CN206094008U - Coaxial integrated power production system of gas and steam turbine based on waste gasification - Google Patents
Coaxial integrated power production system of gas and steam turbine based on waste gasification Download PDFInfo
- Publication number
- CN206094008U CN206094008U CN201621036907.4U CN201621036907U CN206094008U CN 206094008 U CN206094008 U CN 206094008U CN 201621036907 U CN201621036907 U CN 201621036907U CN 206094008 U CN206094008 U CN 206094008U
- Authority
- CN
- China
- Prior art keywords
- steam
- incinerator
- outlet
- air
- gasification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/12—Heat utilisation in combustion or incineration of waste
Landscapes
- Incineration Of Waste (AREA)
- Gasification And Melting Of Waste (AREA)
Abstract
The utility model discloses a coaxial integrated power production system of gas and steam turbine based on waste gasification, including the waste gasification system of burning, boiler system, power generation system, power generation system includes the blender, air compressor, synthetic flue gas compressor, synthetic flue gas combustion chamber, the turbine, a steam turbine, an electric generator, exhaust -heat boiler and feedwater input system, the saturated steam outlet of the entry linkage steam pocket of blender, air compressor's gas outlet, the water inlet of steam pocket is connected to the delivery port of blender, the steam inlet of over heater is connected to the play steam ports of blender, boiler system's exhaust port is connected to the air inlet of flue gas compressor, the play steam ports of over heater, the gas outlet of flue gas compressor connects gradually synthetic flue gas combustion chamber, the turbine, exhaust -heat boiler, the steam inlet of steam turbine is connected to exhaust -heat boiler's play steam ports, the turbine, the steam turbine is connected with a motor dynamic. It can carry out the continuous gasification treatment of large -scale rubbish, and hot recovery efficiency is high, and the pollution abatement thing discharges.
Description
Technical field
This utility model belongs to solid waste incineration Treatment and recovery processing technology field, more particularly to one kind is based on
The combustion gas of refuse gasification and the coaxial combined generating system of steam turbine.
Background technology
Existing technology of garbage disposal mainly has burning, sanitary landfills, compost, waste recovery etc..In garbage disposal routine
In technology, burning disposal has reduced training substantially, and innoxious thorough, occupation of land amount is little, and waste heat energy is obtained by, and secondary pollution is few
The advantages of, meet the strategic requirement of China's sustainable development.But with to the continuous improvement of environmental requirement, how strengthening both at home and abroad
Control to secondary pollution is particularly important.Therefore, refuse pyrolysis gasification burning technology is gradually shifted onto the road of industrial applications
On, all kinds of incineration technologies are primarily now used especially for domestic rubbish, the extensive industrialization of gasification burning technology will
The technological innovation for bringing domestic garbage disposal industry is regenerated.
For many years, scientific research of the China to the gasification burning technology such as biomass, rubbish, be in progress a lot of, the base of laboratory
Plinth research is a lot, also has applied research, such as:Rotary kiln type, vertical and fluidized bed type destructive gasifying or temperature gasification and high melting skill
Art etc..But in Technique Popularizing application or there is a definite limitation, raw material type, garbage treatment quantity, secondary pollution control and economy
Benefit etc. is principal element.
In existing burning process and equipment, fire grate type incinerator is various informative, and its application accounts for whole world waste incineration
More than the 80% of the total market size, wherein having in body of heater using mechanical type backstepping fire grate, forwards fire grate or combined fire grate, also adopts
With fire grates such as chain-plate type and drum-types.In boiler plant, boiler recovery heat methods are a lot of, technology maturation;Thermal source kind
Class is also more, such as:The thermals source such as solar energy, smelting furnace waste heat, coal furnace, fluid bed, fixed bed, rotary kiln, using boiler heat is reclaimed
Amount, for generating electricity, heat supply, heating etc..
In sum, typical gasification burning and boiler plant technology maturation, respectively there is its own advantage, but in China's reality
The problem and shortage for solving is needed using in:
1., for characteristics such as China's house refuse water content height, complicated components, the technology of moving hearth is used, to rubbish
Conveying capacity needs emphasis to consider.Fly ash content is higher in flue gas burn simultaneously after, and collecting ash is heavier, deashing repair and maintenance
Cycle is short.
2. being on the increase with refuse production, sanitary fill such as mountain, garbage treatment quantity must be effectively improved,
Could meeting the market requirement.
3. require in the face of strict pollutant emission, secondary pollution control is the key problem for technically needing to solve.
4., in order to effectively increase economic efficiency, in rubbish heat treatment process, the organic efficiency of heat needs to improve.It is existing
Rubbish heat treatment technics generally using boiler reclaim waste incineration after high-temperature flue gas heat, produce steam shift onto steam turbine send out
Electricity, whole transition heat efficiency losses are larger, process identical quantity of refuse, and relative reduction thermal losses and raising heat exchanger effectiveness can
To improve the thermal efficiency.
The for example following patent of existing technology:External combustion wet air gas turbine power generating system (ZL 01120378.1), combustion gas wheel
Machine electricity generation system and its progress control method (ZL 200880007113.7), double-fuel combustion-supporting type gas-steam combined cycle system
The process of system (ZL 200610062631.1), coal powder gas turbine generation system and generation coal powder two-phase flow fuel
(ZL200610062055.0), multiple row sectional drive combined type domestic garbage incinerator (ZL200710092508.9) and two-part
The problem all referred in incinerator (ZL201010268376.2):Rubbish heat treatment mode method is not bound with, and
The problems such as secondary pollution control, smoke components complexity of rubbish heat treatment;Conventional garbage heat treatment thermal chemical reaction is anti-to aoxidize
Based on answering, reduction reaction auxiliary is also easy to produce secondary pollution, and burned oxygen quotient is big, and First air, secondary wind infeed amount are big,
Dust content is higher in flue gas, affects larger to heat reclaiming system and smoke processing system, and easy dust stratification, exhaust gas volumn is larger,
Relative reduction thermal conversion efficiency;Refuse gasification synthesizes the deep purifying problem of flue gas after burning, need to synthesize flue gas cleannes
Meet gas turbine requirement, and the application of refuse gasification burning-gas and steam turbine combined cycle generation;Rubbish heat treatment
The innovation of mode, reduces exhaust gas volumn, changes flue gas composition, and chemical reaction environment becomes reduction reaction, the relative raising of the thermal efficiency.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, there is provided a kind of combustion gas and steaming based on refuse gasification
The coaxial combined generating system of steam turbine, there is provided a kind of transition heat efficiency losses are less, and the organic efficiency of heat is higher, pollutant row
Put the electricity generation system that lower utilization refuse gasification burns synthesis gas.
