CN206094562U - Equal-resistance flow-equalizing preheating backwater condensing heat exchanger - Google Patents

Equal-resistance flow-equalizing preheating backwater condensing heat exchanger Download PDF

Info

Publication number
CN206094562U
CN206094562U CN201620419698.5U CN201620419698U CN206094562U CN 206094562 U CN206094562 U CN 206094562U CN 201620419698 U CN201620419698 U CN 201620419698U CN 206094562 U CN206094562 U CN 206094562U
Authority
CN
China
Prior art keywords
pipe
water
main pipe
water inlet
exchange device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620419698.5U
Other languages
Chinese (zh)
Inventor
刘永义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Puruima Industrial Co Ltd
Original Assignee
Zhongshan Prima Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Prima Industrial Co ltd filed Critical Zhongshan Prima Industrial Co ltd
Priority to CN201620419698.5U priority Critical patent/CN206094562U/en
Application granted granted Critical
Publication of CN206094562U publication Critical patent/CN206094562U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model provides a wait to hinder flow equalizing and preheat return water condensation type heat exchange device, high-efficient module stove condenser is including the equal long reposition of redundant personnel water pipe of last female pipe, female pipe and a plurality of that are used for the rivers circulation, reposition of redundant personnel water pipe respectively with last female pipe, female pipe intercommunication down, going up and being equipped with the inlet tube on female pipe, being equipped with the outlet pipe down on female pipe, inlet tube and outlet pipe diagonal distribution respectively, make the inlet tube, go up female pipe, every reposition of redundant personnel water pipe, female pipe and outlet pipe form the rivers passageway that waits to hinder flow equalizing down, reduce the heat energy consume of the water after preheating, the latent heat that sensible heat and vapor condensed and release in the abundant absorption gas module high temperature of water in the make full use of condenser discharge fume, improve the thermal efficiency of gas module, reach the energy-concerving and.

