CN206090470U - Modular hydraulic engineering slope - Google Patents

Modular hydraulic engineering slope Download PDF

Info

Publication number
CN206090470U
CN206090470U CN201621141257.XU CN201621141257U CN206090470U CN 206090470 U CN206090470 U CN 206090470U CN 201621141257 U CN201621141257 U CN 201621141257U CN 206090470 U CN206090470 U CN 206090470U
Authority
CN
China
Prior art keywords
guardrail
bank protection
protection
bricks
bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621141257.XU
Other languages
Chinese (zh)
Inventor
刘战伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201621141257.XU priority Critical patent/CN206090470U/en
Application granted granted Critical
Publication of CN206090470U publication Critical patent/CN206090470U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a modular hydraulic engineering slope, including guardrail, ground, first bank protection, platform and second bank protection, the bottom mounting of guardrail is provided with the ground, and the both sides of guardrail all are provided with the scale mark, the multilayer bridge stand is highly practical, through being equipped with the guardrail, can reduce the impact of rivers to the embankment, prevent that soil from leading to running off because of erodeing, the guardrail can also be paddled by to prevent children from, and lead to the accident to take place, through being equipped with first bank protection and second bank protection, can plant the vegetation on two bank protections, can reduce the loss of soil, not only can reach the effect of protection dykes and dams, but also can beautify dykes and dams, make the bank protection more pleasing to the eye, the bottom of guardrail is equipped with the through -hole, can make the rainwater pass through drainage tunnel flows in the river, the reduction is erodeed the ramp, when river rising, can pass through through -hole rising, alleviate the pressure of flood discharge, be equipped with the scale mark on the guardrail, make things convenient for the staff to look over the fluctuation condition of river, the operation is thus simple.