What the purpose of this utility model was realized in:
A kind of coaxial combined generating system of combustion gas and steam turbine based on refuse gasification, including refuse gasification burning system
System, steam generator system, association circulating power generation system, the steam generator system has drum, superheater, the association circulating power generation system
Including blender, air compressor, synthesis flue gas compressor, synthesis smoke combustion room, turbine, steam turbine, electromotor, waste heat
Boiler and feedwater input system, the side wall of the blender is provided with first entrance, second entrance, the bottom of the blender
Outlet is provided with, venthole is provided with the top of the blender, the first entrance of the blender connects the saturated vapor of drum
Outlet, the second entrance of the blender connects the gas outlet of air compressor, the air inlet and air of the air compressor
Connection, the outlet of the blender connects the water inlet of drum, and the venthole of the blender connects the air intake of superheater,
The venthole output high pressure superheated steam of the superheater, the waste gas row of the air inlet connection steam generator system of the flue gas compressor
Put mouth, the high-pressure synthesis flue gas that the gas outlet output steam generator system of flue gas compressor has not been utilized, the venthole of the superheater,
The gas outlet of flue gas compressor connects respectively the air inlet of the synthesis smoke combustion room, by high pressure superheated steam and high-pressure synthesis
Mixed combustion in flue gas input synthesis smoke combustion room, the gas outlet of smoke combustion room connects the air inlet of turbine, the whirlpool
Turbine is connected with generator power, and high-temperature flue gas promote turbine generation, and the gas outlet connection waste heat boiler of turbine is described remaining
The venthole of heat boiler connects the air intake of steam turbine, and the steam turbine is connected with generator power, the height that waste heat boiler is discharged
Press through the generating of vapourss pushing turbine, the discharge outlet connection feedwater input system of waste heat boiler, the discharge outlet connection of steam turbine
Feedwater input system, the feedwater input system supplies water to steam generator system, waste heat boiler.
Further, the feedwater input system includes condenser, water pump, oxygen-eliminating device, the increasing being sequentially connected in series by pipeline
Water pump, the discharge outlet of the waste heat boiler is connected between water pump, oxygen-eliminating device by pipeline, between the water pump, oxygen-eliminating device
Water source is connected by moisturizing pipeline, the water inlet of the condenser connects the discharge outlet of steam turbine, the pressurized water by pipeline
The outlet of pump connects the soda pop import of steam generator system and waste heat boiler by pipeline.
Steam output device can not be all converted to water by condenser using complete steam, and absorb the heat of steam release
Amount, the Main Function of oxygen-eliminating device be exactly with it to remove boiler feedwater in oxygen and other gases, it is ensured that the quality of feedwater, increase
Water pump can improve hydraulic pressure, it is ensured that the water supply capacity of feedwater input system, and feedwater input system can be to steam turbine, waste heat pot
The water that fire grate goes out carries out further heat recovery, improves heat recovery efficiency.
The air compressor, synthesis flue gas compressor, turbine, steam turbine, electromotor power connector successively, and synchronously
Rotate.
Further, the steam generator system includes boiler body, and the boiler body has cyclone dust removal room, furnace chamber a, stove
Room b, the lower end of the cyclone dust removal room arranges smoke inlet, and smoke inlet and the refuse gasification CIU of cyclone dust removal room connect
Connect, cyclone dust removal room upper end is the 3rd exhanst gas outlet, the 3rd exhanst gas outlet of cyclone dust removal room upper end connects with the upper end of furnace chamber a
It is logical, the furnace chamber a, the lower end connection of furnace chamber b, the upper end of the furnace chamber b arranges waste gas outlet, along week in the cyclone dust removal room
To the water-cooling wall being provided with a ring, described superheater is provided with the furnace chamber a, vaporizer, boiler sheet are provided with furnace chamber b
The top of body arranges described drum, and the cyclone dust removal room, furnace chamber a, furnace chamber b are respectively positioned on drum lower section, set on the drum
There is soda pop import, water separator is provided with drum, for separating steam water interface, drum connects water by the first down-comer
The water inlet of cold wall, for exporting the water that water separator is isolated, drum connects entering for vaporizer by the second down-comer
The mouth of a river, for exporting the water that water separator is isolated, the water-cooling wall, the venthole of vaporizer are connected respectively by steam pipe
The air intake of drum, for the high-temperature steam that flows back.
In order to carry out harmless treatment to the flue gas that furnace chamber c is discharged, it is preferable that the boiler body has furnace chamber c, described
The upper end of furnace chamber c connects with the waste gas outlet of furnace chamber b upper ends, and the lower end of furnace chamber c arranges Waste gas outlet, and the furnace chamber c's is useless
Gas floss hole connects flue gas purification system, and the flue gas purification system includes thick cleaning system, booster fan, the essence being sequentially connected
Cleaner unit is washed, the flue gas after purification feeds synthesis flue gas compressor.
Preferably, the thick cleaning system includes aeration tower and cleaner unit, and the fine purifiation cleaner unit adopts Lei Shi venturi
Washing system, including Venturi scrubber and cyclone separator, the aeration tower connects the Waste gas outlet of furnace chamber c, aeration tower
Outlet connection cleaner unit, then make deep purifying into fine purifiation cleaner unit after being pressurized by booster fan.
Thick cleaning system can remove the impurity of big particle diameter, dust, and fine purifiation cleaner unit can remove steam, micropowder dirt etc.,
Meet gas turbine to require combustion gas cleannes.
In order to carry out further heat recovery to the flue gas that furnace chamber b is discharged, heat recovery efficiency is improved, further
Ground, is provided with economizer in the furnace chamber c, the water inlet of the economizer is connected with the outlet of feedwater input system, the section
The outlet of hot device and the soda pop inlet communication of drum.
Further, the refuse gasification CIU includes incinerator, circulation air feed system, the gasification burning
Stove includes grate, and feed hopper, gasification furnace and the incinerator set gradually along feedstock direction on grate, the rear of gasification furnace
For the cinder notch that falls of gasification furnace, incinerator falls the front lower place of cinder notch positioned at gasification furnace, the rear of incinerator for incinerator slag notch,
The grate is provided with garbage pusher device, and the garbage pusher device is located at the lower section of feed hopper, for by the rubbish in feed hopper
Push in gasification furnace, the lower section of gasification furnace moving hearth and incinerator moving hearth to be respectively arranged below with least one independent
The air compartment for arranging, is provided with windrow seal section, the stove between the gasification furnace and incinerator between the feed hopper, gasification furnace
Leave transition on frame part to fall slag section, the transition slag section that falls is provided with residue pusher, for the rubbish that will be fallen in gasification furnace
Rubbish residue is pushed in incinerator, and the transition falling to be provided with slag section isolating door to be opened/closed, and the isolating door is used for will gasification
Stove, incinerator cut-off;The gasification furnace, incinerator include respectively furnace shell, moving hearth, and the forward and backward side of the gasification furnace distinguishes
By windrow seal section, transition fall slag section sealing, the transition fall slag section isolation gasification furnace, incinerator, make gasification furnace, incinerator
It is separate;The gasification furnace, incinerator are respectively provided with secondary confession respectively in arching upward shape on the face arch of the gasification furnace, rear arch
Air port, the vault of the gasification furnace arranges the first exhanst gas outlet, the smoke inlet and the first exhanst gas outlet of the cyclone dust removal room
Connection, the vault of the incinerator arranges the second exhanst gas outlet, and igniting combustion supporting hole is respectively equipped with the gasification furnace, incinerator;
The circulation air feed system includes dust arrester, the first blower fan, the second blower fan, and the inlet end of the dust arrester leads to
Piping is connected with the second exhanst gas outlet, and the outlet side of the dust arrester is connected by pipeline with the inlet end of the first blower fan,
The outlet side of first blower fan connects the house steward of the first manifold, the arm of first manifold respectively with gasification furnace moving hearth
Each air compartment of lower section, each secondary confession air port on gasification furnace and cyclone dust removal room smoke inlet connection, described the
The first regulating valve, the air inlet and atmosphere of second blower fan, second wind are respectively provided with each arm of one manifold
The gas outlet of machine connects the house steward of the second manifold, the arm of second manifold respectively with incinerator moving hearth below each one
The inlet end of secondary air compartment and dust arrester, outlet side connection, on each arm of second manifold the second regulation is respectively provided with
Valve, the cyclone dust removal room is provided with some combustion airs and supplies air port, some combustion airs for air port be located at smoke inlet, the 3rd
Between exhanst gas outlet, also including the 3rd manifold, the house steward of the 3rd manifold connects with the gas outlet of the second blower fan, and the described 3rd
Each arm of manifold is connected respectively with some combustion airs for air port, and on each arm of the 3rd manifold the 3rd regulating valve is respectively provided with.
For the waste residue for discharging furnace chamber a, furnace chamber b, flue gas deposition is produced in cyclone dust removal room, and prevent waste residue effusion from producing
Pollution, it is preferable that the furnace chamber a, furnace chamber b lower section is provided with common slag notch, the lower end of the cyclone dust removal room is provided with from upper
To the taper slag notch that lower radius diminishes, common slag notch, the taper slag notch are connected respectively with the burner hearth of gasification furnace.
In order to carry out further heat recovery to the flue gas that furnace chamber b is discharged, heat recovery efficiency is improved, it is preferable that
Air preheater is provided with the furnace chamber c, the outlet side of second blower fan connects the air inlet of air preheater, air preheat
The gas outlet of device connects the house steward of the second manifold.
As a result of above-mentioned technical proposal, this utility model has the advantages that:
This utility model employs the pressure-air that blender exports to air compressor, the saturated vapor of drum output and enters
Row mixing, exports high pressure superheated steam after hot device, and this utility model is not utilized using flue gas compressor output steam generator system
Complete high-pressure synthesis flue gas, high pressure superheated steam and mixed combustion in high-pressure synthesis flue gas input synthesis smoke combustion room, it is described
Turbine is connected with generator power, and high-temperature flue gas promote turbine generation, takes full advantage of not utilized for steam generator system
Flue gas carries out combined cycle generation;The gas outlet connection waste heat boiler of turbine, the discharge outlet connection feedwater input of waste heat boiler
System, the venthole of the superheater is also connected with steam turbine, and the steam turbine is connected with generator power, by remaining overheated steaming
Vapour pushing turbine generates electricity, the discharge outlet of steam turbine connection feedwater input system, and the feedwater input system is to steam generator system, remaining
Heat boiler supplies water, and take full advantage of turbine, steam turbine does not carry out combined cycle generation using complete flue gas, greatly reduces
The discharge capacity of waste gas, transition heat efficiency losses are less, and the organic efficiency of heat is higher.
This steam generator system by annular water-cooling wall be arranged on cyclone dust removal room on, synthesis gas in cyclone dust removal Indoor Combustion more
For abundant, the temperature for producing of burning is higher, relatively reduces thermal losses and improves heat exchanger effectiveness.What this steam generator system was reclaimed
In the high-temperature synthesis gas flue gas of refuse gasification outlet of still, synthesis gas flue gas enters cyclone dust removal room to origin of heat, while to whirlwind
Tangential air-supplied combustion-supporting flammable synthesis gas in dirt pocket, flue gas sequentially passes through cyclone dust removal room, furnace chamber a, furnace chamber b, section heat
Device and air preheater.Recycle the pre- hot condensed water of economizer, pre- hot condensed water enters boiler part, condensed water in water-cooling wall and
Heat in vaporizer, form saturated vapor and enter drum, saturated vapor enters superheater after steam-water separation, is thermally formed again
Vapourss are exported, for generating electricity.This utility model is novel, using cyclone-burning method, reduces fly ash content in flue gas;
Syngas combustion temperature is high, and gas residence time is long, and pollutant are effectively decomposed, and reduces pollutant emission, realizes rubbish
Synthesis gas burning disposal and heat recovery and utilization after continuous gasification.
The gasification furnace of incinerator, incinerator are provided separately, and the vault of gasification furnace arranges the first exhanst gas outlet, incinerator
Vault arrange the second exhanst gas outlet, flue gas is processed respectively beneficial to according to the difference of flue gas quality, while being conducive to removing flue gas
Dirt, can provide the flue gas of higher quality, make the utilization rate of flue gas higher, and the waste residue of discharge is less.
Second blower fan blast air for incinerator provide First air and for cyclone separator, the first blower fan provide homoiothermic supply
Wind, by the second regulation valve regulation wind supply quantity on correspondence pipeline, makes incinerator residue fully burn;Then, the first blower fan is taken out
The flue gas of incinerator is taken, after homoiothermic and cyclone collection flying dust, the flue gas supply gasification furnace of certain pressure is formed
First air and secondary wind, by the first regulation valve regulation wind supply quantity on correspondence pipeline, make rubbish in gasification furnace produce gasification, gas
Change the flue gas that stove is contained within a certain amount of synthesis gas, discharge from the first exhanst gas outlet, into cyclone dust removal room processing links, the first wind
The unnecessary flue gas that machine is extracted also enters cyclone dust removal room simultaneously, takes full advantage of the high-temperature flue gas of incinerator discharge, improves energy
The utilization rate of amount, cyclone dust removal room provides high-temperature flue gas.The stoker fired grate formula refuse gasification incinerator garbage treatment quantity of this structure
Greatly, the rubbish bed of material can experience the stage that burns of drying, gasification and residue on stoker fired grate, and adaptation China house refuse is aqueous
The characteristics such as amount height, complicated component, improve the energy conversion efficiency in garbage processing procedure and reduce pollutant emission in flue gas
Amount, effectively prevents secondary pollution, and can realize large-scale rubbish continuous gasification burning disposal, it is ensured that refuse gasification burns effect
Fruit and lime-ash clinker ignition loss, it is relative to reduce thermal losses and improve heat exchanger effectiveness, improve the thermal efficiency.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of association circulating power generation system;
Fig. 3 is the structural representation of steam generator system;
Fig. 4 is the structural representation of flue gas purification system;
Fig. 5 is the structural representation of cyclone dust removal room;
Fig. 6 is the schematic top plan view of Fig. 5;
Fig. 7 is the structural representation of incinerator;
Fig. 8 is the structural representation for circulating air feed system.
Reference
1 is incinerator, and 101 is grate, and 102 is feed hopper, and 103 is gasification furnace, and 104 is incinerator, and 105 is stove
Bed, 106 is garbage pusher device, and 107 is an air compartment, and 108 is windrow seal section, and 109 fall slag section for transition, and 110 push away for residue
Glassware, 111 is isolating door, and 112 is the first exhanst gas outlet, and 113 is the second exhanst gas outlet, and 114 is igniting combustion supporting hole, and 115 is two
Secondary confession air port, 116 is slag notch, and 117 is the cinder notch that falls;
201 is dust arrester, and 202 is the first blower fan, and 203 is the second blower fan, and 204 is the first manifold, and 205 is the second discrimination
Pipe, 206 is the 3rd manifold, and 207 is the first regulating valve, and 208 is the second regulating valve, and 209 is the 3rd regulating valve;
3 is cyclone dust removal room, and 301 is dirt pocket igniting combustion supporting hole, and 302 is taper slag notch, and 303 is smoke inlet, 304
For the 3rd exhanst gas outlet, 305 supply air port for combustion air;
4 is boiler body, and 402 is furnace chamber a, and 403 is furnace chamber b, and 404 is furnace chamber c, and 405 is water-cooling wall, and 406 is superheater,
407 is vaporizer, and 408 is drum, and 409 is the first down-comer, and 410 is the second down-comer, and 411 is steam turbine, and 412 is defeated for feedwater
Enter system, 413 is condenser, and 414 is water pump, and 415 is oxygen-eliminating device, and 416 is booster water pump, and 417 is moisturizing pipeline, and 418 are section
Hot device, 419 is flue gas purification system, and 420 is aeration tower, and 421 is cleaner unit, and 422 is booster fan, and 423 is fine purifiation cleaner unit,
424 is air preheater.
5 is association circulating power generation system, and 501 is blender, and 502 is electromotor, and 503 is air compressor, and 504 are synthesis
Flue gas compressor, 505 are synthesis smoke combustion room, and 506 is turbine, and 507 is waste heat boiler.
Specific embodiment
It is a kind of preferably real of combustion gas based on refuse gasification and the coaxial combined generating system of steam turbine referring to Fig. 1
Apply example, including refuse gasification CIU, steam generator system, association circulating power generation system 5, the steam generator system have drum 408,
Superheater 406.
Referring to Fig. 2, the association circulating power generation system 5 includes that blender 501, air compressor 503, synthesis flue gas are calmed the anger
Machine 504, synthesis smoke combustion room 505, turbine 506, steam turbine, electromotor 502, waste heat boiler 507 and feedwater input system
System, the air compressor 503, synthesis flue gas compressor 504, turbine 506, steam turbine, the rotating shaft of electromotor 502 are led to successively
Cross power transmission shaft power connector, and synchronous axial system.
The side wall of the blender 501 is provided with first entrance, second entrance, and the bottom of the blender 501 is provided with out
The mouth of a river, the top of the blender 501 is provided with venthole, and the saturation of the first entrance connection drum 408 of the blender 501 is steamed
Vapor outlet, the second entrance of the blender 501 connects the gas outlet of air compressor 503, and the air compressor 503 enters
QI KOU and atmosphere, the outlet of the blender 501 connects the water inlet of drum 408, the venthole of the blender 501
The air intake of connection superheater 406, the venthole output high pressure superheated steam of the superheater 406, the flue gas compressor
Air inlet connects the Waste gas outlet of steam generator system, and the height that the gas outlet output steam generator system of flue gas compressor has not been utilized is pressed
Into flue gas, the venthole of the superheater, the gas outlet of flue gas compressor connect respectively entering for the synthesis smoke combustion room 505
QI KOU, by mixed combustion in high pressure superheated steam and high-pressure synthesis flue gas input synthesis smoke combustion room 505, smoke combustion room
Gas outlet connects the air inlet of turbine 506, the turbine 506 and the power connector of electromotor 502, and high-temperature flue gas promote turbine
Machine 506 generates electricity, the gas outlet connection waste heat boiler 507 of turbine 506.
The venthole connection steam turbine of the waste heat boiler 507, the steam turbine and the power connector of electromotor 502, waste heat
The high pressure superheated steam pushing turbine that boiler 507, superheater is discharged generates electricity, and the discharge outlet connection feedwater of waste heat boiler 507 is defeated
Enter system, the discharge outlet of steam turbine connects feedwater input system, and the feedwater input system is to steam generator system, waste heat boiler 507
Supply water.Further, the feedwater input system includes condenser, water pump, oxygen-eliminating device, the pressurized water being sequentially connected in series by pipeline
Pump, the discharge outlet of the waste heat boiler 507 is connected between water pump, oxygen-eliminating device by pipeline, is led between the water pump, oxygen-eliminating device
Moisturizing pipeline connection water source is crossed, the water inlet of the condenser connects the discharge outlet of steam turbine, the booster water pump by pipeline
Outlet pass through the soda pop import that pipeline connects steam generator system and waste heat boiler 507.
Referring to Fig. 3, in the present embodiment, steam generator system includes boiler body 4, and the boiler body 4 has cyclone dust removal room
3rd, furnace chamber a402, furnace chamber b403, furnace chamber c404.
Referring to Fig. 5, Fig. 6, the lower end of the cyclone dust removal room 3 arranges smoke inlet 303, the cigarette of the cyclone dust removal room 3
Gas entrance 303 is connected by pipeline with the first exhanst gas outlet 112 of gasification furnace 103, and the upper end of cyclone dust removal room 3 goes out for the 3rd flue gas
Mouth 304, the smoke inlet 303, the 3rd exhanst gas outlet 304 are located at the opposition side of the circumferential wall of cyclone dust removal room 3, cyclone dust removal room
3 top arranges dirt pocket igniting combustion supporting hole 301.In order that flue gas, combustion air are sufficiently mixed, burn in cyclone dust removal room 3
Discharge from the 3rd exhanst gas outlet 304 afterwards, the cyclone dust removal room 3 is provided with some combustion airs for air port 305, described some combustion-supporting
Wind is located between smoke inlet 303, the 3rd exhanst gas outlet 304 for air port 305.The smoke inlet 303, the 3rd exhanst gas outlet
304th, combustion air is radially or tangentially arranged for air port 305 along the circumferential wall of cyclone dust removal room 3.3rd cigarette of the upper end of cyclone dust removal room 3
Gas outlet 304 is connected with the upper end of furnace chamber a402, the furnace chamber a402, the lower end connection of furnace chamber b403, the furnace chamber b403's
Upper end arranges waste gas outlet, and the lower end of the cyclone dust removal room 3 is provided with the taper slag notch 302 that radius from top to bottom diminishes, should
Taper slag notch 302 is connected with the burner hearth of gasification furnace 103.The furnace chamber a402, furnace chamber b403 lower section is provided with common slag notch,
The common slag notch is connected with the burner hearth of gasification furnace 103.In the present embodiment, the common slag notch and taper slag notch
302 connect with the afterbody changeover portion of the burner hearth of gasification furnace 103.
The interior water-cooling wall 405 being circumferentially with along inwall in a ring in the cyclone dust removal room 3, is provided with the furnace chamber a402
Superheater 406, is provided with vaporizer 407 in furnace chamber b403, the top of boiler body 4 arranges drum 408, the cyclone dust removal room
3rd, furnace chamber a402, furnace chamber b403 are respectively positioned on the lower section of drum 408, and the drum 408 is provided with soda pop import, mix for being input into soda pop
Water separator is provided with compound, drum 408, for separating steam water interface, drum 408 is connected by the first down-comer 409
The water inlet of water receiving cold wall 405, for exporting the water that water separator is isolated, drum 408 is connected by the second down-comer 410
The water inlet of vaporizer 407 is connect, for exporting the water that water separator is isolated, the water-cooling wall 405, vaporizer 407
Venthole connects respectively the air intake of drum 408 by steam pipe, for the high-temperature steam that flows back, the saturated vapor of the drum 408
The air intake for connecting superheater 406 by pipeline is exported, for the high-temperature steam of backflow to be input in superheater 406, the mistake
The venthole output superheated steam of hot device 406.
