole;It is described Sleeve body is used to be threaded connection hole and connect with the first reinforcing wire to be connected, and which is structurally characterized in that, the other end of the sleeve body sets The slurry chamber extended inside oriented sleeve body, overall slurry intracavity in blind hole shape are used to insert the second reinforcing bar.
Thus, this utility model creatively is provided for encapsulating the slurry chamber of multiple slurry capsules in sleeve, is not provided with Grout hole and slurry outlet, so as to avoid later stage grouting, improve work efficiency.
According to embodiment of the present utility model, this utility model can also be made it is further optimize, below for optimization after The technical scheme of formation:
Diaphragm seal is provided with the accent of the slurry intracavity, the diaphragm seal is mounted in slurry chamber for multiple slurries are encapsulated It is interior.
The slurry capsule is glass or capsule made by tinfoil paper or glue material, intracapsular to be packaged with slurry.
In order to further improve the reliability of connection, the wall in the slurry chamber is provided with the structure for increasing bond stress.It is excellent Select the female thread that the structure for increasing bond stress is that cross sectional shape is rectangle.
First reinforcing bar is the upper reinforcement that top prefabricated components are stretched out in part, and it is pre- that the second reinforcing bar stretches out bottom for part The lower rebar of component processed;The sleeve body bottom package has the diaphragm seal.
The slurry capsule of slurry intracavity is caused to flow out in order to prevent diaphragm seal in transit from rupturing, the sleeve body bottom Equipped with plug ring.It is preferred that the plug ring is elastic plug ring.While diaphragm seal is protected, can without remove rubber stopper and by reinforcing bar Slurry intracavity is entered directly through the hole of rubber stopper.
First reinforcing bar according to another embodiment of the present utility model is the bottom that bottom prefabricated components are stretched out in part Reinforcing bar, the second reinforcing bar are the upper reinforcement that top prefabricated components are stretched out in part;The sleeve body top encapsulation has the diaphragm seal.
It is highly preferred that the diaphragm seal is 10-20mm apart from the distance of the slurry chamber accent of sleeve body, it is for building preset Interim fixation when grouting material sleeve is pre-buried reserves position.
Based on same inventive concept, this utility model additionally provides a kind of prefabricated component attachment structure, and which is included with upper The top prefabricated components of portion's reinforcing bar and the bottom prefabricated components with lower rebar;Characterized in that, the upper reinforcement is with Portion's reinforcing bar is by for building preset grouting material sleeve as described in one of claim 1-8;The upper reinforcement or lower rebar Insertion makes the multiple slurry capsules rupture of the slurry intracavity, the mutual condensation by mixing of the intracapsular slurry of each slurry and by the first reinforcing bar, Sleeve body and the second reinforcing bar are fixed together.
Being aligned between reinforcing bar and sleeve, has between the top prefabricated components and bottom prefabricated components existing for convenience Section is poured, the preset grouting material sleeve for building is arranged in the Cast-in-Situ Segment.It is possible thereby to facilitate reinforcing bar to insert, so as to improve Work efficiency.
Slurry capsule of the present utility model is divided at least two slurry capsules, and every kind of slurry is intracapsular to be packaged with a kind of paste composition, At least two slurries intracapsular paste composition forms building slurry when mixing;Or each slurry it is intracapsular be packaged with various slurries into Point, separated by barrier film between various paste compositions, and various paste compositions form building slurry when mixing.Various paste compositions Conventional grouting material is formed after mixing.
Used as a kind of conventional formula, the paste composition is common building slurry, it include cement, water, sandstone and Micro-expanding agent or epoxy resin.
Compared with prior art, the beneficial effects of the utility model are:
1st, sleeve connection is easy to reinforcing bar to insert in Cast-in-Situ Segment, easy construction, and efficiency is improved.
When conventional preform is produced, sleeve is in prefabricated components, fixed difficult, in addition it is also necessary to pre-buried pipeline make injected hole with it is outer UNICOM of portion, is arranged on Cast-in-Situ Segment, and reinforcing bar insertion is convenient, and production and installation effectiveness are improved.
2nd, slurry capsule is put in sleeve in advance, exempts from later stage slip casting, quality assurance, improve production efficiency.
Traditional mode of production is reinforcing bar insertion sleeve, after lifting is in place, slurry is pressed in sleeve by grout hole, this Upper reinforcement is connected by utility model with telescopic screw, below prefabricated components stretch out in reinforcing bar insertion sleeve, or will be pre- above Component processed stretches out in reinforcing bar insertion sleeve, and last slurry capsule rupture mixes generation reaction and condenses, upper reinforcement and under Portion's reinforcing bar is by the firm connection of sleeve.
3rd, sleeve of the present utility model is not provided with grout hole and slurry outlet, reduces grouting tube material and pulp tube material, subtracts Few grout pipe and grout outlet installation procedure, reduce the installation difficulty of sleeve;Grouting material is preset can also to reduce grouting procedure, reduce Grouting material is wasted and installation fee can greatly reduce link cost;In producer's dispensing, grouting material can realize that accurate dispensing is stably starched Material quality;The preset grouting matter that scene grouting can be overcome to cause due to operator's reason and external environment condition reason of grouting material The big shortcoming of amount discreteness;Grouting material is preset can be guaranteed quality of connection and overcome grout sleeve to be in the milk by product sampling observation program The fatal defects that quality cannot be detected(At present industry thinks that grout sleeve rebar connecting technology is feasible but unreliable, using when Hold the suspicious attitude, constrain the development of assembled architecture).Cost Problems that the preset sleeve technology of grouting material is solved, quality problems, Test problems are provided for assembled architecture health, stable development it may be said that solve the key technical problem of assembled architecture Technology ensures that greatly promoted the development of housing industrialization, its effect is limitless.