Description

The resistance such as one kind stream preheating backwater condensed heat exchanger
Technical field
The utility model is related to gas fired-boiler field, and in particular to a kind of resistance stream preheating backwater that waits of module furnace is condensed Formula heat exchanger.
Background technology
Condensed type combustion gas module furnace is a kind of new central heating appliance, and its effects of energy conservation and environmental protection significantly, is extensively applied Live the large-scale occasion central heating such as cell, hospital, supermarket, hotel, bath center, swimming pool, supply in factory building, office block, business Hot water.
The furnace interior of above-mentioned gas module stove is provided with several gas modules, and gas module is by smoke collection pipe and stove Outlet flue connection above body.When gas module furnaceman makees, fuel combustion produces high temperature heat, can also after main heat exchanger The high-temperature flue gas of 160 DEG C~200 DEG C of discharge, high-temperature flue gas are discharged into by the fume collecting chamber's Jing air-introduced machines for heating module, smoke collection pipe In air.The exhaust gas temperature of conventional boiler is even as high as more than 250 DEG C, generally also can be absorbed in high-temperature flue gas with retracting device Part sensible heat, but due to being limited by retracting device structure and material, exhaust gas temperature is dropped less than condensation temperature.It is clear that Sensible heat in high-temperature flue gas does not make full use of.More importantly:Superheated vapour in high-temperature flue gas is warm when condensation is dropped to Substantial amounts of latent heat can be condensed and discharged when spending then not utilize completely, therefore, the thermal efficiency can only achieve 86%~90%.
Certainly, gas module stove can reduce exhaust gas temperature by strengthening the exchange capability of heat of heat exchanger.But with row The reduction of cigarette temperature, superheated vapour will be in gas module internal condensate into acid condensate water.On the one hand, acid condensate water meeting Corrosion air-introduced machine, main heat exchanger and burner assembly, affect the service life of gas-heating module;On the other hand, fuel combustion When need more than 10 times of air to mix, and the dust in air can meet humidity hysteresis when inside modules and stay and pile up, and also can drop Low efficiency, even can cause hot-spot and burn out module when serious.
Therefore, in order to ensure the normal work and use life-span of gas module, the exhaust temperature of flue gas cannot be below 150 DEG C, which limits the further raising of gas module furnace thermal efficiency.Also, the water produced during fuel combustion(Such as natural gas CH4+2O2=CO2+2H2O)In high temperature discharge, it is discharged in the form of acid superheated vapour in air, this is not only Also can aggravate the greenhouse effects of the earth to environment.
For above-mentioned, condensing waste-heat recovery device generally carries out hot friendship using multigroup distributive pipe in parallel with high-temperature flue gas Change, the latent heat that the sensible heat in high-temperature flue gas and water recovery are discharged is utilized, for preheating backwater, reach energy-conservation it Purpose.But, due to being limited by waste-heat recovery device volume, each distributive pipe is often difficult to flow, and flow difference causes It is heated uneven, heat exchanger effectiveness can not give full play to, the latent heat that the sensible heat and water recovery in high-temperature flue gas is discharged is not Can make full use of.
The content of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, there is provided the resistance such as one kind stream preheating backwater condensing Heat exchanger, it can fully absorb the latent heat that the sensible heat in gas module high-temperature smoke discharging and water recovery are discharged, and improve heat Energy organic efficiency, and then the thermal efficiency of gas module is improved, reach preferable energy-saving effect.
What goal of the invention of the present utility model was realized in:The resistance such as one kind stream preheating backwater condensed heat exchanger, It includes upper main pipe, the isometric shunting water pipe of lower main pipe and some for current circulation, and the water inlet end of water pipe is shunted per bar Connect with upper main pipe, lower main pipe respectively with water side, the upper main pipe is provided with water inlet pipe, lower main pipe is provided with outlet pipe, enters Water pipe is diagonally distributed with outlet pipe, forms water inlet pipe, upper main pipe, some shunting water pipes, lower main pipe and outlet pipes and has etc. The water stream channel that resistance is flowed.
It is optimized according to above-mentioned, the water inlet pipe is diagonally distributed with water outlet pipe part in same level.
It is optimized according to above-mentioned, the upper main pipe, lower main pipe are in same level and column distribution.
Be optimized according to above-mentioned, be provided with intake chamber in the upper main pipe, water inlet pipe, shunting water pipe respectively with intake chamber Water inlet is connected with delivery port.
Be optimized according to above-mentioned, be provided with effluent trough in the lower main pipe, shunting water pipe, outlet pipe respectively with effluent trough Water inlet is connected with delivery port.
It is optimized according to above-mentioned, some shuntings water pipe is listed in spacing respectively between main pipe, lower main pipe.
Be optimized according to above-mentioned, water inlet end and the water side that water pipe is shunted per bar respectively with the water outlet of intake chamber The water inlet connection of mouth, effluent trough.
It is optimized according to above-mentioned, the shunting water pipe includes straight tube linkage section and ripple linkage section, straight tube linkage section point It is not arranged at the first and last section and delivery port respectively with intake chamber of ripple linkage section, the water inlet of effluent trough to connect.
It is optimized according to above-mentioned, the ripple linkage section is serpentine-like to be moved towards to arrange.
The utility model has the advantage of:Diagonally it is distributed using the water inlet pipe and water outlet pipe in upper and lower main pipe, makes each bar shunting water pipe Water resistance is equal, flow is identical, be heated evenly, improve energy recovery efficiency, and then improve the thermal efficiency of gas module, reach reason The energy-saving effect thought.
Description of the drawings
Accompanying drawing 1 is the stereogram of the utility model preferred embodiment.
Accompanying drawing 2 is the right view of the utility model preferred embodiment.
Accompanying drawing 3 moves towards figure for the current of the water stream channel of the utility model preferred embodiment.
Accompanying drawing 4 moves towards figure for the current of the water stream channel of another angle of the utility model preferred embodiment.
Specific embodiment
Below in conjunction with the accompanying drawings the utility model will be further described.
It is of the present utility model to wait resistance stream preheating backwater condensed heat exchanger, its bag with reference to the accompanying drawings shown in 1 to accompanying drawing 4 Include upper main pipe 1, the isometric shunting water pipe 3 of lower main pipe 2 and some for current circulation.The water inlet end of water pipe 3 is shunted per bar Connect with upper main pipe 1, lower main pipe 2 respectively with water side, the upper main pipe 1 is provided with water inlet pipe 4, lower main pipe 2 is provided with water outlet Pipe 5, water inlet pipe 4 and the diagonal distribution respectively of outlet pipe 5, make water inlet pipe 4, upper main pipe 1, shunting water pipe 3, lower main pipe 2 and outlet pipe 5 Formed to have to wait and hinder the water stream channel 6 that flows.
With reference to shown in Fig. 2 and Fig. 4, intake chamber 7 is provided with the upper main pipe 1, water inlet pipe 4 connects with the water inlet of intake chamber 7 Logical, the water inlet end that water pipe 3 is shunted per bar is connected respectively with the delivery port of intake chamber 7.Effluent trough 8 is provided with the lower main pipe 2, often The water side of bar shunting water pipe 3 connects with the water inlet of effluent trough 8, and outlet pipe 5 is connected with the delivery port of effluent trough 8.And, institute State main pipe 1, lower main pipe 2 to be in same level and column distribution, and water inlet pipe 4 is in same level with outlet pipe 5 Diagonal distribution, so that shunting water pipe 3 per bar, all to form distance with water inlet pipe 4, upper main pipe 1, lower main pipe 2 and outlet pipe 5 identical Water stream channel 6.
That is, operation when, current by water inlet pipe 4 enter upper main pipe 1 intake chamber 7 in, be then tapped off to each shunting water pipe 3, then the effluent trough 8 of lower main pipe 2 is come together in, finally conveyed outward by outlet pipe 5.Period, it is high that water energy fully absorbs gas module The latent heat that sensible heat and water recovery in temperature smoke evacuation is discharged, makes water effectively be preheated, and improves the thermal effect of gas module Rate;Also, in the presence of the water stream channel 6 for waiting resistance to flow, the consume of energy is reduced, reach preferable effects of energy conservation and environmental protection.
Wherein, some shunting water pipes 3 are equally spacedly listed between main pipe 1, lower main pipe 2, and increasing shunt water per bar The heating surface area of pipe 3.
With reference to shown in Fig. 2 to Fig. 4, the shunting water pipe 3 includes straight tube linkage section 31 and ripple linkage section 32, straight tube connection Section 31 is respectively arranged at the first and last section and delivery port respectively with intake chamber 7 of ripple linkage section 32, the water inlet of effluent trough 8 connects It is logical, simplify structure, it is convenient to install.Wherein, the ripple linkage section 32 is serpentine-like moves towards to arrange, plus the heating surface of large shunt water pipe 3 Product, the latent heat for making full use of the sensible heat in gas module high-temperature smoke discharging and water recovery to be discharged improves the heat of gas module Efficiency, reaches preferable effects of energy conservation and environmental protection.
Above-mentioned specific embodiment is only the preferable specific embodiment of the utility model effect, it is all with it is of the present utility model etc. Resistance stream preheats the structure that backwater condensed heat exchanger is identical or is equal to, in protection domain of the present utility model.