Description

A kind of combination type protection slope
Technical field
This utility model is related to protection slope field, specially a kind of combination type protection slope.
Background technology
At present, China's soil erosion phenomenon is increasingly serious, and for prevention soil and water loss, conventional measure is repaiied on river side Build water conservancy bank protection.
With the continuous progress of society, hydraulic engineering personnel also more pay attention to during protection soil erosion Attractive in appearance, the concrete revetment or grout block that traditional protection slope is mostly sealed, it is impossible to using biological procreation of bank protection Soil is grasped, and appearance color is dark, once there is damaged, reparation more difficulty, and visual effect is poor, affects The beautiful style and features on riverbank.
Utility model content
The purpose of this utility model is to provide a kind of combination type protection slope, to solve to carry in above-mentioned background technology The problem for going out.
For achieving the above object, this utility model provides following technical scheme:A kind of combination type protection slope, including Guardrail, ground, the first bank protection, platform and the second bank protection, the bottom of the guardrail are fixedly installed the ground, the guardrail Both sides are provided with graduation mark, and the bottom spaced set of the guardrail has through hole, and the side of the guardrail is in edaphic table Face is provided with first bank protection, and first bank protection is connected with second bank protection by the platform, first bank protection On be uniformly equipped with some hexagonal bricks, the centre of some hexagonal bricks is provided with circular perforations, the both sides of the platform Drainage trough is symmetrically arranged with, some square bricks is evenly arranged with second bank protection, is fixedly installed on some square bricks Square hole, some square brick two rows are interlaced, and are provided with buffer strip between some square brick two rows.
Further, the guardrail is made up of Reinforced Concrete Materials, and the ground adds armored concrete to make by sandstone.
Preferably, stair are provided with first bank protection and second bank protection, the both sides of the stair symmetrically set It is equipped with penstock.
Preferably, cement is filled between some hexagonal bricks and the gap of common brick.
Preferably, cement is filled between some square bricks and the gap of common brick.
Compared with prior art, the beneficial effects of the utility model are:This utility model is provided by guardrail, can subtract Few impact of the current to embankment, prevents soil from causing to be lost in because washing away, and guardrail can also prevent child from paddling, and cause unexpected sending out It is raw, by being provided with the first bank protection and the second bank protection, vegetation can be planted on two bank protections, the stream that soil reduces soil can be grasped Lose, the effect of protection dykes and dams can not only be reached, but also dykes and dams can be beautified so that bank protection is more attractive in appearance, the bottom of guardrail Through hole is provided with, rainwater is enabled to and river is flowed into by sluice way, reduction is washed away to ramp, when eagre, Neng Goutong Through hole rise is crossed, mitigates the pressure of flood discharge, guardrail is provided with graduation mark, facilitates staff to check the fluctuation situation of river, just In record, by being provided with platform, it is easy to the daily step exercises of people, overall structure is simple, practical, it is easy to promote.
Description of the drawings
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is the structural representation of this utility model side-looking;
In reference:1- guardrails;2- grounds;3- soil horizons;The first bank protections of 4-;5- platforms;The second bank protections of 6-;7- scales Line;8- through holes;9- hexagonal bricks;10- square bricks;11- ladders;12- penstocks;13- circular perforations;14- square holes;15- buffer strips.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only this utility model a part of embodiment, rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Fig. 1-2 is referred to, this utility model provides a kind of combination type protection slope, including guardrail 1, ground 2, first Bank protection 4, platform 5 and the second bank protection 6, the bottom of guardrail 1 are fixedly installed ground 2, and the both sides of guardrail 1 are provided with graduation mark 7, The side that the bottom spaced set of guardrail 1 has through hole 8, guardrail 1 is provided with the first bank protection 4, the first shield on the surface of soil horizon 3 Slope 4 is connected with the second bank protection 6 by platform 5, is uniformly equipped with some hexagonal bricks 9, in some hexagonal bricks 9 on the first bank protection 4 Center portion position is provided with circular perforations 13, and the both sides of platform 5 are symmetrically arranged with drainage trough, are evenly arranged with some on the second bank protection 6 Square brick 10, is fixedly installed square hole 14 on some square bricks 10,10 two rows of some square bricks are interlaced, and some square bricks 10 Buffer strip 15 is provided between two rows.
Further, guardrail 1 is made up of Reinforced Concrete Materials, and ground 2 adds armored concrete to make by sandstone.
Preferably, stair 11 are provided with the first bank protection 4 and the second bank protection 6, the both sides of stair 11 are symmetrically arranged with draws Water channel 12.
Preferably, cement is filled between some hexagonal bricks 9 and the gap of common brick.
Preferably, cement is filled between some square bricks 10 and the gap of common brick.
Operation principle:Protection slope includes guardrail 1, ground 2, the first bank protection 4, platform 5 and the second bank protection 6, guardrail 1 Bottom be fixedly installed ground 2, the both sides of guardrail 1 are provided with graduation mark 7, and the bottom spaced set of guardrail 1 has through hole 8, the side of guardrail 1 is provided with the first bank protection 4 on the surface of soil 3, and the first bank protection 4 is connected with the second bank protection 6 by platform 5, Some hexagonal bricks 9 are equipped with first bank protection 4 uniformly, the centre of some hexagonal bricks 9 is provided with circular perforations 13, platform 5 Both sides be symmetrically arranged with drainage trough, some square bricks 10 are evenly arranged with the second bank protection 6, are fixedly installed on some square bricks 10 There is square hole 14,10 two rows of some square bricks are interlaced, and between 10 two rows of some square bricks, be provided with buffer strip 15, have When body is used, by ground 2 in embankment after the bank casting at water source, after its solidification, building guardrail 1 thereon, in guardrail 1 Both sides fixed point graduation mark 7 is set, the change of convenient observation water level is fitted by guardrail 1 between the gap of hexagonal brick 9, brick and brick Filling concrete so that the connection between brick and brick is even closer firmly, combination first bank protection 4 of composition of some hexagonal bricks 9, first The top of bank protection 4 is provided with platform 5, and platform 5 is formed by cobblestone and cement laying, taken exercise for people, and the opposite side of platform 5 is provided with Second bank protection 6, lays some square bricks 10, is provided with square hole 14, in sleet sky, rainwater or thawing in square brick 10 on the second bank protection 6 Snow water afterwards, by brickwork joint penetrate into soil, it is a part of then with drainage trough and sluice way 12 inflow river, in 13 He of circular perforations In square hole 14, plantation vegetation, can not only beautify riverbank, but also can grasp soil, reduce the loss of soil, in the first shield On slope 4 and the second bank protection 6, fixed point is provided with stair 11, and it is movable to arrive platform 5 up and down, next to that easy access personnel inspection fragment of brick Adaptation, if be damaged, be easy in time repairing, facilitate the work of staff.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, Be appreciated that these embodiments can be carried out various changes in the case of without departing from principle of the present utility model and spirit, repair Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of combination type protection slope, including guardrail(1), ground(2), the first bank protection(4), platform(5)With the second shield Slope(6), it is characterised in that:The guardrail(1)Bottom be fixedly installed the ground(2), the guardrail(1)Both sides be all provided with It is equipped with graduation mark(7), the guardrail(1)Bottom spaced set have through hole(8), the guardrail(1)Side in soil horizon (3)Surface be provided with first bank protection(4), first bank protection(4)By the platform(5)With second bank protection (6)Connection, first bank protection(4)On be uniformly equipped with some hexagonal bricks(9), some hexagonal bricks(9)Centre It is provided with circular perforations(13), the platform(5)Both sides be symmetrically arranged with drainage trough, second bank protection(6)On uniformly set It is equipped with some square bricks(10), some square bricks(10)On be fixedly installed square hole(14), some square bricks(10)Up and down Two rows of mutually staggered, and some square bricks(10)Buffer strip is provided between two rows(15).
2. a kind of combination type protection slope according to claim 1, it is characterised in that:The guardrail(1)By reinforcing bar Concrete material is made, the ground(2)It is made up of sandstone plus armored concrete.
3. a kind of combination type protection slope according to claim 1, it is characterised in that:First bank protection(4)With Second bank protection(6)On be provided with stair(11), the stair(11)Both sides be symmetrically arranged with penstock(12).
4. a kind of combination type protection slope according to claim 1, it is characterised in that:Some hexagonal bricks(9) Cement is filled with and the gap of common brick between.
5. a kind of combination type protection slope according to claim 1, it is characterised in that:Some square bricks(10)With Cement is filled between the gap of common brick.
CN201621141257.XU 2016-10-20 2016-10-20 Modular hydraulic engineering slope Expired - Fee Related CN206090470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621141257.XU CN206090470U (en) 2016-10-20 2016-10-20 Modular hydraulic engineering slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621141257.XU CN206090470U (en) 2016-10-20 2016-10-20 Modular hydraulic engineering slope