4th, economic effect of the present utility model is also clearly.Worked as using preset grouting material sleeve technology according to initial estimate Front assembly rate(35%)Under level, sleeve makes and installs saves about 6 yuan/square metre, and grouting material and labour cost are saved about 28 yuan/square metre;The whole nation in 2015 completes about 45,000,000 square meter of assembled architecture according to statistics, to go up within 2016 100000000 square metres with On, 15.3 hundred million yuan or so can be saved within such 2015,3,400,000,000 yuan or so of estimated saving in 2016.And China is building assembling at present Formula builds ratio less than 6%, and western developed country has reached 60%-70%, and assembly rate only reaches 30% or so, and west prosperity state Family has generally reached 70% to 80%, if our national assembled architecture ratios and assembly rate reach external average level, if The saving for all being brought using preset grouting material sleeve connection technology can reach hundred billion scales.
Description of the drawings
Fig. 1 is the structure principle chart of this utility model one embodiment;
Fig. 2 is the application state figure of Fig. 1;
Fig. 3 is the structure principle chart of another embodiment of this utility model;
Fig. 4 is the application state figure of Fig. 3.
In figure
1- upper reinforcements;2- is threadedly coupled;3- sleeve bodies;4- slurry capsules;5- seals tinfoil paper;6- plug rings;7- lower rebars; 8- tops prefabricated components;9- bottoms prefabricated components;10- superimposed sheets.
Specific embodiment
Below with reference to accompanying drawing and in conjunction with the embodiments describing this utility model in detail.It should be noted that not conflicting In the case of, the feature in embodiment and embodiment in this utility model can be mutually combined.For sake of convenience, hereinafter such as Occur " on ", D score, "left", "right" printed words, only represent it is consistent with the upper and lower, left and right direction of accompanying drawing itself, not to structure Play restriction effect.
Embodiment 1
A kind of preset grouting material sleeve for building, as shown in figure 1, including sleeve body 3, the top of the sleeve body 3 has to be used In the threaded connection hole 2 being threadedly coupled with upper reinforcement 1, there is slurry chamber in the sleeve body 3, the slurry intracavity is provided with multiple slurries Material capsule 4, slurry capsule 4 are encapsulated in slurry intracavity by sealing tinfoil paper 5, in order to ensure that sealing tinfoil paper 5 is damaged during transport, in sleeve body Equipped with the rubber stopper for shielding, preferred rubber plug is perforated rubber stopper ring 6 for 3 bottoms.
The slurry capsule 4 includes at least two slurry capsules, and the slurry in each capsule is non-condensing, but at least two slurries Capsule is mixed by the slurry that lower rebar is extruded after rupture, then form coagulable slurry, and various slurries are mixed After solidification, upper reinforcement and lower rebar are fixed together.
Slurry capsule 4 is preferably extra quality slurry capsule.
A kind of prefabricated component attachment structure, as shown in Fig. 2 including the top prefabricated components 8 with upper reinforcement 1 and under having The bottom prefabricated components 9 of portion's reinforcing bar 7, the upper reinforcement 1 of top prefabricated components 8 are threaded connection hole 2 and are connected with 3 screw thread of sleeve body Connect, lower rebar 7 punctures sealing tinfoil paper 5 through rubber plug ring 6 and insertion has been placed in, in the sleeve body 3 of slurry capsule 4, making slurry Capsule 4 ruptures, mixes generation reaction solidification, makes upper reinforcement 1 and lower rebar 7 by the firm connection of above-mentioned sleeve body, exempts pre- Pre-buried grout sleeve during component processed, grout lines are set up, 1 insertion sleeve 3 of upper reinforcement of top prefabricated components 8 is compared with traditional approach It is convenient.
Prefabricated component method of attachment is carried out using above-mentioned preset grouting material sleeve for building to comprise the steps:
S1, load multiple slurry capsules in the slurry chamber of described for building preset grouting material sleeve, and encapsulated with diaphragm seal In slurry intracavity;
S2, the first reinforcing bar is threaded connection into hole and sleeve body is fixedly linked;
S3, the second reinforcing bar is inserted into slurry intracavity through diaphragm seal, and by the multiple slurry capsules rupture of slurry intracavity, it is each to starch The intracapsular mutual condensation by mixing of slurry of material is until the first reinforcing bar, sleeve body and the second reinforcing bar are fixed together;
When the accent in slurry chamber is embedded in inside the prefabricated component of top downwards, diaphragm seal moves a spacing on slurry intracavity From reserving position to interim fixes sleeve during embedded sleeve barrel, preferably get lodged in and prevent serosity downward at the accent in slurry chamber by plug Spill;
When the accent in slurry chamber is embedded in the cast-in-place band of bottom prefabricated component upper end upwards, diaphragm seal slurry intracavity is moved down Certain distance, is easy to the positioning of preset grouting material sleeve for building to fix.