Claims (9)

1. the resistance such as one kind stream preheats backwater condensing heat-exchange device, it is characterised in that:The heat-exchange device include for The upper main pipe of current circulation(1), lower main pipe(2)And some isometric shunting water pipes(3), water pipe is shunted per bar(3)Water inlet End with water side respectively with upper main pipe(1), lower main pipe(2)Connection, the upper main pipe(1)It is provided with water inlet pipe(4), lower main pipe (2)It is provided with outlet pipe(5), water inlet pipe(4)With outlet pipe(5)Diagonal distribution, makes water inlet pipe(4), upper main pipe(1), some Shunting water pipe(3), lower main pipe(2)And outlet pipe(5)Formed to have to wait and hinder the water stream channel that flows(6).
2. resistance stream preheating backwater condensing heat-exchange device is waited according to claim 1, it is characterised in that:The water inlet pipe (4)With outlet pipe(5)Diagonally it is distributed in same level.
3. resistance stream preheating backwater condensing heat-exchange device is waited according to claim 1, it is characterised in that:The upper main pipe (1), lower main pipe(2)In same level and column distribution.
4. resistance stream preheating backwater condensing heat-exchange device is waited according to claim 1, it is characterised in that:The upper main pipe (1)Inside it is provided with intake chamber(7), water inlet pipe(4), shunting water pipe(3)Respectively with intake chamber(7)Water inlet connect with delivery port.
5. resistance stream preheating backwater condensing heat-exchange device is waited according to claim 1, it is characterised in that:The lower main pipe (2)Inside it is provided with effluent trough(8), shunt water pipe(3), outlet pipe(5)Respectively with effluent trough(8)Water inlet connect with delivery port.
6. resistance stream preheating backwater condensing heat-exchange device is waited according to any one of claim 1 to 5, it is characterised in that: The some shuntings water pipe(3)Main pipe is equally spacedly listed in respectively(1), lower main pipe(2)Between.
7. resistance stream preheating backwater condensing heat-exchange device is waited according to claim 6, it is characterised in that:It is described to divide per bar Overflow pipe(3)Water inlet end and water side respectively with intake chamber(7)Delivery port, effluent trough(8)Water inlet connection.
8. resistance stream preheating backwater condensing heat-exchange device is waited according to claim 6, it is characterised in that:The shunting water Pipe(3)Including straight tube linkage section(31)With ripple linkage section(32), straight tube linkage section(31)It is respectively arranged at ripple linkage section (32)First and last section and respectively with intake chamber(7)Delivery port, effluent trough(8)Water inlet connection.
9. resistance stream preheating backwater condensing heat-exchange device is waited according to claim 8, it is characterised in that:The ripple connects Connect section(32)It is serpentine-like to move towards to arrange.
CN201620419698.5U 2016-05-11 2016-05-11 Equal-resistance flow-equalizing preheating backwater condensing heat exchanger Active CN206094562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620419698.5U CN206094562U (en) 2016-05-11 2016-05-11 Equal-resistance flow-equalizing preheating backwater condensing heat exchanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620419698.5U CN206094562U (en) 2016-05-11 2016-05-11 Equal-resistance flow-equalizing preheating backwater condensing heat exchanger