Publications (1)

Publication Number Publication Date
CN206090470U true CN206090470U (en) 2017-04-12

Family

ID=59976439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621141257.XU Expired - Fee Related CN206090470U (en) 2016-10-20 2016-10-20 Modular hydraulic engineering slope

Country Status (1)

Country Link
CN (1) CN206090470U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107980415A (en) * 2017-12-29 2018-05-04 南京林业大学 A kind of anti-miscellany plant protection Rotating fields of lake bank green vegetation
CN109868789A (en) * 2019-03-19 2019-06-11 上海市水利工程设计研究院有限公司 A kind of sea dike revetment ecological reconstruction structure
CN110804995A (en) * 2018-07-18 2020-02-18 苏州园林营造产业股份有限公司 Landscape river course slope protection manufacturing method and slope protection structure
CN112359840A (en) * 2020-10-09 2021-02-12 李治俊 Based on multistage coordinated type building foundation ditch bank protection support

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107980415A (en) * 2017-12-29 2018-05-04 南京林业大学 A kind of anti-miscellany plant protection Rotating fields of lake bank green vegetation
CN110804995A (en) * 2018-07-18 2020-02-18 苏州园林营造产业股份有限公司 Landscape river course slope protection manufacturing method and slope protection structure
CN109868789A (en) * 2019-03-19 2019-06-11 上海市水利工程设计研究院有限公司 A kind of sea dike revetment ecological reconstruction structure
CN109868789B (en) * 2019-03-19 2024-05-17 上海市水利工程设计研究院有限公司 Ecological reconstruction structure of seawall revetment
CN112359840A (en) * 2020-10-09 2021-02-12 李治俊 Based on multistage coordinated type building foundation ditch bank protection support

Similar Documents

Publication Publication Date Title
CN206090470U (en) Modular hydraulic engineering slope
CN203373705U (en) Ecological slope protection
CN106759104A (en) Ecological slope protection structure and construction method
CN106149625B (en) A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method
CN204875687U (en) Chain preformed block of river course bank protection
CN207619930U (en) A kind of high stable state ecoscape protective slope structure
CN209760145U (en) Stepped ecological landscape slope protection
CN206438465U (en) A kind of ecological self-purification type landscape revetment reconstruction structure
CN204252074U (en) A kind of bank slope protection structure
CN208266797U (en) A kind of ecological dike of firm river bank slope
CN207176627U (en) Large-scale earthing concrete block
CN207933975U (en) A kind of high stability concrete structure for slope protection system
CN203007909U (en) Ecological slope protection building block system and building blocks used by the same
CN206204890U (en) A kind of mud-rock flow safeguard structure
CN205369167U (en) Back -up sand gravel material weir dam body is thrown to aquatic
CN201649042U (en) Water storage structure of artificial underground river
CN108193649A (en) Core-wall homogeneous dam
CN210857095U (en) Structure suitable for view river flood control wall material stone wainscot
CN113481940A (en) Green ecological hollow square slope protection structure of seawall
CN107881986B (en) Solidified-formed plane interlocking three-dimensional buckling engineering building block and production method thereof
CN207597544U (en) A kind of high resiliency water conservancy chute
CN208072333U (en) Formula of taking root ecology grid bank protection
CN207775818U (en) A kind of anchoring grid bank protection
CN205444096U (en) Sea water sea sand concrete fence board
CN205907654U (en) Palm brick permeates water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20171020

CF01 Termination of patent right due to non-payment of annual fee