This utility model is arranged on Cast-in-Situ Segment using by sleeve connection, and upper component is stretched out reinforcing bar and connected with sleeve by screw thread Connect, lower member is stretched out in reinforcing bar insertion sleeve, through rubber stopper and sealing tinfoil paper, make the rupture mixing of slurry capsule react solidifying Gu, lower rebar is closely connected with sleeve, last upper reinforcement and lower rebar are born structure together by sleeve connection and are answered Power, the attachment means reduce operation, facilitate bar connecting, and connection is reliable, and sleeve and slurry capsule can be after pre-stage tests Batch production is easy to quality assurance, exempts late detection.
During precast shear wall, post assembly, certain amount slurry capsule will be put in proportion in advance in grout sleeve, and And sealed, during splicing prefabricated components, first sleeve is threadedly coupled with upper reinforcement in Cast-in-Situ Segment, finally will be following pre- Component processed stretches out in reinforcing bar insertion sleeve, during insertion reinforcing bar more expect that capsules break mixes generation reaction and condenses, top Reinforcing bar and lower rebar instead of traditional form of construction work for first by reinforcing bar insertion sleeve, the later stage leads to by the firm connection of sleeve Cross grout hole serosity material is pressed in sleeve, grouting material condenses realizes the firm connection of sleeve.Sleeve and slurry capsule can sleeve productions Manufacturer's system is placed in advance in finished product, it is possible to reduce burying work beforehand amount and pre-buried difficulty, reduces live grouting procedure, it is often more important that can The predicament for detecting is difficult to overcome grouting quality to be difficult to ensure that, prefabricated, efficiency of assembling can also be greatly enhanced, greatly reduced Production cost.It is final to pave the way for architectural industrialization assembled architecture of realizing carrying out in an all-round way.
Embodiment 2
A kind of preset grouting material sleeve for building, as shown in figure 3, including sleeve body 3, the bottom of the sleeve body 3 has to be used In the threaded connection hole 2 being threadedly coupled with lower rebar 7, there is slurry chamber in the sleeve body 3, the slurry intracavity is provided with multiple slurries Material capsule 4, slurry capsule 4 are encapsulated in slurry intracavity by sealing tinfoil paper 5.
The slurry capsule 4 includes at least two slurry capsules, and the slurry in each capsule is non-condensing, but at least two slurries Capsule is mixed by the slurry that upper reinforcement is extruded after rupture, then form coagulable slurry, and various slurries are mixed After solidification, upper reinforcement and lower rebar are fixed together.
Slurry capsule 4 is preferably extra quality slurry capsule.
A kind of prefabricated component attachment structure, as shown in figure 4, including the top prefabricated components 8 with upper reinforcement 1 and under having The bottom prefabricated components 9 of portion's reinforcing bar 7, the lower rebar 7 of bottom prefabricated components 9 are threaded connection hole 2 and are connected with 3 screw thread of sleeve body Connect, upper reinforcement 1 punctures the sealing insertion of tinfoil paper 5 and has been placed in the sleeve body 3 of slurry capsule 4, ruptures slurry capsule 4, mixes product Raw reaction solidification, makes upper reinforcement 1 and lower rebar 7 by the firm connection of above-mentioned sleeve, embedded sleeve barrel when exempting prefabricated components, Grout lines are set up, 1 insertion sleeve 3 of upper reinforcement of top prefabricated components 8 is convenient compared with traditional approach.
Slurry capsule 4 is preferably extra quality slurry capsule.
Cast-in-Situ Segment is arranged on using by sleeve connection, lower member stretches out reinforcing bar by screw thread and sleeve connection, top structure Part is stretched out in reinforcing bar insertion sleeve, through sealing tinfoil paper, makes the rupture mixing of slurry capsule react solidification, by upper reinforcement with cover Cylinder closely connects, and last upper reinforcement and lower rebar bear structural stress together by sleeve connection, and the attachment means are reduced Working procedure, facilitates bar connecting, and connection is reliable, and sleeve and slurry capsule can be easy to guarantee by pre-stage test batch production Quality, release later stage check.
Thus work progress, during precast shear wall, post assembly, will be pressed in grout sleeve in advance with reference to embodiment 1 Ratio is put into certain amount slurry capsule, and is sealed, during splicing prefabricated components, in Cast-in-Situ Segment first by sleeve and lower rebar Be threadedly coupled, finally stretching out prefabricated components above in reinforcing bar insertion sleeve, insertion reinforcing bar when more expect capsules break mix It is combined generation reaction to condense, upper reinforcement and lower rebar instead of traditional form of construction work by the firm connection of sleeve For first by reinforcing bar insertion sleeve, the later stage is pressed into serosity material in sleeve by grout hole, grouting material condenses realizes the firm company of sleeve Connect.Sleeve and slurry capsule can sleeve production firm system be placed in advance in finished product, it is possible to reduce burying work beforehand amount and pre-buried difficulty, reduce Live grouting procedure, it is often more important that grouting quality can be overcome to be difficult to ensure that the predicament for being difficult to detect, greatly can also be carried High prefabricated, efficiency of assembling, greatly reduces production cost.It is final to pave for architectural industrialization assembled architecture of realizing carrying out in an all-round way Road.
The content that above-described embodiment is illustrated should be understood to that these embodiments are only used for being illustrated more clearly that this utility model, Rather than scope of the present utility model is limited, after this utility model has been read, those skilled in the art are new to this practicality The modification of the various equivalent form of values of type each falls within the application claims limited range.