The upper end of the furnace chamber c404 connects with the waste gas outlet of furnace chamber b403 upper ends, and the lower end of furnace chamber c404 arranges waste gas
Floss hole, is provided with economizer 418, the water inlet of the economizer 418 and the outlet of booster water pump 416 in the furnace chamber c404
Connection, the outlet of the economizer 418 and the soda pop inlet communication of drum 408.The Waste gas outlet connection cigarette of furnace chamber c404
Gas cleaning system 419, referring to Fig. 4, the flue gas purification system 419 includes thick cleaning system, the booster fan being sequentially connected
422nd, fine purifiation cleaner unit 423, the flue gas after purification feeds synthesis flue gas compressor.The thick cleaning system includes aeration tower 420
With cleaner unit 421, the fine purifiation cleaner unit 423 adopts Lei Shi venturi scrubbing systems, including Venturi scrubber and whirlwind point
From device, the aeration tower 420 connects the Waste gas outlet of furnace chamber c, and the outlet of aeration tower 420 connects cleaner unit 421, then by supercharging wind
Machine 422 makees deep purifying after being pressurized into fine purifiation cleaner unit 423.
It is that refuse gasification CIU includes incinerator and its circulation air feed system, gasification burning referring to Fig. 7, Fig. 8
Stove includes gasification furnace 103, incinerator 104, can seal between gasification furnace 103 and incinerator 104 or connect, the stove of gasification furnace 103
The lower section of bed and the siege of incinerator 104 are respectively arranged below with two independent air compartments 107, the gasification furnace 103
Secondary confession air port 115 is respectively provided with face arch, rear arch, the vault of the gasification furnace 103 arranges the first exhanst gas outlet 112, described
The vault of incinerator 104 arranges the second exhanst gas outlet 113.
Incinerator includes grate 101, and the feed hopper 102, gas set gradually along feedstock direction on grate 101
Change stove 103 and incinerator 104, the rear of incinerator 104 is the slag notch 116 of incinerator 104, and the incinerator 104 is provided with
Fall cinder notch 117, and the slag notch 116 of the incinerator 104 falls the underface of cinder notch 117 positioned at incinerator, it is described fall cinder notch 117 lead to
Piping is connected with the slag notch of dust arrester 201.This sealing structure effect is good, can effectively hold reduction pollutant discharge amount.
Gasification furnace 103 mainly gasifies to the carbon-containing part of rubbish, and discharges flammable gasification flue gas and rubbish residue, incinerator
104 are substantially carried out the burn processing of carbon residue, and discharge innoxious lime-ash.The siege 105 of gasification furnace 103 and incinerator 104 is equal
Using the independent stoker fired grate formula moving hearth 105 for driving of segmentation, the fire grate of stoker fired grate formula moving hearth 105 is by travelling oven
Row's plate forward laps with fixed grate plate, it is spaced collect form, adjacent multigroup moving grate plate is adopted by pull bar connection
Driven with a set of driving means.Used as the carrier of conveying garbage, embodiments thereof can be each to stoker fired grate formula moving hearth 105
Type moving hearth 105, such as chain-plate type, drum-type, multisection type fire grate system.
The grate 101 is provided with garbage pusher device 106, and the garbage pusher device 106 is located at the lower section of feed hopper 102,
For the rubbish in feed hopper 102 to be pushed in gasification furnace 103, the lower section of the moving hearth 105 of gasification furnace 103 and incinerator
104 moving hearths 105 are respectively arranged below with least one air compartment 107 being independently arranged, in the present embodiment, with gasification furnace
The corresponding fire grate of air compartment 107 of 103 first halfs, driving means, as the dryer section of the siege 105 of gasification furnace 103, with gasification
The gasification section of the latter half of corresponding fire grate of an air compartment 107 of stove 103, driving means as the siege 105 of gasification furnace 103.Gasification
The dryer section of the siege 105 of stove 103, gasification section can be respectively adopted a 1-2 independent air feed of air compartment 107, it is also possible to respectively
Using a 3-4 independent air feed of air compartment 107.Certainly, fire grate, driving means and an air compartment 107 also can not be correspondingly arranged,
Preferably adjust bed of material movement and air distribution relation on moving hearth 105.Incinerator 104 can adopt 1-4 independent First air
The air feed of room 107, burns rear lime-ash and excludes from slag notch, into next step treatment process.
It is provided with windrow seal section 108 between the feed hopper 102, gasification furnace 103, the work of garbage pusher device 106 is entered and located in place
In windrow seal section 108, garbage raw material is put into from feed hopper 102 and falls, and garbage pusher device 106 is retreated, then is advanced, reciprocal many
Secondary pusher forms windrow in windrow seal section 108, makes the entrance of gasification furnace 103 in windrow sealing state, strengthens gasification furnace 103 close
Envelope effect, solves garbage pusher device 106 and the easy leakage problem of feed hopper 102.When needing complete prepurging to dispose all rubbish,
The forward impelling half stroke again of garbage pusher device 106, rubbish is pushed completely in gasification furnace 103, loses the entrance of gasification furnace 103
Windrow sealing effectiveness.Leave transition on the part of grate 101 between the gasification furnace 103 and incinerator 104 to fall slag section 109, institute
State the transition slag section 109 that falls and be provided with residue pusher 110, for the rubbish residue fallen in gasification furnace 103 to be pushed into incinerator
In 104, the transition slag section 109 that falls can be at windrow sealing state when rubbish residue is piled up, and strengthen the sealing effectiveness of gasification furnace 103,
Solve the problems, such as string wind between gasification furnace 103, incinerator 104.In the present embodiment, falls in the transition, and be provided with slag section 109 can
The isolating door 111 of opening and closing, the isolating door 111 is used to separate gasification furnace 103, incinerator 104.The furnace lifting initial stage or need control
When altering wind between gasification furnace processed 103 and incinerator, isolating door 111 is closed, stack a certain amount of residue when the slag section that falls and form windrow
After sealing, isolating door 111 can be kept to open, coordinate to use with the residue pusher 110 that lower section is arranged, to realize that rubbish is continuous
Gasification burning process.
, respectively in the shape that arches upward, the face arch of the gasification furnace 103 is for the upper end of the gasification furnace 103, the upper end of incinerator 104
Flat construction, or, the face arch of gasification furnace 103 is inclined upwardly structure for rear end.The vault of the gasification furnace 103 arranges the first cigarette
Gas outlet 112, the vault of the incinerator 104 arranges the second exhanst gas outlet 113, and the upper end of the gasification furnace 103 is arched upward, burns
Igniting combustion supporting hole 114 is respectively equipped with the arching upward of the upper end of stove 104.Gasification flue gas is from the first exhanst gas outlet 112, the second exhanst gas outlet
113 exclude, and the furnace cavity of gasification furnace 103 is relatively reduced compared with traditional incinerator;Forward and backward arch and moving hearth 105
Relative position diminishes, and reduces the space of incinerator occupancy, is also easier to insulation, reduces the amount of leakage of heat, is conducive to rubbish
Rubbish fully gasifies.Secondary confession air port 115 is respectively provided with the face arch of the gasification furnace 103, rear arch.
The circulation air feed system includes dust arrester 201, the first blower fan 202, the second blower fan 203, in the present embodiment, institute
Dust arrester 201 is stated for cyclone separator or hot precipitator 421, first blower fan 202 is high-temperature blower, described second
Blower fan 203 is aerator.The inlet end of the dust arrester 201 is connected by pipeline with the second exhanst gas outlet 113, the dedusting
The outlet side of device 201 is connected by pipeline with the inlet end of the first blower fan 202, the outlet side connection of first blower fan 202
The house steward of the first manifold 204, the arm of first manifold 204 respectively with the lower section of the moving hearth of gasification furnace 103 it is each once
The smoke inlet 303 in each secondary confession air port 115 and cyclone dust removal room 3 on air compartment 107, gasification furnace 103 is connected, and described first
The first regulating valve 207 is respectively provided with each arm of manifold 204, air inlet and the material pit air of second blower fan 203 connect
It is logical, the foul smell distributed in material pit can be absorbed, the gas outlet of second blower fan 203 connects the house steward of the second manifold 205, institute
State the arm of the second manifold 205 respectively with the moving hearth of incinerator 104 below each air compartment 107 and dust arrester 201
Inlet end, outlet side connection, the second regulating valve 208 is respectively provided with each arm of second manifold 205.Also include the 3rd
Manifold 206, the house steward of the 3rd manifold 206 connects with the gas outlet of the second blower fan 203, each of the 3rd manifold 206
Pipe is connected respectively with some combustion airs for air port 305, and on each arm of the 3rd manifold 206 the 3rd regulating valve 209 is respectively provided with.Institute
State and air preheater 424 be provided with furnace chamber c404, in the present embodiment, air preheater 424 is located at the downstream of economizer 418,
The outlet side of second blower fan 203 connects the air inlet of air preheater 424, the gas outlet connection of air preheater 424 the
The house steward of two manifolds 206, the house steward of the 3rd manifold 206 connects with the gas outlet of air preheater 424.
The First air of gasification furnace 103 is that the flue gas generation certain pressure of high-temperature blower extraction incinerator 104 blasts gasification furnace 103
In the corresponding air compartment 107 in the lower section of stoker fired grate formula moving hearth 105, then sprayed by an air holes on moving hearth 105
Rubbish is shot through, is gasified, wind supply quantity is adjusted by the first regulating valve 207 on each arm of correspondence.The secondary wind of gasification furnace 103
Be high-temperature blower extract incinerator 104 flue gas produce certain pressure blast the burner hearth of gasification furnace 103, its spray-hole is arranged on gasification
On the face arch of stove 103 and rear arch.Secondary confession air port 115 is provided with forward and backward arch, gasification efficiency is improved, strengthens macromolecule in flue gas
Substance decomposition.Igniting combustion supporting hole 114 is provided with rear arch, temperature is used in furnace lifting, baker and stable gasification furnace 103, by correspondence
The first regulating valve 207 on each arm adjusts wind supply quantity.The air inlet of second blower fan 203 and material pit atmosphere, the
The air that two blower fans 203 are blasted can be cold wind or the hot blast after heating.The gas outlet connection the of second blower fan 203
The house steward of two manifolds 205, the arm of second manifold 205 respectively with each First air of the lower section of 104 moving hearth of incinerator 105
The inlet end of room 107 and dust arrester 201, outlet side connection, on each arm of second manifold 205 second is respectively provided with
Regulating valve 208.The First air of incinerator 104 is that aerator blasts the air of certain pressure under stoker fired grate formula moving hearth 105
In the corresponding air compartment 107 in side, then by an air holes spray penetration residue on moving hearth 105, residual burning is carried out,
Wind supply quantity is adjusted by the first regulating valve 207 on each arm of correspondence.The inlet end of dust arrester 201, the air intake of outlet side are
Homoiothermic air feed, homoiothermic air feed is that the air of certain pressure is blasted incinerator 104 and exports (i.e. cyclone inlet) by aerator
Homoiothermic is carried out, meanwhile, Cyclone outlet (i.e. high-temperature blower entrance) blasts further homoiothermic, by each arm of correspondence
First regulating valve 207 adjusts wind supply quantity.
Circulation air feed system to the waste disposal method after stoker fired grate formula refuse gasification incinerator air feed, the method press with
Lower step is carried out:
Step A, the gate for closing stoker fired grate formula refuse gasification incinerator 1 and atmospheric vent, start mechanical grate-type rubbish
Rubbish incinerator 1, by garbage raw material feed hopper 102 is put into, and the pusher back and forth of garbage pusher device 106 will be from feed hopper 102
The garbage raw material for falling pushes the windrow seal section 108 between feed hopper 102, gasification furnace 103, forms windrow seal section 108
Windrow sealing state, unnecessary rubbish falls into the moving hearth 105 of gasification furnace 103, and the moving hearth 105 of gasification furnace 103 works,
Rubbish is conveyed into into transition to fall slag section 109, the pusher back and forth of residue pusher 110, the transition rubbish in slag section 109 that falls is pushed away
Enter in incinerator 104, the work conveying garbage of moving hearth 105 of incinerator 104, until rubbish is in gasification furnace 103, incinerator
104 moving hearth 105 is accumulated to required thickness:0.6-0.8m, during baker, the rubbish piled up can protect moving hearth
105, prevent scaling loss siege 105.Stop being fed intake to feed hopper 102, the moving hearth 105 of gasification furnace 103 and incinerator 104 stops
Work, then, with start-up burner by the igniting combustion supporting hole 114 of gasification furnace 103 and incinerator 104 respectively with gasification furnace 103
Communicate with the burner hearth of incinerator 104, in the presence of start-up burner, furnace lifting is carried out to gasification furnace 103 and incinerator 104, is dried
Stove, treats that this process stabilization is completed, and makes gasification furnace 103 and the burner hearth of incinerator 104 reach 600-700 DEG C of predetermined temperature;Baker
Purpose be in order to remove lining in Natural Water and water of crystallization, in order to avoid when going into operation because furnace temperature rises too fast, moisture content is swollen in a large number
It is swollen to cause body of heater spalling, bubbling or deformation even furnace wall to collapse, affect the intensity and service life of heating furnace furnace wall.
Step B, startup adjust circulation air feed system 2, adjust gasification furnace 103, incinerator 104 and circulation air feed system 2
Technological parameter (pusher speed, fire grate speed, pathogenic wind-warm, blast and an air quantity, secondary air temperature, blast and air quantity, furnace temperature,
Negative pressure, thickness of feed layer etc. in stove), feed intake to feed hopper 102, the work conveying garbage of moving hearth 105 of gasification furnace 103, rubbish
Burning is proceeded by the burner hearth of gasification furnace 103, rubbish residue is piled up to form windrow sealing at transition falls slag section 109, made
The stove chamber inner combustion state temperature of gasification furnace 103 is stabilized to more than 850 DEG C, the work output combustion of moving hearth 105 of incinerator 104
Rubbish residue after cinder.
Step C, each technological parameter (the pusher speed for adjusting gasification furnace 103, incinerator 104 and circulation air feed system 2
Negative pressure, thickness of feed layer in degree, fire grate speed, pathogenic wind-warm, blast and an air quantity, secondary air temperature, blast and air quantity, furnace temperature, stove
Deng), gasification furnace 103 gradually gasifies to rubbish, and gasification temperature is stable between 700-800 DEG C, gasification furnace 103 is stably produced
The raw high-temperature flue gas containing 10%-20% synthesis gas, it is equal that the vaporized state of gasification furnace 103 stably carries out low temperature, middle temperature or high-temperature gasification
Can.Make the fired state temperature stabilization of incinerator 104 to more than 850 DEG C, realize rubbish continuous gasification burning disposal;Need to adjust simultaneously
Each technological parameter of cyclone dust removal room 3, makes the temperature stabilization of the 3rd exhanst gas outlet of cyclone dust removal room 3 304 to more than 850 DEG C.
Step D, need to overhaul or during blowing out, stop feeding intake, adjust gasification furnace 103, incinerator 104 and circulation air feed system
2 technological parameter, makes gasification furnace 103 be gradually restored to fired state, after rubbish and rubbish residue burn, closes stoker fired grate
Formula refuse gasification incinerator 1 and circulation air feed system 2.Each technological parameter of cyclone dust removal room 3 need to be simultaneously adjusted, gasification furnace is made
103 are gradually restored to fired state.
Finally illustrate, preferred embodiment above is only unrestricted to illustrate the technical solution of the utility model, to the greatest extent
Gutron crosses above preferred embodiment and this utility model is described in detail, but those skilled in the art should manage
Solution, can make in the form and details various changes, without departing from this utility model claims institute to it
The scope of restriction.
Claims (10)
- A kind of 1. coaxial combined generating system of combustion gas and steam turbine based on refuse gasification, including refuse gasification CIU, Steam generator system, association circulating power generation system, the steam generator system has drum, superheater, it is characterised in that:The combined cycle Electricity generation system includes blender, air compressor, synthesis flue gas compressor, synthesis smoke combustion room, turbine, steam turbine, sends out Motor, waste heat boiler and feedwater input system, the side wall of the blender is provided with first entrance, second entrance, described mixed The bottom of clutch is provided with outlet, and venthole, the first entrance connection drum of the blender are provided with the top of the blender Saturated vapor outlet, the second entrance of the blender connects the gas outlet of air compressor, and the air compressor enters QI KOU and atmosphere, the outlet of the blender connects the water inlet of drum, and the venthole connection of the blender is overheated The air intake of device, the venthole output high pressure superheated steam of the superheater, the air inlet connection boiler of the flue gas compressor The Waste gas outlet of system, the gas outlet of flue gas compressor exports the high-pressure synthesis flue gas that steam generator system has not been utilized, the mistake The venthole of hot device, the gas outlet of flue gas compressor connect respectively the air inlet of the synthesis smoke combustion room, by high pressure superheater Steam and mixed combustion in high-pressure synthesis flue gas input synthesis smoke combustion room, the gas outlet connection turbine of smoke combustion room Air inlet, the turbine is connected with generator power, and high-temperature flue gas promote turbine generation, and the gas outlet connection of turbine is remaining Heat boiler, the venthole of the waste heat boiler connects the air intake of steam turbine, and the steam turbine is connected with generator power, waste heat The high pressure superheated steam pushing turbine that boiler is discharged generates electricity, the discharge outlet connection feedwater input system of waste heat boiler, steam turbine Discharge outlet connection feedwater input system, the feedwater input system to steam generator system, waste heat boiler supply water.
- 2. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 1, its feature It is:The feedwater input system includes condenser, water pump, oxygen-eliminating device, the booster water pump being sequentially connected in series by pipeline, described remaining The discharge outlet of heat boiler is connected between water pump, oxygen-eliminating device by pipeline, is connected by moisturizing pipeline between the water pump, oxygen-eliminating device Water receiving source, the water inlet of the condenser connects the discharge outlet of steam turbine by pipeline, and the outlet of the booster water pump passes through Pipeline connects the soda pop import of steam generator system and waste heat boiler.
- 3. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 1, its feature It is:The air compressor, synthesis flue gas compressor, turbine, steam turbine, electromotor power connector successively, and synchronously turn It is dynamic.
- 4. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 1, its feature It is:The steam generator system includes boiler body, and the boiler body has cyclone dust removal room, furnace chamber a, furnace chamber b, the whirlwind The lower end of dirt pocket arranges smoke inlet, and the smoke inlet of cyclone dust removal room is connected with refuse gasification CIU, cyclone dust removal Room upper end is the 3rd exhanst gas outlet, and the 3rd exhanst gas outlet of cyclone dust removal room upper end is connected with the upper end of furnace chamber a, the furnace chamber a, The lower end connection of furnace chamber b, the upper end of the furnace chamber b arranges waste gas outlet, circumferentially arranged with a ring in the cyclone dust removal room Water-cooling wall, described superheater is provided with the furnace chamber a, vaporizer is provided with furnace chamber b, the top of boiler body is arranged Described drum, the cyclone dust removal room, furnace chamber a, furnace chamber b are respectively positioned on drum lower section, and the drum is provided with soda pop import, vapour Water separator is provided with bag, for separating steam water interface, drum connects the water inlet of water-cooling wall by the first down-comer, For exporting the water that water separator is isolated, drum connects the water inlet of vaporizer by the second down-comer, for exporting The water that water separator is isolated, the water-cooling wall, the venthole of vaporizer connect respectively the air intake of drum by steam pipe, For the high-temperature steam that flows back.
- 5. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 4, its feature It is:The upper end that the boiler body has furnace chamber c, the furnace chamber c connects with the waste gas outlet of furnace chamber b upper ends, under furnace chamber c End arrange Waste gas outlet, the furnace chamber c Waste gas outlet connection flue gas purification system, the flue gas purification system include according to The thick cleaning system of secondary connection, booster fan, fine purifiation cleaner unit, the flue gas after purification feeds synthesis flue gas compressor.
- 6. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 5, its feature It is:The thick cleaning system includes aeration tower and cleaner unit, and the fine purifiation cleaner unit adopts Lei Shi venturi scrubbing systems, bag Venturi scrubber and cyclone separator are included, the aeration tower connects the Waste gas outlet of furnace chamber c, aeration tower outlet connection dedusting Device, then make deep purifying into fine purifiation cleaner unit after being pressurized by booster fan.
- 7. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 5, its feature It is:Economizer is provided with the furnace chamber c, the water inlet of the economizer is connected with the outlet of feedwater input system, described The outlet of economizer and the soda pop inlet communication of drum.