Publications (1)

Publication Number Publication Date
CN206094562U true CN206094562U (en) 2017-04-12

Family

ID=58471040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620419698.5U Active CN206094562U (en) 2016-05-11 2016-05-11 Equal-resistance flow-equalizing preheating backwater condensing heat exchanger

Country Status (1)

Country Link
CN (1) CN206094562U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106123340A (en) * 2016-05-11 2016-11-16 中山普瑞玛实业有限公司 Equal-resistance flow-equalizing preheating backwater condensing heat exchanger
CN106955558A (en) * 2017-05-16 2017-07-18 福建龙净环保股份有限公司 A kind of condensing duster

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106123340A (en) * 2016-05-11 2016-11-16 中山普瑞玛实业有限公司 Equal-resistance flow-equalizing preheating backwater condensing heat exchanger
CN106955558A (en) * 2017-05-16 2017-07-18 福建龙净环保股份有限公司 A kind of condensing duster
CN106955558B (en) * 2017-05-16 2024-05-28 福建龙净环保股份有限公司 Condensing dust remover

Similar Documents

Publication Publication Date Title
CN201662226U (en) Condensation-type gas-fired heating water heater
CN104501413A (en) High-efficient flue gas condensation waste heat recovery device and have this recovery unit's gas module stove
CN106989512A (en) condensing secondary heat exchanger
CN106123340A (en) Equal-resistance flow-equalizing preheating backwater condensing heat exchanger
CN102798215B (en) Condensation type coal-fired boiler with high heat efficiency and desulfurizing and dedusting functions
CN109186092A (en) Energy saving and environment friendly condensing gas wall hanging stove
CN206094562U (en) Equal-resistance flow-equalizing preheating backwater condensing heat exchanger
CN205606904U (en) High-efficient two condensing gas module stoves
CN201078704Y (en) Condensing recover type vacuum hot water boiler
CN102353139B (en) A kind of condensed type combustion gas water heater
CN204373216U (en) Burnt gas wall hanging furnace stainless steel time condensation heat exchanger
CN202048667U (en) Boiler
CN201014751Y (en) Wastewater afterheat recovering gas water heater
CN202002316U (en) Built-in vacuum hot water boiler with condensing heat recovery
CN105823215B (en) High-efficient two condensing gas module stoves
CN201206829Y (en) Liquid phase intermediate medium heat exchanging type heat exchanger
CN204345922U (en) High-efficient flue gas condensation waste heat recovery device and have this recovery unit's gas module stove
CN210197704U (en) Condensing heat exchanger for water heater
CN204213956U (en) A kind of boiler smoke step waste heat recovery economizer
CN105823218A (en) High-efficient condensing flue gas waste heat recovery device
CN205717933U (en) High-efficient condensing flue gas waste heat recovery device
CN206018671U (en) A kind of exhaust-gas treatment structure for being applied to incinerator
CN207335489U (en) A kind of preheating type hot-water boiler
CN205579623U (en) Condensing air preheating flue gas waste heat recovery device
CN206280991U (en) A kind of gas fired-boiler flue gas low-temperature afterheat utilizing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 528425 Real Estate Road, Dongfeng Town and Hetai Industrial Zone, Zhongshan City, Guangdong Province

Patentee after: Guangdong Puruima Industrial Co. Ltd.

Address before: 528425 Real Estate Road, Dongfeng Town and Hetai Industrial Zone, Zhongshan City, Guangdong Province

Patentee before: ZHONGSHAN PRIMA INDUSTRIAL CO., LTD.

CP01 Change in the name or title of a patent holder