Claims (10)

1. a kind of preset grouting material sleeve for building, including sleeve body(3), the sleeve body(3)One end be provided with threaded connection hole (2);The sleeve body(3)For being threaded connection hole(2)Connect with the first reinforcing wire and be connected, it is characterised in that the sleeve Body(3)The other end be provided with to sleeve body(3)The internal slurry chamber for extending, overall slurry intracavity in blind hole shape are used to insert Second reinforcing bar.
2. preset grouting material sleeve for building according to claim 1, it is characterised in that at the accent of the slurry intracavity Diaphragm seal is provided with, the diaphragm seal is for by multiple slurry capsules(4)It is encapsulated in slurry intracavity.
3. preset grouting material sleeve for building according to claim 2, it is characterised in that the slurry capsule(4)For glass Or capsule made by tinfoil paper or glue material, it is intracapsular to be packaged with slurry.
4. preset grouting material sleeve for building according to claim 1, it is characterised in that set on the wall in the slurry chamber Having increases the structure of bond stress.
5. for building preset grouting material sleeve according to one of claim 1-4, it is characterised in that first reinforcing bar is Stretch out top prefabricated components in part(8)Upper reinforcement(1), the second reinforcing bar for part stretch out bottom prefabricated components(9)Bottom Reinforcing bar(7);The sleeve body(3)Bottom package has the diaphragm seal.
6. preset grouting material sleeve for building according to claim 5, it is characterised in that the sleeve body(3)Bottom fills There is plug ring(6).
7. for building preset grouting material sleeve according to one of claim 1-4, it is characterised in that first reinforcing bar is Stretch out bottom prefabricated components in part(9)Lower rebar(7), the second reinforcing bar for part stretch out top prefabricated components(8)Top Reinforcing bar(1);The sleeve body(3)Top encapsulation has the diaphragm seal.
8. for building preset grouting material sleeve according to claim 5 or 7, it is characterised in that the diaphragm seal distance set Cylinder(3)Slurry chamber accent distance be 10-20mm.
9. a kind of prefabricated component attachment structure, including with upper reinforcement(1)Top prefabricated components(8)With with lower rebar (7)Bottom prefabricated components(9);Characterized in that, the upper reinforcement(1)With lower rebar(7)By such as claim 1-8 One of described in for building preset grouting material sleeve;The upper reinforcement(1)Or lower rebar(7)Insertion makes the slurry intracavity Multiple slurry capsules(4)Rupture, each slurry capsule(4)The mutual condensation by mixing of interior slurry and by the first reinforcing bar, sleeve body(3)With Two reinforcing bars are fixed together.
10. prefabricated component attachment structure according to claim 9, it is characterised in that the top prefabricated components(8)And bottom Prefabricated components(9)Between there is Cast-in-Situ Segment, the preset grouting material sleeve for building is arranged in the Cast-in-Situ Segment.
CN201621100103.6U 2016-09-30 2016-09-30 Grout material sleeve, prefab connection structure of presetting for building Active CN206110492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621100103.6U CN206110492U (en) 2016-09-30 2016-09-30 Grout material sleeve, prefab connection structure of presetting for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621100103.6U CN206110492U (en) 2016-09-30 2016-09-30 Grout material sleeve, prefab connection structure of presetting for building