- 8. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 5, its feature It is:The refuse gasification CIU includes incinerator, circulation air feed system, and the incinerator includes grate, And feed hopper, gasification furnace and the incinerator set gradually along feedstock direction on grate, the rear of gasification furnace is gasification furnace Fall cinder notch, and incinerator falls the front lower place of cinder notch positioned at gasification furnace, the rear of incinerator for incinerator slag notch, on the grate Garbage pusher device is provided with, the garbage pusher device is located at the lower section of feed hopper, for the rubbish in feed hopper to be pushed into gasification furnace Interior, being respectively arranged below with for the lower section of gasification furnace moving hearth and incinerator moving hearth at least one is independently arranged once Air compartment, is provided with windrow seal section between the feed hopper, gasification furnace, stay on the grate part between the gasification furnace and incinerator There is transition to fall slag section, the transition slag section that falls is provided with residue pusher, for the rubbish fallen in gasification furnace residue to be pushed In incinerator, the transition falling to be provided with slag section isolating door to be opened/closed, the isolating door be used for by gasification furnace, incinerator every It is disconnected;The gasification furnace, incinerator include respectively furnace shell, moving hearth, and the forward and backward side of the gasification furnace is sealed respectively by windrow Section, transition fall slag section sealing, the transition fall slag section isolation gasification furnace, incinerator, make gasification furnace, incinerator separate;Institute Gasification furnace, incinerator are stated respectively in arching upward shape, on the face arch of the gasification furnace, rear arch secondary confession air port, the gas are respectively provided with The vault for changing stove arranges the first exhanst gas outlet, and the smoke inlet of the cyclone dust removal room is connected with the first exhanst gas outlet, the combustion The vault of cinder stove arranges the second exhanst gas outlet, and igniting combustion supporting hole is respectively equipped with the gasification furnace, incinerator;The circulation air feed system includes dust arrester, the first blower fan, the second blower fan, and the inlet end of the dust arrester is by pipe Road is connected with the second exhanst gas outlet, and the outlet side of the dust arrester is connected by pipeline with the inlet end of the first blower fan, described The outlet side of the first blower fan connects the house steward of the first manifold, the arm of first manifold respectively with gasification furnace moving hearth under The smoke inlet connection of each air compartment of side, each secondary confession air port on gasification furnace and cyclone dust removal room, first discrimination It is respectively provided with the first regulating valve on each arm of pipe, the air inlet and atmosphere of second blower fan, second blower fan Gas outlet connects the house steward of the second manifold, the arm of second manifold respectively with incinerator moving hearth below each First air The inlet end of room and dust arrester, outlet side connection, are respectively provided with the second regulating valve, institute on each arm of second manifold State cyclone dust removal room and be provided with some combustion airs and supply air port, some combustion airs are located at smoke inlet, the 3rd flue gas for air port Between outlet, also including the 3rd manifold, the house steward of the 3rd manifold connects with the gas outlet of the second blower fan, the 3rd manifold Each arm connect for air port with some combustion airs respectively, be respectively provided with the 3rd regulating valve on each arm of the 3rd manifold.
- 9. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 8, its feature It is:The furnace chamber a, furnace chamber b lower section is provided with common slag notch, and the lower end of the cyclone dust removal room is provided with radius from top to bottom The taper slag notch for diminishing, the common slag notch, taper slag notch are connected respectively with the burner hearth of gasification furnace.
- 10. the coaxial combined generating system of combustion gas and steam turbine based on refuse gasification according to claim 8, its feature It is:Air preheater is provided with the furnace chamber c, the outlet side of second blower fan connects the air inlet of air preheater, empty The gas outlet of air preheater connects the house steward of the second manifold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621036907.4U CN206094008U (en) | 2016-09-05 | 2016-09-05 | Coaxial integrated power production system of gas and steam turbine based on waste gasification |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621036907.4U CN206094008U (en) | 2016-09-05 | 2016-09-05 | Coaxial integrated power production system of gas and steam turbine based on waste gasification |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206094008U true CN206094008U (en) | 2017-04-12 |
Family
ID=58475710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621036907.4U Withdrawn - After Issue CN206094008U (en) | 2016-09-05 | 2016-09-05 | Coaxial integrated power production system of gas and steam turbine based on waste gasification |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206094008U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106287642A (en) * | 2016-09-05 | 2017-01-04 | 重庆科技学院 | Combustion gas based on refuse gasification and the coaxial combined generating system of steam turbine |
-
2016
- 2016-09-05 CN CN201621036907.4U patent/CN206094008U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106287642A (en) * | 2016-09-05 | 2017-01-04 | 重庆科技学院 | Combustion gas based on refuse gasification and the coaxial combined generating system of steam turbine |
CN106287642B (en) * | 2016-09-05 | 2018-02-23 | 重庆科技学院 | The coaxial combined generating system of combustion gas and steam turbine based on refuse gasification |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106224036B (en) | A kind of refuse gasification combustion gas of multi-stage heat exchanger and steam turbine combined generating system | |
CN106224972B (en) | The refuse gasification combustion gas and steam turbine combined generating system that high-moisture gas recycles | |
CN105402736B (en) | Double-deck stoker fired grate formula refuse gasification CIU and its processing method | |
CN106122977B (en) | CO2 recovery systems based on refuse gasification combustion gas and steam turbine cogeneration | |
CN105465793B (en) | Double-deck stoker fired grate formula refuse gasification burns double boiler electricity generation system | |
CN105444145B (en) | The steam generator system of synthesis gas is burned using refuse gasification | |
CN105402737B (en) | Stoker fired grate formula rubbish list stove gasification burning boiler system | |
CN106287642B (en) | The coaxial combined generating system of combustion gas and steam turbine based on refuse gasification | |
CN106224035B (en) | Humid air turbine electricity generation system based on the recovery of refuse gasification synthesis gas | |
CN205560766U (en) | Double -deck mechanical stoker formula waste gasification incineration boiler system | |
CN105402738B (en) | Double-deck stoker fired grate formula refuse gasification incinerator and its double boiler system | |
CN105509060B (en) | Stoker fired grate formula refuse gasification incinerator and its boiler power generation system | |
CN105465789B (en) | Double-deck stoker fired grate formula refuse gasification incinerator and its boiler power generation system | |
CN105423307B (en) | Stoker fired grate formula refuse gasification incinerator and its steam generator system | |
CN105464727B (en) | Boiler power generation system utilizing rubbish gasification and incineration synthesis gas | |
CN205560762U (en) | Mechanical stoker formula waste gasification incineration boiler system | |
CN205560759U (en) | Mechanical stoker formula waste gasification burns dual -boiler power generation system | |
CN205560764U (en) | Mechanical stoker formula waste gasification burns dual -boiler system | |
CN206094008U (en) | Coaxial integrated power production system of gas and steam turbine based on waste gasification | |
CN105627320B (en) | Double boiler electricity generation system based on stoker fired grate formula refuse gasification incinerator | |
CN105627323B (en) | Stoker fired grate formula refuse gasification incinerator and its double boiler system | |
CN105627324B (en) | The double boiler electricity generation system of synthesis gas is burned using refuse gasification | |
CN206092090U (en) | Multi - stage heat's waste gasification gas and steam turbine integrated power production system | |
CN206001479U (en) | A kind of refuse gasification combustion gas of humid air turbine and steam turbine combined generating system | |
CN206112953U (en) | CO2 recovery system based on waste gasification gas and steam turbine cogeneration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170412 Effective date of abandoning: 20180223 |
|
AV01 | Patent right actively abandoned |