Publications (1)

Publication Number Publication Date
CN206110492U true CN206110492U (en) 2017-04-19

Family

ID=58522543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621100103.6U Active CN206110492U (en) 2016-09-30 2016-09-30 Grout material sleeve, prefab connection structure of presetting for building

Country Status (1)

Country Link
CN (1) CN206110492U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113737845A (en) * 2021-08-26 2021-12-03 安徽省建筑科学研究设计院 Assembled precast concrete retaining wall and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113737845A (en) * 2021-08-26 2021-12-03 安徽省建筑科学研究设计院 Assembled precast concrete retaining wall and construction method

Similar Documents

Publication Publication Date Title
CN106351404B (en) A kind of preset grouting material sleeve, prefabricated component connection structure and connection method for building
CN102134852B (en) Concrete pouring device and method
CN207260443U (en) A kind of grout sleeve prefabricated for building structure
CN106320162B (en) Using the precast assembly bent cap structure and construction method of steel shear connector
CN106351401B (en) Half assembled super-high strength steel pipe slip casting overlaps rod structure and production method
CN206279628U (en) A kind of precast concrete reinforcing bar grouting connecting structure
CN206110492U (en) Grout material sleeve, prefab connection structure of presetting for building
CN106149878B (en) Concrete frame structure prefabricated post and the connection structure and method at beam slab node
CN108708452A (en) The U-shaped integral prefabricated window member that floats, assembled float window joint structure and its construction method
CN208763204U (en) A kind of vertical connecting structure of low layer assembled architecture prefabricated panel
CN104911999B (en) Buried anchor construction method
CN109440925A (en) A kind of prefabricated concrete structure node connection prefabricated component and its connection type
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN106149877A (en) Docking structure at concrete frame structure prefabricated post and beam slab node and method
CN102518129B (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN106245765B (en) Slip casting joint steel pipe apparatus structure and connection method
CN208472707U (en) A kind of combined type grout pipe for pile end post jacking
CN206581282U (en) Diaphram wall Ω type milling joints
CN206636571U (en) One kind can prestress steel structure concrete pipe sheet
CN206873665U (en) A kind of prefabricated shear wall and overlapping plate node
CN213952721U (en) Grouting sleeve for prefabricated building
CN206000021U (en) Attachment structure at concrete frame structure prefabricated post and beam slab node
CN206052957U (en) Slip casting joint steel pipe apparatus structure
CN107620387B (en) Method for detecting internal defects of connecting sleeve of assembly type building component
CN208379918U (en) A kind of PC component production and construction system grout sleeve device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant